U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Texas

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Texas 0095022-02 VARIOUS LOCATIONS IN TARRANT COUNTY, CONGESTION MITIGATION & AIR QUALITY 21,301,440.00 26,626,800.00
Texas 0108184 IH 10 FROM W OF ADAMS BAYOU, EAST TO W OF SABINE RIVER BRIDGE RECONSTRUCT MAIN LANES OF EXISTING 4 LANE FREEWAY 15,079,960.37 55,519,614.93
Texas 0354235 IH 35 IN MCLENNAN, FALLS AND BELL COUNTIES. RECONSTRUCT AND WIDEN FROM FOUR TO SIX LANES REDUCE CONGESTION AND ENHANCE SAFETY. 121,308,608.57 137,861,091.63
Texas 0355152 IH 35W FROM IH 820 TO IH 30. RECONSTRUCT FREEWAY AND ADD MANAGED TOLL LANES 220,313,023.61 294,794,414.93
Texas 0356438 IH 35E FROM SANDY LAKE RD/WHITLOCK LN TO LOOP 288. RECONST 6 LN TO 8 MAINLANES, 4 CONCURRENT MANAGED/HOV AND FR 397,540,702.04 1,049,891,743.18
Texas 0451346 IH 45 FROM AT IH 610 S TO CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB 22,024,369.15 27,697,662.26
Texas 1102012 ON US 290 FROM US 183 TO SH 130.CONSTRUCT 6-LANE TOLLWAY W/ FRT RDS 103,120,000.00 240,301,000.00
Texas 1102054 US 190 FR. 0.20 MI E OF FM 3470 TO 0.30 MI W OF FM 2410 FR. 3470 TO ROY REYNOLDS . CONSTRUCT OVERPASS AND WIDEN FR 2 TO 4 LNS W/CO 4,033,312.66 25,842,684.00
Texas 1102319 SH 242 FROM AT IH 45 TO . CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH 242 TO SB IH 45 & NB IH 45 TO WB SH 242 ( 1,480,218.39 31,278,253.00
Texas 1102477 IH 10 FROM AT NECHES RIVER BRIDGE TO (STR 002809065). REPLACE EXISTING BRIDGE AND APPROACHES 64,447,646.73 71,746,969.97
Texas 1102493 FROM IH 20 TO FM 700. CONSTRUCT NEW RELIEF ROUTE 63,362,556.40 79,120,364.25
Texas 1102558 ON LP 1 FROM FM 734 (PARMER LANE) TO CESAR CHAVEZ STREET INTERCHANGE. PHASE 1: CONSTRUCT NB AND SB MANAGED LANES_(TOLL) 160,595,203.40 200,744,004.75
Texas 1402016 RECONSTRUCT CLINTON DRIVE 15,711,497.00 31,121,001.72
Texas 1402039 FM 1938 FROM 0.2 MILE SOUTH OF FM 1709 TO RANDOL MILL RD/WESTLAKE C/L. RECONSTRUCT AND WIDEN 2 LANE COUNTY ROAD TO A 4 LANE 16,800,000.00 26,578,548.05
Texas 1402081 IH 69 FR W OF FM 762 TO 0.31 MI W OF FM 2759. WIDEN TO 8 ML, FRTG RDS, ITS, TMS, CONST 2-WAY HOV LNS & INT IMPRVS AT FM 762. 130,353,034.39 183,422,238.85
Texas 1402183 IH 45 FROM SP 5 TO US 59. CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE EXISTING US 59 NB AND SB DIRECT CONNECTORS. 30,657,439.71 38,321,799.64
Texas 1502083 00US 75 FROM PGBT TO PARK BLVD. WIDEN D-C FR PGBT TO NB US75 & SB US75 TO PGBT; EXT DART RR BR & REPL PLANO PKWY O/PASS; AUX LN NB 33,698,196.89 60,430,306.01
Texas 1502184 ON US 290 FR W OF BAUER ROAD TO W OF MASON ROAD (SEGMENT 10B). WDN TO 8 MAIN LNS WITH AUX LNS & 2 - 2 LN FRONTAGE RDS. 38,901,478.39 49,048,505.79
Texas 1502464 US 83 FROM 0.28 MI WEST OF SHOWERS RD TO 0.85 MI E OF FM 886(EL FARO RD). CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY 21,812,000.00 67,039,536.19
Texas 1502486 ON IH 45 FR 0.4 MI SOUTH OF FM 246 TO 2.1 MI SOUTH OF BI 45F. WIDEN FRWY FR 4 TO 6 LNS; INSTALL WIRELESS ITS. 49,939,087.87 79,676,120.01
Texas 1502487 IH 45 FROM FM 739 TO 15TH STREET IN CORSICANA CONSTRUCT PHASE 1 INTERCHANGE AT NEW LOCATION-SH 31 BYPASS 30,416,428.27 32,690,661.65
Texas 1502488 ON SH 31 FR 3.2 MI W OF FM 2555 TO 3.7 MI E OF IH 45. CONSTR NEW LOC RELIEF RTE; ULTIMATE 4 LN DIV LIM ACC FAC W/IC @ IH45. 12,561,278.72 86,687,316.45
Texas 1502521 IH35 FR N. STASSNEY LN TO S. WILLIAM CANNON DR ADD SHLDERS, AUX LNS, RAMP IMPRVMTS, PAV REHAB, BIKE & PED IMPRVM, FRT RD INTSE IMP 31,332,261.92 77,852,159.34
Texas 1502531 ON IH 35E FR US 77 S OF WAXAHACHIE TO US 77 N OF WAXAHACHIE. RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES 107,208,988.92 139,999,756.15
Texas 1502613 FM 1626 LANE RECONSTRUCTION 0.00 25,689,139.16
Texas 1602189 REHAB EXISTING ROADWAY ON IH 40 11,475,826.98 28,689,649.86
Texas 1602247 IH 410 AT US 90. RECONSTRUCT INTERCHANGE AND OPERATIONAL IMPROVEMENTS 73,498,308.65 81,664,787.39
