U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Illinois

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Illinois 000S658 I-70 - Bridge replacement and new interchange on I-55/70 under IL 162 at Troy in Madison County. 26,155,295.30 27,110,914.46
Illinois 000V127 0.72 miles reconstruction/widening of I-290 EB mainline pavmt. from Racine to Congress Parkway (i-9094) retain wall, lighting 29,610,659.43 33,360,580.97
Illinois 0020074 CREATE - Construction on CREATE project EW1: Plan number EW1-BRC-TSX-001-Z-BD 0.00 58,652,208.00
Illinois 0055410 1.11 mi of the reconst. of the outbound structures of I-55 (Stevenson Expy) & US.41 (Lake Shore Dr.) inc 3 curved ramp struct. ** 69,283,706.73 77,150,429.99
Illinois 0055455 Resurfacing, bridge repairs etc on I-55 through Will, DuPage and Cook Counties 29,478,421.41 33,182,785.81
Illinois 0055475 1.0 miles of roadway reconstruction and the removal and replacement of the 3 inbound bridge structures of I-55 & US41, 3 new** 56,668,039.83 63,087,543.96
Illinois 0057309 Bourbonnais road improvements, Bourbonnais. 1.42 miles of a new structure an interchange on I-57 at 6000N and improvements at** 46,105,899.29 51,787,033.35
Illinois 0057312 9.28 mi of milling, rubblizing & 11.75" of HMA resurf, guardrail, striping etc on I-57 from Old IL 13 to Johnson Cty 26,438,888.53 30,285,436.37
Illinois 0064403 0.711 mi of proposed bridge & additional lane on I-64 from MLK Bridge EB to I-55/64 WB 29,321,246.02 32,620,141.26
Illinois 0070027 6.6 miles of resurfacing, bridge repairs etc. on I 70 in Bond and Madison Counties 24,288,210.63 27,735,905.31
Illinois 0070047 9.05 miles of rebbilization/overlay of I-70 - starts at abandoned RR bridge in Altamont to Little Wabash River W of Effingham 52,618,927.00 58,465,475.00
Illinois 0070405 Appr 9 mi of milling, patching, resurfacing, grdrl & bridge repair on I-70 from 2.5 mi east of I- 55/70 int just west of Prairie Rd 28,064,642.27 31,284,519.13
Illinois 0074324 0.5 miles added lanes & ramps, bridge replacement/rehab, lighting & drainage improvements on I-74 from Mississippi River to 7th Ave Moline 83,228,205.05 94,651,112.00
Illinois 0074326 2 miles of reconstruction of I-74 starting (7th ave) south to (Avenue in Cities) - within the City of Moline 84,587,618.00 96,169,621.00
Illinois 0075156 Construct 4 lane ext. of IL.Rte.29 from Rochester to Taylorville - new 4 lanes expressway around Edinburg incl. ** 34,925,049.85 43,952,254.25
Illinois 0080408 Remove & repl stw structures over Green Rvr, two over BN&SF RR & two over Barstow Rd & resurf from .8 mi N of IL5/IL92 to Henry* 23,348,529.82 26,008,312.21
Illinois 0090401 Removal & replacement of structure carrying EB I-90 over CTA BLue Line & EB I-90, retaining walls, recons of East River Rd bridge* 13,634,730.00 25,266,246.00
Illinois 0090403 2.67 miles of a new lane on I-90 from Cumberland Ave to Harlem Ave in Chicago 22,925,248.58 28,958,658.64
Illinois 0290201 0.49 miles of the construction of 2 new WB expressway lanes along I-290 from Peoria to Racine St inc 4 new retaining walls and** 27,346,416.25 33,212,207.99
Illinois 0310139 5.5 miles of new 4-lane roadway; Seminary Road to US 67 in Godfrey including grading, paving, box culvert and signing. 23,502,425.43 29,378,031.79
Illinois 0321015 TIGER PROJECT-US 54, PIKE CO. REPLACE CHAMP CLARK BRIDGE OVER MISSISSIPPI RIVER AT LOUISIANA 25,182,100.00 29,626,000.00
Illinois 0322096 4.5 mi of grading, paving, new bridge and an additional lane to an existing bridge on US.51 from 1.4 mi S.of Assumption ** 22,203,584.77 27,764,886.77
Illinois 0326088 4.47 mi of addition of 2 or more lanes on IL 47 from N of I-80 in Morris to just N of Sherrill Rd in Kendall Cty inc 32' median * 34,791,382.00 44,185,444.00
