| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | $119,612.87 | $119,612.87 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $7,814,950.16 | $9,768,687.71 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $540,687.82 | $675,859.52 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $11,940,000.00 | |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $358,904.00 | $448,630.00 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $2,275,008.93 | $2,843,760.93 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | Preliminary Engineering | $1,697,714.00 | $1,697,714.00 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | Right of Way | $282,286.00 | $282,286.00 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $17,510,019.00 | |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $25,000,000.00 | $346,987,066.00 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | Preliminary Engineering | $617,007.61 | $9,319,571.48 |
| Nebraska | 0026120 | Lancaster | >= 200,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | Right of Way | $26,452,600.63 | |
| Nebraska | 0071033 | Platte | >= 5,000 AND < 50,000 | Local | HSIP LIMITING FLEXIBLE | Bridge New Construction | $10,846,769.52 | $12,760,905.35 |
| Nebraska | 0071033 | Platte | >= 5,000 AND < 50,000 | Local | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,339,224.97 | $2,752,029.37 |
| Nebraska | 0071033 | Platte | >= 5,000 AND < 50,000 | Local | HSIP LIMITING FLEXIBLE | Right of Way | $404,643.50 | $476,051.18 |
| Nebraska | 0071033 | Platte | >= 5,000 AND < 50,000 | Local | HSIP LIMITING FLEXIBLE | Utilities | $765,614.55 | $900,723.00 |
| Nebraska | 0071033 | Platte | >= 5,000 AND < 50,000 | Local | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | $5,045,510.26 | $6,170,107.98 |
| Nebraska | 0071033 | Platte | >= 5,000 AND < 50,000 | Local | RAIL HWY CROSSING HAZ ELI | Construction Engineering | $11,481.06 | |
| Nebraska | 0071033 | Platte | >= 5,000 AND < 50,000 | Local | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | $1,788,543.87 | |
| Nebraska | 0071033 | Platte | >= 5,000 AND < 50,000 | Local | RAIL HWY CROSSING HAZ ELI | Right of Way | $773,456.50 | $909,948.82 |
| Nebraska | 0125122 | Knox | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Bridge Replacement - No Added Capacity | $38,530,886.16 | $44,461,568.60 |
| Nebraska | 0125122 | Knox | >= 5,000 AND < 50,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $377,745.47 | $472,181.84 |
| Nebraska | 0305131 | Platte | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Bridge Replacement - No Added Capacity | $3,819,063.00 | |
| Nebraska | 0305131 | Platte | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Construction Engineering | $1,107,569.00 | |
| Nebraska | 0305131 | Platte | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Preliminary Engineering | $2,360,339.00 | |
| Nebraska | 0305131 | Platte | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $8,465,010.20 | $18,724,342.00 |
| Nebraska | 0305131 | Platte | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Right of Way | $20,000.00 | |
| Nebraska | 0305131 | Platte | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | Utilities | $236,329.00 | |
| Nebraska | 0305134 | Platte | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $3,025,000.00 | $3,781,250.00 |
| Nebraska | 0305134 | Platte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $22,938,625.00 | $32,774,158.00 |
| Nebraska | 0305134 | Platte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,274,727.00 | $1,794,432.00 |
| Nebraska | 0305134 | Platte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,475,525.00 | |
| Nebraska | 0305134 | Platte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,313,000.00 | |
| Nebraska | 0305134 | Platte | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $632,063.00 | |
| Nebraska | 0722181 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $7,337,668.36 | $9,172,085.19 |
| Nebraska | 0722181 | Nemaha | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $6,420,842.00 | $14,943,814.30 |
| Nebraska | 0722181 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $676,437.00 | $1,184,651.95 |
| Nebraska | 0722181 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $14,469.00 | |
| Nebraska | 0722181 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $320,127.00 | |
| Nebraska | 0752128 | Cass | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $20,000,000.00 | $45,339,302.00 |
| Nebraska | 0752128 | Cass | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,222,319.00 | |
| Nebraska | 0752128 | Cass | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,907,317.00 | |
| Nebraska | 0752128 | Cass | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $971,562.00 | |
| Nebraska | 0752128 | Cass | >= 5,000 AND < 50,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | $4,511,652.00 | |
| Nebraska | 0801192 | Cheyenne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $3,499,432.00 | $3,888,258.00 |