Texas 1602259 SH 358 FROM NILE STREET TO AYERS STREET. RAMP REVERSAL PHASE II-A, SOUTH SIDE ONLY. 38,176,406.49 47,720,508.11
Texas 1602317 REHABILITATE EXISTING ROAD ON SH 7 18,092,436.34 29,074,820.43
Texas 1602427 CONSTRUCT 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND SIDEWALKS ON IH 20 9,975,395.26 67,199,506.15
Texas 1602430 CONSTRUCT MAINLANES AND ENTRANCE/EXIT RAMPS FOR SH 199 41,993,887.46 52,492,359.31
Texas 1602470 WIDEN EXISTING FOUR LANE TO SIX LANE ON IH 10 38,949,591.46 48,686,989.33
Texas 1602504 SL 20. CONSTRUCTION OF INTERCHANGE FACILITY 21,557,826.47 29,377,283.08
Texas 1602671 SH 288 AT BW 8 INTERCHANGE. CONSTRUCT 8 DIRECT CONNECTORS 1,802,655.00 100,253,318.00
Texas 1702007 IH 10 ADDITIONAL LANE CONSTRUCTION 153,348,307.03 192,080,905.63
Texas 1702354 CONSTRUCT 0 TO 3/4 COLLECTOR DISTRIBUTOR, RECONSTRUCT 1/3 LANE SOUTHBOUND FRONTAGE ROADS AND RAMP MODIFICATIONS ON IH 35E 66,366,111.88 82,997,575.32
Texas 1702355 CONSTRUCT 4 LANE BRIDGE AND RAMP MODIFICATIONS ON SH 114 26,585,626.44 46,732,033.06
Texas 1702416 FM 521 - WIDEN TO 4-LANE DIVIDED SECTION AND CONSTRUCT GRADE SEPARATION AT UNION PACIFIC RAIL ROAD 20,458,196.69 25,684,230.42
Texas 1702473 SL 335- CONSTRUCT FRONTAGE ROADS. 19,184,316.02 31,420,395.03
Texas 1702492 US 77 - CONSTRUCT MAINLANES & OVERPASS 20,752,001.16 25,940,001.46
Texas 1702501 IH 10 INTERCHANGE IMPROVEMENTS 14,441,495.74 32,825,598.60
Texas 1702506 IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES 94,615,640.22 118,269,550.27
Texas 1702559 CONSTRUCT 4-LANE DIVIDED URBAN STREET FACILITY ON NEW LOCATION ON AIRPORT BOULEVARD 28,171,736.97 35,230,786.81
Texas 1702626 RECONSTRUCTION OF DIRECT CONNECTOR ON IH 69 8,192,098.06 25,478,331.19
Texas 1702631 CONSTRUCT DIRECT CONNECTOR AND HOV ACCESS TO UPTOWN TRANSIT CENTER ON IH 610 56,915,556.97 68,253,926.76
Texas 1702633 IH 610 RECONSTRUCTION 82,764,189.06 94,871,321.17
Texas 1702650 IH 35 OPERATIONAL IMPROVEMENTS 116,499,570.90 138,383,967.68
Texas 1702682 CONSTRUCT TWO LANE RURAL HIGHWAY ON SH 211. 0.00 27,120,592.81
Texas 1702687 US 54 WIDEN AND CONSTRUCT RAMP REVERSALS 34,101,968.63 42,627,460.78
Texas 1702696 WIDEN FREEWAY ON IH 45 103,488,702.00 129,360,877.51
Texas 1702730 FM 2181. WIDEN ROADWAY 2,724,755.09 33,083,435.70
Texas 1702792 SL 1 GRADE SEPARATION OF MAIN LANES 47,550,061.36 59,058,271.19
Texas 1702818 RECONSTRUCT ROADWAY AT BUFFALO SPEEDWAY 2,196,640.00 27,975,271.62
Texas 1702839 CONSTRUCT 4 LANE TOLLWAY IN SECTIONS ON SH 249 154,400,000.00 309,757,180.00
Texas 1702842 CONVERT REVERSIBLE HOV TO REVERSIBLE EXPRESS LANES, RECONSTRUCT AND WIDEN MAINLANES AND FRONTAGE ROADS ON IH35 E AND US 67 317,248,899.00 624,975,805.00
Texas 1802011 WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED, INCLUDING INTERSECTION IMPROVEMENTS ON FM 664. 24,946,752.10 32,296,841.69
Texas 1802175 IH 610 - RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS AT CAMBRIDGE STREET/ALMEDA ROAD/UNION PACIFIC RAILROAD 65,000,000.00 84,171,015.81
Texas 1802203 REHABILITATE AND RAISE ROADWAY ON SH 87 17,531,249.14 26,443,393.32
Texas 1802312 ASPHALT CONCRETE PAVEMENT OVERLAY ON SH 158. 23,478,803.77 29,568,456.48
Texas 1802325 ROADWAY WIDEN TO A MODIFIED SUPER 2 ON US 67. 5,000,000.00 53,396,420.94
Texas 1802372 WIDEN 2 LANE TO 6 LANE DIVIDED URBAN SECTION; AND REPLACE RAILROAD OVERPASS ON US 377 4,400,000.00 39,003,515.57
Texas 1802387 CONSTRUCT GRADE SEPARATION, RECONFIGURE RAMPS AND WIDEN FRONTAGE ROAD TO CONVERT TO ONE WAY ON IH 10 33,236,451.18 36,948,609.84
Texas 1802390 EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 50,100,000.00 200,648,881.31
Texas 1802395 US 82 - ADD TWO LANES WITH SHOULDERS AND WIDEN FROM 2 LANE TO 4 LANE 64,335,054.86 80,513,975.57
Texas 1802404 CONSTRUCT MAIN LANES, OVERPASSES, FRONTAGE ROADS AND STRUCTURES ON US 77 32,383,849.12 40,479,811.40
Texas 1802412 US 69 - WIDEN FREEWAY FROM 4 TO 6 LANES 27,865,125.15 34,831,406.44
