RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Nevada | 0003139 | I15 / CC215 BELTWAY INTERCHANGE: PE/ROW | 116,584,912.60 | 136,198,336.00 |
Nevada | 0003158 | NORTH 5TH ST FM LOSEE RD TO CHEYENNE AVE. WIDEN TO 4 LANES WITH GRADE SEPARATION OVER LOSEE RD. PE/RW/CONSTRUCTION | 30,148,750.00 | 31,735,527.00 |
Nevada | 0003231 | LAUGHLIN TO BULLHEAD CITY BRIDGE, CLARK CO., FROM MOHAVE VALLEY HWY TO NEEDLES HWY. OFF SYSTEM | 18,190,998.67 | 51,787,335.00 |
Nevada | 0017003 | LV SO BELTWAY (I-215) FM STEPHANIE TO I-515, PE, ROWA utilities/acquisition, construction. Construct system interchange & roadway. | 90,686,811.67 | 131,470,387.37 |
Nevada | 0151134 | I15 NORTH OF US95/I515 TO CRAIG ROAD WIDEN FM 6 TO 10 LANES FROM US 95/I515 TO LAKE MEAD BLVD: WIDEN 8 TO 10 FM LAKE MEAD TO CRAIG | 77,981,027.00 | 259,704,838.00 |
Nevada | 0151146 | I 15 CACTUS AVE IN LAS VEGAS NEVADA. CONSTRUCT NEW INTERCHANGE. PE/ROW/CONSTRUCTION | 59,402,861.98 | 63,081,090.29 |
Nevada | 0151150 | I 15 AT STARR AVENUE / PE AND RW FOR NEW INTERCHANGE. | 12,755,741.45 | 60,043,179.31 |
Nevada | 0151155 | I 15/ US 95 NEON DESIGN BUILD, SAHARA AVE. TO US 95 INTERCHANGE | 95,262,083.47 | 667,221,824.00 |
Nevada | 0151158 | I 15, CLARK COUNTY, GARNET INTERCHANGE @ US 93 MP CL 64.29 US 93 FROM MP CL 52.00 TO MP CL 57.00 | 70,255,946.00 | 80,634,198.00 |
Nevada | 0151161 | I 15, LAS VEGAS, AT TROPICANA AVE INTERCHANGE; I 15 AT HARMON AVENUE OVERPASS; ACTIVE TRAFFIC MANAGEMENT FROM TROPICANA TO WARM SPRINGS ROAD | 109,850,000.00 | 243,000,000.00 |
Nevada | 0151162 | I 15 NORTH, CLARK COUNTY, FROM SPEEDWAY TO APEX (PHASE 3) MP CL 53.61 TO MP CL 58.38 | 41,337,229.00 | 43,512,872.00 |
Nevada | 0151163 | I 15 NORTH, CLARK COUNTY, FROM APEX TO GARNET (PHASE 3) MP CL 58.38 TO MP CL 64.28 | 42,550,840.00 | 44,790,356.00 |
Nevada | 0152047 | I 15, CLARK COUNTY, IN MESQUITE FROM 1.677 MI NORTH OF THE LOGANDALE/OVERTON INTERCHANGE TO 0.370 MI NORTH OF LOWER FLAT TOP DR; SB MP CL 95.559 TO MP | 36,984,258.00 | 38,930,797.00 |
Nevada | 0445011 | SR 445 PYRAMID HIGHWAY FROM TYLER TO 0.23MN OF QUEEN WAY. PE/ROW/CONSTRUCTION | 54,210,785.20 | 60,938,175.00 |
Nevada | 0502016 | US 50, LYON COUNTY, FROM ROY'S ROAD TO THE JUNCTION WITH US 95A. MP LY 19.90 TO LY 29.44 | 57,595,639.46 | 60,917,455.00 |
Nevada | 0802057 | I 80, PERSHING COUNTY, FROM 2.28 MILES EAST OF COAL CANYON INTERCHANGE TO 1.69 MILES EAST OF HUMBOLDT INTERCHANGE. MP PE 26.15 TO MP PE 51.30 | 26,925,231.00 | 28,342,349.00 |
Nevada | 0804097 | I 80, EUREKA COUNTY, AT EMIGRANT PASS | 10,332,245.00 | 28,343,063.00 |
Nevada | 0804101 | I 80, ELKO COUNTY, FROM 0.932 MILES WEST OF OSINO INTERCHANGE TO 0.611 MILES EAST OF GRAYS CREEK; MP EL 31.980 TO MP EL 61.966 | 27,590,461.00 | 29,042,590.00 |
Nevada | 0805041 | I80 1.04 MI E OF MOOR INTRCHG TO 1.87 MI E OF OASIS INTRCHG. PE/ROW | 37,297,334.88 | 39,293,353.00 |
