RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Tennessee | 0001150 | SR-1, Near SR-281 in Cannon County to Centertown in Warren County - Construction New | 28,772,789.26 | 35,965,985.00 |
Tennessee | 0001298 | SR-1, From East of Kingston Avenue to SR-382 - Widen from 2 lanes to 5 lanes | 24,059,896.00 | 25,442,120.00 |
Tennessee | 0002106 | SR-2, Bridge over Tennessee River, LM 21.14 - Bridge Replacement | 29,700,802.00 | 29,700,802.00 |
Tennessee | 0004008 | SR-4 (US-78), From the Mississippi State Line to South of Shelby Drive - Widen from 4-Lane to 6-Lane | 67,670,000.00 | 99,671,931.00 |
Tennessee | 0006083 | SR-6, From South of SR-441(Moores Lane) to SR-253 (Concord Road) in Brentwood - Reconstruction and Widen | 26,821,756.00 | 35,388,438.00 |
Tennessee | 0009066 | SR-9 (US-25W) - Bridge over Clinch River in Clinton LM 10.71 - Bridge Replacement | 27,443,875.00 | 34,347,593.00 |
Tennessee | 0010024 | SR-10, South of Goose Creek to SR-52 in Lafayette - Widen | 26,332,391.00 | 27,775,244.00 |
Tennessee | 0014062 | SR-14, East of Old Covington Pike to SR-385 (Paul Barrett Pkwy) - Widen to 5-Lanes | 30,218,327.00 | 37,649,917.00 |
Tennessee | 0014063 | SR-14 (Austin Peay Hwy), From SR-385 to East of Kerrville-Rosemark Road (IA) - Reconstruction - Widen from 2-ln to 4-ln divided typical section | 33,748,270.00 | 42,185,337.00 |
Tennessee | 0015097 | SR-15, Old Highway 64 to Little Fortyeight Creek Road - Reconstruction | 20,982,984.00 | 26,444,108.00 |
Tennessee | 0015108 | SR-15, FROM FIRETOWER ROAD TO WEST OF BIGBEE BRANCH - Widen | 53,021,752.42 | 66,320,820.00 |
Tennessee | 0016054 | SR-16(Madison Street), From West of Jenkins Road to Near SR-276 (Thompson Creek Road) - Widen | 28,003,423.00 | 35,011,718.00 |
Tennessee | 0019053 | SR-19 (Brownsville Bypass), From East of SR-87 to West of Windrow Road (IA) - Widen from 2- lane to 4-lane divided | 24,524,506.58 | 31,322,985.00 |
Tennessee | 0026076 | SR-26 (Nashville Hwy), From near SR-53 to near SR-96 - Reconstruction | 27,145,732.00 | 33,962,637.00 |
Tennessee | 0028031 | SR-28(US 127), North of I-40 to Near Potato Farm Road | 17,810,720.00 | 86,916,182.50 |
Tennessee | 0029048 | SR-29, From Manufacturers Rd(Olgiati Bridge) to SR-8(Signal Mtn Blvd) in Chattanooga - Reconstruction | 102,343,003.00 | 128,078,754.00 |
Tennessee | 0029072 | SR-29, Olgiati Bridge over Tennessee River - Widen | 26,311,341.30 | 32,889,176.75 |
Tennessee | 0029084 | SR-29, From SR-61 in Harriman to South of Whetstone Road in Morgan County - Reconstruction | 58,791,103.00 | 73,668,871.00 |
Tennessee | 0029086 | SR-29, From South of Whetstone Road to North of SR-328 - Reconstruction and Widening | 31,139,148.00 | 38,938,341.00 |
Tennessee | 0030048 | SR-30(White Street); Near Knight Street in Athens to East of County Road 609 - Widening | 19,994,274.16 | 25,110,330.75 |
Tennessee | 0033043 | SR-33, Bridge over Clinch River, LM 15.69 - Bridge Replacement | 29,953,756.00 | 37,407,445.00 |