Texas 1802413 IH 10 - WIDEN FREEWAY FROM 4 TO 6 LANES 112,175,146.80 140,218,933.50
Texas 1802439 WIDEN ROAD - ADD LANES ON SH 97 36,000,000.00 70,119,828.47
Texas 1802497 WIDEN TO SIX MAIN LANES, 2-LANE FRONTAGE ROADS, SAFETY LIGHTING; INTELLIGENT TRANSPORTATION SYSTEM ON IH 10 125,000,000.00 373,870,824.61
Texas 1802506 US 83 CONSTRUCT OVERPASS, RELOCATE RAMPS, AND REGRADE CURVE. 15,555,536.36 31,402,942.17
Texas 1802535 REPLACE BRIDGE AND APPROACHES ON IH 35. 31,139,856.53 34,639,578.08
Texas 1802544 CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS ON IH 30 34,727,761.59 43,465,575.34
Texas 1802546 CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION ON US 377 35,668,539.46 56,399,568.86
Texas 1802552 WIDEN 2 TO 4 LANE DIVIDED ON FM 156. 45,803,593.63 57,254,492.03
Texas 1802558 CONSTRUCT GRADE SEPARATION ON US 181 23,585,793.48 29,482,241.85
Texas 1802575 RAMPS RECONFIGURATION AND FRONTAGE ROAD EXTENSION ON SL 375 29,294,331.68 36,617,914.61
Texas 1802735 CONSTRUCT INTERCHANGES ON US 67. 34,107,050.15 42,644,067.82
Texas 1902002 WIDEN ROAD - ADD LANES ON SH 36 7,000,000.00 98,644,061.78
Texas 1902024 REHABILITATION OF EXISTING ROAD ON OLD SAN ANTONIO ROAD. 36,081,764.56 47,827,911.87
Texas 1902056 FM 2221. CONSTRUCT CONTROLLED ACCESS FACILITY. 91,218,763.56 114,516,232.45
Texas 1902057 CONSTRUCT RAMPS ON IH 35. 63,128,251.91 70,219,374.38
Texas 1902060 REHABILITATIONS AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 85. 10,000,000.00 40,682,774.72
Texas 1902063 REHABILITATION OF EXISTING ROAD ON SH 123. 21,394,897.17 26,752,645.11
Texas 1902081 CONSTRUCT 4 LANE DIRECT CONNECTION (FUTURE I-69) ON US 59. 60,440,799.99 92,628,331.74
Texas 1902105 IH 45 WIDEN ROAD ADD LANES 142,813,404.19 179,214,098.64
Texas 1902107 REHABILITATION OF EXISTING ROAD ON US 183 22,000,000.00 28,720,936.06
Texas 1902148 HAZARD ELIMINATION AND SAFETY ON IH 27 AND US 87. 27,579,130.44 42,640,057.38
Texas 1902182 FM 2100 WIDEN TO 4 LANE DIVIDED 23,531,834.67 29,496,649.84
Texas 1902201 INTERCHANGE IMPROVEMENT ON SL 12 AND SS 482. 100,000,000.00 341,709,166.57
Texas 1902215 WIDEN ROAD AND ADD LANES ON IH 410 64,126,345.37 84,896,921.79
Texas 1902268 WIDEN FROM 2 LANE TO 4 LANE WITH A CONTINUOUS LEFT TURN LANE; REPLACE BRIDGE AT SAND CREEK 7,000,000.00 35,502,514.54
Texas 1902275 HAZARD ELIMINATION AND SAFETY 27,094,864.76 30,105,405.28
Texas 1902276 HAZARD ELIMINATION AND SAFETY ON IH 20 27,295,472.37 27,550,524.86
Texas 1902299 CONSTRUCT NEW ROADWAY LANES ON US 281 66,747,449.27 83,434,311.59
Texas 1902314 WIDEN FREEWAY - ADD LANES ON IH 10. 80,492,432.23 100,790,599.37
Texas 1902343 SH 87 - FERRY OPERATION PROJECTS 21,874,049.60 27,342,562.00
Texas 1902350 EMERGENCY BRIDGE REPLACEMENT AT LAKE LYNDON B. JOHNSON. 20,507,762.40 25,634,703.00
Texas 1902389 WIDEN FREEWAY ON IH 635. 591,159,862.83 1,720,223,200.00
Texas 1902417 CONSTRUCT INTERCHANGE ON IH 2 AND IH 69C. 117,480,000.00 300,051,164.00
Texas 1996001 STATEWIDE, STATE INFRASTRUCTURE BANK -ADV CAP 71,726,747.00 192,462,886.00
Texas 2002040 IH 30 FROM EAST OF SYLVAN AVE TO IH 35E. WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV. 36,234,552.00 112,449,552.20
Texas 2002632 US CUSTOMS PORT OF ENTRY EXIT TO US 281. CONSTRUCTION OF BORDER SAFETY INSPECTION FACILITY (BSIF) 33,146,456.76 36,270,895.40
Texas 2004426 FROM IH 35E AT TRINITY RIVER NB & SB. REPLACE BRIDGES OVER TRINITY R; WIDEN & RECONSTRUCT 7 ML'S, 9 C-D LANES & 2 REVERSIBLE HO 43,673,139.93 112,035,000.00
Texas 2005862 US 82 FROM US 82 AT US 281 TO .. CONSTRUCT DIRECT CONNECT INTERCHANGE 0.00 31,139,709.00
Texas 2005994 IH 635 FROM WEBB CHAPEL TO WEST OF US 75 (MERIT DR). IMPROVE FREEWAY - PHASE 1; ADD SUBSURFACE HOV/MANAGED LANES 346,160,303.95 930,082,152.42
Texas 2007405 FM 1314 FROM 1.0 MI S OF SH 242 TO 2.6 MILE NW OF LOOP 494 WIDEN TO 4 LANE DIVIDED RURAL ROAD AND LENGTHEN OR REPLACE 29,683,024.19 46,093,270.00
Texas 2007688 FM 1484 FROM FM 3083 TO FM 2432. WIDEN TO 4 LANE DIVIDED 18,508,072.78 33,997,859.93
