U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
Utah

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2025
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity $5,877,973.67 $7,347,466.84
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Construction Engineering $14,355.77 $17,944.71
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Other $63.79 $92,980,079.74
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Preliminary Engineering $47,627.82 $59,534.77
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way $777,582.03 $971,977.55
Utah F003728 Salt Lake >= 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Utilities $30,399.92 $37,999.90
Utah F003728 Salt Lake >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $3,421.54 $3,670.00
Utah F003728 Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ 4R - Added Capacity $361,741.65 $388,009.92
Utah F003728 Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ Preliminary Engineering $18,559.29 $19,906.99
Utah F003728 Salt Lake >= 200,000 N/A TRANSPORTATION IMP PROJ Right of Way $1,431,975.06 $1,535,959.52
Utah F007701 Utah >= 200,000 State HIGH RISK RURAL ROAD 4R - Added Capacity $282,055.27 $302,537.03
Utah F007701 Utah >= 200,000 State HIGH RISK RURAL ROAD Construction Engineering $103,485.30 $111,000.00
Utah F007701 Utah >= 200,000 State HIGH RISK RURAL ROAD Preliminary Engineering $267,069.43 $286,462.97
Utah F007701 Utah >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity $525,458.26 $563,615.00
Utah F007701 Utah >= 200,000 State HSIP LIMITING FLEXIBLE Other $256,720.87 $1,075,362.94
Utah F007701 Utah >= 200,000 State HSIP LIMITING FLEXIBLE Preliminary Engineering $150,120.87 $161,022.06
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   $12,961,379.93
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $643,287.00 $690,000.00
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $9,311,742.34 $9,987,924.86
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $59,376.45 $63,688.16
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Environmental Only $9,323.00 $10,000.00
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering $1,403,111.50 $1,505,000.00
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Right of Way $689,902.00 $740,000.00
Utah F007701 Utah >= 200,000 State NATIONAL HIGHWAY SYSTEM Utilities $34,855.91 $37,387.01
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity $228,434.07 $245,022.06
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $117,970.47 $126,537.03
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $419,535.00 $450,000.00
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $3,982,855.65 $4,272,075.14
Utah F007701 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $1,506,005.51 $1,615,365.77
Utah F011687 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $18,032,148.57 $19,341,573.07
Utah F011687 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $49,174.17 $52,745.01
Utah F011687 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $68,200.62 $73,153.08
Utah F011687 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $207,669.76 $222,749.91
Utah F011687 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $376,443.08 $403,778.93
Utah F011687 Davis >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $122,309.04 $131,190.65
Utah F011687 Morgan >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $221,709.66 $237,809.35
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $5,123.16 $5,495.18
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $14,468,127.40 $15,518,746.54
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,625,126.96 $1,743,137.36
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $1,171,773.04 $1,256,862.64
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   $5,519,934.97
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   $3,980,065.03
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,102,937.22 $2,255,644.35
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $1,160,112.78 $1,244,355.65
Utah F011687 Davis >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $4,228.87 $4,535.96
Utah F011687 Morgan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $7,665.67 $8,222.32
Utah F011826 Salt Lake >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Rail/Hwy Crossing $11,352,772.00 $18,921,286.67
Utah F011826 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,704,905.84 $2,901,325.57
Utah F011826 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $4,585,000.17 $4,917,945.06
Utah F011826 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Rail/Hwy Crossing $190,423.96 $204,251.81
Utah F011826 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $653,613.10 $701,075.94
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $2,634,606.54 $2,825,921.42
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Other $677,840.56 $727,062.71
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $351,222.76 $376,727.19
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Rail/Hwy Crossing $5,896,944.44 $6,325,157.61
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Right of Way $8,390,700.00 $9,000,000.00
Utah F011826 Salt Lake >= 200,000 State NATIONAL HWY FREIGHT PGM Utilities $2,551,880.58 $2,737,188.22
Utah F011826 Salt Lake >= 200,000 State RAIL HWY CROSSING HAZ ELI Rail/Hwy Crossing $450,000.00 $500,000.00
Utah F011826 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   $15,341,788.55
Utah F011826 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $1,800,000.00 $1,930,709.00
Utah F011826 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Rail/Hwy Crossing $14,199,996.26 $15,231,144.77
Utah F012559 Utah >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Right of Way $316,257.77 $316,257.77
Utah F012559 Utah >= 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $746,168.07 $800,351.90
Utah F012559 Utah >= 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way $462,979.05 $496,598.79
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Environmental Only $1,288,702.44 $1,382,283.00
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway $2,135,167.84 $2,290,215.42
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other   $85,287,248.89
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $5,569,892.28 $5,974,356.19
Utah F012559 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $16,163,835.56 $17,337,590.44
Utah F012559 Utah >= 200,000 State TRANSPORTATION ALTERNATIVES Right of Way $2,536,162.35 $2,720,328.60
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $6,495,606.48 $6,967,292.17
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Environmental Only $236,643.84 $253,828.00
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Other   $18,203,090.00
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,169,917.18 $1,254,872.00
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $4,865,190.00 $5,218,481.18
Utah F012730 Grand >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $284,842.50 $305,526.65
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $1,280,472.53 $45,799,690.60
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $2,796,900.00 $3,000,000.00
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $8,000.91 $8,581.90
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $5,634,307.22 $6,043,448.70
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $1,584,910.00 $1,700,000.00
