RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Florida | 00B5025 | SR 19 OVER LITTLE LAKE HARRIS BRIDGE # 110026;BRIDGE REPLACEMENT;CONSTRUCTION;DB | 20,037,803.00 | 27,590,549.00 |
Florida | 0105152 | I-10 (SR 8) / SR 200 (US 301) INTERCHANGE OPERATIONAL IMPROVEMENTS;INTERCHANGE IMPROVEMENT;CONSTRUCTION | 79,783,137.00 | 149,512,122.00 |
Florida | 0751184 | I-75 FROM HERNANDO CO LINE TO SR 470;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | 78,842,976.00 | 85,137,965.00 |
Florida | 0751185 | I-75 FROM SR 470 TO SR91(FLORIDA TURNPIKE);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | 14,552,512.00 | 51,938,456.00 |
Florida | 0751186 | I-75 (SR 93) FROM NORTH OF SR/CR 54 TO NORTH OF SR 52;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION;DB | 75,750,440.00 | 83,127,881.00 |
Florida | 0751190 | I-75 (SR 93) FM S OF US98/SR50/CORTEZ TO N OF US98/SR50/CORTEZ;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | 70,445,689.00 | 79,828,096.00 |
Florida | 0751191 | I-75 (SR 93) FROM N OF SR 50 TO HERNANDO/SUMTER CO/L;ADD LANES & REHABILITATE PVMNT;PRELIMINARY ENGINEER;DB | 30,923,979.00 | 35,100,922.00 |
Florida | 0754175 | SR-93/I-75 ML SYSTEM FR S OF MIRAMAR PKWY INTG TO S OF SHERIDAN ST;ADD SPECIAL USE LANE;CONSTRUCTION;DB | 2,805,391.00 | 98,004,211.00 |
Florida | 0754179 | SR 93/I-75 ML SYSTEM FR S. OF HEFT INTCH. TO MIAMI/DADE COUNTYLINE;ADD SPECIAL USE LANE;CONSTRUCTION;DB | 32,345,641.00 | 173,129,267.00 |
Florida | 0754180 | SR 93/I-75 ML SYSTEM FROM NW 170 STREET TO S OF HEFT INTERCHANGE;ADD SPECIAL USE LANE;CONSTRUCTION;DB | 6,724,472.00 | 39,480,256.00 |
Florida | 0755096 | I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE;INTERCHANGE IMPROVEMENT;PRELIMINARY ENGINEER | 30,788,275.00 | 61,399,266.00 |
Florida | 0756128 | I-75 (SR93) AT UNIVERSITY INTERCHANGE; INTERCHANGE - ADD LANES;CONSTRUCTION | 41,438,043.00 | 55,153,665.00 |
Florida | 0756129 | I-75 (SR93) AT UNIVERSITY PARKWAY;INTERCHANGE - ADD LANES;CONSTRUCTION | 36,257,399.00 | 43,596,583.00 |
Florida | 0757443 | I-75 AT SR 64; INTERCHANGE IMPROVEMENT;CONSTRUCTION | 44,967,112.00 | 51,708,749.00 |
Florida | 0951641 | SR-9/I-95 (SPANISH RIVER) FROM NORTH OF GLADES ROAD TO SOUTH OF CONGRESS AVE;INTERCHANGE (NEW);CONSTRUCTION | 69,102,417.00 | 86,900,865.00 |
Florida | 0951671 | SR-9/I-95 FR S. OF SR-842/BROWARD BLVD TO N. OF SR-870/COMMERCIAL BLVD; ADD SPECIAL USE LANE;CONSTRUCTION;DB | 74,582,527.00 | 193,873,236.00 |
Florida | 0951685 | SR 9A/I-95 FROM NW 8 STREET TO NW 29 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER;DB | 33,151,041.00 | 40,931,817.00 |
Florida | 0951689 | SR 9A/I-95 FROM NW 29 STREET TO NW 79 STREET ;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER AND CONSTRUCTION;DB | 63,373,804.00 | 204,703,197.00 |
Florida | 0951691 | SR-9/I-95 FROM SW 10TH STREET TO BROWARD/PALM BEACH COUNTY LINE;ADD SPECIAL USE LANE;CONSTRUCTION;DB | 30,666,549.00 | 119,415,106.00 |
