RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Missouri | 0351291 | CLAY CO, CST 19TH ST, NEW INTERCHANGE SOUTH OF RT 92 AT 19TH ST IN KEARNEY | 9,950,000.01 | 29,392,074.18 |
Missouri | 0441102 | NEWTON CO, IS 44, BRIDGE IMPROVEMENTS AT VARIOUS LOCATIONS FROM .9 MI E OF LOOP 49 (RANGE LINE RD) IN JOPLIN TO RT Z IN HALLTOWN | 34,291,450.00 | 36,191,000.00 |
Missouri | 0441106 | WEBSTER CO, IS 44, DB BRIDGE IMPROVE TO BRIDGES IN JASPER, LAWRENCE, GREENE, & WEBSTER COUNTIES & POTENTIAL IMPROVE IN DALLAS COUNTY. | 40,913,700.00 | 43,174,000.00 |
Missouri | 0442332 | PHELPS CO, IS 44, PAVEMENT REBUILD ON THE EB LANES FROM E OF RT 63 TO WEST OF RT 68. | 23,321,073.38 | 25,806,169.59 |
Missouri | 0444188 | IS44 ST LOUIS CO; BRIDGE REPLACEMENT & ADD PED BRIDGE FROM I-270 TO WEST OF MERAMEC RIVER | 51,657,592.76 | 57,192,327.74 |
Missouri | 0471072 | TIGER PROJECT-ROUTE 47, FRANKLIN COUNTY; PROJECT TO REPLACE BRIDGE OVER THE MISSOURI RIVER FROM RTE. 94 TO 5TH STREET IN WASHINGTON, 3.502 MILES | 59,074,351.40 | 73,842,939.25 |
Missouri | 0553101 | ST LOUIS CO, IS 55 N, BRIDGE REHABILITATION FROM N OF LINDBERGH BLVD TO LOUGHBOROUGH AVE AND REMOVE PED BRIDGE AT DAYCARE OVERPASS. | 16,061,702.44 | 31,463,578.72 |
Missouri | 0641061 | IS 64 ST LOUIS CITY CO; MODIFY INTERCHANGE CONFIGURATION BETWEEN 18TH ST AND GARRISON AVE | 20,156,307.02 | 33,327,887.12 |
Missouri | 0641070 | RT I-64 ST LOUIS CO; BRIDGE & RAMP IMPROVEMENTS ON THE POPLAR STREET BRIDGE; 0.52 MI | 30,372,936.54 | 39,255,566.12 |
Missouri | 0701202 | IS 70, JACKSON CO. INTERCHANGE IMPROVEMENTS AT I-435. 1.657 MI | 47,773,349.96 | 52,242,819.29 |
Missouri | 0703275 | INFRA DB, IS 70, COOPER CO; BRIDGE REPLACEMENT OVER THE MISSOURI RIVER NEAR ROCHEPORT | 78,400,000.00 | 241,992,015.14 |
Missouri | 0704204 | ST CHARLES CO, MO 364, BRIDGE REHABILITATION ON BLANCHETTE BRIDGE OVER THE MO RIVER. | 32,886,587.35 | 36,473,517.50 |
Missouri | 0711063 | BUILD - IS 49, MCDONALD CO, CONSTRUCT NEW INTERSTATE ROADWAY TO COMPLETE I-49 FROM PINEVILLE TO THE ARKANSAS STATE LINE (BELLA VISTA) | 56,990,552.35 | 64,988,190.44 |
Missouri | 1001070 | MO 100, ST LOUIS CO; UPGRADE PED FACILITY TO COMPLY WITH ADA PLAN & PVMT RESURFACING FROM RT 61 TO BID BEND BLVD, BRIDGE REPLACEMENT OVER BLACK CREEK, | 25,165,574.97 | 31,178,003.87 |
Missouri | 1411029 | ARRA ROUTE 141, ST LOUIS COUNTY, RELOCATE/CONSTRUCT RTE 141 FROM RTE 40 TO RTE 340. 2.707 MI | 80,135,256.80 | 87,357,366.09 |