Nevada | 0931008 | US93 From the Hoover Dam Interchange Bridge to 1 MS of the Junction of US95/ US93. Hoover Dam Bypass - Boulder Extension. | 243,423,385.21 | 282,838,892.03 |
Nevada | 0931013 | US 93 BOULDER CITY BYPASS PART 1, PACKAGE 3 FROM SILVERLINE TO FOOTHILL ROAD. CL 16.35 TO CL 14.72 | 82,745,184.00 | 128,678,039.00 |
Nevada | 0952037 | US95 AT RAINBOW CURVE (PHASES 2C & 2D). CONSTRUCTION | 44,561,874.41 | 47,835,106.00 |
Nevada | 0952039 | US 95 FM MARTIN LUTHER KING TO VALLEY VIEW BLVD. CONSTRUCTION | 64,943,610.66 | 68,551,694.71 |
Nevada | 0952043 | US 95 from East of Valley View to Rainbow Interchange (Phase 4B/5). Construction | 95,112,193.73 | 106,034,709.00 |
Nevada | 0952060 | US95 FM ANN RD TO DURANGO DR. PACKAGE 2A. CONSTRUCTION | 36,889,966.94 | 40,324,880.55 |
Nevada | 0952062 | US 95, LAS VEGAS, FROM ANN ROAD TO KYLE CANYON ROAD MP CL 86.75 TO MP CL 92.70 PACKAGE 2B/5 | 42,356,460.00 | 77,979,339.00 |
Nevada | 0952064 | US 95 NW CORRIDOR PHASE 3C AT MP 88 AND CC 215 FROM GRAND MONTECITO TO TENAYA WAY. MP 88 AND CC 215 37-39. | 18,391,964.00 | 80,030,703.00 |
Nevada | 0952065 | US 95 NW PHASE 3D, MP 88 AND CC215 FROM GRAND MONTECITO TO TENAYA, MP CL 37-39 AND US 95 AT LONE MOUNTAIN MP CL 85.6 | 88,634,108.00 | 155,193,795.00 |
Nevada | 0953013 | US 95 FROM 12.16 MILES NORTH OF BEATTY TO 3.67 MILES SOUTH OF THE NY/ES COUNTY LINE. NY 72.036 TO NY 103.552 | 10,967,999.00 | 30,487,331.00 |
Nevada | 1601028 | SR 160, BLUE DIAMOND ROAD, CLARK CO. FROM THE WEST EDGE OF MOUNTAIN SPRINGS COMMUNITY TO THE BEGINNING OF MOUNTAINOUS AREA MP CL 16.51 TO MP CL 22.20 | 39,197,146.00 | 46,971,122.00 |
Nevada | 1601029 | SR 160 BLUE DIAMOND RD, CLARK COUNTY, FROM 1.03 MILES NORTH OF MOUNTAIN SPRINGS SUMMIT TO CL/NY CO. LINE (EASTBOUND ONLY) MP CL 21.960 TO MP NY 0.950 | 21,317,123.00 | 25,262,492.00 |
Nevada | 2151004 | I-215 Southern Beltway/Airport Connector; I-215 from I-15 to Windmill Lane. Phase 2. Construction | 35,855,000.00 | 71,680,000.00 |
Nevada | 3951015 | US 395 FM US 50 EAST TO LAKEVIEW INTERCHANGE PHASE 1B Construct a 4 lane controlled access freeway. Construction. | 86,183,570.00 | 103,271,106.00 |
Nevada | 3951018 | US 395, CARSON FREEWAY PHASE 2A: CONSTRUCTION. | 54,758,708.87 | 58,317,204.81 |
Nevada | 3951027 | US395 Carson City Fwy fm So Carson St to Fairview Dr. Pkg 2B-3. Construction. | 52,974,150.00 | 55,881,653.00 |
Nevada | 5151040 | I 515/US 95, LAS VEGAS, FROM EASTERN AVENUE TO LAS VEGAS SPAGHETTI BOWL, MP CL 73.35 TO MP CL 75.66 | 32,556,338.00 | 34,269,830.00 |
Nevada | 5801023 | I580 FM WINTERS RANCH TO NR MOUNT ROSE HWY structures at Corey Canyon, Browns Creek, St.James Parkway and Galena Creek. | 63,573,324.63 | 75,881,582.00 |
Nevada | 5801025 | I-580 Freeway Near Winters Ranch to Near Mt. Rose Highway - Package B. Construction | 341,504,146.20 | 443,275,930.01 |