| RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
|---|---|---|---|---|---|---|---|---|
| Missouri | 0212085 | St. Louis | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - No Added Capacity | $1,206,792.67 | $2,266,208.76 |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | CARBON REDUCTION PROGRAM | Bridge Rehabilitation - No Added Capacity | $59,496.40 | |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $105,150.66 | |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | CARBON REDUCTION PROGRAM | Utilities | $1,644.19 | |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $311,095.00 | |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,529,263.77 | $13,563,839.73 |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,005,964.04 | $1,183,487.10 |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,777,885.45 | $2,091,629.94 |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,960,597.94 | $2,535,181.17 |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,549,329.00 | $4,549,329.00 |
| Missouri | 0212085 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $27,799.94 | $32,705.81 |
| Missouri | 0301048 | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $10,893,005.22 | |
| Missouri | 0301048 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $14,303,364.62 | |
| Missouri | 0301048 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,441,653.34 | |
| Missouri | 0301048 | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,097,919.14 | |
| Missouri | 0301048 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $908,280.97 | $1,135,351.22 |
| Missouri | 0301048 | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $691,719.03 | $864,648.78 |
| Missouri | 0301048 | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $113,168.98 | |
| Missouri | 0301048 | Franklin | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $86,186.02 | |
| Missouri | 0351291 | Clay | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $13,298.14 | $13,298.14 |
| Missouri | 0351291 | Clay | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $141,151.86 | $141,151.86 |
| Missouri | 0351291 | Clay | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $416,010.64 | $1,888,902.26 |
| Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,415,704.23 | $20,049,568.07 |
| Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $966,791.68 | $4,389,731.40 |
| Missouri | 0351291 | Clay | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $91,083.00 | $413,563.68 |
| Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $667,062.10 | $1,847,933.54 |
| Missouri | 0351291 | Clay | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $51,052.66 | $276,628.10 |
| Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $541,893.51 | $2,936,241.97 |
| Missouri | 0351291 | Clay | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $36,213.34 | $196,221.36 |
| Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $384,382.95 | $2,082,772.79 |
| Missouri | 0351291 | Clay | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $121,897.02 | $121,897.02 |
| Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,293,864.17 | $1,293,864.17 |
| Missouri | 0351291 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $719,600.56 | $3,827,184.80 |
| Missouri | 0351291 | Clay | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $67,794.73 | $351,144.09 |
| Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $37,140,967.90 | $41,267,742.15 |
| Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,801,188.54 | $4,223,542.82 |
| Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $117,000.00 | $130,000.00 |
| Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $967,686.00 | $967,686.00 |
| Missouri | 0352118 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $51,881.99 | $57,646.66 |
| Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,808,200.00 | $2,956,000.00 |
| Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $26,677,900.00 | $28,082,000.00 |
| Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $5,616,400.00 | $5,912,000.00 |
| Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $589,981.69 | $621,033.36 |
| Missouri | 0441106 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $94,816.18 | $99,806.51 |
| Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $377,777.13 | $397,660.13 |
| Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,062,575.00 | $1,118,500.00 |
| Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $908,870.00 | $994,300.00 |
| Missouri | 0441106 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $237,272.96 | $261,094.84 |
| Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $494,794.86 | $544,470.73 |
| Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $620,225.95 | $682,494.62 |
| Missouri | 0441106 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $99,636.23 | $109,639.81 |
| Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,043.29 | $16,887.67 |
| Missouri | 0441106 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,026.61 | $4,238.54 |
| Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $45,125.00 | $47,500.00 |
| Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $25,055.10 | $26,373.79 |
| Missouri | 0441106 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $42,360.50 | $44,590.00 |
| Missouri | 0441106 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $263,796.00 | $277,680.00 |
| Missouri | 0441106 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $617,500.00 | $650,000.00 |
| Missouri | 0441106 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $100,899.50 | $106,210.00 |
| Missouri | 0441106 | Jasper | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $210,444.00 | $221,520.00 |
| Missouri | 0442332 | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $26,555,187.52 | $29,505,763.91 |
| Missouri | 0442332 | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,765,383.63 | $3,072,648.48 |