Missouri | 1691117 | BUILD, JACKSON CO, US 169 N, DESIGN BUILD, BRIDGE REPLACEMENT OF BUCK O'NEIL BRIDGE OVER MO RIVER & BRIDGE/RD IMPROVEMENTS RICHARDS RD TO 12 ST IN KC | 174,604,800.00 | 257,879,000.00 |
Missouri | 2553052 | IS 255, ST LOUIS CO; BRIDGE REHABILITATION AT THE MISSISSIPPI RIVER (JEFFERSON BARRACKS BR) | 24,550,562.37 | 26,129,303.62 |
Missouri | 2705352 | DESIGN-BUILD, IS 270, ST LOUIS CO, PAVE & BRIDGE IMPROVE ON THE I-270 NORTH CORRIDOR ON DISCONNECTED SECTIONS IN NORTH CO. | 231,926,622.97 | 280,604,846.28 |
Missouri | 3641035 | RTE 364, ST CHARLES CO, PAGE AVE EXTENSION FROM MID RIVERS MALL DR TO I-64, 0.00 MI | 87,837,196.90 | 119,795,120.00 |
Missouri | 4351316 | RT 435, JACKSON CO, DESIGN-BUILD PROJECT - BRIDGE, PAVEMENT AND CORRIDOR IMPROVEMENTS FROM THE KS STATE LINE TO 1-49 | 68,338,139.86 | 72,018,766.51 |
Missouri | 4351323 | IS 435, CLAY CO, BRIDGE DECK REPLACEMENT AT THE MISSOURI RIVER. | 32,855,524.66 | 36,484,397.54 |
Missouri | 5901816 | DB, BUILD GRANT, GREENE CO, CITY OF SPRINGFIELD, RECONSTRUCT MULTI-USE PATH ALONG GRANT AVE. PARKWAY FROM DOWNTOWN TO SUNSHINE ST. | 20,960,822.00 | 31,525,000.00 |
Missouri | 5909802 | GREENE CO; PUBLIC IMPROVEMENTS FOR THE EXTENSION OF KANSAS EXPRESSWAY FROM REPUBLIC RD TO THE FUTURE EAST/WEST ARTERIAL. | 24,679,487.88 | 30,849,359.83 |
Missouri | ES06017 | ARRA ST LOUIS COUNTY DESIGN BUILD MARYLAND HTS EXPRESSWAY CONNECTOR FROM MO 364 TO MO 340; 2.5 MILES; NEW 4-LN FREEWAY | 20,000,000.00 | 67,157,689.19 |
Missouri | P201004 | PREVENTATIVE MAINTENANCE - ASPHALT PVMT REPAIR ON VARIOUS RTES IN VARIOUS COUNTIES (STATEWIDE) | 22,844,653.61 | 28,555,817.01 |
Missouri | S102026 | CHBP, VARIOUS, VARIOUS, BRIDGE REPLACEMENTS AT VARIOUS LOCATIONS IN THE NORTHEAST AND NORTHWEST DISTRICT | 20,794,000.00 | 25,992,500.00 |
Missouri | S201001 | TIGER PROJECT-US 54, PIKE CO, REPLACE CHAMP CLARK BRIDGE OVER MISSISSIPPI RIVER AT LOUISIANA. | 32,701,933.81 | 36,846,104.77 |
Missouri | S502015 | DB OR 70,ST CHARLES;CORRIDOR IMPROVEMENTS FROM CAVE SPRINGS BLVD TO FAIRGROUNDS RD;BRIDGE REHAB OVER I-70 @ZUBEHL & CAVE SPRINGS & MODIFY INTERCHANGE | 31,607,026.35 | 62,782,249.75 |
Missouri | S602025 | MO 86, TANEY CO, BRIDGE REPLACEMENT OVER TABLE ROCK LAKE | 35,127,628.72 | 41,561,988.74 |
Missouri | S703077 | DESIGN-BUILD,BOLLINGER CO, MO 51, BRIDGE REPLACEMENT OVER DRAINAGE DITCH #65 & CASTOR RIVER OVERFLOW AND BRIDGE IMPRVMTS OVER VARIOUS DRAINAGE DITCHES | 21,694,550.00 | 25,523,000.00 |