RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Illinois | 000S658 | I-70 - Bridge replacement and new interchange on I-55/70 under IL 162 at Troy in Madison County. | 26,155,295.30 | 27,110,914.46 |
Illinois | 000V127 | 0.72 miles reconstruction/widening of I-290 EB mainline pavmt. from Racine to Congress Parkway (i-9094) retain wall, lighting | 29,610,659.43 | 33,360,580.97 |
Illinois | 0020074 | CREATE - Construction on CREATE project EW1: Plan number EW1-BRC-TSX-001-Z-BD | 0.00 | 58,652,208.00 |
Illinois | 0055410 | 1.11 mi of the reconst. of the outbound structures of I-55 (Stevenson Expy) & US.41 (Lake Shore Dr.) inc 3 curved ramp struct. ** | 69,283,706.73 | 77,150,429.99 |
Illinois | 0055455 | Resurfacing, bridge repairs etc on I-55 through Will, DuPage and Cook Counties | 29,478,421.41 | 33,182,785.81 |
Illinois | 0055475 | 1.0 miles of roadway reconstruction and the removal and replacement of the 3 inbound bridge structures of I-55 & US41, 3 new** | 56,668,039.83 | 63,087,543.96 |
Illinois | 0057309 | Bourbonnais road improvements, Bourbonnais. 1.42 miles of a new structure an interchange on I-57 at 6000N and improvements at** | 46,105,899.29 | 51,787,033.35 |
Illinois | 0057312 | 9.28 mi of milling, rubblizing & 11.75" of HMA resurf, guardrail, striping etc on I-57 from Old IL 13 to Johnson Cty | 26,438,888.53 | 30,285,436.37 |
Illinois | 0064403 | 0.711 mi of proposed bridge & additional lane on I-64 from MLK Bridge EB to I-55/64 WB | 29,321,246.02 | 32,620,141.26 |
Illinois | 0070027 | 6.6 miles of resurfacing, bridge repairs etc. on I 70 in Bond and Madison Counties | 24,288,210.63 | 27,735,905.31 |
Illinois | 0070047 | 9.05 miles of rebbilization/overlay of I-70 - starts at abandoned RR bridge in Altamont to Little Wabash River W of Effingham | 52,618,927.00 | 58,465,475.00 |
Illinois | 0070405 | Appr 9 mi of milling, patching, resurfacing, grdrl & bridge repair on I-70 from 2.5 mi east of I- 55/70 int just west of Prairie Rd | 28,064,642.27 | 31,284,519.13 |
Illinois | 0074324 | 0.5 miles added lanes & ramps, bridge replacement/rehab, lighting & drainage improvements on I-74 from Mississippi River to 7th Ave Moline | 83,228,205.05 | 94,651,112.00 |
Illinois | 0074326 | 2 miles of reconstruction of I-74 starting (7th ave) south to (Avenue in Cities) - within the City of Moline | 84,587,618.00 | 96,169,621.00 |
Illinois | 0075156 | Construct 4 lane ext. of IL.Rte.29 from Rochester to Taylorville - new 4 lanes expressway around Edinburg incl. ** | 34,925,049.85 | 43,952,254.25 |
Illinois | 0080408 | Remove & repl stw structures over Green Rvr, two over BN&SF RR & two over Barstow Rd & resurf from .8 mi N of IL5/IL92 to Henry* | 23,348,529.82 | 26,008,312.21 |
Illinois | 0090401 | Removal & replacement of structure carrying EB I-90 over CTA BLue Line & EB I-90, retaining walls, recons of East River Rd bridge* | 13,634,730.00 | 25,266,246.00 |
Illinois | 0090403 | 2.67 miles of a new lane on I-90 from Cumberland Ave to Harlem Ave in Chicago | 22,925,248.58 | 28,958,658.64 |
Illinois | 0290201 | 0.49 miles of the construction of 2 new WB expressway lanes along I-290 from Peoria to Racine St inc 4 new retaining walls and** | 27,346,416.25 | 33,212,207.99 |
Illinois | 0310139 | 5.5 miles of new 4-lane roadway; Seminary Road to US 67 in Godfrey including grading, paving, box culvert and signing. | 23,502,425.43 | 29,378,031.79 |
Illinois | 0321015 | TIGER PROJECT-US 54, PIKE CO. REPLACE CHAMP CLARK BRIDGE OVER MISSISSIPPI RIVER AT LOUISIANA | 25,182,100.00 | 29,626,000.00 |
Illinois | 0322096 | 4.5 mi of grading, paving, new bridge and an additional lane to an existing bridge on US.51 from 1.4 mi S.of Assumption ** | 22,203,584.77 | 27,764,886.77 |
Illinois | 0326088 | 4.47 mi of addition of 2 or more lanes on IL 47 from N of I-80 in Morris to just N of Sherrill Rd in Kendall Cty inc 32' median * | 34,791,382.00 | 44,185,444.00 |