| Nebraska | 0801192 | Cheyenne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $33,809,308.86 | $37,565,897.86 |
| Nebraska | 0801192 | Cheyenne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $751,786.48 | $835,318.31 |
| Nebraska | 0801192 | Cheyenne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $164,454.00 | |
| Nebraska | 0801192 | Cheyenne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,341,319.00 | |
| Nebraska | 0801192 | Cheyenne | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $12,000.00 | |
| Nebraska | 0801196 | Kimball | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $39,008,526.51 | $43,342,807.23 |
| Nebraska | 0801196 | Kimball | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $775,139.11 | $861,265.68 |
| Nebraska | 0801196 | Kimball | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $452,000.00 | |
| Nebraska | 0801196 | Kimball | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $856,800.00 | |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $27,029,615.45 | $30,032,904.80 |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $91,401.00 | $101,557.00 |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,265,764.00 | $8,073,071.00 |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $873,423.39 | $970,470.43 |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $91,981.00 | |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,697,510.00 | |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $10,000.00 | |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $2,777,401.53 | $3,125,403.53 |
| Nebraska | 0802103 | Deuel | < 5,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $8,588,390.00 | $9,542,656.00 |
| Nebraska | 0803156 | Keith | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,556,108.45 | $43,062,503.00 |
| Nebraska | 0803156 | Keith | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $121,213.00 | $134,681.00 |
| Nebraska | 0803156 | Keith | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,908,008.00 | $2,120,009.00 |
| Nebraska | 0803156 | Keith | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $310,000.00 | |
| Nebraska | 0803156 | Keith | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,325,000.00 | |
| Nebraska | 0804155 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $49,314,161.00 | |
| Nebraska | 0804155 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $531,742.00 | |
| Nebraska | 0804155 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,925,913.00 | |
| Nebraska | 0804155 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,589,353.00 | |
| Nebraska | 0804155 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,455,000.00 | |
| Nebraska | 0804155 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,658,756.00 | |
| Nebraska | 0805075 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $37,996,058.69 | $42,217,842.99 |
| Nebraska | 0805075 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $580,768.93 | $645,298.81 |
| Nebraska | 0805075 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $560,000.00 | |
| Nebraska | 0805076 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $4,370,185.43 | $8,967,042.04 |
| Nebraska | 0805076 | Buffalo | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | 4R - No Added Capacity | $19,163,392.57 | $39,320,744.96 |
| Nebraska | 0805076 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Bridge Rehabilitation - No Added Capacity | $5,267,867.00 | $5,853,186.00 |
| Nebraska | 0805076 | Buffalo | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $1,934,948.62 | $2,149,942.55 |
| Nebraska | 0805076 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Construction Engineering | $441,262.38 | $490,291.45 |
| Nebraska | 0805076 | Buffalo | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $793,954.98 | |
| Nebraska | 0805076 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Preliminary Engineering | $181,045.02 | |
| Nebraska | 0805076 | Buffalo | >= 50,000 AND < 200,000 | State | NATIONAL HWY FREIGHT PGM | Utilities | $1,221,450.00 | |
| Nebraska | 0805076 | Dawson | >= 5,000 AND < 50,000 | State | NATIONAL HWY FREIGHT PGM | Utilities | $278,550.00 | |
| Nebraska | 0808103 | Lancaster | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Preservation | $74,444.00 | $82,716.00 |
| Nebraska | 0808103 | Lancaster | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $21,284,226.00 | $23,649,140.00 |
| Nebraska | 0808103 | Lancaster | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,435,338.00 | $93,817,042.00 |
| Nebraska | 0808103 | Lancaster | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $642,767.87 | $5,760,647.00 |
| Nebraska | 0808103 | Lancaster | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,211,000.00 | |
| Nebraska | 0808103 | Lancaster | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,150,000.00 | |
| Nebraska | 0D30107 | Dixon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,694,485.76 | $3,368,107.20 |
| Nebraska | 0D30107 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,696,103.12 | $3,370,128.90 |