| Missouri | 0442332 | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $296,694.36 | $329,660.40 |
| Missouri | 0442332 | Phelps | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,220,720.93 | $1,220,720.93 |
| Missouri | 0442344 | Greene | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $50,587.70 | $316,702.17 |
| Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $10,230,494.77 | $28,022,329.38 |
| Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $6,065,946.13 | |
| Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,142,405.23 | $3,491,561.36 |
| Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,100,348.91 | $2,333,721.01 |
| Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,241,323.15 | |
| Missouri | 0442344 | Greene | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,740,499.81 | |
| Missouri | 0442344 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $975,387.19 | $1,521,068.94 |
| Missouri | 0442344 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $234,865.28 | $309,286.87 |
| Missouri | 0442344 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $181,634.42 | $227,042.78 |
| Missouri | 0442344 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $43,451.45 | $79,439.68 |
| Missouri | 0442344 | Greene | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Restoration & Rehabilitation | $237,690.36 | $309,547.28 |
| Missouri | 0442344 | Greene | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Construction Engineering | $54,368.18 | $67,960.22 |
| Missouri | 0492434 | Benton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Vernon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Bates | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,357,030.00 | $20,396,700.00 |
| Missouri | 0492434 | Cedar | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | St. Clair | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0492434 | Bates | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,017,700.00 | $3,353,000.00 |
| Missouri | 0492434 | Cedar | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0492434 | Vernon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0492434 | Benton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0492434 | St. Clair | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0492434 | St. Clair | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0492434 | Bates | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,291,435.44 | $4,768,261.60 |
| Missouri | 0492434 | Cedar | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0492434 | Vernon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0492434 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0492434 | Benton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0492434 | St. Clair | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0492434 | Vernon | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0492434 | Benton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0492434 | Cedar | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0492434 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0492434 | Bates | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $48,600.00 | $54,000.00 |
| Missouri | 0492434 | St. Clair | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Vernon | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Cedar | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Bates | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | $7,743,870.00 | $8,604,300.00 |
| Missouri | 0492434 | Benton | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Henry | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | ||
| Missouri | 0492434 | Benton | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | ||
| Missouri | 0492434 | Bates | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $1,293,300.00 | $1,437,000.00 |
| Missouri | 0492434 | Cedar | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | ||
| Missouri | 0492434 | Vernon | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | ||
| Missouri | 0492434 | St. Clair | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | ||
| Missouri | 0492434 | Henry | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | ||
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge Replacement - Added Capacity | $12,406,572.19 | $15,508,215.24 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Construction Engineering | $209,785.17 | $262,231.46 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Other | $128,466.12 | $160,582.65 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $247,468.56 | $494,937.12 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Right of Way | $1,284.66 | $1,605.83 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Utilities | $6,423.30 | $8,029.13 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $116,257,717.04 | $136,773,784.76 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,936,953.26 | $2,278,768.54 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,138,504.75 | $1,339,417.35 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,642,031.44 | $5,284,062.88 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,385.05 | $13,394.17 |
| Missouri | 0512043 | Perry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $462,375.24 | $543,970.87 |
| Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,948,628.05 | $8,366,976.90 |
| Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $13,154,541.58 | $13,846,885.85 |
| Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,161,558.73 | $2,275,324.98 |
| Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,222.29 | $8,024.77 |
| Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $539,387.00 | $539,387.00 |
| Missouri | 0553097 | St. Louis | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $1,087,484.80 | $1,208,316.44 |
| Missouri | 0553099 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | Safety | $2,253,694.50 | $2,253,694.50 |
| Missouri | 0553099 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $23,302,457.20 | $24,528,902.32 |
