RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Connecticut 0003109 GLASTONBURY; RTE 3 BRIDGE REHABILITATION - NO ADDED CAPACITY (PUTNAM BR. #417) OVER THE CONNECTICUT RIVER. (CN) 22,511,556.40 44,957,727.00
Connecticut 0006113 BRISTOL; PROVIDE A SECOND EASTBOUND THROUGH LANE FROM CAROL DRIVE TO PEGGY LANE, A ONE MILE SEGMENT OF THE ROUTE 6 CORRIDOR. (CN) 20,186,524.85 27,168,595.02
Connecticut 0008130 SHELTON/DERBY; REHABILITATION OF BRIDGE #00571A, (COMMODORE HULL) ROUTE 8 OVER THE HOUSATONIC RIVER, ROUTE 110 & LOCAL ROADS. (CN) 28,521,949.60 35,652,437.00
Connecticut 0008134 WATERBURY; REHABILITATION OF BRIDGES (NO ADDED CAPACITY) IN THE ROUTE 8/I- 84 INTERCHANGE AREA (CN). 123,871,585.60 160,013,036.01
Connecticut 0008141 D-B RBC PROJECT - RESURFACING, BRIDGE REHABILITATION, & SAFETY IMPROVEMENTS ON APPROX. 6.43 MILES OF MAINLINE (CN). 36,778,488.51 84,063,620.01
Connecticut 0015105 NEW CANAAN/NORWALK - MERRITT PARKWAY (RTE 15) IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS (CN). 0.00 59,051,500.00
Connecticut 0015134 WESTPORT - SAFETY IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS ON THE MERRITT PKWY (CT15) IN THE TOWNS OF WESTPORT & FAIRFIELD (CN). 66,014,459.41 82,522,757.02
Connecticut 0015145 NORWALK - MERRITT PARKWAY (ROUTE 15) RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS (CN) 34,963,744.80 43,708,449.01
Connecticut 0032203 EAST HARTFORD - RESURFACING, BRIDGE & SAFETY IMPROVEMENTS ON RTE 2 FROM THE CHARTER OAK BRIDGE AREA (CN) 68,814,621.60 86,018,277.00
Connecticut 0034122 NEWTOWN - MAJOR INTERSECTION IMPROVEMENTS, CT 34 at I-84 (CN). 23,113,964.39 32,117,666.13
Connecticut 0044139 HARTFORD - SAFETY IMPROVEMENTS, HOMESTEAD AVE TO GARDEN STREET, RT44 (CN). 23,510,222.40 31,073,020.25
Connecticut 0066121 MIDDLETOWN, REHABILITATION OF BRIDGE #00524 (ARRIGONI) WHICH CARRIES ROUTE 66 OVER THE CONNECTICUT RIVER (CN). 28,229,810.00 55,874,274.00
Connecticut 0082141 EAST HADDAM - REHABILITATION OF BRIDGE #01138, ROUTE 82 OVER CONNECTICUT RIVER (CN) 37,150,108.00 57,276,400.00
Connecticut 0841095 DANBURY; IMPROVEMENTS TO I-84 INTERCHANGE 5, 6 & ROUTE 37 TO ADDRESS SAFETY & TRAFFIC OPERATIONS-ADDED CAPACITY. (CN) 23,885,980.20 26,956,221.00
Connecticut 0842195 WATERBURY, I-84 RECONSTRUCT EXPRESSWAY (ADDED CAP) & OPERATIONAL IMPROVEMENTS INCLUDING INTERCHANGES - PHASE 3 (CN). 256,807,457.22 335,107,487.04
Connecticut 0842306 WATERBURY; REHABILITATION OF BR. 03191B CARRYING I-84 WB OVER RTE. 8 AND THE NAUGATUCK RIVER. (CN) 44,352,312.30 50,844,997.02
Connecticut 0842307 WATERBURY; REHABILITATION OF BR. 03191A CARRYING I-84 EB OVER I-84 WB, RTE. 8, AND THE NAUGATUCK RIVER. (CN) 52,640,191.80 61,307,321.00
Connecticut 0842310 NEWTOWN; RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS ON I-84. 38,486,323.80 42,762,582.04
