RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Ohio | E034667 | IR-77 from near Oakes Rd. to IR-480 in Cuyahoga County. GARVEE Bond Project. | 76,257,886.37 | 112,446,681.03 |
Ohio | E036192 | FRA IR 270 2.60 (Recon),Major reconstruction project with pavement replacement. Upgrade drainage, guardrail, GARVEE BOND PROJECT | 73,677,523.16 | 89,934,819.29 |
Ohio | E036466 | FRA IR 270 9.15 | 8,599,408.75 | 65,155,191.42 |
Ohio | E036702 | IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation. | 72,417,190.43 | 105,367,679.71 |
Ohio | E040035 | SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work. | 17,973,482.29 | 72,669,019.89 |
Ohio | E040187 | US-33 in the vicinity of Carroll in Fairfield County. New interchange. | 27,940,259.23 | 49,790,118.01 |
Ohio | E040268 | IR-75 from 3.4 miles north of Butler County to Montgomery County in Warren County. Reconstruction and added capacity. GARVEE BOND. | 57,980,743.61 | 139,035,087.49 |
Ohio | E040452 | SR-161 from Simpson's Run east to the city of Grandville in Licking County. GARVEE Bond Debt Service for St Proj # 77221. | 58,632,228.13 | 71,391,326.59 |
Ohio | E040537 | US-24 from US-127 to SR-424 in Paulding and Defiance Counties. GARVEE Bond project | 61,057,259.23 | 77,851,085.87 |
Ohio | E040542 | MOT IR 75 11.01, PROVIDE THREE CONTINUOUS LANES AT THE US35 INTERCHANGE. PHASE 1B. GARVEE BOND PROJECT.. | 62,383,899.82 | 75,559,723.95 |
Ohio | E040549 | LUC IR 75 3.99 intrchg Mod P2, Widen and upgrade existing facility and modify interchanges to provide better ingress & egress | 23,805,366.36 | 153,586,962.00 |
Ohio | E040555 | MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes | 12,254,114.55 | 105,826,389.39 |
Ohio | E040563 | SUM IR 0076 10.00. Reconstruct IR-76/77, & change the access points & geometry of Main/Broadway & Wolf Ledges/Grant Interchanges. | 106,410,332.90 | 121,799,042.52 |
Ohio | E040631 | IR-70/71 from Hague to James Rd, city of Columbus in Franklin Cty. Reconstruct I-70/71 Split in Downtown Columbus. Design/Build | 222,381,450.59 | 247,817,411.60 |
Ohio | E040793 | IR-75 from the Great Miami River to Leo St. in the city of Dayton in Montgomery County. Reconstruction. MPI-0042 - GARVEE bond | 111,937,634.54 | 140,620,721.69 |
Ohio | E040822 | IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County. | 54,215,826.86 | 65,011,744.66 |
Ohio | E040823 | IR-75 from 0.1 miles south of Harrison Ave. to 0.1 miles south of Paddock Rd. in Hamilton County. | 116,230,191.09 | 142,004,200.02 |
Ohio | E040889 | Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements | 16,915,410.60 | 108,761,845.90 |
Ohio | E050571 | SR-73 from US-68 to US-22 in Clinton County. GARVEE Bond Project. | 33,775,925.72 | 42,223,274.33 |
Ohio | E050670 | JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg | 31,735,233.60 | 138,678,494.76 |
Ohio | E060287 | LUC US 24 6.19 Part 3 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. | 60,472,732.53 | 77,239,169.93 |
Ohio | E060288 | HEN/LUC US 24 15.85 Part 2 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. | 55,237,286.46 | 70,612,514.22 |
Ohio | E060290 | LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports | 27,037,332.83 | 43,180,688.23 |
Ohio | E060308 | IR-70 at US-40 in Belmont County. | 18,481,566.08 | 26,759,263.68 |
Ohio | E060384 | SR-2 from Newell Creek to SR-44 in Lake County. Major rehab and add lane. GARVEE BOND PROJECT. | 37,005,602.23 | 70,152,458.45 |
