U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Tennessee

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Tennessee 0001150 SR-1, Near SR-281 in Cannon County to Centertown in Warren County - Construction New 28,772,789.26 35,965,985.00
Tennessee 0001298 SR-1, From East of Kingston Avenue to SR-382 - Widen from 2 lanes to 5 lanes 24,059,896.00 25,442,120.00
Tennessee 0002106 SR-2, Bridge over Tennessee River, LM 21.14 - Bridge Replacement 29,700,802.00 29,700,802.00
Tennessee 0004008 SR-4 (US-78), From the Mississippi State Line to South of Shelby Drive - Widen from 4-Lane to 6-Lane 67,670,000.00 99,671,931.00
Tennessee 0006083 SR-6, From South of SR-441(Moores Lane) to SR-253 (Concord Road) in Brentwood - Reconstruction and Widen 26,821,756.00 35,388,438.00
Tennessee 0009066 SR-9 (US-25W) - Bridge over Clinch River in Clinton LM 10.71 - Bridge Replacement 27,443,875.00 34,347,593.00
Tennessee 0010024 SR-10, South of Goose Creek to SR-52 in Lafayette - Widen 26,332,391.00 27,775,244.00
Tennessee 0014062 SR-14, East of Old Covington Pike to SR-385 (Paul Barrett Pkwy) - Widen to 5-Lanes 30,218,327.00 37,649,917.00
Tennessee 0014063 SR-14 (Austin Peay Hwy), From SR-385 to East of Kerrville-Rosemark Road (IA) - Reconstruction - Widen from 2-ln to 4-ln divided typical section 33,748,270.00 42,185,337.00
Tennessee 0015097 SR-15, Old Highway 64 to Little Fortyeight Creek Road - Reconstruction 20,982,984.00 26,444,108.00
Tennessee 0015108 SR-15, FROM FIRETOWER ROAD TO WEST OF BIGBEE BRANCH - Widen 53,021,752.42 66,320,820.00
Tennessee 0016054 SR-16(Madison Street), From West of Jenkins Road to Near SR-276 (Thompson Creek Road) - Widen 28,003,423.00 35,011,718.00
Tennessee 0019053 SR-19 (Brownsville Bypass), From East of SR-87 to West of Windrow Road (IA) - Widen from 2- lane to 4-lane divided 24,524,506.58 31,322,985.00
Tennessee 0026076 SR-26 (Nashville Hwy), From near SR-53 to near SR-96 - Reconstruction 27,145,732.00 33,962,637.00
Tennessee 0028031 SR-28(US 127), North of I-40 to Near Potato Farm Road 17,810,720.00 86,916,182.50
Tennessee 0029048 SR-29, From Manufacturers Rd(Olgiati Bridge) to SR-8(Signal Mtn Blvd) in Chattanooga - Reconstruction 102,343,003.00 128,078,754.00
Tennessee 0029072 SR-29, Olgiati Bridge over Tennessee River - Widen 26,311,341.30 32,889,176.75
Tennessee 0029084 SR-29, From SR-61 in Harriman to South of Whetstone Road in Morgan County - Reconstruction 58,791,103.00 73,668,871.00
Tennessee 0029086 SR-29, From South of Whetstone Road to North of SR-328 - Reconstruction and Widening 31,139,148.00 38,938,341.00
Tennessee 0030048 SR-30(White Street); Near Knight Street in Athens to East of County Road 609 - Widening 19,994,274.16 25,110,330.75
Tennessee 0033043 SR-33, Bridge over Clinch River, LM 15.69 - Bridge Replacement 29,953,756.00 37,407,445.00
Tennessee 0035038 SR-35(Newport Bypass), From SR-9 to Saint Tide Hollow Road - Construction - New 59,244,713.00 74,270,179.00
Tennessee 0035064 SR-35 - Intersection of SR-92 / Dickey Road to Grapevine Hollow Road - Construction - New - Construct 5th Lane on 4-Lane Divided Road 35,844,942.00 35,875,733.00
Tennessee 0050027 SR-50, SR-106(US-431, Franklin Pike) to SR-11(US-31A, Verona Avenue) in Lewisburg - Reconstruction 46,798,094.67 48,360,229.00
Tennessee 0052043 SR-52(Corridor "J"), SR-53 to Existing SR-52 - New Construction 29,392,645.00 36,740,807.00
Tennessee 0052048 SR-52 (Corridor "J"), From Near Oakley-Allons Road to SR-111 - Widen 32,224,767.00 33,783,385.00
Tennessee 0054026 SR-54, Near Rison Street to Near Smith Road - Construction - Widen from 2-Lane to 5-Lane 34,312,612.00 43,102,176.00
Tennessee 0056029 SR-56, South of SR-288 Near Magness Road to East Bryant Street in Smithville - Widen 5 Lanes 28,574,417.05 36,733,470.00