Florida | 0951694 | SR-9/I-95 FROM BROW/PALM BCH CO LINE TO SOUTH OF GLADES RD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | 49,450,693.00 | 58,996,046.00 |
Florida | 0951695 | SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON BLVD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | 28,285,020.00 | 48,851,187.00 |
Florida | 0953112 | I-95 FROM SR 406 TO 0.5 MILE N OF SR 44;ADD LANES & REHABILITATE PVMN;CONSTRUCTION | 122,876,471.00 | 255,040,693.00 |
Florida | 0953118 | I-95/SR-9 FROM SR-60/OSCEOLA BLVD TO THE BREVARD COUNTY LINE;ADD LANES & RECONSTRUCT;DESIGN/BUILD | 49,244,623.00 | 60,211,456.00 |
Florida | 0953133 | I-95 INT @ ELLIS RD /ST JOHNS HERITAGE PKWY ;INTERCHANGE (NEW);CONSTRUCTION | 46,183,911.00 | 52,452,099.00 |
Florida | 0953134 | I-95 INT @ ST JOHNS HERITAGE PKWY/PALM BAY PK WY N OF MICCO RD;INTERCHANGE (NEW);CONSTRUCTION;DB | 28,575,076.00 | 30,992,959.00 |
Florida | 0954140 | I-95 FROM 0.5 MILES N OF SR 44 TO 1.6 MILES N OF US 92;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | 84,693,542.00 | 219,328,396.00 |
Florida | 0955313 | I-95 (SR 9) AT NORTH I-295 INTERCHANGE ;INTERCHANGE RAMP (NEW);CONSTRUCTION;DB | 82,538,168.00 | 231,815,021.00 |
Florida | 0955314 | I-95 (SR 9) AT I-10 INTERCHANGE OPERATIONAL IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | 389,233.00 | 149,529,277.00 |
Florida | 1001069 | SR 80 FROM DALTON LANE TO INDIAN HILLS DRIVE ;ADD LANES & RECONSTRUCT;CONSTRUCTION | 31,003,154.00 | 41,154,656.00 |
Florida | 1001070 | SR 80 FROM INDIAN HILLS DRIVE TO CR 833;ADD LANES & RECONSTRUCT;CONSTRUCTION | 33,881,356.00 | 50,463,455.00 |
Florida | 1002062 | SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION | 46,786,099.00 | 116,254,189.00 |
Florida | 1171052 | SR 77 FROM NORTH OF CR 279 TO N SUNNY HILLS ENTRANCE;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | 53,661,379.00 | 88,298,585.00 |
Florida | 1190014 | SR 83 (US 331) FROM NORTH OF SR 20 TO SR 8 (I-10);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | 53,231,560.00 | 62,339,828.00 |
Florida | 1301041 | SR-710/BEELINE HWY FROM E. OF SR-76 TO PALM BEACH/MARTIN CL;ADD LANES & RECONSTRUCT;CONSTRUCTION | 32,204,865.00 | 41,098,776.00 |
Florida | 1316003 | GATEWAY EXPRESSWAY FM SR690 @ US19 & SR686 EXT @ CR611 TO W OF I-275;NEW ROAD CONSTRUCTION;PRELIMINARY ENGINEER;DB | 251,726,203.00 | 2,588,097,186.00 |
Florida | 1356011 | SR 694 (GANDY BLVD) FROM W OF 9TH ST NORTH E OF 4TH ST NORTH;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | 85,865,495.00 | 109,530,891.00 |
Florida | 1503051 | SR 70 FROM NE 34TH AVENUE TO NE 80TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION | 20,484,320.00 | 30,949,577.00 |
Florida | 1600003 | SR 95 (US 29) FROM SR 8 (I-10) TO N OF SR 10 (US 90A) 9 MILE ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | 55,555,324.00 | 66,998,874.00 |