Utah F013038 Box Elder >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $697,977.93 $748,662.37
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM 4R - Restoration & Rehabilitation $2,504,692.61 $2,686,573.64
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Construction Engineering $46,615.00 $50,000.00
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Other   $69,782,019.76
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Preliminary Engineering $25,516.08 $27,368.96
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Right of Way $893,143.40 $958,000.00
Utah F013042 Cache >= 50,000 AND < 200,000 State CARBON REDUCTION PROGRAM Utilities $383,804.91 $411,675.33
Utah F013042 Cache >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Preliminary Engineering $126,954.36 $136,173.29
Utah F013042 Cache >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way $734,672.60 $788,021.67
Utah F013042 Cache >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $38,086.04 $40,851.70
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $9,939,473.98 $10,661,239.95
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $655,079.53 $702,648.87
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $249,318.85 $267,423.41
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way $2,104,118.70 $2,256,911.59
Utah F013042 Cache >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $261,791.55 $280,801.83
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $19,558,740.01 $20,767,402.86
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity $12,772,510.00 $13,700,000.00
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $5,177,464.51 $5,497,414.00
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $337,355.43 $4,550,412.66
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $8,656,834.57 $9,191,797.16
Utah F013049 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $423,810.00 $450,000.00
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $79,935,081.33 $85,739,656.05
Utah F013049 Statewide N/A Other SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $26,669,262.97 $28,605,881.12
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering $4,902,621.70 $5,258,631.02
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Other $255,263.74 $273,800.00
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering $2,754,836.12 $2,954,881.60
Utah F013049 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities $21,751.58 $23,331.09
Utah F013050 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $43,251,752.04 $46,392,526.06
Utah F013050 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $10,501,177.95 $11,263,732.65
Utah F013050 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $311,984.83 $334,639.95
Utah F013050 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $11,171,140.97 $11,982,345.78
Utah F013050 Salt Lake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $24,944.21 $26,755.56
Utah F013050 Salt Lake >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Restoration & Rehabilitation $3,939,808.07 $4,225,901.61
Utah F013050 Salt Lake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $43,916,592.76 $115,774,098.39
Utah F015019 San Juan >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC 4R - Restoration & Rehabilitation $47,920,779.00 $67,289,071.44
Utah F015019 San Juan >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC Preliminary Engineering   $5,523,905.91
Utah F015019 San Juan >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -ALLOC Right of Way   $107,801.65
Utah F015019 San Juan >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $95,789.58 $102,745.45
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM 4R - Restoration & Rehabilitation $19,601,513.49 $21,024,899.17
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Construction Engineering $1,724,755.00 $1,850,000.00
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Other $1,942,129.14 $2,083,159.00
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Preliminary Engineering $11,267,865.52 $12,086,094.09
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Right of Way $1,174,307.93 $1,259,581.60
Utah F015019 San Juan >= 5,000 AND < 50,000 State NATIONAL HWY FREIGHT PGM Utilities $1,406,341.92 $1,508,465.00
Utah F015019 San Juan >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $33,880,729.16 $36,341,015.94
Utah F015460 Utah >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Restoration & Rehabilitation $14,902.00 $14,902.00
Utah F015460 Utah >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Other $63,713.96 $1,264,106.78
Utah F015460 Utah >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Preliminary Engineering $3,681,384.04 $3,681,384.04
Utah F015460 Utah >= 200,000 State HIGHWAY INFRA PRGM - COVID APP Right of Way $1,140,000.00 $1,140,000.00
Utah F015460 Utah >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation $16,733,680.43 $17,948,815.22
Utah F015460 Utah >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering $2,129,373.20 $2,284,000.00
Utah F015460 Utah >= 200,000 State HIGHWAY INFRA PRGM -APPOR Right of Way $687,066.71 $736,958.82
Utah F015460 Utah >= 200,000 State HIGHWAY INFRA PRGM -APPOR Utilities $1,011,805.33 $1,085,278.70
Utah F015460 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation $21,671,264.33 $23,244,947.26
Utah F015460 Utah >= 200,000 Other REDISTRIBUTION OF TIFIA FUNDS 4R - Restoration & Rehabilitation $582,298.31 $624,582.55
Utah F015460 Utah >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation $17,270,857.50 $18,525,000.00
Utah F016289 Utah >= 200,000 State HSIP LIMITING FLEXIBLE 4R - Added Capacity   $3,000,000.00
Utah F016289 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity   $454,250.73
Utah F016289 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering   $4,010,000.00
Utah F016289 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other   $36,671,930.81
Utah F016289 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $932,300.02 $1,000,000.02
Utah F016289 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way $643,287.00 $690,000.00
Utah F016289 Utah >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $602,032.03 $845,749.25
Utah F016938 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $7,776,705.86 $8,341,420.00
Utah F016938 Weber >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity $4,006,181.82 $4,297,095.16
Utah F016938 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $567,414.16 $608,617.57
Utah F016938 Weber >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Construction Engineering $748,695.04 $803,062.36
Utah F016938 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Other $7,222.13 $2,607,454.07
Utah F016938 Weber >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Other $9,529.49 $2,968,052.99
Utah F016938 Weber >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $2,123,494.96 $2,277,694.90
Utah F016938 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering $1,745,212.71 $1,871,943.27
Utah F016938 Weber >= 200,000 Local NATIONAL HIGHWAY PERF PROGRAM Utilities $185,347.99 $198,807.24
Utah F016938 Weber >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities $152,329.84 $163,391.44
Utah F016938 Weber >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $1,119,878.76 $1,201,200.00
Utah F016938 Weber >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity $576,907.24 $618,800.00