Texas 2007717 FM 1488 FROM EAST OF FM 149 AT MOSTYN TO FM 2978. WIDEN 2 LANES TO 4-LANE DIVIDED (PTF) 26,026,471.13 36,148,371.04
Texas 2007869 SS 601 FROM US 54 (PATRIOT FREEWAY) TO LOOP 375 (PURPLE HEART FREEWAY). CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES 244,634,419.55 359,350,000.00
Texas 2007913 FM 3407 FROM RM 12 TO RM 2439 CONSTRUCT 4-LN DIVIDED ROADWAY 32,415,232.10 41,732,542.58
Texas 2008345 ON SH 199 AT BYPASS CHANNEL IN FTW TO NEAR CBD & TRINITY RIVER. CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL. 14,124,013.00 27,893,538.40
Texas 2008654 US 79 FROM 79-B E OF TAYLOR TO E OF FM 1063. UPGRADE TO 4-LN DIVIDED RDWY 17,287,231.24 28,636,441.29
Texas 2008830 IH 20 FROM SH 171; IN WEATHERFORD TO FM 2552; ON EAST AND WEST BOUND FRONTAGE ROADS. RECONSTRUCT AND EXTEND FRONTAGE ROAD. 19,108,835.27 35,689,114.71
Texas 2009235 FM 646 FROM FM 517 TO FM 1764. WIDEN FROM 2 LANES TO 4-LANE DIVIDED (PTF) 12,677,960.97 26,866,332.00
Texas 2009513 ENGINEERING, ROW, & CONSTRUCTION OF DFW CONNECTOR ON SH 114 AND SH 121. RECONSTRUCT FREEWAY, FRONTAGE ROADS AND RAMPS 609,278,566.00 696,394,133.00
Texas 2009656 IH 10 @ LP 375. INTERCHANGE IMPROVEMENTS INCLUDING THE CONSTRUCTION OF DIRECT-CONNECTORS 6,484,439.64 38,105,549.55
Texas 2009661 SH 31 WIDEN FROM TWO TO FOUR LANES 37,300,000.00 69,744,817.42
Texas 2009753 ENGINEERING, ROW AND CST OF DFW CONNECTOR ON SH 121 AND SH 114. RECONST FRWY 4 TO 6 W/AUX LNS,FR RDS & RAMPS & ADD COLLECTOR 591,539,254.30 739,424,067.78
Texas 2009919 IH 820 FROM IH 35W TO SH 121/SH 183. RECONSTRUCT 4 TO 10 W/ HOV/MANAGED LANE, INTERCHANGE AND CONNECTORS 421,105,616.27 526,087,354.64
Texas 2011591 US 271 FROM 0.3 MI. NORTH OF US 67 TO .7MI SOUTH OF FM 3417. CONSTRUCT FIRST PHASE OF ULTIMATE 4-LANE DIVIDED FREEWAY 46,038,349.13 87,852,142.31
Texas 2011998 IH 610 FROM TC JESTER TO N OF IH 10 ON IH 610 AND TO 34TH ST ON US 290. RECONSTR US290/IH610 IC, CONSTR INTERCHANGE W/ DC'S W/ TWO 36,665,773.00 171,036,404.00
Texas 2012125 LP 363 FROM IH 35 NORTH OF TEMPLE TO SH 53. CONSTRUCT NORTHBOUND FRONTAGE ROAD TO PROVIDE INTERIM 4-LANE 22,880,997.38 39,597,527.26
Texas 2012221 SH 550 @ US 77/83 TO 0.53 MI E OF OLD ALICE RD. CONSTRUCT TOLLED DIRECT CONNECTORS & MAIN LANES 2,300,000.00 34,495,766.00
Texas 2012232 US 290 FROM WEST OF RM 1826 TO SL 1; RECONSTRUCT 4-LANE TO 6-LANE CONTROLLED ACCESS HIGHWAY AND FRONTAGE ROADS 13,049,468.00 557,993,285.72
Texas 2012530 US 281 FROM RIVER CROSSING TO BLANCO CO LINE. EXPAND 2 TO 4 LANES DIVIDED RURAL 17,894,628.00 26,362,043.00
Texas 2012594 US 59 - WIDEN TO 6 MAIN LANES WITH FRONTAGE ROADS 64,105,000.00 120,120,653.85
Texas 2012596 SH 71 FROM US 290 WEST TO SILVERMINE DR. CONSTRUCT 4-LANE DIVIDED HIGHWAY WITH DIRECT CONNECTORS 2,059,000.00 137,988,342.91
Texas 2012691 IH 35 FROM S LP 363 IN TEMPLE TO NUGENT AVE. RECONSTRUCT AND WIDEN FROM FOUR TO EIGHT LANES. 233,750,004.59 275,865,720.60
Texas 2012805 RECONSTRUCT AND WIDEN FROM 4-LANE TO 6-LANE ON MEDICAL DISTRICT DRIVE. 19,376,490.00 27,202,300.29
Texas 2013082 AT VARIOUS LOCATIONS ON US290, WEST OF FM 529 AND LITTLE YORK.CONSTRUCT FRONTAGE RDS AND ADD AUXILIARY LANES & GRADE SEPARATIONS 69,991,557.83 87,879,332.83
Texas 2013136 ON IH 610 FROM W OF W 34TH ST ON US 290 TO N AND S OF US 290 ON IH 610.RECONSTRUCT US 290/IH 610 INCLUDING IH10 TO US 290 OUTBOUND 99,132,093.21 124,346,658.20
Texas 2013148 ON US 290 FROM WEST OF FM 529 TO E OF W LITTLE YORK (SEGMENT 6). CONSTRUCT 5 MAIN LANES WITH AUXILIARY LANES & 2 OR 3 LANE 36,171,937.49 44,886,633.00
Texas 2013163 IH 45 FROM 0.9884 MILES SOUTH OF FM 2351 TO SOUTH OF MEDICAL CENTER DRIVE. WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3-LANE FR 84,974,107.91 106,485,347.46
Texas 2013218 CONSTRUCT FOUR LANE FREEWAY AT DIBOLL (FUTURE I-69) 14,237,000.00 171,923,286.00
Texas 2013226 IH 10 AT SH 87 AND T&NO RR. REPLACE BRIDGE AND APPROACHES 24,578,123.17 30,722,653.80