Florida | 1852019 | US 19 (SR 55) FROM W JUMP COURT TO W FORT ISLAND TRAIL;ADD LANES & RECONSTRUCT;CONSTRUCTION | 22,029,655.00 | 135,446,712.00 |
Florida | 2757410 | I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB | 32,485,905.00 | 231,953,917.00 |
Florida | 2955310 | I-295 (SR 9A) FROM BUCKMAN BRIDGE TO I-95 AUX-LANES;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB-E2S01 | 92,480,060.00 | 106,103,227.00 |
Florida | 2955314 | I-295 (SR 9A) FROM SR202 JTB BLVD TO SR 9B (MANAGED LANES);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | 149,141,306.00 | 223,526,892.00 |
Florida | 3003056 | SR 50 FROM SR 429 (WESTERN BELTWAY) TO E OF WEST OAKS MALL;ADD LANES & RECONSTRUCT;CONSTRUCTION | 23,886,106.00 | 45,499,633.00 |
Florida | 3114051 | SR223(ALT US301 TRUCK ROUTE) FROM SR100 TO SR16;NEW ROAD CONSTRUCTION;CONSTRUCTION | 25,403,898.00 | 52,117,250.00 |
Florida | 3115028 | SR201 FROM S OF BALDWIN TO N OF BALDWIN (BYPASS);NEW ROAD CONSTRUCTION;CONSTRUCTION | 69,647,979.00 | 77,520,016.00 |
Florida | 3141036 | SR429/46(WEKIVA PKW) FROM W OF OLD MCDONALD RD TO E OF WEKIVA RIVER RD;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | 22,249,383.00 | 292,621,913.00 |
Florida | 3141042 | SR429/46(WEKIVA PKWY)FROM E OF WEKIVA RIVER RD TO ORANGE BOULEVARD;NEW ROAD CONSTRUCTION;CONSTRUCTION | 57,898,024.00 | 245,482,870.00 |
Florida | 3531067 | US 17 FROM CR 760A (NOCATEE) TO HEARD STREET;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | 18,241,794.00 | 34,573,766.00 |
Florida | 3951501 | SR 836/I-395 FROM WEST OF I-95 TO MACARTHUR CSWY BRIDGE;BRIDGE-REPLACE AND ADD LANES;CONSTRUCTION;DB | 176,870,720.00 | 716,711,522.00 |
Florida | 4002027 | SR20 FROM SW 56TH AVENUE TO CR315 IN INTERLACHEN;ADD LANES & RECONSTRUCT; UTILITY WORK IN PREP FOR CONSTRUCTION. | 23,177,088.00 | 36,668,532.00 |
Florida | 4031035 | SR 997/KROME AVENUE FROM SW 232 STREET TO S OF SW 184TH ST/EUREKA DR.;ADD LANES & RECONSTRUCT;CONSTRUCTION SUPPORT | 25,361,621.00 | 41,366,590.00 |
Florida | 4047203 | CR 580/SAM ALLEN RD FM W OF SR39/BUCHMAN HWY TO E OF PARK RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | 21,717,923.00 | 31,469,053.00 |
Florida | 4221091 | SR 30 (US 98) PENSACOLA BAY BRIDGE NO. 480035;BRIDGE REPLACEMENT;CONSTRUCTION;DB | 18,343,966.00 | 472,007,267.00 |
Florida | 4221093 | SR 30 (US 98) FROM CR 30F AIRPORT ROAD TO WALTON COUNTY LINE;ADD LANES & RECONSTRUCT;CONSTRUCTION | 44,805,110.00 | 63,708,346.00 |
Florida | 4222077 | SR 30 (US 98) @ SR 368 23RD STREET INTERSECTION PHASE I;ADD LANES & RECONSTRUCT;CONSTRUCTION | 78,797,529.00 | 98,866,572.00 |
Florida | 4222081 | SR 30 (US 98) FROM EMERALD BAY DRIVE TO TANG-O-MAR DRIVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | 46,458,986.00 | 57,677,248.00 |
Florida | 4751119 | SR-7/US-441 FROM N OF HALLANDALE BCH TO FUNSTON STREET;ADD LANES & RECONSTRUCT;CONSTRUCTION | 12,376,742.00 | 43,734,790.00 |
