RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
New Mexico | 0254078 | ALBUQUERQUE, I-40/I-25 SYSTEM INTERCH. CONS. | 128,379,620.95 | 393,790,943.26 |
New Mexico | 0261011 | NM 26 PAVEMENT AND BRIDGE REHAB | 5,823,963.83 | 29,997,767.77 |
New Mexico | 0401117 | INTERSTATE 40 WEST OF GALLUP SEG. 1 | 25,354,332.82 | 38,792,786.27 |
New Mexico | 0402073 | I-40, M.P. 117 TO M.P. 122.5 | 17,364,284.79 | 28,542,736.35 |
New Mexico | 0403144 | I-40 COORS INTERCHANGE | 106,160,056.98 | 170,948,981.23 |
New Mexico | 0403147 | I-40, MP 177.15 TO MP 181.66 | 22,802,030.34 | 35,115,658.89 |
New Mexico | 0403150 | I 4O TO NM 14 | 29,255,466.73 | 43,244,497.54 |
New Mexico | 0403155 | San Mateo I-40 Interchange, 160.73 MP TO 162.17 MP | 37,825,706.06 | 52,397,258.61 |
New Mexico | 0403157 | I-40 SAN MATEO TO PENNSYLVANIA STREET | 16,666,554.03 | 32,678,321.95 |
New Mexico | 0403165 | RECONSTRUCTION I-40, WEST CENTRAL TO 98TH ST. | 6,792,005.38 | 25,488,748.62 |
New Mexico | 0403187 | I-40, MP 173.73 TO MP 177.11 | 22,135,895.10 | 27,597,341.05 |
New Mexico | 0405072 | RECONSTRUCTION - NO ADDED CAPACITY I-40, MP 308 TO MP 313.87 | 10,891,793.83 | 31,668,269.74 |
New Mexico | 0541031 | 6.5 MI N ORO GRANDE - N., MAJOR WIDENING | 19,284,011.58 | 57,935,981.98 |
New Mexico | 0542027 | US 54, FROM MP 94.23 TO MP 107.1, TULAROSA TO VAUGHN, RECONSTRUCTION | 19,132,359.87 | 29,311,759.98 |
New Mexico | 0644027 | US 64, DULCE TO LUMBERTON | 18,073,522.30 | 30,091,320.66 |
New Mexico | 0702023 | US 70 INTERCHANGE, I-25 TO INT-E., CONS. DESIGN, R/W, RECONS.,CMGT | 7,737,936.17 | 33,904,153.58 |
New Mexico | 0702031 | 1.4 MI. E I-25 INTERCHANGE - E., RECONSTRUCTION W/ADDED CAPACITY | 8,628,772.24 | 30,346,255.45 |
New Mexico | 0702032 | T.4 MI E I-25 INTERCHANGE-E., RECONSTRUCTION | 14,392,134.76 | 37,008,916.81 |
New Mexico | 0704035 | US 70, Hondo Valley, Design Build Project | 39,412,219.57 | 139,602,150.50 |
New Mexico | 0846078 | ALAMO DRIVE TO OPERA/FLEA MARKET, RECONSTRUCTION | 33,651,554.87 | 81,877,166.70 |
New Mexico | 1101021 | I-25 ROADWAY RECONSTRUCTION | 23,975,947.42 | 28,070,266.38 |
New Mexico | 2100554 | US-54-P, FROM MP 72 TO MP 78.2, BETWEEN US 54/ US 70 INTERSECTION AT THE BYPASS TO TULAROSA, ROADWAY RECONSTRUCTION AND DRAINAGE | 31,742,002.28 | 37,157,067.08 |
New Mexico | 2101381 | Downtown Lovington Construction Phase I | 22,115,848.08 | 25,915,075.24 |
New Mexico | 2101771 | US-82-P, FROM MP 107.4 TO MP 139.1, NOT SPECIFIED, ROADWAY CONSTRUCTION | 44,242,000.33 | 76,375,310.51 |
New Mexico | 2102160 | US-285-P, FROM MP 0 TO MP 22, FROM TX STATE LINE TO LOVING, PHASE 1A/1B ALIGNMENT AND GEOTECHNICAL STUDY, PHASE 1C ENVIRONMENTAL, AND PHASE 1D PRELIMI | 6,401,802.98 | 55,388,334.33 |
New Mexico | 2102163 | US 285 Corridor Construction Phase IV | 12,590,456.26 | 35,858,395.31 |
New Mexico | 4100401 | US-54-P, FROM MP 324.9 TO MP 326.3, 22.1 MILES NORTH OF JCT. LOOP 36 - EAST, BRIDGE REPLACEMENT | 22,034,614.45 | 25,934,468.79 |
New Mexico | 5100750 | NM 68, US 64 FROM LA POSTA RD. NORTH TO CAMINO DE LA PLACITAS (NORTH) IN THE TOWN OF TAOS -, ALIGNMENT STUDY | 19,362,124.57 | 30,672,054.87 |
New Mexico | 6100780 | 41.846 MILES NORTH OF I-40 ON US491 BEGINNING IN GALLUP, NM | 10,764,292.11 | 27,999,763.78 |
New Mexico | 6100783 | US 491, FROM MP15.116 TO MP 36.984, 15 MILES NORTH OF I40, RECONSTRUCTION WITH ADDED CAPACITY | 11,507,920.54 | 92,931,191.71 |
New Mexico | 6101181 | I-40 Concrete Wall Barrier Project near Laguna | 9,151,784.08 | 27,219,507.55 |
New Mexico | A300160 | T/LPA-SUNPORT BLVD EXTENSION-FROM BROADWAY TO I-25 EXIT 221 AT SUNPORT BLVD.CONSTRUCT NEW 4 LANE DIVIDED FACILITY WITH BIKE LANES | 23,705,527.00 | 28,152,339.20 |
New Mexico | A300280 | I-25, MP 221.62 TO MP 222.02, RECONSTRUCT INTERCHANGE WITH POSSIBLE CHANGES IN CONFIGURATION | 50,566,726.25 | 64,791,085.58 |
New Mexico | A300381 | NM 528, FROM MP 8.32 TO MP 9.79, NM 528 RIO RANCHO BLVD IMPROVEMENTS (UPPER SECTION) - FROM RIDGECREST DR/LEON GRANDE AVE | 30,417,883.27 | 35,733,197.06 |
New Mexico | A301234 | US0550, FROM MP .6 TO MP 3, US 550 CONSTRUCTION & WIDENING PHASE 2 - FROM MP.6 TO MP 3.0, ROW PURCHASE, | 26,563,226.73 | 34,906,879.10 |
New Mexico | LC00160 | NM 188, from MP 1.4 to MP 3, Valley Drive from Avenida De Mesilla to City Limits, Phase A/B, C Phase I-D & ll | 17,342,361.09 | 30,757,579.23 |
New Mexico | LC00250 | I00025, FROM MP 1 TO MP 2, UNIVERSITY INTERCHANGE, BRIDGE REPLACEMENT, RAMP MODIFICATIONS/RECONSTRUCTION, ROADWAY RECONSTRUCTION, AND EXTENSION OF MUL | 35,504,560.03 | 42,639,340.42 |