Texas 2013287 US 77 FROM CR 16 TO FM 1898. CONSTRUCT MAIN LANES, PARTIAL FRONTAGE ROADS AND OVERPASSES. 68,072,909.39 85,091,136.74
Texas 2013292 SH183 FROM FM157 TO I35E; LP12 FROM SH183 TO I35E; AND SH114 FROM SH97 TO SH183. RECONSTRUCT & ADD MANAGED LANES 576,221,762.15 809,451,840.03
Texas 2013307 IH 30 EAST OF SYLVAN AVE TO IH 35E. MARGARET MCDERMOTT BRIDGES. 27,240,122.00 34,050,152.40
Texas 2013353 IH 30 AT BECKLEY, AT TRINITY RIVER, AND AT RIVERFRONT BLVD. REPLACE BRIDGE AND APPROACHES WITH 10 MAINLANES 35,919,281.17 45,850,000.00
Texas 2013400 US 82 FROM FM 1840 TO SH 98. RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES 8,226,671.75 27,294,014.40
Texas 2013420 ON SH 365 FROM FM 396 TO US 281. CONSTRUCT 4-LANE CONTROLLED ACCESS TOLLED FACILITY 28,293,144.00 256,493,439.00
Texas 2013567 CONSTRUCT 6-LANE DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY WITH AUTO PUMP STATION AND RAILROAD LINE WITH UNDERPASSES ON HEMPSTEAD ROAD 32,852,164.82 61,662,913.46
Texas 2013596 REHABILITATION OF EXISTING ROADWAY AND INTERCHANGE IMPROVEMENTS ON US 175 AND SH 310. 14,000,000.00 47,506,925.80
Texas 2013734 FM 359 AT US 90A AND UPRR. RAILROAD GRADE SEPARATION (ELEVATED T). 28,028,742.88 35,075,317.23
Texas 2013737 US 290 FR W OF PINEMONT TO W OF 34TH ST. RECONSTRUCT & WIDEN TO 8 MN LNS WITH 3 REV MANAGED LNS, AUX LNS; 2-2 LN FRTG RDS. 50,689,709.93 176,105,503.14
Texas 2013740 US 290 - RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES AND TWO 2-LANE FRONTAGE ROADS 90,576,521.07 194,587,373.84
Texas 2013741 ON US 290 FR E OF W LITTLE YORK TO W OF PINEMONT. RECONSTRUCT & WIDEN TO 8 MN LNS, 3 REV MNG LNS, AUX LNS; 2 2-LN FRTG RDS, GRD SE 102,778,084.87 189,407,321.74
Texas 2013874 REPLACE BRIDGE AND APPROACHES ON FM 1495. 13,745,943.81 28,166,041.85
Texas 2013875 CONSTRUCT NEW ROAD ON LP 375. 29,427,716.36 36,784,645.46
Texas 2013983 US 290 FROM E OF MUESCHKE RD TO E OF TELGE RD. RECON AN WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MAIN LANES, AUX LANES AND 2-LN FR 37,362,073.98 98,369,741.82
Texas 2013984 CONSTRUCT DIRECT CONNECTOR ON IH 45 AT IH 610 E. 54,173,017.24 56,633,472.39
Texas 2013991 IH 610 FROM W OF 34TH ST ON US 209 TO IH 610. RECONSTRUCT US 290/IH 610 INTERCHANGE WITH DIRECT CONNECTORS AND 3-LANE REVERSIBLE 2,830,000.00 181,761,983.83
Texas 2013996 FM 1957 FROM SH 211 TO LOOP 1604. EXPAND FROM 2 LANES TO 4 LANE DIVIDED. 2,224,000.00 37,501,000.00
Texas 2014154 SH 26 RECONSTRUCTION 22,499,087.33 28,634,874.16
Texas 2014211 ON US 59 FROM SP 10 TO W OF FM 762. WIDEN TO 6-LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM W/ GRADE SEPARATION 126,532,655.18 155,662,867.49
Texas 2014326 CONSTRUCT NEW ROAD ON MCHARD ROAD. 0.00 32,841,012.00
Texas 2014444 WIDEN ROAD, ADD LANES, AND SHOULDERS ON US 69 33,829,736.79 42,287,170.98
Texas 2014643 SH 105 FROM AT THE BRAZOS RIVER TO . REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, STRUCTURES, BASE AND SURFACE 28,167,790.30 35,209,737.90
Texas 2014669 AT WHITE SETTLEMENT RD IN FTW. CONST 4 LN BRIDGE AT NEW LOC OF PROPOSED BYPASS CHANNEL FOR TRINITY RIVER NEAR CBD OF FTW 6,200,000.00 33,796,872.18
Texas 2014953 US 290 FR W OF MASON RD TO E OF MUESCHKE RD. RECONST & WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE MANAGED LANES, AUX LANES, FRTG RDS. 53,086,121.17 66,881,090.26
Texas 2015062 ON IH 30 AT FM 3549. RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS AND RAMPS CONSTRUCTION. 16,709,036.80 26,585,311.57
Texas 2015220 IH 10 FROM MESA STREET TO EXECUTIVE CENTER. COLLECTOR DISTRIBUTOR LANES AND CONSTRUCT INTERCHANGE @ US 85/NM 273 132,281,613.44 178,994,034.63
Texas 2016108 ADD SHOULDERS, AUXILLARY LNS, RAMP IMPROVEMENTS, PAVEMENT REHAB, BIKE AND PED IMPROVEMENTS & FRONTAGE ROAD INTERSECTION IMPROVEMENTS ON IH 35 42,031,638.29 46,713,820.32
Texas 2016183 ON IH30 FR 1.0 MI W OF SH360 TO GREAT SOUTHWEST PKWY; AT SIX FLAGS DR. CONST DIR CONN INTCHG AT SH360 & TMS & RECONSTR BRIDGE. 43,206,971.49 260,791,576.08