Tennessee | 0035038 | SR-35(Newport Bypass), From SR-9 to Saint Tide Hollow Road - Construction - New | 59,244,713.00 | 74,270,179.00 |
Tennessee | 0035064 | SR-35 - Intersection of SR-92 / Dickey Road to Grapevine Hollow Road - Construction - New - Construct 5th Lane on 4-Lane Divided Road | 35,844,942.00 | 35,875,733.00 |
Tennessee | 0050027 | SR-50, SR-106(US-431, Franklin Pike) to SR-11(US-31A, Verona Avenue) in Lewisburg - Reconstruction | 46,798,094.67 | 48,360,229.00 |
Tennessee | 0052043 | SR-52(Corridor "J"), SR-53 to Existing SR-52 - New Construction | 29,392,645.00 | 36,740,807.00 |
Tennessee | 0052048 | SR-52 (Corridor "J"), From Near Oakley-Allons Road to SR-111 - Widen | 32,224,767.00 | 33,783,385.00 |
Tennessee | 0054026 | SR-54, Near Rison Street to Near Smith Road - Construction - Widen from 2-Lane to 5-Lane | 34,312,612.00 | 43,102,176.00 |
Tennessee | 0056029 | SR-56, South of SR-288 Near Magness Road to East Bryant Street in Smithville - Widen 5 Lanes | 28,574,417.05 | 36,733,470.00 |
Tennessee | 0056039 | SR-56, South of Warren/Dekalb County Line to Near Magness Road - Reconstruction | 23,926,892.00 | 30,251,971.00 |
Tennessee | 0060013 | SR-60, From 4-Lane North of I-75 (Westlake Drive) to SR-306 - Reconstruction and Widening | 29,475,067.38 | 77,141,600.00 |
Tennessee | 0062034 | SR-62 (Western Avenue), From Texas Avenue to Major Avenue in Knoxville - Reconstruction - Widen 2 Lane to 5 Lane | 7,558,705.58 | 51,743,308.96 |
Tennessee | 0065010 | SR-65 - From Old Hwy 431 to Walling Road - Reconstruction | 32,739,835.65 | 40,941,724.56 |
Tennessee | 0066044 | SR-66REL, North of I-81 at SR-341 in Jefferson County to SR-160 in Morristown - Construction - New | 59,845,961.05 | 75,012,752.31 |
Tennessee | 0069049 | PROPOSED I-69, SOUTH OF SR-5/22 TO WEST OF SR-21 - New Stage Construction | 39,515,116.00 | 48,660,761.00 |
Tennessee | 0069053 | I-69 PROP, From South of SR-3(US-51) to South of SR-5 - Construction - New | 48,375,748.00 | 60,827,145.00 |
Tennessee | 0069097 | I-69PROP - From West of SR-21 to SR-3(US-51) Near Mayberry Road (IA) - Construction - New 4-Lane Divided Limited Access Interstate Highway | 62,327,712.00 | 77,909,640.00 |
Tennessee | 0073050 | SR-73, From SR-2 (US-11) to East of Little Tennessee River (Ft Loudoun/Tellico Canal) - | 61,906,734.00 | 78,453,840.00 |
Tennessee | 0076065 | SR-76, From West of Cades-Atwood Road to East of SR-77 - Reconstruction | 36,335,187.00 | 45,418,983.75 |
Tennessee | 0092011 | SR-92, Bridge over French Broad River, LM 9.16 in Dandridge - Bridge Replacement | 29,027,603.00 | 36,487,532.00 |
Tennessee | 0099048 | SR-99 (New Salem Highway), From Cason Lane to I-24 in Murfreesboro - Widen | 24,363,241.00 | 31,544,770.00 |
Tennessee | 0101016 | SR-101, From Firetower Road to East of Lakeview Drive - Reconstruction - Widen from Two Lanes to Multi-Lane Facility | 34,396,083.00 | 43,387,182.00 |
Tennessee | 0101017 | SR-101(Peavine Road), From Lakeview Drive to East of Westchester Drive / Catoosa Boulevard in Fairfield Glade - Reconstruction | 32,546,689.00 | 41,166,774.00 |
