Montana | 0002923 | US 93 2008 ISSUANCE (OT) Missoula District, Financing of the US 93 Corridor reconstruction | 52,588,212.57 | 65,802,428.53 |
Montana | 0017044 | LOHMAN-E & W (CN & CE) National Highway 1, Blaine County, Reconstruct the roadway and structure work from reference point 393.1 to 403.5 | 31,726,343.26 | 34,643,310.00 |
Montana | 0041061 | ROCKVALE-LAUREL 2 LANES (CN & CE) National Highway 4, Multiple counties, Reconstruct the roadway from reference point 42.5 to 52.5 | 28,051,485.59 | 29,936,601.00 |
Montana | 0056089 | BBP-YELLOWSTONE RIVER (IC, CN & CE) Yellowstone County, Construction of a new roadway and structure | 35,354,625.27 | 38,900,891.00 |
Montana | 0084066 | TOSTON STRUCTURES US-287 (CN & CE) National Highway 8, Broadwater County, Reconstruction from reference point 85.7 to 89.5 | 35,922,160.80 | 38,295,477.54 |
Montana | 0152113 | RARUS/SILVER BOW CR STRUCTURES (CN & CE) Multiple routes, Silver Bow County, Reconstruction of the roadway and structure work at various locations | 30,301,889.55 | 31,452,990.38 |
Montana | 0908173 | WEST LAUREL INTCH-WEST PHASE 1 (CN & CE) Multiple routes, Yellowstone County, Reconstruction of the existing roadway at various locations | 26,914,416.03 | 28,455,049.87 |
Montana | 0908177 | I-90 YELLOWSTONE R-BILLINGS (CN & CE) Multiple routes, Yellowstone County, Reconstruct the roadway and replace structures at various locations | 73,852,215.33 | 85,063,431.56 |