Connecticut 0843236 HARTFORD; REHABILITATION OF BR #03160A-D, BR #03301, AND BR #03303 (I - 84 HARTFORD VIADUCT). (CN) 55,622,232.26 61,961,168.46
Connecticut 0912136 WETHERSFIELD/HARTFORD; I-91 IMPROVEMENTS AND UPGRADES. 56,891,514.30 63,131,127.06
Connecticut 0951181 NEW HAVEN; I-95/Q BR.RPL(NO ADDED CAPACITY) & DEMOLITION (CONTRACT B) FR. VIC EAST ST TO VIC. WOODWARD AVE, E. SHORE (CN). 427,528,518.33 492,192,934.00
Connecticut 0951189 NEW HAVEN; I-95, OVER WEST RIVER & SR745 BRIDGE REPLACEMENT (ADDED CAPACITY) BRIDGE #00163A (CN). 155,197,500.30 174,630,678.00
Connecticut 0951191 NORWALK/WESTPORT; I-95 RECONSTRUCT THE MEDIAN AND INSTALL 45" CONCRETE BARRIER CURB IN NORWALK & WESTPORT 37,045,395.00 95,510,000.00
Connecticut 0951204 NEW HAVEN; ADVANCE SOIL PRELOAD CONTRACT FOR S. P. #92-531 - I-91/I-95/CT RTE. 34 INTERCHANGE (CONTRACT E1)(CN) 25,882,832.80 32,400,274.00
Connecticut 0951222 NEW HAVEN; I-95 - NB APPROACH AND RIVER PIERS FOR NEW PEARL HARBOR MEMORIAL BR., CONTRACT B1 (CN) 135,771,245.61 156,113,746.00
Connecticut 0951243 NEW HAVEN; BREAKOUT OF PROJ 92-531. RECONST OF I-95 / I-91 / ROUTE 34 INTERCHANGE ASSOC WITH Q BR. REPL. CONTRACT E-2 (CN) 98,935,740.54 113,777,781.00
Connecticut 0951348 NEW HAVEN; CONTRACT B2, THE CONSTRUCTION OF THE I-95 SB WEST APPROACH TO THE PEARL HARBOR MEMORIAL "Q" BRIDGE-BREAKOUT PROJ. (CN). 85,862,994.30 95,819,265.12
Connecticut 0951372 NORWALK; REHAB OF BRIDGE #00059 (YANKEE DOODLE BRIDGE), I-95 OVER NORWALK RIVER AND HENDRICKS RD. (CN) 32,313,332.70 36,789,257.01
Connecticut 0951377 STRATFORD; PROVIDE A FULL INTERCHANGE ON I-95 AT INTERCHANGE 33 BY CONSTRUCTING A NEW SB OFF-RAMP AND A NEW NB ON-RAMP. 35,645,277.60 39,605,864.02
Connecticut 0951378 STAMFORD; REHABILITATION OF BRIDGE NO. 00032 CARRYING I-95 AND I-95 RAMPS OVER MNRR AND LOCAL ROADS. (CN) 24,054,682.50 26,727,425.03
Connecticut 0952101 NEW HAVEN; I-95 RECONSTRUCTION - UPGRADE EXPRESSWAY FROM WOODARD AVE. TO NEW HAVEN/EAST HAVEN TOWN LINE. (CONST.) 42,701,500.08 49,082,189.00
Connecticut 0953073 NEW LONDON/GROTON; PHASE 1A OF REHAB FOR BR #03819 NB (GOLD STAR MEMORIAL BRIDGE) CARRYING I-95 OVER THAMES RIVER & LOCAL ROADS. 0.00 64,821,120.00
Connecticut 1063143 HARTFORD; INTERCHANGE 29 @ I-91N & RTE 15N IMPROVEMENTS 0.00 233,612,079.00
Connecticut 1092122 NEW HAVEN; REPLACEMENT OF BRIDGE #3748 STATE STREET OVER MILL RIVER (CN). 27,244,976.00 34,056,223.00
Connecticut 1092144 NEW HAVEN; MAJOR REHABILITATION OF BRIDGE #03810 OVER QUINNIPIAC RIVER. 4,916,605.11 27,929,200.00
Connecticut 1096111 NEWTOWN; REHABILITATION OF BRIDGES 01218 & 04180, I-84 EB & WB O/ HOUSATONIC RIVER. SUPERSTRUCTURE REPLACEMENTS. 54,860,356.80 66,243,253.34
Connecticut H100002 DERBY; RECONSTRUCTION OF APPROXIMATELY 2,400 FEET OF ROUTE 34. 14,690,640.00 29,608,320.03
Connecticut H121002 STAMFORD; REPLACEMENT OF DEFICIENT MNRR BRIDGE #08012R OVER ATLANTIC ST (CN). 4,214,710.77 69,702,343.76