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $37,731.75 | $39,717.63 |
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $58,210.56 | $61,274.27 |
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,645,750.00 | $2,984,998.04 |
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,060,373.48 | $2,289,303.87 |
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $22,500.00 | $25,000.00 |
| Missouri | 0553099 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Safety | $966,411.28 | $966,411.28 |
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | ||
| Missouri | 0553099 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | ||
| Missouri | 0553101 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | ||
| Missouri | 0553101 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $381,442.00 | $381,442.00 |
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $13,978,117.65 | $14,713,808.04 |
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | ||
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $23,763,617.66 | $25,014,334.35 |
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,822,481.22 | $4,023,664.44 |
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,177,016.77 | $1,307,796.41 |
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $127,060.00 | $127,060.00 |
| Missouri | 0553101 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | ||
| Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
| Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $199,677,650.00 | $210,187,000.00 |
| Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,039,100.00 | $14,778,000.00 |
| Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $3,121,833.00 | $3,286,140.00 |
| Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $13,167.00 | $13,860.00 |
| Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $15,552,450.00 | $16,371,000.00 |
| Missouri | 0553103 | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $954,750.00 | $1,005,000.00 |
| Missouri | 0553103 | Jefferson | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $16,664,349.71 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Bridge Rehabilitation - No Added Capacity | $1,390,669.81 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | $373,337.03 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $165,692.44 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $29,056,206.52 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,424,743.91 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,987,500.00 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $146,635.42 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $650,942.93 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $722,120.41 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | 4R - No Added Capacity | $13,223,259.47 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Bridge Rehabilitation - No Added Capacity | $1,103,456.16 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | $2,553,703.28 | $2,837,448.09 |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Safety | $296,232.12 | |
| Missouri | 0602117 | Webster | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Utilities | $131,472.15 | |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $52,405.74 | $52,405.74 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $8,384.35 | $8,384.35 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | Safety | $119,906.91 | $119,906.91 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,682,817.29 | $8,781,026.83 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $327,440.13 | $614,002.30 |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,046,641.96 | $3,837,779.02 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,545,684.02 | $4,773,562.22 |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,272,842.01 | $2,386,781.11 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,272,842.00 | $2,386,781.07 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $60,054.44 | $112,611.63 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $858,856.11 | $1,610,491.73 |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $375,366.12 | $703,871.14 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,799.77 | $5,250.00 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $5,599.52 | $10,500.00 |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,799.76 | $5,250.00 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $98,264.54 | $109,182.82 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,405,352.22 | $1,561,502.47 |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $614,153.32 | $682,392.58 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $135,117.54 | $181,609.60 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,932,413.82 | $2,597,330.40 |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $844,484.64 | $1,135,060.00 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $60,742.91 | $60,742.91 |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $379,669.47 | $379,669.47 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Safety | $868,702.37 | $868,702.37 |
| Missouri | 0641061 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,741.52 | $85,772.62 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,741.50 | $85,772.59 |
| Missouri | 0641061 | St. Louis | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $91,483.04 | $171,545.24 |
| Missouri | 0701216 | Jackson | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Bridge Replacement - No Added Capacity | $5,680,000.00 | $5,978,947.37 |
| Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $165,091,536.65 | $237,272,052.63 |
| Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,960,000.00 | |
| Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,045,000.00 | $1,100,000.00 |
| Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,176,300.26 | $12,162,493.58 |
| Missouri | 0701216 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,888,000.00 | |