Florida | 4751163 | SR-7/US-441 FROM N. OF FILLMORE TO S OF STIRLING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | 4,067,857.00 | 46,692,946.00 |
Florida | 4752036 | SR-7 FROM 60TH STREET TO NORTH LAKE BLVD.;NEW ROAD CONSTRUCTION;CONSTRUCTION | 1,506,364.00 | 41,962,674.00 |
Florida | 4881064 | SR 200 (A1A) FROM WEST OF RUBIN RD TO EAST OF CR 107/SCOTT RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | 58,926,678.00 | 81,957,841.00 |
Florida | 4881072 | SR200(A1A) FROM I-95 TO W OF STILL QUARTERS RD/INCLUDES I95 LIGHTING;ADD LANES & RECONSTRUCT;CONSTRUCTION | 45,550,282.00 | 60,222,046.00 |
Florida | 4913014 | SRA1A(3RD ST) FROM SEAGATE AVE TO BEACH BLVD ;DRAINAGE IMPROVEMENTS;CONSTRUCTION | 28,666,824.00 | 32,700,176.00 |
Florida | 4968004 | SR-614/INDRIO ROAD FROM WEST OF SR-9/I-95 TO EAST OF SR-670/EMERSON AV;ADD LANES & RECONSTRUCT;CONSTRUCTION | 26,221,318.00 | 29,375,669.00 |
Florida | 5951553 | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION | 665,709,135.00 | 3,156,518,694.00 |
Florida | 5951556 | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | 0.00 | 80,952,434.00 |
Florida | 5951557 | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | 0.00 | 124,950,849.00 |
Florida | 5951560 | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB - AVAILABILITY PAYMENTS & OPERATIONS UNDER CRRSSA | 160,390,282.00 | 160,390,282.00 |
Florida | 6107003 | SR 847/NW 47 AVENUE FROM SR 860/NW 183 STREET TO N. OF NW 199 STREET;ADD LANES & RECONSTRUCT;CONSTRUCTION | 19,601,171.00 | 28,481,649.00 |
Florida | 6268021 | SR 826 FROM FLAGLER ST TO NW 154 ST. & I-75 FROM SR 826 TO NW 170 ST.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | 219,600,345.00 | 319,623,323.00 |
Florida | 7079006 | SR-713/KINGS HWY FR 800' S OF SR-70 TO N OF PICOS ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | 11,022,021.00 | 34,903,578.00 |
Florida | 7810035 | SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | 27,267,130.00 | 51,167,907.00 |
Florida | 8785019 | SR 423 (JOHN YOUNG PARKWAY) WIDENING FROM SR 50 TO SHADER RD;PRELIM ENG FOR FUTURE CAPACITY;CONSTRUCTION | 10,211,738.00 | 37,856,314.00 |
Florida | 8886496 | CR 4050 ORANGE AVE BR#794003 VETERANS MEMORIAL BRIDGE;BRIDGE REPLACEMENT;CONSTRUCTION;LAP | 43,067,780.00 | 50,241,166.00 |
Florida | 8886535 | CROSSTOWN PARKWAY FROM MANTH LANE TO SR-5/US-1;NEW BRIDGE CONSTRUCTION;CONSTRUCTION;LAP | 46,236,653.00 | 107,737,674.00 |
Florida | 8886777 | W. MIDWAY RD/CR-712 FROM S. 25TH STREET/SR-615 TO SR-5/US-1;ADD LANES & RECONSTRUCT;CONSTRUCTION | 31,814,499.00 | 40,877,695.00 |
Florida | 8886805 | DESIGN BUILD PUSHBUTTON - PROGRAM MANAGEMENT ;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION;DB | 1,595,001.00 | 29,719,770.00 |
Florida | 8886919 | SR 46 / US 441 FROM W OF US 441 TO E OF VISTA VIEW LANE;ADD LANES & RECONSTRUCT;CONSTRUCTION; WEKIVA SECTIONS 3A AND 3B | 8,051,024.00 | 40,247,459.00 |