Tennessee 0056039 SR-56, South of Warren/Dekalb County Line to Near Magness Road - Reconstruction 23,926,892.00 30,251,971.00
Tennessee 0060013 SR-60, From 4-Lane North of I-75 (Westlake Drive) to SR-306 - Reconstruction and Widening 29,475,067.38 77,141,600.00
Tennessee 0062034 SR-62 (Western Avenue), From Texas Avenue to Major Avenue in Knoxville - Reconstruction - Widen 2 Lane to 5 Lane 7,558,705.58 51,743,308.96
Tennessee 0065010 SR-65 - From Old Hwy 431 to Walling Road - Reconstruction 32,739,835.65 40,941,724.56
Tennessee 0066044 SR-66REL, North of I-81 at SR-341 in Jefferson County to SR-160 in Morristown - Construction - New 59,845,961.05 75,012,752.31
Tennessee 0069049 PROPOSED I-69, SOUTH OF SR-5/22 TO WEST OF SR-21 - New Stage Construction 39,515,116.00 48,660,761.00
Tennessee 0069053 I-69 PROP, From South of SR-3(US-51) to South of SR-5 - Construction - New 48,375,748.00 60,827,145.00
Tennessee 0069097 I-69PROP - From West of SR-21 to SR-3(US-51) Near Mayberry Road (IA) - Construction - New 4-Lane Divided Limited Access Interstate Highway 62,327,712.00 77,909,640.00
Tennessee 0073050 SR-73, From SR-2 (US-11) to East of Little Tennessee River (Ft Loudoun/Tellico Canal) - 61,906,734.00 78,453,840.00
Tennessee 0076065 SR-76, From West of Cades-Atwood Road to East of SR-77 - Reconstruction 36,335,187.00 45,418,983.75
Tennessee 0092011 SR-92, Bridge over French Broad River, LM 9.16 in Dandridge - Bridge Replacement 29,027,603.00 36,487,532.00
Tennessee 0099048 SR-99 (New Salem Highway), From Cason Lane to I-24 in Murfreesboro - Widen 24,363,241.00 31,544,770.00
Tennessee 0101016 SR-101, From Firetower Road to East of Lakeview Drive - Reconstruction - Widen from Two Lanes to Multi-Lane Facility 34,396,083.00 43,387,182.00
Tennessee 0101017 SR-101(Peavine Road), From Lakeview Drive to East of Westchester Drive / Catoosa Boulevard in Fairfield Glade - Reconstruction 32,546,689.00 41,166,774.00
Tennessee 0109031 SR-109, From North of SR-24(US-70) to South of Dry Fork Creek - Reconstruction 30,815,434.00 38,532,301.00
Tennessee 0109032 SR-109, From South of Dry Fork Creek to South of Cumberland River - Reconstruction 39,853,985.00 50,974,068.50
Tennessee 0112006 SR-112, From SR-12 (Ashland City Highway) to SR-155 (Briley Parkway) -Reconstruction, Widen, Curb and Gutter, Sidewalk, Signalization 39,064,420.26 51,005,040.00
Tennessee 0115027 SR-115, South of Topside Road to North of Maloney Road - Widen 63,031,188.00 78,877,045.00
Tennessee 0115054 SR-115, From North of Maloney Road to Woodson Drive - Widen from 4 to 6 Lanes 66,345,900.00 87,316,818.00
Tennessee 0115057 SR-115 - (Relocated Alcoa Highway), From SR-35 (Hall Road), South of Airport Road to Proposed Interchange at Tyson Boulevard - Widen 57,078,945.00 71,853,312.00
Tennessee 0136008 SR-136, SR-111 to I-40 - Widen 39,784,618.27 57,767,801.00
Tennessee 0149012 SR-149, From River Road to SR-13; SR-13, SR-149 to Zinc Plant Road - Widen to 5 Lanes 24,971,955.00 78,589,966.00
Tennessee 0243090 I-24, Interchanges at SR-2(Broad Street) and SR-58(Market Street) in Chattanooga - Interchange Modification 36,840,728.00 41,759,295.00
Tennessee 0243097 I-24, Bridges over Germantown Road, LM 12.08 and Belvoir Avenue, 12.59 in East Ridge- Bridge Replacement 36,062,644.89 40,069,609.00
Tennessee 0247009 SR-247(Duplex Rd), SR-6 (US-31, Main St) in Spring Hill to Near I-65 - Widen 2-3 lanes, 31,660,465.00 37,034,476.00
Tennessee 0249079 I-24, Interchange modification at Hickory Hollow Parkway - Modify Interchange 28,653,509.02 31,837,232.00
Tennessee 0266013 SR-266 (Jefferson Pike), From SR-102 to East of I-840 - Widen 14,678,704.00 74,112,669.00
Tennessee 0269020 I-269PROP(Paul Barret Parkway), From North of SR-57 in Fayette County to South of Raleigh- Lagrange Road - Stage Construction - New 35,261,150.07 43,959,254.59