Ohio | E060418 | LIC SR 16 16.50 (Cherry Val Int), Upgrade at grade intersection to an interchange facility. PDP Steps 1-4 under PID 78116 | 23,164,043.43 | 28,399,828.45 |
Ohio | E060822 | Ironton-Russell Bridge over the Ohio River in Lawrence County. | 18,239,164.56 | 102,283,254.50 |
Ohio | E070090 | FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work. | 33,148,500.04 | 101,531,730.59 |
Ohio | E070348 | HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond. | 45,715,520.59 | 68,474,980.98 |
Ohio | E070396 | HAM IR 75 6.78,Reconstruct I-75 from north of the Mitchell Avenue interchange through the SR 562 interchange | 4,270,584.49 | 36,385,530.00 |
Ohio | E070405 | HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system | 96,016,448.50 | 130,940,283.36 |
Ohio | E080600 | HAM IR 71 1.34, Plane and Pave, Includes bridge overlay and deck replacement work | 21,856,817.23 | 26,514,840.56 |
Ohio | E080604 | LAK IR 090 21.42, MAJOR REHAB FROM PAINE RD TO THE ASHTABULA COUNTY LINE SFY 2010. GARVEE Bond Project | 36,398,949.62 | 41,077,161.34 |
Ohio | E080951 | FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes | 11,461,724.16 | 55,944,611.82 |
Ohio | E081090 | FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures | 22,917,162.02 | 48,153,355.08 |
Ohio | E090644 | CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge | 31,923,655.19 | 50,591,435.13 |
Ohio | E100378 | LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St | 17,565,240.61 | 49,751,620.01 |
Ohio | E100386 | LOR SR 0057 19.42, Add Lanes in each direction from IR 80 to IR 90, Interchange modifications at I-90. | 7,424,241.60 | 25,325,753.26 |
Ohio | E100545 | LUC IR 75 6.70 widening.the widening and reconstruction of LUC-75 from Lagrange St to I-280; perform necessary related work | 7,644,726.32 | 72,199,526.00 |
Ohio | E100633 | DEL IR 71 11.500, Full depth pavement replacement and addition of 3rd median lane. Widen ML Bridge MRW-71-3.00. | 23,145,286.99 | 58,977,692.63 |
Ohio | E100634 | FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps | 20,550,196.42 | 91,927,124.83 |
Ohio | E100878 | Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County. | 48,990,813.21 | 71,070,319.71 |
Ohio | E100995 | HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work | 19,862,551.47 | 32,128,716.87 |
Ohio | E101051 | CUY INNERBELT CCG2 EB Bridge, New structure to replace existng Innerbelt Bridge (1809393). CCG2. Design Build Finance.. | 31,940,928.27 | 311,215,128.01 |
Ohio | E110266 | R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville | 33,060,932.28 | 55,791,678.34 |
Ohio | E110547 | FRA Lazelle Road Ph B | 19,715,047.00 | 27,992,252.50 |
Ohio | E110820 | HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT | 52,695,522.47 | 144,436,442.97 |
Ohio | E110840 | CUY IR 271 00.00 Addlane, Add one (1) lane in each direction along I-271 | 127,973,451.17 | 147,423,143.78 |
Ohio | E111416 | CUY IR 480 18.42 L&R Deck | 77,549,372.33 | 242,522,379.20 |
Ohio | E120394 | MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd. | 26,967,588.04 | 34,155,108.28 |
Ohio | E120441 | MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path. | 14,857,173.05 | 32,584,825.09 |
Ohio | E120585 | LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges | 5,037,456.00 | 163,920,251.62 |
Ohio | E120602 | LUC IR 75 2.75 Pav Reconst, Bridge repl | 9,552,060.04 | 30,748,054.68 |