Florida | ARR1134 | SR 826/SR 836 FROM N OF SW 8 ST TO S OF NW 25 ST & FM NW 87 TO 57 AVE';INTERCHANGE (MODIFY);CONSTRUCTION;DB | 309,200,189.00 | 453,633,639.00 |
Florida | ARR1279 | I-4/SELMON EXPRESSWY FROM S OF SELMON EXPRSSW TO I-4;INTERCHANGE (NEW);CONSTRUCTION | 220,736,422.00 | 226,120,955.00 |
Florida | D117027 | I-75 FROM S OF N JONES LOOP TO N OF US 17 ;ADD LANES & RECONSTRUCT;CONSTRUCTION | 29,988,796.00 | 36,279,243.00 |
Florida | D117115 | I-75 AT SR 70 INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | 84,453,097.00 | 118,337,813.00 |
Florida | D118021 | US 41 - VENICE BYPASS FROM CENTER RD TO GULF COAST BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | 12,721,381.00 | 27,317,117.00 |
Florida | D118039 | US 41 (SR 45) FROM WINKLER AVENUE TO SR 82 ;RESURFACING;CONSTRUCTION | 6,475,366.00 | 29,496,746.00 |
Florida | D118043 | I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB | 30,764,974.00 | 89,706,987.00 |
Florida | D118127 | I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | 117,335,654.00 | 170,023,809.00 |
Florida | D119037 | US 27 AT SR 60;INTERCHANGE - ADD LANES;CONSTRUCTION | 23,198,002.00 | 55,205,711.00 |
Florida | D119075 | SR 542 FROM BUCKEYE LOOP ROAD TO US 27;ADD LANES & RECONSTRUCT;CONSTRUCTION | 42,535,121.00 | 50,785,278.00 |
Florida | D120030 | I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | 0.00 | 61,204,777.00 |
Florida | D120059 | I-4 (SR 400) AT CSX RAILROAD;BRIDGE REPLACEMENT;CONSTRUCTION | 5,115,341.00 | 32,216,844.00 |
Florida | D217011 | FCX SOUTH OF US17 TO NORTH OF SR16; NEW ROAD CONSTRUCTION;CONSTRUCTION | 99,174,216.00 | 907,553,396.00 |
Florida | D217080 | SR15(US17) FROM: W. OF DUNNS CREEK TO: HORSE LANDING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | 41,814,456.00 | 51,703,243.00 |
Florida | D217128 | I-10 FROM I-295 TO I-95;ADD MANAGED LANES;PRELIMINARY ENGINEER;DB | 162,149,877.00 | 262,596,545.00 |
Florida | D218017 | SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD);NEW ROAD CONSTRUCTION;CONSTRUCTION | 54,318,801.00 | 279,781,031.00 |
Florida | D219037 | I-95(SR9) FROM: FLAGLER C/L TO: SR207;RESURFACING;CONSTRUCTION | 25,195,907.00 | 28,206,814.00 |
Florida | D219120 | URBAN CORE RIVERFRONT REVITALIZATION & COMPLETE STREETS;MISCELLANEOUS CONSTRUCTION;PRELIMINARY ENGINEER;LAP | 12,519,073.00 | 51,081,261.00 |
Florida | D219130 | I-95(SR9) FROM SR207 TO INTL GOLF PARKWAY;RESURFACING;CONSTRUCTION | 0.00 | 25,085,901.00 |
Florida | D221010 | SR116(WONDERWOOD) FROM: JANE STREET TO SAND CASTLE LANE;RESURFACING;CONSTRUCTION | 13,326,477.00 | 26,803,553.00 |
Florida | D317016 | SR 30 (US 98) ELEVATED ROADWAY E TO W OF TYNDALL AFB ENTRANCE;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | 12,566,961.00 | 35,708,532.00 |
Florida | D317035 | SR 388 WEST BAY PARKWAY FROM SR 79 TO E OF NWF BEACHES INTL AIRPORT;ADD LANES & RECONSTRUCT;CONSTRUCTION | 51,252,511.00 | 81,553,325.00 |
