U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Nevada

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Nevada 0003139 I15 / CC215 BELTWAY INTERCHANGE: PE/ROW 116,584,912.60 136,198,336.00
Nevada 0003158 NORTH 5TH ST FM LOSEE RD TO CHEYENNE AVE. WIDEN TO 4 LANES WITH GRADE SEPARATION OVER LOSEE RD. PE/RW/CONSTRUCTION 30,148,750.00 31,735,527.00
Nevada 0003231 LAUGHLIN TO BULLHEAD CITY BRIDGE, CLARK CO., FROM MOHAVE VALLEY HWY TO NEEDLES HWY. OFF SYSTEM 18,190,998.67 51,787,335.00
Nevada 0017003 LV SO BELTWAY (I-215) FM STEPHANIE TO I-515, PE, ROWA utilities/acquisition, construction. Construct system interchange & roadway. 90,686,811.67 131,470,387.37
Nevada 0151134 I15 NORTH OF US95/I515 TO CRAIG ROAD WIDEN FM 6 TO 10 LANES FROM US 95/I515 TO LAKE MEAD BLVD: WIDEN 8 TO 10 FM LAKE MEAD TO CRAIG 77,981,027.00 259,704,838.00
Nevada 0151146 I 15 CACTUS AVE IN LAS VEGAS NEVADA. CONSTRUCT NEW INTERCHANGE. PE/ROW/CONSTRUCTION 59,402,861.98 63,081,090.29
Nevada 0151150 I 15 AT STARR AVENUE / PE AND RW FOR NEW INTERCHANGE. 12,755,741.45 60,043,179.31
Nevada 0151155 I 15/ US 95 NEON DESIGN BUILD, SAHARA AVE. TO US 95 INTERCHANGE 95,262,083.47 667,221,824.00
Nevada 0151158 I 15, CLARK COUNTY, GARNET INTERCHANGE @ US 93 MP CL 64.29 US 93 FROM MP CL 52.00 TO MP CL 57.00 70,255,946.00 80,634,198.00
Nevada 0151161 I 15, LAS VEGAS, AT TROPICANA AVE INTERCHANGE; I 15 AT HARMON AVENUE OVERPASS; ACTIVE TRAFFIC MANAGEMENT FROM TROPICANA TO WARM SPRINGS ROAD 109,850,000.00 243,000,000.00
Nevada 0151162 I 15 NORTH, CLARK COUNTY, FROM SPEEDWAY TO APEX (PHASE 3) MP CL 53.61 TO MP CL 58.38 41,337,229.00 43,512,872.00
Nevada 0151163 I 15 NORTH, CLARK COUNTY, FROM APEX TO GARNET (PHASE 3) MP CL 58.38 TO MP CL 64.28 42,550,840.00 44,790,356.00
Nevada 0152047 I 15, CLARK COUNTY, IN MESQUITE FROM 1.677 MI NORTH OF THE LOGANDALE/OVERTON INTERCHANGE TO 0.370 MI NORTH OF LOWER FLAT TOP DR; SB MP CL 95.559 TO MP 36,984,258.00 38,930,797.00
Nevada 0445011 SR 445 PYRAMID HIGHWAY FROM TYLER TO 0.23MN OF QUEEN WAY. PE/ROW/CONSTRUCTION 54,210,785.20 60,938,175.00
Nevada 0502016 US 50, LYON COUNTY, FROM ROY'S ROAD TO THE JUNCTION WITH US 95A. MP LY 19.90 TO LY 29.44 57,595,639.46 60,917,455.00
Nevada 0802057 I 80, PERSHING COUNTY, FROM 2.28 MILES EAST OF COAL CANYON INTERCHANGE TO 1.69 MILES EAST OF HUMBOLDT INTERCHANGE. MP PE 26.15 TO MP PE 51.30 26,925,231.00 28,342,349.00
Nevada 0804097 I 80, EUREKA COUNTY, AT EMIGRANT PASS 10,332,245.00 28,343,063.00
Nevada 0804101 I 80, ELKO COUNTY, FROM 0.932 MILES WEST OF OSINO INTERCHANGE TO 0.611 MILES EAST OF GRAYS CREEK; MP EL 31.980 TO MP EL 61.966 27,590,461.00 29,042,590.00
Nevada 0805041 I80 1.04 MI E OF MOOR INTRCHG TO 1.87 MI E OF OASIS INTRCHG. PE/ROW 37,297,334.88 39,293,353.00