| Missouri | 0701223 | Lafayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,676,438.05 | |
| Missouri | 0701223 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $865,398.44 | |
| Missouri | 0701223 | Saline | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,935,018.32 | |
| Missouri | 0701223 | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,382,399.83 | |
| Missouri | 0701223 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,751,715.14 | |
| Missouri | 0701223 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $575,564.46 | |
| Missouri | 0701223 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,244,351.96 | |
| Missouri | 0701223 | Montgomery | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,711,008.70 | |
| Missouri | 0701223 | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,258,105.10 | |
| Missouri | 0701223 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,075,053.65 | |
| Missouri | 0701223 | Montgomery | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,344,304.13 | |
| Missouri | 0701223 | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,894,067.23 | |
| Missouri | 0701223 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $788,598.07 | |
| Missouri | 0701223 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,400,077.21 | |
| Missouri | 0701223 | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,093,897.32 | |
| Missouri | 0701223 | Lafayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,667,067.73 | |
| Missouri | 0701223 | Saline | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,651,226.40 | |
| Missouri | 0701223 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,185,708.26 | |
| Missouri | 0701225 | Jackson | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Safety | $7,308,229.82 | $7,308,229.82 |
| Missouri | 0701225 | Lafayette | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Safety | $7,744,760.18 | $7,744,760.18 |
| Missouri | 0701225 | Lafayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $514.51 | |
| Missouri | 0701225 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $485.49 | |
| Missouri | 0701225 | Lafayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,543,499.37 | |
| Missouri | 0701225 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,456,500.63 | |
| Missouri | 0701225 | Lafayette | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $172,984,313.25 | |
| Missouri | 0701225 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $163,234,120.75 | |
| Missouri | 0702128 | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $15,727,618.00 | $15,727,618.00 |
| Missouri | 0702128 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $403,272,382.00 | |
| Missouri | 0702128 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,000.00 | |
| Missouri | 0702128 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,500,000.00 | |
| Missouri | 0702128 | Boone | >= 50,000 AND < 200,000 | State | WILDLIFE CROSSING PRGM IIJA | 4R - Added Capacity | $900,000.00 | $1,000,000.00 |
| Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | ||
| Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | $77,233,770.07 | $161,250,000.00 |
| Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $661,770.35 | $1,885,049.45 |
| Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $504,459.58 | $1,436,950.55 |
| Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | ||
| Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | $4,500,000.00 | |
| Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $34,709,722.96 | |
| Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,000,000.00 | |
| Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,000,000.00 | |
| Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,178,000.00 | |
| Missouri | 0703275 | Cooper | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | $26,032,292.18 | $26,032,292.18 |
| Missouri | 0703275 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | ||
| Missouri | 0703310 | Boone | >= 50,000 AND < 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Safety | $3,283,788.66 | $4,104,735.80 |
| Missouri | 0703310 | Callaway | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | Safety | $5,016,211.34 | $6,270,264.20 |
| Missouri | 0703310 | Boone | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Safety | $1,704,092.45 | $1,704,092.45 |
| Missouri | 0703310 | Callaway | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Safety | $2,603,117.55 | $2,603,117.55 |
| Missouri | 0703310 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $156,721,780.65 | |
| Missouri | 0703310 | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $239,403,219.35 | |
| Missouri | 0703310 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,608,265.18 | |
| Missouri | 0703310 | Callaway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,456,734.82 | |
| Missouri | 0704215 | Warren | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Safety | $8,279,649.43 | $8,279,649.43 |
| Missouri | 0704215 | St. Charles | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Safety | $6,027,560.57 | $6,027,560.57 |
| Missouri | 0704215 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,167,830.66 | |
| Missouri | 0704215 | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,604,169.34 | |
| Missouri | 0704215 | Warren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $340,199,772.69 | |