Florida | D318058 | SR 30 (US 98) GREGORY ST & BAYFRONT PKWY @ 17TH AVE INTERCHANGE;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION;DB | 7,931,218.00 | 30,524,983.00 |
Florida | D319003 | SR 390 ST ANDREWS FROM SR 368 23RD ST TO E OF CR 2312 BALDWIN ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | 29,975,310.00 | 52,782,219.00 |
Florida | D319075 | SR 77 FROM BAY COUNTY LINE TO NORTH OF CR 279;ADD LANES & RECONSTRUCT;CONSTRUCTION | 7,106,422.00 | 42,216,864.00 |
Florida | D319079 | SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | 16,283,063.00 | 89,958,540.00 |
Florida | D319080 | SR 369 (US 319) FROM EAST IVAN ROAD TO NORTH OF SR 267;ADD LANES & RECONSTRUCT;CONSTRUCTION | 9,955,555.00 | 31,608,229.00 |
Florida | D320013 | SR 8 (I-10) INTERCHANGE WEST OF CRESTVIEW ;INTERCHANGE (NEW);CONSTRUCTION SUPPORT;DB | 5,247.00 | 94,964,510.00 |
Florida | D320021 | SR 10 (US 90) OVER SIMPSON RIVER BRIDGE NO. 580056 & 580108;BRIDGE REPLACEMENT;CONSTRUCTION | 8,450,501.00 | 26,855,091.00 |
Florida | D417080 | SR-80 FROM W OF LION COUNTRY SAFARI RD TO FOREST HILL/CRESTWOOD BLVD.;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | 30,972,580.00 | 46,815,729.00 |
Florida | D418011 | SR-9/I-95 @ SR-808/GLADES ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | 14,738,298.00 | 28,794,073.00 |
Florida | D419098 | SR-9/I-95 @COPANS RD FR S OF NB EXIT RAMP TO N OF SB TO WB EXIT RAMP;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION | 18,349,922.00 | 27,644,720.00 |
Florida | D420092 | SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 ;BRIDGE REPLACEMENT;CONSTRUCTION | 6,064.00 | 99,445,881.00 |
Florida | D421056 | SR-5/US-1 FEDERAL HIGHWAY FROM CR-A1A TO BEACH ROAD;BRIDGE REPLACEMENT;CONSTRUCTION SUPPORT | 3,828,159.00 | 135,087,295.00 |
Florida | D421085 | SR-25/US-27 FROM HENDRY/PALM BEACH COUNTYLINE TO SR- 80;RESURFACING;CONSTRUCTION | 21,890.00 | 26,614,497.00 |
Florida | D517015 | SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400);NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | 129,520,859.00 | 319,672,631.00 |
Florida | D518022 | SR 46 (WEKIVA PKWY) FROM ORANGE BLVD TO N. OREGON ST/WAYSIDE DR; ADD LANES & RECONSTRUCT; CONSTRUCTION | 11,457,005.00 | 26,079,015.00 |
Florida | D519013 | SR 500 (US 441) FROM LAKE ELLA RD TO AVENIDA CENTRAL; ADD LANES & RECONSTRUCT; CONSTRUCTION | 31,038,123.00 | 51,118,374.00 |
Florida | D617032 | GOLDEN GLADES MULTI-MODAL TERMINAL (GGMMT);INTERMODAL HUB CAPACITY; PRELIMINARY ENGINEER; DB | 29,786,323.00 | 72,710,901.00 |
Florida | D617044 | SR 968/SW 1ST STREET AT MIAMI RIVER (BRIDGE #870660);BRIDGE REPLACEMENT;CONSTRUCTION | 57,495,356.00 | 87,898,590.00 |
Florida | D618066 | SR 997/KROME AVENUE FROM SW 296 STREET TO S OF SW 232 STREET;ADD LANES & RECONSTRUCT;CONSTRUCTION | 30,185,803.00 | 38,820,370.00 |
Florida | D620056 | SR 25/OKEECHOBEE RD FROM E. OF NW 107 AVE TO E. OF NW 116 WAY(CNCRETE);ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | 0.00 | 123,670,052.00 |