Tennessee 0311028 SR-311, Interchange Between I-75(Exit 20) and SR-2(US-11) in Cleveland - Construct New Interchange 27,379,197.00 34,342,496.00
Tennessee 0317014 SR-317(Apison Pike), From Old Lee Highway to SR-321(Ooltewah-Ringold Road) - Widen 30,760,772.00 41,494,338.00
Tennessee 0317017 SR-317, SR-321(Ooltewah-Ringgold Road) to Near Layton Lane - Reconstruction and Widen from 2 Lanes to 5 Lanes 92,923,113.00 117,999,997.00
Tennessee 0374010 SR-374 (Warfield Blvd), South of Dunbar Cave Road to West of Stokes Road, in Clarksville - Widen 23,171,685.80 31,262,551.00
Tennessee 0396004 SR-396(Saturn Parkway Extension), From SR-6 to SR-247; SR-247, From Cleburne Rd to Town Center Pkwy; and SR-6, Intersection at Stephen P Yokich Pkwy 26,107,686.00 32,634,608.00
Tennessee 0397010 SR-397 (Mack Hatcher Parkway West) - From S of SR-96 W of Franklin to E of SR-106 N of Franklin - Construction - New 47,221,165.56 62,766,993.00
Tennessee 0401294 I-40, Interchange at I-240 East in Memphis (Phase 2) - Modify Interchange 118,149,848.00 147,687,579.00
Tennessee 0401326 I-40, Bridge over Mississippi River (Seismic Retrofit Phase 8)-Miscellaneous Improvements 28,205,127.00 52,231,718.00
Tennessee 0401348 I-40, From West of SR-186 (US-45 ByPass) to East of SR-5 (North Highland Avenue) - Widen 62,761,320.65 78,451,650.81
Tennessee 0402337 I-40, From East of SR-5(US-45) to East of SR-1(US-70) in Jackson - Widen from 4-Lane to 6- Lane on existing alignment 56,266,400.00 101,123,062.00
Tennessee 0405140 I-40, From West of SR-171 to East of SR-109 - Widen 51,528,150.00 57,253,500.00
Tennessee 0405142 I-40, From East of SR-109 to East of I-840 - Widen, HOV Lanes, Shoulders, Bridge Widening 35,167,816.31 43,959,771.00
Tennessee 0406130 I-40, Interchange at Mine Lick Creek Road - Construct New Interchange 28,109,437.00 32,192,533.00
Tennessee 0406173 I-40, Westbound near MM 342 to near MM 344 - Slope Stabilization and Resurfacing 6,590,468.00 47,080,032.00
Tennessee 0459010 SR-459(Lexington Bypass), From SR-20(US-412) West of Lexington to Near SR-22 South of Lexington - New - Super 2-lane bypass on new alignment 31,854,845.19 39,818,557.00
Tennessee 0652096 I-65, Interchange at SR-99 (US-412) in Columbia - Modify Interchange 4,564,156.43 35,795,855.92
Tennessee 0652113 I-65, Interchange at Buckner Road in Spring Hill (Design Build) - New Interchange 31,928,097.00 57,800,000.00
Tennessee 0653113 I-65 (Prop Intch), Existing SR-109 to I-65 (Includes SR-41 Widening) - Widening, Construct New Interchange 52,235,500.00 65,388,327.00
Tennessee 0653128 I-65, From near SR-25 (Main Street) to near SR-109 - Section 4 - Widen 127,546,569.00 159,596,116.00
Tennessee 0751131 I-75, Interchange at I-24 - Modify Interchange 136,876,258.00 152,084,732.00
Tennessee 0983030 I-24 SMART Corridor (Phase II), From I-440 (Exit 53) to SR-10 (Exit 81 / US-231) in Murfreesboro and SR-1 from I-24 to SR-10 in Murfreesboro - ITS 29,548,554.52 51,554,092.00
Tennessee 1243081 I-124, From the I-24 Interchange to South of the Tennessee River Bridge - Widen - Add Lanes 131,563,917.00 164,459,234.00
Tennessee 2401290 I-240, From North of SR-385 (South of Poplar Avenue) to North of Walnut Grove Road - Widen 43,962,243.00 55,086,536.00
Tennessee 2401294 I-240,4 Overhead Bridges: Norfolk Southern R/R, SR-57 (Poplar Ave, EB & WB) and Park Ave., Ramps Connecting SR-57 to SB I-240-Bridge Replacement 66,977,401.00 70,818,317.00
Tennessee 4404084 I-440, From I-40 to I-24 - Reconstruction 134,000,000.00 167,500,000.00
Tennessee 6407161 I-640, Interchange at North Broadway (Phase II) in Knoxville - Reconstruction and Relocation of Ramps 5,497,200.00 31,310,230.00
Tennessee 8300070 Albert Gallatin Ave/Hatten Track Rd Ext, From SR-109 to SR-174 - New Construction 28,435,790.00 37,352,392.00