U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Montana

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Montana 0002923 US 93 2008 ISSUANCE (OT) Missoula District, Financing of the US 93 Corridor reconstruction 52,588,212.57 65,802,428.53
Montana 0017044 LOHMAN-E & W (CN & CE) National Highway 1, Blaine County, Reconstruct the roadway and structure work from reference point 393.1 to 403.5 31,726,343.26 34,643,310.00
Montana 0041061 ROCKVALE-LAUREL 2 LANES (CN & CE) National Highway 4, Multiple counties, Reconstruct the roadway from reference point 42.5 to 52.5 28,051,485.59 29,936,601.00
Montana 0056089 BBP-YELLOWSTONE RIVER (IC, CN & CE) Yellowstone County, Construction of a new roadway and structure 35,354,625.27 38,900,891.00
Montana 0084066 TOSTON STRUCTURES US-287 (CN & CE) National Highway 8, Broadwater County, Reconstruction from reference point 85.7 to 89.5 35,922,160.80 38,295,477.54
Montana 0152113 RARUS/SILVER BOW CR STRUCTURES (CN & CE) Multiple routes, Silver Bow County, Reconstruction of the roadway and structure work at various locations 30,301,889.55 31,452,990.38
Montana 0908173 WEST LAUREL INTCH-WEST PHASE 1 (CN & CE) Multiple routes, Yellowstone County, Reconstruction of the existing roadway at various locations 26,914,416.03 28,455,049.87
Montana 0908177 I-90 YELLOWSTONE R-BILLINGS (CN & CE) Multiple routes, Yellowstone County, Reconstruct the roadway and replace structures at various locations 73,852,215.33 85,063,431.56