Florida | D621008 | SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO WEST OF HEFT;ADD LANES & RECONSTRUCT;CONSTRUCTION | 0.00 | 58,358,619.00 |
Florida | D717045 | I-75 (SR 93A) FM WB SR60 ENTRANCE RAMP TO S OF CSX RR/CR 574;INTERCHANGE - ADD LANES;CONSTRUCTION | 18,067,835.00 | 59,060,285.00 |
Florida | D717046 | I-75 (SR93A)& SR 60 FM S OF SR60 @ SLIP RMP TO S OF CSX BRIDGE 100471;INTERCHANGE - ADD LANES;CONSTRUCTION | 17,146,722.00 | 33,222,674.00 |
Florida | D717060 | I-4/SR 400 FROM E OF 50TH ST TO E OF MCINTOSH;RESURFACING;CONSTRUCTION | 27,552,872.00 | 40,126,018.00 |
Florida | D717065 | I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I);INTERCHANGE - ADD LANES;CONSTRUCTION | 29,147,633.00 | 46,408,908.00 |
Florida | D718036 | SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45);ADD LANES & RECONSTRUCT;CONSTRUCTION | 30,267,521.00 | 56,710,083.00 |
Florida | D718055 | I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | 172,457,181.00 | 243,884,761.00 |
Florida | D718056 | I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60;BRIDGE- REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | 3,568,447.00 | 41,924,163.00 |
Florida | D718067 | SR 50 FM WINDMERE RD/BRONSON BL TO US 98/MCKETHAN RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | 35,871,093.00 | 42,015,541.00 |
Florida | D719008 | SR 50 FROM US 98/MCKETHAN RD TO US 301;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | 11,469,044.00 | 25,344,662.00 |
Florida | D720024 | US 301/SR 43 FROM N OF LAKE ST CHARLES BLVD TO N OF PROGRESS BLVD;RESURFACING;CONSTRUCTION;DB | 0.00 | 35,422,465.00 |
Florida | D720029 | US 41/SR 45 FROM N OF 15TH AVE TO S OF BULLFROG CREEK;RESURFACING;CONSTRUCTION | 0.00 | 27,764,156.00 |
Florida | D720031 | I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | 0.00 | 104,722,054.00 |
Florida | D721012 | I-275 (SR 93) FROM N OF MLK TO N OF HILLSBOROUGH AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | 0.00 | 41,783,257.00 |
Florida | D721013 | I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION | 0.00 | 55,266,825.00 |
Florida | D721027 | I-4/SR 400 FROM DOWNTOWN TAMPA TO POLK COUNTY LINE;ITS COMMUNICATION SYSTEM;CONSTRUCTION | 10,071,600.00 | 26,809,579.00 |
Florida | NASA002 | NASA CAUSEWAY BRIDGE; BRIDGE REPLACEMENT; CONSTRUCTION | 86,988,000.00 | 127,593,095.00 |
Florida | PMT1001 | PORT OF MIAMI TUNNEL FROM PORT OF MIAMI TO SR 836/I-395;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | 214,270,573.00 | 2,438,151,832.00 |
Florida | SR20001 | SR20 FROM ALACHUA C/L TO SW 56TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION | 24,730,032.00 | 69,593,316.00 |
Florida | TAMI002 | SR-90/US HWY-41/TAMIAMI TRAIL FROM STRUCTURE S-333 TO STRUCTURE S- 334;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION;DB | 60,069,034.00 | 72,677,767.00 |