| Nebraska | 0D30107 | Wayne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge Replacement - No Added Capacity | $2,696,103.12 | $3,370,128.90 |
| Nebraska | 0D30107 | Dixon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $132,383.04 | $165,478.80 |
| Nebraska | 0D30107 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $132,462.48 | $165,578.10 |
| Nebraska | 0D30107 | Wayne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $132,462.48 | $165,578.10 |
| Nebraska | 0D30107 | Wayne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $3,283,011.80 | $4,103,764.92 |
| Nebraska | 0D30107 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $3,283,011.80 | $4,103,764.92 |
| Nebraska | 0D30107 | Dixon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $3,281,042.40 | $4,101,303.16 |
| Nebraska | 0D30107 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $159,431.22 | $199,288.86 |
| Nebraska | 0D30107 | Wayne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $159,431.22 | $199,288.86 |
| Nebraska | 0D30107 | Dixon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $159,335.56 | $199,169.28 |
| Nebraska | 0D30107 | Dixon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $11,260.11 | |
| Nebraska | 0D30107 | Wayne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $11,480.12 | |
| Nebraska | 0D30107 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $32,958.77 | |
| Nebraska | 0D30107 | Wayne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $343,176.96 | |
| Nebraska | 0D30107 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $355,433.28 | |
| Nebraska | 0D30107 | Dixon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $527,021.76 | |
| Nebraska | 0D30107 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Right of Way | $51,343.60 | |
| Nebraska | 0D30107 | Dixon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Right of Way | $51,312.80 | |
| Nebraska | 0D30107 | Wayne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Right of Way | $51,343.60 | |
| Nebraska | 0D30107 | Dixon | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $151,370.76 | |
| Nebraska | 0D30107 | Pierce | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $151,461.62 | |
| Nebraska | 0D30107 | Wayne | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $151,461.62 | |
| Nebraska | 2814130 | Boyd | < 5,000 | State | EMERGENCY RELIEF | Bridge Replacement - No Added Capacity | $23,205,865.61 | $26,611,603.66 |
| Nebraska | 2814130 | Boyd | < 5,000 | State | EMERGENCY RELIEF | Bridge Replacement - No Added Capacity | $342,249.20 | $342,249.20 |
| Nebraska | 2814130 | Boyd | < 5,000 | State | EMERGENCY RELIEF | Construction Engineering | $878,129.91 | $1,097,662.39 |
| Nebraska | 2814130 | Boyd | < 5,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $574,641.95 | $638,491.06 |
| Nebraska | 3811001 | Douglas | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $2,452,692.00 | $3,065,865.00 |
| Nebraska | 3811001 | Douglas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $23,815,141.00 | $29,768,927.75 |
| Nebraska | 3811001 | Douglas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,892,386.36 | $4,865,482.70 |
| Nebraska | 3811001 | Douglas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,243,530.14 | $1,554,411.68 |
| Nebraska | 3811001 | Douglas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,807,739.00 | $2,259,673.75 |
| Nebraska | 3853119 | Morrill | < 5,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $18,263,743.00 | $32,485,886.00 |
| Nebraska | 3853119 | Morrill | < 5,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $1,594,945.00 | |
| Nebraska | 3853119 | Morrill | < 5,000 | State | NAT SIG FREIGHT AND HWY PROJ | Other | $154,114.00 | |
| Nebraska | 3853119 | Morrill | < 5,000 | State | NAT SIG FREIGHT AND HWY PROJ | Preliminary Engineering | $610,000.00 | |
| Nebraska | 3853119 | Morrill | < 5,000 | State | NAT SIG FREIGHT AND HWY PROJ | Utilities | $1,404,961.00 | |
| Nebraska | 4809003 | Douglas | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Preservation | $6,377,523.00 | $7,086,137.00 |
| Nebraska | 4809003 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preservation | $29,660,620.73 | $32,956,244.81 |
| Nebraska | 4809003 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $980,325.49 | $1,089,250.54 |
| Nebraska | 4809003 | Douglas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $562,157.00 | |
| Nebraska | 5147001 | Douglas | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $7,200,517.28 | $9,000,647.35 |
| Nebraska | 5147001 | Douglas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $17,877,837.00 | $22,590,477.00 |
| Nebraska | 5147001 | Douglas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,231,284.20 | $2,797,424.84 |
| Nebraska | 5147001 | Douglas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,553,918.00 | $3,480,199.00 |
| Nebraska | 5147001 | Douglas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,699,739.84 | $3,374,674.80 |