Ohio | E120609 | CLA IR 70 10.55/13.98, Ph. 2, Major rehabilitation of the existing lanes and the construction of an additional lane. | 51,649,040.00 | 52,203,490.00 |
Ohio | E120958 | WOO/LUC IR75 30.70/0.00 Major | 19,601,169.78 | 202,410,581.08 |
Ohio | E120960 | JEF SR 7 4.800. Bench exisitng hillside to eliminate rockfall and landslide hazards. OH11-01, DSR JEF-004 | 23,015,134.92 | 28,768,918.64 |
Ohio | E130382 | RIC US 0030 09.13 | 58,979,060.80 | 72,808,576.00 |
Ohio | E130407 | SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures | 34,853,137.51 | 97,578,275.36 |
Ohio | E130765 | WOO SR 25 0.75 Reconstruction | 0.00 | 26,896,590.00 |
Ohio | E130869 | STA IR 0077 08.40/VAR | 23,694,366.75 | 65,533,753.02 |
Ohio | E130952 | HAM IR 275 39.81 | 6,242,885.54 | 34,951,502.88 |
Ohio | E131492 | CUY INNERBELT CCG6B Broadway, Remove and build a new longer bridge for Broadway (SR 14) over IR-77 | 29,195,085.47 | 33,950,849.53 |
Ohio | E131510 | WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange | 10,941,739.53 | 27,321,384.50 |
Ohio | E140008 | PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements | 5,894,956.00 | 35,573,730.00 |
Ohio | E140305 | CUY IR 077 14.35 CCG6A, Replace the mainline IR-77 bridge over IR-490. | 25,601,745.30 | 29,689,662.96 |
Ohio | E140310 | STW - Ohio Bridge Partnership Program Debt Service Authorization | 53,622,958.58 | 92,206,574.94 |
Ohio | E140606 | SCI SR 823 (DBFOM), Design- Build- Finance- Operate- Maintain the Portsmouth Bypass | 58,998,071.00 | 58,998,071.00 |
Ohio | E140985 | HAM IR 71 8.42 | 14,369,476.43 | 35,985,589.58 |
Ohio | E150336 | FRA CR 103 2.56 | 20,314,959.40 | 26,281,003.68 |
Ohio | E150345 | SUM IR 0076 05.62 | 10,617,798.67 | 29,091,026.88 |
Ohio | E150808 | GRE IR 675 0.00 - Pt. 1 | 23,104,917.00 | 25,947,620.00 |
Ohio | E150996 | PRE IR 70 0.00 | 16,786,495.40 | 32,566,771.00 |
Ohio | E161031 | FRA-70-14.56 (2G) Parts 1&2 | 39,609,396.06 | 46,740,518.43 |
Ohio | E170601 | SUM Main Street Corridor | 13,270,672.00 | 34,404,852.00 |
Ohio | E170641 | BUT SR 129 25.00 Liberty Way | 12,598,610.61 | 25,629,546.01 |
Ohio | E170713 | HAM IR 75 3.84 | 50,521,257.09 | 95,685,509.00 |
Ohio | E170961 | LAK VROOMAN ROAD | 13,569,869.07 | 25,062,005.37 |
Ohio | E170982 | FRA-71-9.62/9.71 Part 1 & 2 | 36,183,724.31 | 116,353,949.08 |
Ohio | E171059 | FRA IR 670 3.920 | 30,133,292.73 | 66,736,983.12 |
Ohio | E171457 | SUM IR 77/277/US 224 Interchange | 9,278,333.24 | 60,176,026.67 |
Ohio | E180134 | FRA IR 70 14.54 (Proj 2E) | 26,980,162.99 | 80,461,302.85 |
Ohio | E180347 | MAD IR 70 8.620 Major Rehab | 35,732,892.11 | 51,668,398.49 |
Ohio | E180428 | SUM IR 0076/0077 8.42/09.74 | 40,531,068.03 | 181,544,221.20 |
Ohio | E180439 | CLE 32-3.50 | 16,010,120.00 | 59,720,350.00 |
Ohio | E180746 | MUS IR 70 10.66 | 41,660,499.47 | 104,963,980.71 |
Ohio | E180796 | FRA IR 71 0.00 | 44,057,417.00 | 50,328,850.00 |
Ohio | E190121 | FRA IR 71 17.46 (Proj 3B) | 35,533,902.62 | 43,802,190.00 |
Ohio | E190122 | FRA-70/71-12.68/15.16 (Proj 4R) | 743,277.47 | 123,938,015.55 |
Ohio | E190328 | WAY SR 0083 10.81 | 25,709,021.80 | 32,634,630.00 |
Ohio | E190498 | MAH Youngstown Smart 2 Network | 19,512,147.00 | 27,010,754.45 |
Ohio | E200851 | HAM-71-0.00 - Brent Spence Paint | 0.00 | 32,000,000.00 |
Ohio | G000243 | IR-280, 0.06MI N OF SR25 TO MANHATTAN BLVD. , MAJOR WIDENING. | 21,292,094.30 | 26,029,254.30 |