Illinois 0326093 Const. of the US. I-80 to I-88 North-South Connector in Illinois - 7.023 mi of reconst. of IL.47 from 2-4 lanes inc. pvmnt, ** 37,588,133.34 49,842,824.18
Illinois 0330070 Reconst./widening of 1.64 mi of US.12-45 (Manheim Rd) from IL.19 to I-94 inc. const. of Balmoral Underpass, retaining walls, ** 35,268,688.40 44,468,015.70
Illinois 0330073 1.8 miles of reconstruction on US 45 from 143rd St. to 159th St., including signals, culverts, pavement marking, additional** 20,188,052.73 29,964,765.33
Illinois 0330074 2.8 miles of additional lanes and roadway reconstruction inc signals, lighting, pavement marking, etc. on US 45 from 159th to** 24,374,900.08 32,592,125.68
Illinois 0331068 10.828 of the addition of a new lane to IL 13, a new bridge over IL 13, new frontage rds, etc on IL 13 from 0.2 miles east on** 20,721,081.24 25,921,525.93
Illinois 0332119 6.02 miles of the reconstruction of the existing 2-lanes and the addition of two more on US 45 beginning in Eldorado from just** 20,948,092.99 26,195,055.45
Illinois 0338048 1.57 miles of roadway reconstruction, resurfacing, lighting, retaining walls, storm sewers, traffic signals, etc. on IL 59** 28,019,725.03 37,895,544.43
Illinois 0341025 Lakefront Bike Trail: Navy Pier Flyover consisting of new pedestrian bridge, furnishing structural steel, lighting, concrete** 20,933,600.00 28,952,200.00
Illinois 0345056 1.33 mi of interchange reconst. on US.20 inc lghtng, traff sgnls, structure work, retaining wall etc from Fleetwood Dr. to ** 30,568,574.44 40,041,517.55
Illinois 0345062 1.4 miles of new interchange ramps, flyover bridge structures, retaining walls, noise wall, drainage improvements, lighting, etc** 29,318,875.29 37,128,469.25
Illinois 0351027 5.15 mi of roadway reconst inc adding lanes, multi-use path, traffic signals lighting etc on IL 7 from Gougar Rd to Will-Cook* 49,078,337.36 67,903,453.66
Illinois 0351028 2.5 mi of rdwy reconst, add lanes, add multi-use path, drainage improvements, signals, lighting, landscaping etc on US6/IL7* 46,548,707.62 61,002,451.05
Illinois 0365012 Wide for add. lanes, reconst. & bridge repl, lndscpng, etc on IL.56 from W.of IL.59 (Joliet Rd.) toE.of Winfield Rd in Wrrnvlle 23,572,903.42 29,936,368.31
Illinois 0373028 2.03 mi of bridge rehab, widening, ramp modification & lighting on IL 171 through Vil of McCook, Lyons & Summit 24,625,889.44 27,402,112.79
Illinois 0556246 2.3 mi of relocate I-55 @ Arsenal Rd. interchange inc new Arsenal bridge, fly-over bridge, lighting, rem exist ** 38,333,919.00 42,594,381.00
Illinois 0557203 STEVENSON EXPWY W DAMEN TO S FORK S.BRANCH, PAVEMENT RECONS & BR REHAB 31,051,347.32 37,488,163.87
Illinois 0591028 Construction of Route 34 Interchange and improvements. 3.65 miles of reconstructing US 34 to 5 lanes inc storm sewers, curb &** 30,158,245.00 38,193,683.00
Illinois 0595034 2.56 mi of pavement reconst. & widening to 6 lanes of IL.5 in Moline from 0.2 mi W.of 38th St. to 0.3 mi E.of 70th St. inc., ** 46,938,191.00 58,759,353.00
Illinois 0698037 0.83 mile of the removal and replacement of the structure carrying IL 89 over the Illinois River located 1 mile south of US 6 in** 35,413,629.00 44,396,158.00
Illinois 0734046 Reconstruction of IL 2 in Rockford 22,954,376.10 34,514,297.23
Illinois 0745305 7.957 mi of repl of bridge carrying IL104 over IL Rvr in Meredosia, bridge rehab, earthwork, lighting, sidewalks, landscaping etc 62,241,919.60 78,036,879.40
Illinois 1279114 5,110' of the removal and replacement of the structure carrying IL 178 over the Illinois River in Utica 22,899,350.00 29,317,862.00