U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
New Mexico

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
New Mexico 0254078 ALBUQUERQUE, I-40/I-25 SYSTEM INTERCH. CONS. 128,379,620.95 393,790,943.26
New Mexico 0261011 NM 26 PAVEMENT AND BRIDGE REHAB 5,823,963.83 29,997,767.77
New Mexico 0401117 INTERSTATE 40 WEST OF GALLUP SEG. 1 25,354,332.82 38,792,786.27
New Mexico 0402073 I-40, M.P. 117 TO M.P. 122.5 17,364,284.79 28,542,736.35
New Mexico 0403144 I-40 COORS INTERCHANGE 106,160,056.98 170,948,981.23
New Mexico 0403147 I-40, MP 177.15 TO MP 181.66 22,802,030.34 35,115,658.89
New Mexico 0403150 I 4O TO NM 14 29,255,466.73 43,244,497.54
New Mexico 0403155 San Mateo I-40 Interchange, 160.73 MP TO 162.17 MP 37,825,706.06 52,397,258.61
New Mexico 0403157 I-40 SAN MATEO TO PENNSYLVANIA STREET 16,666,554.03 32,678,321.95
New Mexico 0403165 RECONSTRUCTION I-40, WEST CENTRAL TO 98TH ST. 6,792,005.38 25,488,748.62
New Mexico 0403187 I-40, MP 173.73 TO MP 177.11 22,135,895.10 27,597,341.05
New Mexico 0405072 RECONSTRUCTION - NO ADDED CAPACITY I-40, MP 308 TO MP 313.87 10,891,793.83 31,668,269.74
New Mexico 0541031 6.5 MI N ORO GRANDE - N., MAJOR WIDENING 19,284,011.58 57,935,981.98
New Mexico 0542027 US 54, FROM MP 94.23 TO MP 107.1, TULAROSA TO VAUGHN, RECONSTRUCTION 19,132,359.87 29,311,759.98
New Mexico 0644027 US 64, DULCE TO LUMBERTON 18,073,522.30 30,091,320.66
New Mexico 0702023 US 70 INTERCHANGE, I-25 TO INT-E., CONS. DESIGN, R/W, RECONS.,CMGT 7,737,936.17 33,904,153.58
New Mexico 0702031 1.4 MI. E I-25 INTERCHANGE - E., RECONSTRUCTION W/ADDED CAPACITY 8,628,772.24 30,346,255.45
New Mexico 0702032 T.4 MI E I-25 INTERCHANGE-E., RECONSTRUCTION 14,392,134.76 37,008,916.81
New Mexico 0704035 US 70, Hondo Valley, Design Build Project 39,412,219.57 139,602,150.50
New Mexico 0846078 ALAMO DRIVE TO OPERA/FLEA MARKET, RECONSTRUCTION 33,651,554.87 81,877,166.70
New Mexico 1101021 I-25 ROADWAY RECONSTRUCTION 23,975,947.42 28,070,266.38
New Mexico 2100554 US-54-P, FROM MP 72 TO MP 78.2, BETWEEN US 54/ US 70 INTERSECTION AT THE BYPASS TO TULAROSA, ROADWAY RECONSTRUCTION AND DRAINAGE 31,742,002.28 37,157,067.08
New Mexico 2101381 Downtown Lovington Construction Phase I 22,115,848.08 25,915,075.24
New Mexico 2101771 US-82-P, FROM MP 107.4 TO MP 139.1, NOT SPECIFIED, ROADWAY CONSTRUCTION 44,242,000.33 76,375,310.51
New Mexico 2102160 US-285-P, FROM MP 0 TO MP 22, FROM TX STATE LINE TO LOVING, PHASE 1A/1B ALIGNMENT AND GEOTECHNICAL STUDY, PHASE 1C ENVIRONMENTAL, AND PHASE 1D PRELIMI 6,401,802.98 55,388,334.33
New Mexico 2102163 US 285 Corridor Construction Phase IV 12,590,456.26 35,858,395.31
New Mexico 4100401 US-54-P, FROM MP 324.9 TO MP 326.3, 22.1 MILES NORTH OF JCT. LOOP 36 - EAST, BRIDGE REPLACEMENT 22,034,614.45 25,934,468.79
New Mexico 5100750 NM 68, US 64 FROM LA POSTA RD. NORTH TO CAMINO DE LA PLACITAS (NORTH) IN THE TOWN OF TAOS -, ALIGNMENT STUDY 19,362,124.57 30,672,054.87
New Mexico 6100780 41.846 MILES NORTH OF I-40 ON US491 BEGINNING IN GALLUP, NM 10,764,292.11 27,999,763.78
New Mexico 6100783 US 491, FROM MP15.116 TO MP 36.984, 15 MILES NORTH OF I40, RECONSTRUCTION WITH ADDED CAPACITY 11,507,920.54 92,931,191.71
New Mexico 6101181 I-40 Concrete Wall Barrier Project near Laguna 9,151,784.08 27,219,507.55
New Mexico A300160 T/LPA-SUNPORT BLVD EXTENSION-FROM BROADWAY TO I-25 EXIT 221 AT SUNPORT BLVD.CONSTRUCT NEW 4 LANE DIVIDED FACILITY WITH BIKE LANES 23,705,527.00 28,152,339.20
New Mexico A300280 I-25, MP 221.62 TO MP 222.02, RECONSTRUCT INTERCHANGE WITH POSSIBLE CHANGES IN CONFIGURATION 50,566,726.25 64,791,085.58
New Mexico A300381 NM 528, FROM MP 8.32 TO MP 9.79, NM 528 RIO RANCHO BLVD IMPROVEMENTS (UPPER SECTION) - FROM RIDGECREST DR/LEON GRANDE AVE 30,417,883.27 35,733,197.06
New Mexico A301234 US0550, FROM MP .6 TO MP 3, US 550 CONSTRUCTION & WIDENING PHASE 2 - FROM MP.6 TO MP 3.0, ROW PURCHASE, 26,563,226.73 34,906,879.10
New Mexico LC00160 NM 188, from MP 1.4 to MP 3, Valley Drive from Avenida De Mesilla to City Limits, Phase A/B, C Phase I-D & ll 17,342,361.09 30,757,579.23
New Mexico LC00250 I00025, FROM MP 1 TO MP 2, UNIVERSITY INTERCHANGE, BRIDGE REPLACEMENT, RAMP MODIFICATIONS/RECONSTRUCTION, ROADWAY RECONSTRUCTION, AND EXTENSION OF MUL 35,504,560.03 42,639,340.42