Tennessee | 0109031 | SR-109, From North of SR-24(US-70) to South of Dry Fork Creek - Reconstruction | 30,815,434.00 | 38,532,301.00 |
Tennessee | 0109032 | SR-109, From South of Dry Fork Creek to South of Cumberland River - Reconstruction | 39,853,985.00 | 50,974,068.50 |
Tennessee | 0112006 | SR-112, From SR-12 (Ashland City Highway) to SR-155 (Briley Parkway) -Reconstruction, Widen, Curb and Gutter, Sidewalk, Signalization | 39,064,420.26 | 51,005,040.00 |
Tennessee | 0115027 | SR-115, South of Topside Road to North of Maloney Road - Widen | 63,031,188.00 | 78,877,045.00 |
Tennessee | 0115054 | SR-115, From North of Maloney Road to Woodson Drive - Widen from 4 to 6 Lanes | 66,345,900.00 | 87,316,818.00 |
Tennessee | 0115057 | SR-115 - (Relocated Alcoa Highway), From SR-35 (Hall Road), South of Airport Road to Proposed Interchange at Tyson Boulevard - Widen | 57,078,945.00 | 71,853,312.00 |
Tennessee | 0136008 | SR-136, SR-111 to I-40 - Widen | 39,784,618.27 | 57,767,801.00 |
Tennessee | 0149012 | SR-149, From River Road to SR-13; SR-13, SR-149 to Zinc Plant Road - Widen to 5 Lanes | 24,971,955.00 | 78,589,966.00 |
Tennessee | 0243090 | I-24, Interchanges at SR-2(Broad Street) and SR-58(Market Street) in Chattanooga - Interchange Modification | 36,840,728.00 | 41,759,295.00 |
Tennessee | 0243097 | I-24, Bridges over Germantown Road, LM 12.08 and Belvoir Avenue, 12.59 in East Ridge- Bridge Replacement | 36,062,644.89 | 40,069,609.00 |
Tennessee | 0247009 | SR-247(Duplex Rd), SR-6 (US-31, Main St) in Spring Hill to Near I-65 - Widen 2-3 lanes, | 31,660,465.00 | 37,034,476.00 |
Tennessee | 0249079 | I-24, Interchange modification at Hickory Hollow Parkway - Modify Interchange | 28,653,509.02 | 31,837,232.00 |
Tennessee | 0266013 | SR-266 (Jefferson Pike), From SR-102 to East of I-840 - Widen | 14,678,704.00 | 74,112,669.00 |
Tennessee | 0269020 | I-269PROP(Paul Barret Parkway), From North of SR-57 in Fayette County to South of Raleigh- Lagrange Road - Stage Construction - New | 35,261,150.07 | 43,959,254.59 |
Tennessee | 0311028 | SR-311, Interchange Between I-75(Exit 20) and SR-2(US-11) in Cleveland - Construct New Interchange | 27,379,197.00 | 34,342,496.00 |
Tennessee | 0317014 | SR-317(Apison Pike), From Old Lee Highway to SR-321(Ooltewah-Ringold Road) - Widen | 30,760,772.00 | 41,494,338.00 |
Tennessee | 0317017 | SR-317, SR-321(Ooltewah-Ringgold Road) to Near Layton Lane - Reconstruction and Widen from 2 Lanes to 5 Lanes | 92,923,113.00 | 117,999,997.00 |
Tennessee | 0374010 | SR-374 (Warfield Blvd), South of Dunbar Cave Road to West of Stokes Road, in Clarksville - Widen | 23,171,685.80 | 31,262,551.00 |
Tennessee | 0396004 | SR-396(Saturn Parkway Extension), From SR-6 to SR-247; SR-247, From Cleburne Rd to Town Center Pkwy; and SR-6, Intersection at Stephen P Yokich Pkwy | 26,107,686.00 | 32,634,608.00 |
Tennessee | 0397010 | SR-397 (Mack Hatcher Parkway West) - From S of SR-96 W of Franklin to E of SR-106 N of Franklin - Construction - New | 47,221,165.56 | 62,766,993.00 |