Texas 2016326 IH 2 FROM 0.209 MI W OF SP 115 TO 0.203 MI E OF SH 336. INTERCHANGE IMPROVEMENTS @ MAIN STREET & BICENTENNIAL. 44,111,471.79 49,012,746.43
Texas 2016367 SL 49 CONTROLLED ACCESS TOLL ROAD CONSTRUCTION 3,232,010.98 66,595,380.24
Texas 2016739 WIDEN 2-LANE UNDIVIDED HIGHWAY TO 4-LANE URBAN FREEWAY WITH GRADE SEPARATED INTERCHANGES AND 0 TO 4-LANE FRONTAGE ON US 287 56,172,445.12 71,175,163.79
Texas 2016884 US 175 & IH 45 WIDENING 100,963,387.50 117,539,821.09
Texas 2017083 CONSTRUCT GRADE SEPARATION ALONG IH 35E 13,378,304.00 37,778,167.76
Texas 2017241 IH 45. WIDEN FREEWAY CONSISTING OF GRADING, STRUCTURES, FLEXIBLE BASE, HMA, CONCRETE PAVEMENT, SIGNS AND PAVEMENT MARKINGS 114,881,928.26 143,602,410.32
Texas 2017368 IH 20. REALIGN EXISTING ROADWAY INCLUDING GRADING, PAVEMENT DRAINAGE, SIGNING, AND ILLUMINATION. 78,781,825.43 88,339,259.79
Texas 2017592 EXPAND TO 6 LANE EXPRESSWAY WITH FRONTAGE ROADS ON US 281 78,000,000.00 199,577,086.75
Texas 2017887 WIDEN FREEWAY FROM FOUR TO SIX LANES ON US 67 3,022,594.50 66,270,431.33
Texas 2017906 WIDEN ROADWAY INCLUDING FRONTAGE ROADS, STRIPING AND SIGNING ON IH 45 63,259,215.23 94,794,666.94
Texas 2017973 REPLACE SWING BRIDGE ON FM 457 45,299,774.23 45,299,774.23
Texas 2017990 IH 10 EXPAND FROM 4 TO 8 LANE EXPRESSWAY 66,199,546.54 82,749,433.17
Texas 2018077 REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 72. 23,907,486.68 33,884,358.34
Texas 2018201 CONSTRUCT RELIEF ROUTE AROUND DRISCOLL ON US 77. 40,000,000.00 98,921,208.78
Texas 2018321 IH 820 AND SH 121. RECONSTRUCTION AND WIDENING. 134,591,824.21 168,259,780.27
Texas 2018359 REPLACE EXISTING APPROACHES AND BRIDGES ON IH 40 36,532,137.11 40,591,263.45
Texas 2018375 DEDICATED BUS LANE ON IH 610 32,250,206.60 64,107,123.38
Texas 2018416 FM 762 AND FM 2759 - WIDEN TO 4 LANES DIVIDED 27,554,687.76 34,539,569.58
Texas 2018434 US 377 AT LAKE TEXOMA. BRIDGE REPLACEMENT. 5,000,000.00 35,234,013.62
Texas 2018456 SH 360 WIDEN AND RECONSTRUCT FROM 6 TO 8 LANES. 50,933,368.17 64,243,032.73
Texas 2018627 CITY STREET FROM MARSALIS AVENUE TO EWING AVENUE. CONSTRUCT LOCAL ENHANCEMENTS. 16,000,000.00 39,388,000.00
Texas 2018811 WIDEN FROM 2 LANES TO 4 LANE ON US 69 52,977,757.81 66,222,197.26
Texas 2018842 UPGRADE FROM 4-LANE DIVIDED HWY TO 4-LANE FREEWAY WITH FRONTAGE ROAD BY CONSTRUCTING 4 MAINLANES, INTERCHANGES, AND FRONTAGE ROADS AT SH 44 26,238,131.10 32,797,663.88
Texas 2018852 WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES ON SH 146 81,128,000.00 253,240,692.19
Texas 2018858 SH 242 AT FM 1314. CONSTRUCT GRADE SEPARATION. 21,168,947.40 26,532,973.00
Texas 2018873 REHAB AND WIDEN TO PROVIDE PASSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16 17,100,000.00 43,749,069.95
Texas 2018882 ROADWAY WIDENING TO A MODIFIED SUPER 2 ON US 285 27,736,526.95 34,670,658.69
Texas 2018907 RECONSTRUCT INTERSECTION ON IH 35. 23,445,433.99 26,050,482.21
Texas 2018953 CONSTRUCT OVERPASS AND RECONFIGURE INTERCHANGE ON IH 10 27,763,717.15 34,704,646.44
Texas 2018963 RECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE ROADS ON IH 45 200,501,389.55 251,138,652.59
Texas 2018972 SL 1604 - EXPAND FROM 2 LANES TO 4 LANE DIVIDED 23,000,000.00 41,186,171.87
Texas 2018973 SL 1604 - EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY 42,055,149.12 52,605,944.00
Texas 2019045 REHABILITATE ROADWAY ON UP 281 14,075,166.97 25,191,978.72
Texas 2019047 REHABILITATE EXISTING ROADWAY ON US 83. 58,274,022.74 72,871,466.30
Texas 2019048 REHABILITATION OF EXISTING HIGHWAY ON US 83. 9,000,000.00 65,135,678.13
Texas 2019063 BUILD FRONTAGE ROADS AND MAINLANES WITH GRADE SEPARATIONS AT INTERSECTIONS ON US 62. 25,000,000.00 172,354,438.05
Texas 2019106 RECONSTRUCT EXISTING 4-LANE UNDIVIDED ROADWAY TO A 4-LANE DIVIDED ROADWAY ON US 290. 25,000,000.00 37,082,955.39
Texas 2019166 US 54 FROM LOOP 375, INTERCHANGE IMPROVEMENTS. 89,673,201.39 112,175,417.14