Nevada 0931008 US93 From the Hoover Dam Interchange Bridge to 1 MS of the Junction of US95/ US93. Hoover Dam Bypass - Boulder Extension. 243,423,385.21 282,838,892.03
Nevada 0931013 US 93 BOULDER CITY BYPASS PART 1, PACKAGE 3 FROM SILVERLINE TO FOOTHILL ROAD. CL 16.35 TO CL 14.72 82,745,184.00 128,678,039.00
Nevada 0952037 US95 AT RAINBOW CURVE (PHASES 2C & 2D). CONSTRUCTION 44,561,874.41 47,835,106.00
Nevada 0952039 US 95 FM MARTIN LUTHER KING TO VALLEY VIEW BLVD. CONSTRUCTION 64,943,610.66 68,551,694.71
Nevada 0952043 US 95 from East of Valley View to Rainbow Interchange (Phase 4B/5). Construction 95,112,193.73 106,034,709.00
Nevada 0952060 US95 FM ANN RD TO DURANGO DR. PACKAGE 2A. CONSTRUCTION 36,889,966.94 40,324,880.55
Nevada 0952062 US 95, LAS VEGAS, FROM ANN ROAD TO KYLE CANYON ROAD MP CL 86.75 TO MP CL 92.70 PACKAGE 2B/5 42,356,460.00 77,979,339.00
Nevada 0952064 US 95 NW CORRIDOR PHASE 3C AT MP 88 AND CC 215 FROM GRAND MONTECITO TO TENAYA WAY. MP 88 AND CC 215 37-39. 18,391,964.00 80,030,703.00
Nevada 0952065 US 95 NW PHASE 3D, MP 88 AND CC215 FROM GRAND MONTECITO TO TENAYA, MP CL 37-39 AND US 95 AT LONE MOUNTAIN MP CL 85.6 88,634,108.00 155,193,795.00
Nevada 0953013 US 95 FROM 12.16 MILES NORTH OF BEATTY TO 3.67 MILES SOUTH OF THE NY/ES COUNTY LINE. NY 72.036 TO NY 103.552 10,967,999.00 30,487,331.00
Nevada 1601028 SR 160, BLUE DIAMOND ROAD, CLARK CO. FROM THE WEST EDGE OF MOUNTAIN SPRINGS COMMUNITY TO THE BEGINNING OF MOUNTAINOUS AREA MP CL 16.51 TO MP CL 22.20 39,197,146.00 46,971,122.00
Nevada 1601029 SR 160 BLUE DIAMOND RD, CLARK COUNTY, FROM 1.03 MILES NORTH OF MOUNTAIN SPRINGS SUMMIT TO CL/NY CO. LINE (EASTBOUND ONLY) MP CL 21.960 TO MP NY 0.950 21,317,123.00 25,262,492.00
Nevada 2151004 I-215 Southern Beltway/Airport Connector; I-215 from I-15 to Windmill Lane. Phase 2. Construction 35,855,000.00 71,680,000.00
Nevada 3951015 US 395 FM US 50 EAST TO LAKEVIEW INTERCHANGE PHASE 1B Construct a 4 lane controlled access freeway. Construction. 86,183,570.00 103,271,106.00
Nevada 3951018 US 395, CARSON FREEWAY PHASE 2A: CONSTRUCTION. 54,758,708.87 58,317,204.81
Nevada 3951027 US395 Carson City Fwy fm So Carson St to Fairview Dr. Pkg 2B-3. Construction. 52,974,150.00 55,881,653.00
Nevada 5151040 I 515/US 95, LAS VEGAS, FROM EASTERN AVENUE TO LAS VEGAS SPAGHETTI BOWL, MP CL 73.35 TO MP CL 75.66 32,556,338.00 34,269,830.00
Nevada 5801023 I580 FM WINTERS RANCH TO NR MOUNT ROSE HWY structures at Corey Canyon, Browns Creek, St.James Parkway and Galena Creek. 63,573,324.63 75,881,582.00
Nevada 5801025 I-580 Freeway Near Winters Ranch to Near Mt. Rose Highway - Package B. Construction 341,504,146.20 443,275,930.01