U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Rhode Island

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Rhode Island 0032018 Bridge Group 32 - I-95 Cranston and Providence 18,576,136.55 25,257,009.01
Rhode Island 0037012 Bridge Group 51A - Rt 37 C-2 12,763,073.59 35,931,572.56
Rhode Island 0138060 Pell Bridge Ramps Phase 2, Newport 800,000.00 28,989,567.17
Rhode Island 0200005 Reconstruction of the Washington Bridge #200, East Providence, Providence, GARVEE added Wash Ped Bridge (03/01/2012) Eng:Pavia 79,296,887.37 84,666,401.64
Rhode Island 0250010 Replacement of the Sakonnet River Bridge No. 250 - GARVEE; Added Fed Hwy funds 09/21/2011 - GARVEE funds exhausted 158,106,513.65 351,493,853.80
Rhode Island 0403016 Rel Rte 403 - B 1009 added 7/27/05, For Prev Auth. see FMIS W96A, See State Remarks Field for addtl projects - GARVEE PROJECT 100,649,114.37 134,174,770.05
Rhode Island 0550003 Replacement of Pawtucket Bridge No. 550 (Engineer: Faraj) 58,596,673.71 91,392,744.78
Rhode Island 0578005 Design Build Services for the Reconstruction of the I-95 Viaduct Northbound, Providence - GARVEE Funds 7,978,488.29 148,575,150.00
Rhode Island 0600005 Bridge Group 49 - Henderson. South Angell Street to North Broadway Cities of Providence & East Providence 11,600,000.00 68,330,415.81
Rhode Island 0700006 Design-Build for I-195 West Bound - Washington Bridge Phase 2 - Bridge Group 57TB-10; Providence & East Providence 2,900,000.00 32,830,000.00
Rhode Island 1954055 IWAY C7 C9 C8 C6A C10,11 Adv. Sig 9/08, Lscp C-A 8/09, C13 7/10, Lscp B 11/11, Dmnd Grnd. 06/12, C14 11/12, C15 02/13 335,488,079.93 561,915,990.58
Rhode Island 2950002 Design-Build Services for I-295 Bridges - Contract 2, Cranston - GARVEE FUNDS 5,925,882.96 40,688,508.03
Rhode Island 610X001 Design Build Services for the Reconstruction of the US Rte 6/Rte 10 Interchange, Providence - GARVEE Funds 27,878,135.31 415,000,000.00
Rhode Island BLDG001 Pell Bridge Ramps Phase 2, Newport 20,000,000.00 25,000,000.00
Rhode Island BLDG002 Bridge Group 57TB-10 - Design-Build of the Washington Bridge North - Phase 2 25,000,000.00 31,125,000.00
Rhode Island FRIP001 GARVEE, Freight Rail Improvement Project, added AMTRAK Force Account, 6/20/2005 33,899,111.95 47,017,206.62
Rhode Island INFR001 I-95 Viaduct Northbound - Providence 60,355,000.00 75,443,750.00
Rhode Island TIGR003 Bridge Group 51A - Rt 37 C-2 20,000,000.00 25,000,000.00