Illinois | 0326093 | Const. of the US. I-80 to I-88 North-South Connector in Illinois - 7.023 mi of reconst. of IL.47 from 2-4 lanes inc. pvmnt, ** | 37,588,133.34 | 49,842,824.18 |
Illinois | 0330070 | Reconst./widening of 1.64 mi of US.12-45 (Manheim Rd) from IL.19 to I-94 inc. const. of Balmoral Underpass, retaining walls, ** | 35,268,688.40 | 44,468,015.70 |
Illinois | 0330073 | 1.8 miles of reconstruction on US 45 from 143rd St. to 159th St., including signals, culverts, pavement marking, additional** | 20,188,052.73 | 29,964,765.33 |
Illinois | 0330074 | 2.8 miles of additional lanes and roadway reconstruction inc signals, lighting, pavement marking, etc. on US 45 from 159th to** | 24,374,900.08 | 32,592,125.68 |
Illinois | 0331068 | 10.828 of the addition of a new lane to IL 13, a new bridge over IL 13, new frontage rds, etc on IL 13 from 0.2 miles east on** | 20,721,081.24 | 25,921,525.93 |
Illinois | 0332119 | 6.02 miles of the reconstruction of the existing 2-lanes and the addition of two more on US 45 beginning in Eldorado from just** | 20,948,092.99 | 26,195,055.45 |
Illinois | 0338048 | 1.57 miles of roadway reconstruction, resurfacing, lighting, retaining walls, storm sewers, traffic signals, etc. on IL 59** | 28,019,725.03 | 37,895,544.43 |
Illinois | 0341025 | Lakefront Bike Trail: Navy Pier Flyover consisting of new pedestrian bridge, furnishing structural steel, lighting, concrete** | 20,933,600.00 | 28,952,200.00 |
Illinois | 0345056 | 1.33 mi of interchange reconst. on US.20 inc lghtng, traff sgnls, structure work, retaining wall etc from Fleetwood Dr. to ** | 30,568,574.44 | 40,041,517.55 |
Illinois | 0345062 | 1.4 miles of new interchange ramps, flyover bridge structures, retaining walls, noise wall, drainage improvements, lighting, etc** | 29,318,875.29 | 37,128,469.25 |
Illinois | 0351027 | 5.15 mi of roadway reconst inc adding lanes, multi-use path, traffic signals lighting etc on IL 7 from Gougar Rd to Will-Cook* | 49,078,337.36 | 67,903,453.66 |
Illinois | 0351028 | 2.5 mi of rdwy reconst, add lanes, add multi-use path, drainage improvements, signals, lighting, landscaping etc on US6/IL7* | 46,548,707.62 | 61,002,451.05 |
Illinois | 0365012 | Wide for add. lanes, reconst. & bridge repl, lndscpng, etc on IL.56 from W.of IL.59 (Joliet Rd.) toE.of Winfield Rd in Wrrnvlle | 23,572,903.42 | 29,936,368.31 |
Illinois | 0373028 | 2.03 mi of bridge rehab, widening, ramp modification & lighting on IL 171 through Vil of McCook, Lyons & Summit | 24,625,889.44 | 27,402,112.79 |
Illinois | 0556246 | 2.3 mi of relocate I-55 @ Arsenal Rd. interchange inc new Arsenal bridge, fly-over bridge, lighting, rem exist ** | 38,333,919.00 | 42,594,381.00 |
Illinois | 0557203 | STEVENSON EXPWY W DAMEN TO S FORK S.BRANCH, PAVEMENT RECONS & BR REHAB | 31,051,347.32 | 37,488,163.87 |
Illinois | 0591028 | Construction of Route 34 Interchange and improvements. 3.65 miles of reconstructing US 34 to 5 lanes inc storm sewers, curb &** | 30,158,245.00 | 38,193,683.00 |
Illinois | 0595034 | 2.56 mi of pavement reconst. & widening to 6 lanes of IL.5 in Moline from 0.2 mi W.of 38th St. to 0.3 mi E.of 70th St. inc., ** | 46,938,191.00 | 58,759,353.00 |
Illinois | 0698037 | 0.83 mile of the removal and replacement of the structure carrying IL 89 over the Illinois River located 1 mile south of US 6 in** | 35,413,629.00 | 44,396,158.00 |
Illinois | 0734046 | Reconstruction of IL 2 in Rockford | 22,954,376.10 | 34,514,297.23 |
Illinois | 0745305 | 7.957 mi of repl of bridge carrying IL104 over IL Rvr in Meredosia, bridge rehab, earthwork, lighting, sidewalks, landscaping etc | 62,241,919.60 | 78,036,879.40 |
Illinois | 1279114 | 5,110' of the removal and replacement of the structure carrying IL 178 over the Illinois River in Utica | 22,899,350.00 | 29,317,862.00 |