Texas 2019242 CONSTRUCT 2 LANE STRUCTURE TO COMPLETE 4 LANE. FACILITY OPERATIONAL IMPROVEMENT TO ELIMINATE BOTTLENECK ON SH 334. 37,531,101.41 46,913,876.76
Texas 2019274 REHABILITATION AND WIDEN ROADWAY TO PROVIDE PASSSING LANES AND OPERATIONAL IMPROVEMENTS ON SH 16. 10,514,458.00 25,646,863.06
Texas 2019312 RECONSTRUCTION ON 1H 35 TO INCLUDE WIDENING FROM 6 TO 8 LANES. 184,225,000.00 373,325,164.70
Texas 2019409 US 54, CONVERT TO SUPER 2 HIGHWAY 19,000,000.00 38,238,067.66
Texas 2019411 CONSTRUCT FRONTAGE ROADS FOR FUTURE FREEWAY ON SL 335. 30,000,000.00 51,379,802.32
Texas 2019437 CONSTRUCT FRONTAGE ROADS ON US 59. 17,000,000.00 38,337,252.61
Texas 2019442 CONSTRUCT NEW INTERCHANGE ON SL 250. 20,067,374.89 27,084,218.61
Texas 2019507 RAMP REVISIONS,INTERSECTION AND FRONTAGE ROAD OPERATIONAL IMPROVEMENTS ON IH 35. 7,000,000.00 27,154,425.57
Texas 2019599 WIDEN NON-FREEWAY FROM 2 LANE TO 4 LANE ON US 190 17,000,000.00 86,376,750.15
Texas 2019609 RECONSTRUCT EXISTING 4 LANE UNDIVIDED ROADWAY TO A 4 LANE DIVIDED ROADWAY ON US 290. 25,471,516.09 31,918,362.62
Texas 2019611 US 60 TO WEST OF BOVINA. REHAB OF EXISTING ROADWAY. 3,000,000.00 28,667,631.21
Texas 2019613 CONSTRUCT TWO NEW COLORADO RIVER 2-LANE FRONTAGE ROAD BRIDGES ON SH 21. 16,000,000.00 44,777,398.93
Texas 2019626 FM 2100 - WIDEN TO 4-LANE DIVIDED 4,000,000.00 48,685,047.79
Texas 2019651 WIDEN ROAD AND ADD LANES ON US 190. 23,765,020.86 29,706,276.07
Texas 2019668 FULL DEPTH CONCRETE REPAIR AND OVERLAY ON IH 20. 5,000,000.00 26,412,368.30
Texas 2019689 REPLACE BRIDGES AND APPROACHES ON SH 8. 18,204,446.57 38,992,035.00
Texas 2019753 WIDEN ROAD - ADD LANES AND SHOULDERS ON SH 214. 8,837,737.11 26,340,126.63
Texas 2019797 SH 242 - WIDEN FROM 2 TO 4 LANES 32,195,200.80 73,431,751.26
Texas 2019822 HIGHWAY IMPROVEMENT ON US 385. 32,906,701.12 41,133,376.40
Texas 2019834 WIDEN FREEWAY ON IH 35E 101,800,943.70 128,702,705.70
Texas 2019859 INTERCHANGE IMPROVEMENT ON IH 45. 2,151,964.14 39,810,234.26
Texas 2019900 BASE REPAIR, SEAL COAT, OVERLAY, AND PAVEMENT MARKINGS ON MAINLANES ON IH 35 AND IH 37. 24,673,647.89 27,450,088.16
Texas 2019952 SH 242 - WIDEN FROM 2 TO 4 LANES 33,206,352.62 41,541,414.96
Texas 2019978 CONSTRUCT INTERCHANGE ON US 287. 3,000,000.00 30,849,400.78
Texas 2019988 FM 3005 - INSTALL CROSS CULVERTS, DRIVEWAY ADJUSTMENTS, OUTFALL IMPROVEMENTS, APPROX 12 INCH OVERLY AND STRIPING. 17,627,032.68 39,141,429.85
Texas 2019990 CONSTRUCT NEW SAFETY REST AREA ON IH 10 19,000,000.00 29,950,324.72
Texas 2019996 CONSTRUCT BRIDGE AT RM 620. 23,128,441.18 28,958,721.48
Texas 2020008 US 75 AT US 82 SOUTH OF CENTER STREET WIDEN ROAD. 13,000,000.00 169,147,954.04
Texas 2020056 WIDEN ROAD - ADD LANES ON SH 36 31,328,433.69 51,291,997.17
Texas 2020057 WIDEN ROAD - ADD LANES ON SH 36 62,840,000.00 91,254,896.60
Texas 2020115 WIDEN ROAD AND ADD LANES ON IH 10 20,000,000.00 164,781,261.91
Texas 2020185 RECONSTRUCT INTERCHANGE AND CONSTRUCT FRONTAGE ROAD ON IH 35. 47,558,158.59 59,510,187.06
Texas 2020303 WIDEN ROAD - ADD LANES ON FM 2218 33,214,590.04 58,166,053.43
Texas 2020314 OSTOS ROAD WIDEN ROAD, ADD LANES, AND SHOULDERS. 19,265,984.48 26,303,348.60
Texas 2020432 CONSTRUCT NEW ROAD ON PELLICANO DRIVE AT JOE BATTLE BOULEVARD TO DARRINGTON AT BERRYVILLE STREET. 18,464,800.00 26,520,124.43
Texas 2020451 BRIDGE REPLACEMENT ON US 271 20,280,865.15 25,351,081.44
Texas 2020455 WIDEN ROAD ADD LANES AND SHOULDERS TO IH 30. 76,946,054.15 97,568,095.52
Texas 2020476 REPLACE BRIDGE AND REHABILITATE FRONTAGE ROADS ON IH 20. 6,000,000.00 33,420,426.78
Texas 2020489 WIDEN FREEWAY ON SH 199. 95,997,373.38 120,008,399.33
Texas 2020493 WIDEN FREEWAY ON SH 170. 86,961,277.60 108,701,597.00
Texas 2020496 CONVERT NON-FREEWAY ON US 59. 30,000,000.00 182,251,470.46
Texas 2020549 HIGHWAY IMPROVEMENT ON IH 40. 20,320,000.00 27,831,657.31
Texas 2020571 HIGHWAY IMPROVEMENT; ROADWAY RECONSTRUCTION ON US 385. 43,685,315.66 54,606,644.57