| Missouri | 0704215 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $247,664,441.31 | |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,999,216.71 | $12,499,020.88 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $147,779.62 | $184,724.53 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $713,368.33 | $891,710.41 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,161,696.06 | $1,452,120.08 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $27,901.75 | $34,877.19 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,613,008.01 | $4,516,260.01 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,043,836.62 | $2,554,795.77 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $815,960.23 | $815,960.23 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $163,807.64 | $204,759.55 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,058,730.27 | $6,323,412.84 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $74,763.58 | $93,454.47 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $360,902.07 | $451,127.59 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $587,716.74 | $734,645.93 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $14,115.85 | $17,644.81 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $299,899.13 | $299,899.13 |
| Missouri | 1001070 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $82,872.36 | $103,590.45 |
| Missouri | 1001074 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,944,030.66 | $12,875,330.19 |
| Missouri | 1001074 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $249,234.92 | $293,217.55 |
| Missouri | 1001074 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,462,462.33 | $2,897,014.50 |
| Missouri | 1001074 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,523,830.86 | $1,792,742.19 |
| Missouri | 1001074 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,260,817.06 | $2,826,021.33 |
| Missouri | 1001074 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,876,850.00 | $4,561,000.00 |
| Missouri | 1001074 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,861,859.70 | $1,861,859.70 |
| Missouri | 1691117 | Jackson | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $5,082,112.00 | $7,353,129.23 |
| Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $90,464,000.00 | $130,406,784.51 |
| Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,041,941.80 | |
| Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,958,058.20 | |
| Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,636,800.00 | $4,230,614.78 |
| Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,565,385.22 | |
| Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,024,000.00 | $20,030,000.00 |
| Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 1691117 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,600,000.00 | $2,000,000.00 |
| Missouri | 1691117 | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | ||
| Missouri | 1691117 | Jackson | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - No Added Capacity | $25,000,000.00 | $36,171,621.35 |
| Missouri | 1691117 | Clay | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - No Added Capacity | ||
| Missouri | 1691117 | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $34,917,888.00 | $50,521,464.91 |
| Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,805,487.50 | $4,005,776.32 |
| Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $18,710,965.15 | $19,695,752.79 |
| Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,636,693.28 | $4,880,729.77 |
| Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $544,569.85 | $605,077.61 |
| Missouri | 2553052 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $48,896.98 | $51,470.50 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $196,829,612.49 | $216,650,948.84 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,339,475.83 | $10,279,988.44 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $641,780.95 | $675,558.90 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,525,569.05 | $14,237,441.10 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,423,140.05 | $7,012,491.16 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $304,702.48 | $332,658.87 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $131,166.15 | $138,165.00 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,764,333.85 | $2,911,835.00 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $43,797.95 | $46,103.11 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $923,044.17 | $971,625.44 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $8,970,646.77 | $9,442,786.08 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - No Added Capacity | $426,107.23 | $448,533.92 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Traffic Management/Engineering - HOV | $742,849.38 | $1,597,113.40 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Traffic Management/Engineering - HOV | $35,247.80 | $75,782.17 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $13,881,978.58 | $14,612,609.03 |
| Missouri | 2705352 | St. Louis | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $659,396.32 | $694,101.39 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $352,818.00 | $352,818.00 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | ||
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | ||
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,523,032.32 | $30,024,244.55 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,219,001.21 | $3,388,422.32 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $73,743.77 | $77,625.02 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,367,493.61 | $3,544,730.11 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,906.04 | $2,006.36 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $1,946.55 | $2,049.00 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,643,377.42 | $1,907,564.58 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | ||
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $505,800.00 | $562,000.00 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | ||
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,600,135.80 | $1,600,135.80 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $20,589.24 | $21,672.88 |
| Missouri | 2705359 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | ||
| Missouri | 2705360 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $337,075.00 | $337,075.00 |
| Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,950,629.09 | $26,263,820.10 |
| Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,405,635.56 | $4,637,511.10 |
| Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $5,493,774.49 | $5,782,920.50 |
| Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,362,239.27 | $4,591,830.81 |
| Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $85,334.14 | $94,815.71 |
| Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,420,916.21 | $1,478,673.30 |
| Missouri | 2705360 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $155,050.00 | |
| Missouri | 2705372 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $103,202,928.86 | |
| Missouri | 2705372 | St. Louis | >= 200,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Replacement - No Added Capacity | $78,117,364.02 | $86,797,071.14 |
| Missouri | 2911091 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,695,803.26 | |
| Missouri | 2911091 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $792,455.03 | |
| Missouri | 2911091 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $988,854.91 | |
| Missouri | 2911091 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,089,639.00 | |
| Missouri | 2911091 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $968,780.41 | |
| Missouri | 2911091 | Jackson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $450,496.40 | |
| Missouri | 2911091 | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,109,212.56 | $12,214,005.30 |
| Missouri | 2911091 | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $423,135.33 | $1,257,704.97 |
| Missouri | 2911091 | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $528,004.01 | $1,569,411.09 |
| Missouri | 2911091 | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $581,818.18 | $1,729,365.48 |
| Missouri | 2911091 | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $517,285.12 | $1,537,550.84 |
| Missouri | 2911091 | Jackson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $240,544.80 | $714,982.60 |
| Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,176,999.74 | $14,432,245.00 |
| Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,077,187.04 | $6,930,158.96 |
| Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $10,756.16 | $69,200.50 |
| Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $218,429.63 | $1,405,282.47 |
| Missouri | 3301527 | Jackson | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $491,627.43 | $3,162,919.84 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $37,671.38 | |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $107,409.62 | |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,100,072.72 | $4,823,614.95 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,690,233.65 | $13,753,216.07 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,010,575.63 | $1,188,912.50 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,474,384.79 | $1,734,570.34 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $517,105.56 | $608,359.48 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,855,301.68 | $2,319,127.10 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $650,703.14 | $813,378.92 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $629,929.29 | |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,796,070.71 | |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $889,253.23 | $906,165.13 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $2,535,461.94 | $2,583,681.59 |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $16,043.21 | |
| Missouri | 3661005 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,742.84 | |
| Missouri | 3701016 | St. Louis | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $27,601.79 | |
| Missouri | 3701016 | St. Charles | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $20,624.11 | |
| Missouri | 3701016 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,050,463.46 | |
| Missouri | 3701016 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,097,496.41 | |
| Missouri | 3701016 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $20,731,708.10 | |
| Missouri | 3701016 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $27,745,797.10 | |
| Missouri | 3701016 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,680,279.56 | |
| Missouri | 3701016 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,587,089.54 | |
| Missouri | 3701016 | St. Charles | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,145,019.53 | $1,431,274.41 |
| Missouri | 3701016 | St. Louis | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,532,410.13 | $1,915,512.66 |
| Missouri | 5617602 | St. Louis | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Restoration & Rehabilitation | $7,576,000.00 | $13,160,576.12 |
| Missouri | 5617602 | St. Louis | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $7,950,000.00 | $11,682,969.77 |
| Missouri | 5617602 | St. Louis | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $7,125,000.00 | $10,470,586.11 |
| Missouri | 5901816 | Greene | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Restoration & Rehabilitation | $19,763,822.00 | $29,725,000.00 |
| Missouri | 5901816 | Greene | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,197,000.00 | $1,800,000.00 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,439,840.00 | $1,799,800.00 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $684,648.73 | $855,810.91 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Utilities | $1,348,655.97 | $1,685,819.95 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $15,574,006.74 | $19,467,508.43 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $4,819,712.57 | $6,024,640.70 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $137,888.00 | $172,360.00 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $780,041.30 | $975,051.63 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,148,271.20 | $6,435,339.00 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $264,687.53 | $330,859.40 |
| Missouri | 5909802 | Greene | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $350,283.56 | $437,854.44 |
