U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Idaho

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Idaho 1568001 SH-55, SMITH'S FERRY TO ROUND VALLEY 35,999,078.69 40,843,853.70
Idaho 4110156 US 95, THORN CREEK ROAD TO MOSCOW, PH 1 35,550,512.89 82,029,740.34
Idaho A013057 I 84, MERIDIAN IC TO FIVE MILE RD 28,031,695.99 30,463,076.10
Idaho A018881 I 84, I 86 SALT LAKE SYSTEM INTERCHANGE 39,452,709.30 42,802,895.00
Idaho A019261 US 95, CULDESAC CANYON PASSING LANE PHASE 2 27,236,270.05 39,176,715.11
Idaho A019682 SH 41, MULLAN AVE TO E. PRAIRIE AVE, POST FALLS 40,089,325.86 49,421,265.00
Idaho A020098 SH 41, E PRAIRIE AVE TO BOEKEL RD, KOOTENAI CO 45,392,717.90 50,115,739.00
Idaho A020139 I 84, COLD SPRINGS IC TO GLENNS FERRY IC 33,932,785.22 36,775,534.00
Idaho A020798 INFRAFY18: I 84, NORTHSIDE BLVD TO FRANKLIN BLVD, NAMPA 44,417,534.00 74,527,876.80
Idaho A020799 INFRAFY18: I 84, KARCHER IC TO NORTHSIDE BLVD 17,037,152.75 28,549,890.77