Tennessee | 0401294 | I-40, Interchange at I-240 East in Memphis (Phase 2) - Modify Interchange | 118,149,848.00 | 147,687,579.00 |
Tennessee | 0401326 | I-40, Bridge over Mississippi River (Seismic Retrofit Phase 8)-Miscellaneous Improvements | 28,205,127.00 | 52,231,718.00 |
Tennessee | 0401348 | I-40, From West of SR-186 (US-45 ByPass) to East of SR-5 (North Highland Avenue) - Widen | 62,761,320.65 | 78,451,650.81 |
Tennessee | 0402337 | I-40, From East of SR-5(US-45) to East of SR-1(US-70) in Jackson - Widen from 4-Lane to 6- Lane on existing alignment | 56,266,400.00 | 101,123,062.00 |
Tennessee | 0405140 | I-40, From West of SR-171 to East of SR-109 - Widen | 51,528,150.00 | 57,253,500.00 |
Tennessee | 0405142 | I-40, From East of SR-109 to East of I-840 - Widen, HOV Lanes, Shoulders, Bridge Widening | 35,167,816.31 | 43,959,771.00 |
Tennessee | 0406130 | I-40, Interchange at Mine Lick Creek Road - Construct New Interchange | 28,109,437.00 | 32,192,533.00 |
Tennessee | 0406173 | I-40, Westbound near MM 342 to near MM 344 - Slope Stabilization and Resurfacing | 6,590,468.00 | 47,080,032.00 |
Tennessee | 0459010 | SR-459(Lexington Bypass), From SR-20(US-412) West of Lexington to Near SR-22 South of Lexington - New - Super 2-lane bypass on new alignment | 31,854,845.19 | 39,818,557.00 |
Tennessee | 0652096 | I-65, Interchange at SR-99 (US-412) in Columbia - Modify Interchange | 4,564,156.43 | 35,795,855.92 |
Tennessee | 0652113 | I-65, Interchange at Buckner Road in Spring Hill (Design Build) - New Interchange | 31,928,097.00 | 57,800,000.00 |
Tennessee | 0653113 | I-65 (Prop Intch), Existing SR-109 to I-65 (Includes SR-41 Widening) - Widening, Construct New Interchange | 52,235,500.00 | 65,388,327.00 |
Tennessee | 0653128 | I-65, From near SR-25 (Main Street) to near SR-109 - Section 4 - Widen | 127,546,569.00 | 159,596,116.00 |
Tennessee | 0751131 | I-75, Interchange at I-24 - Modify Interchange | 136,876,258.00 | 152,084,732.00 |
Tennessee | 0983030 | I-24 SMART Corridor (Phase II), From I-440 (Exit 53) to SR-10 (Exit 81 / US-231) in Murfreesboro and SR-1 from I-24 to SR-10 in Murfreesboro - ITS | 29,548,554.52 | 51,554,092.00 |
Tennessee | 1243081 | I-124, From the I-24 Interchange to South of the Tennessee River Bridge - Widen - Add Lanes | 131,563,917.00 | 164,459,234.00 |
Tennessee | 2401290 | I-240, From North of SR-385 (South of Poplar Avenue) to North of Walnut Grove Road - Widen | 43,962,243.00 | 55,086,536.00 |
Tennessee | 2401294 | I-240,4 Overhead Bridges: Norfolk Southern R/R, SR-57 (Poplar Ave, EB & WB) and Park Ave., Ramps Connecting SR-57 to SB I-240-Bridge Replacement | 66,977,401.00 | 70,818,317.00 |
Tennessee | 4404084 | I-440, From I-40 to I-24 - Reconstruction | 134,000,000.00 | 167,500,000.00 |
Tennessee | 6407161 | I-640, Interchange at North Broadway (Phase II) in Knoxville - Reconstruction and Relocation of Ramps | 5,497,200.00 | 31,310,230.00 |
Tennessee | 8300070 | Albert Gallatin Ave/Hatten Track Rd Ext, From SR-109 to SR-174 - New Construction | 28,435,790.00 | 37,352,392.00 |