| Missouri | P241001 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Safety | $37,176,740.50 | $37,176,740.50 |
| Missouri | P241001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $40,540,364.90 | $50,675,456.12 |
| Missouri | P241001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $495,500.57 | $619,375.71 |
| Missouri | P241001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | $6,563,392.59 | $8,204,240.73 |
| Missouri | P251001 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Safety | $36,526,861.77 | $36,526,861.77 |
| Missouri | P251001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $45,603,989.90 | $57,004,987.38 |
| Missouri | P251001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $527,248.44 | $659,060.55 |
| Missouri | P251001 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | $6,505,160.60 | $8,131,450.75 |
| Missouri | S102026 | Schuyler | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,736,484.32 | $3,420,605.41 |
| Missouri | S102026 | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $684,209.00 | $855,261.25 |
| Missouri | S102026 | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,505,048.80 | $1,881,311.00 |
| Missouri | S102026 | Scotland | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,642,031.27 | $2,052,539.09 |
| Missouri | S102026 | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,402,531.74 | $1,753,164.67 |
| Missouri | S102026 | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $718,322.74 | $897,903.42 |
| Missouri | S102026 | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,326,064.43 | $2,907,580.54 |
| Missouri | S102026 | Gentry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $854,953.53 | $1,068,691.91 |
| Missouri | S102026 | Lewis | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,778,662.06 | $2,223,327.58 |
| Missouri | S102026 | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,131,380.32 | $1,414,225.40 |
| Missouri | S102026 | Shelby | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $855,129.37 | $1,068,911.71 |
| Missouri | S102026 | Adair | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $1,231,259.68 | $1,539,074.60 |
| Missouri | S102026 | Macon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $718,322.74 | $897,903.42 |
| Missouri | S102026 | Schuyler | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $174,294.40 | $217,868.00 |
| Missouri | S102026 | Lewis | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $113,288.00 | $141,610.00 |
| Missouri | S102026 | Warren | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $45,752.00 | $57,190.00 |
| Missouri | S102026 | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $72,060.80 | $90,076.00 |
| Missouri | S102026 | Macon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $45,752.00 | $57,190.00 |
| Missouri | S102026 | Gentry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $54,454.40 | $68,068.00 |
| Missouri | S102026 | Adair | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $78,422.40 | $98,028.00 |
| Missouri | S102026 | Shelby | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $54,465.60 | $68,082.00 |
| Missouri | S102026 | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $89,331.20 | $111,664.00 |
| Missouri | S102026 | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $148,153.60 | $185,192.00 |
| Missouri | S102026 | Scotland | < 5,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $104,585.60 | $130,732.00 |
| Missouri | S102026 | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $95,860.80 | $119,826.00 |
| Missouri | S102026 | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $43,579.20 | $54,474.00 |
| Missouri | S102026 | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Other | $320,000.00 | $400,000.00 |
| Missouri | S102026 | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Preliminary Engineering | $1,760,000.00 | $2,200,000.00 |
| Missouri | S102026 | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Right of Way | $8,000.00 | $10,000.00 |
| Missouri | S102026 | Statewide | N/A | State | HIGHWAY INFRA PRGM -ALLOC | Utilities | $1,600.00 | $2,000.00 |
| Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $14,576,342.82 | $18,220,428.52 |
| Missouri | S102057 | Mercer | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Putnam | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $15,473.12 | $19,341.40 |
| Missouri | S102057 | Mercer | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $7,343.43 | $9,179.28 |
| Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $4,720.55 | $5,900.68 |
| Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $11,277.76 | $14,097.20 |
| Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $15,735.20 | $19,669.00 |
| Missouri | S102057 | Putnam | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $13,506.47 | $16,883.08 |
| Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $27,539.18 | $34,423.96 |
| Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $8,404.29 | $10,505.40 |
| Missouri | S102057 | Putnam | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $6,129,571.48 | |
| Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Mercer | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | ||
| Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | S102057 | Mercer | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | S102057 | Putnam | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | ||
| Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,647,000.00 | |
| Missouri | S102057 | Livingston | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | S102057 | Grundy | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | S102057 | Linn | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | S102057 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | S102057 | Chariton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | S102057 | Sullivan | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,960,000.00 | $3,700,000.00 |
