U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
North Dakota

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
North Dakota 1A94078 BISMARCK-MANDAN MEMORIAL BRIDGE - Structure 24,035,401.00 27,035,441.50
North Dakota 4083111 US 83, Minot Broadway Viaduct; Structural Replacement, Grading, Aggregate Base Course, Concrete Pavement, Curb and Gutter, Retaining Walls, Sidewalk 20,019,448.33 25,527,975.99
North Dakota 5094121 I-94,Youngmans Butte to 2 mi W Eagle Nest WB; Grading, Salvaged Base Course, PCC Pavement, Mill & Overlay, Guardrail, Bridge Deck Overlay 23,718,803.04 26,354,225.60
North Dakota 7085109 US 85, Long X Bridge 2.2 mi S of CMC 2739; Grading, Aggregate Base, HMA, Structure Replacement (new NBI #), Wildlife Crossing Structure (new) & Inc. 0.00 37,528,661.00
North Dakota 7804062 ND 1804, Red Mike Area (W of CMC 5334) to .03 mi W of CMC 5333; Grading, Aggregate Base, Hot Mix Asphalt, Passing Lanes, Lighting, Signing 3,336,428.27 44,730,547.90
North Dakota 8094092 I-94, West Fargo Horace Interchange (I-94 & Sheyenne St); Grading, Aggregate Base, PCC Pavement, Storm Sewer, Signing, Marking & Lighting 21,492,990.46 25,030,803.87
North Dakota SB97001 STATE INFRASTRUCTURE BANK FY97, SIB - ACAP 2,540,000.00 27,106,700.00