| Missouri | S102057 | Putnam | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | S102057 | Mercer | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | ||
| Missouri | S502015 | St. Charles | >= 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - No Added Capacity | $2,034,760.92 | $2,483,413.00 |
| Missouri | S502015 | St. Charles | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $53,835.08 | $65,705.38 |
| Missouri | S502015 | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $42,148,996.37 | $51,442,587.00 |
| Missouri | S502015 | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,115,165.32 | $1,361,052.31 |
| Missouri | S502015 | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $4,376,841.17 | $5,471,051.46 |
| Missouri | S502015 | St. Charles | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,589,500.00 | $1,870,000.00 |
| Missouri | S502067 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $581,538.91 | $3,300,000.00 |
| Missouri | S502067 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,600,000.00 | $4,000,000.00 |
| Missouri | S502067 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Right of Way | $98,481.07 | $100,000.00 |
| Missouri | S502067 | Statewide | N/A | State | HSIP LIMITING FLEXIBLE | Safety | $36,030,887.31 | $44,369,000.00 |
| Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,024,124.45 | $10,616,617.00 |
| Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $47,449,233.80 | $55,822,628.00 |
| Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,651,480.00 | $6,648,800.00 |
| Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $27.68 | $32.56 |
| Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,157,304.68 | $3,946,630.85 |
| Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $160,000.00 | $200,000.00 |
| Missouri | S602025 | Taney | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $48,755.00 | $48,755.00 |
| Missouri | S604074 | Greene | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $176,250.76 | $220,313.45 |
| Missouri | S604074 | Greene | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $959,125.51 | |
| Missouri | S604074 | Greene | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Bridge Rehabilitation - No Added Capacity | $424,056.21 | |
| Missouri | S604074 | Greene | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $154,961.62 | |
| Missouri | S604074 | Greene | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | $39,422.14 | |
| Missouri | S604074 | Greene | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $166,434.52 | |
| Missouri | S604074 | Greene | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Facilities for Pedestrians and Bicycles | $183,318.67 | $229,148.35 |
| Missouri | S604074 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $12,382,797.89 | |
| Missouri | S604074 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $5,474,781.29 | |
| Missouri | S604074 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,000,633.36 | |
| Missouri | S604074 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $234,768.85 | |
| Missouri | S604074 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,290,686.55 | |
| Missouri | S604074 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,536,000.00 | |
| Missouri | S604074 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $2,148,754.36 | |
| Missouri | S604074 | Greene | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $276,251.70 | |
| Missouri | S604074 | Greene | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $163,545.33 | $204,431.66 |
| Missouri | S703077 | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 | $1,738,640.00 |
| Missouri | S703077 | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,955,688.00 | $3,477,280.00 |
| Missouri | S703077 | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 | $1,738,640.00 |
| Missouri | S703077 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 | $1,738,640.00 |
| Missouri | S703077 | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,389,220.00 | $8,693,200.00 |
| Missouri | S703077 | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,477,844.00 | $1,738,640.00 |
| Missouri | S703077 | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,216,766.00 | $2,607,960.00 |
| Missouri | S703077 | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,851.85 | $128,061.00 |
| Missouri | S703077 | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $541,658.25 | $637,245.00 |
| Missouri | S703077 | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 | $127,449.00 |
| Missouri | S703077 | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $216,663.30 | $254,898.00 |
| Missouri | S703077 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 | $127,449.00 |
| Missouri | S703077 | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 | $127,449.00 |
| Missouri | S703077 | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,331.65 | $127,449.00 |
| Missouri | S703077 | Butler | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,746.55 | $32,643.00 |
| Missouri | S703077 | Reynolds | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 | $32,487.00 |
| Missouri | S703077 | Cape Girardeau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 | $32,487.00 |
| Missouri | S703077 | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $965,382.06 | $1,135,743.60 |
| Missouri | S703077 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 | $32,487.00 |
| Missouri | S703077 | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $451,915.59 | $531,665.40 |
| Missouri | S703077 | St. Francois | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,613.95 | $32,487.00 |
| Missouri | S703077 | Bollinger | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $271,782.14 | $319,743.70 |
| Missouri | S703077 | Pemiscot | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $93,717.86 | $110,256.30 |