Texas 2020573 REHABILITATION OF EXISTING ROAD ON SH 302 39,000,000.00 62,962,918.69
Texas 2020649 CONSTRUCT NEW INTERCHANGE AT NORTH SL 338 AT US 385 22,391,183.03 28,353,088.78
Texas 2020652 HIGHWAY IMPROVEMENT ON US 67 20,582,562.25 25,826,006.33
Texas 2020751 REHABILITATION OF EXISTING ROAD ON FM 2119 7,000,000.00 66,252,295.96
Texas 2020863 CONSTRUCT BRIDGE ON IH 20 30,674,839.02 40,343,548.78
Texas 2020864 CONSTRUCT BRIDGE ON SH 302. 25,000,000.00 60,650,012.18
Texas 2020871 CONVERT FROM NON-FREEWAY TO FREEWAY ON US 77 50,681,059.16 63,385,134.88
Texas 2020879 WIDEN NON-FREEWAY FACILITY ON FM 2818 38,019,405.83 48,166,546.29
Texas 2020944 ADD PASSING LANES ON US 83. 21,996,924.75 27,552,731.94
Texas 2020950 SURFACING AND ROADWAY RESTORATION ON SH 137 25,000,000.00 57,214,901.80
Texas 2020966 WIDEN ROAD - ADD LANES ON IH 10. 46,028,828.08 57,536,035.10
Texas 2021093 WIDEN ROAD - ADD LANES ON SL 121 0.00 35,249,903.86
Texas 2021189 REHABILITATION OF EXISTING ROAD ON FM 2004 3,000,000.00 31,453,621.29
Texas 2021213 BRIDGE REPLACEMENT ON SH 198. 0.00 33,163,967.62
Texas 2021310 WIDEN ROAD - ADD LANES ON SH 72. 0.00 50,911,818.47
Texas 2021327 WIDEN ROAD AND ADD LANES ON IH 35. 45,000,000.00 235,087,606.29
Texas 2021339 HIGHWAY IMPROVEMENT ON US 183 0.00 120,001,000.00
Texas 2021404 CONSTRUCT DIRECT CONNECTORS ON IH 410 84,762,682.49 105,987,638.80
Texas 2021488 WIDEN ROAD-ADD LANES ON SL 1604 0.00 163,323,331.38
Texas 2021492 WIDEN ROAD - ADD LANES ON FM 1463 0.00 59,035,106.62
Texas 2021518 HIGHWAY IMPROVEMENT ON IH 27. 0.00 27,358,852.92
Texas 2021536 CONSTRUCT NEW ROADWAY LANES AND INSTALL ILLUMINATION ON US 380. 138,991,089.90 174,035,900.20
Texas 2021543 CONSTRUCT AND WIDEN ROAD ON FM 60. 0.00 55,821,911.10
Texas 2021547 RECONSTRUCT AND WIDEN ROADWAYS ON SH 242 19,897,876.84 38,337,694.34
Texas 2021576 CONVERT NON-FREEWAY ON FM 1585 7,856,000.00 170,958,500.84
Texas 2021615 HIGHWAY IMPROVEMENT ON SL 1604 AT FM 2696 8,125,762.13 48,020,707.81
Texas 2021616 WIDEN ROAD-ADD LANES ON SL 1604 FROM IH 10 TO US 281. 8,288,838.00 257,653,930.70
Texas 2021678 SAFETY IMPROVEMENT PROJECTS ON PA 1502 21,533,305.74 26,916,632.18
Texas 2021704 WIDEN ROAD AND ADD LANES ON US 82 63,410,846.40 79,245,695.00
Texas 2021728 WIDEN ROAD - ADD LANES ON SH 36. 52,784,000.00 109,576,404.03
Texas 2021745 CONSTRUCT NEW ROAD AT KENNY FORT BOULEVARD. 5,431,696.00 28,369,555.49
Texas 2021810 NEW LOCATION NON-FREEWAY ON FM 110 3,440,000.00 25,164,732.78
Texas 2021811 NEW LOCATION NON-FREEWAY ON FM 110 800,000.00 25,502,664.07
Texas 2021826 INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES ON US 190 0.00 30,616,591.91
Texas 2021840 RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES ON FM 2100. 34,560,000.00 61,963,335.66
Texas 2021858 CONSTRUCT FRONTAGE ROADS ON SL 9. 23,758,923.76 59,163,821.39
Texas 2021859 CONSTRUCT FRONTAGE ROADS ON SL 9. 53,789,342.40 72,846,153.75
Texas 2021864 WIDEN ROAD - ADD SHOULDERS ON US 287 29,081,956.02 36,459,683.01
Texas 2021943 CONSTRUCT RAMPS ON SH 6. 44,131,774.41 55,164,718.01
Texas 2022009 WIDEN ROAD-ADD LANES ON IH 45. 0.00 246,040,384.39
Texas 2022013 HIGHWAY IMPROVEMENT ON US 69. 0.00 79,990,717.03
Texas 2022027 CONSTRUCT NEW ROADWAY LANES AND RECONSTRUCT EXISTING ROADWAY ON IH 35E 690,423,072.25 715,368,752.50
Texas 2022053 WIDEN FREEWAY ON IH 10 158,948,684.85 237,000,275.22
Texas 2022097 WIDEN ROAD - ADD LANES ON IH 10. 0.00 175,235,048.43
Texas 2B20004 CONSTRUCT SUPER 2, GRADING, BASE, EXTEND CULVERTS, OVERLAY, PAVEMENT MARKING ON US 281. 6,000,000.00 26,322,526.80
Texas 2B20006 WIDEN ROAD AND INSTALL SIGNS ON SH 114. 25,977,982.83 35,472,478.54
Texas 2B20010 INFRASTRUCTURE IMPROVEMENTS ON SL 375 33,600,250.88 42,000,313.61
Texas 2B20015 CONSTRUCT NEW ROADWAY LANES ON IH 37. 0.00 69,791,097.00
Texas 2B20048 WIDEN ROAD AND ADD LANES ON IH 45 78,971,131.75 98,859,273.45
Texas 2B20200 NEW LOCATION FREEWAY AND INTERSECTION IMPROVEMENTS ON AVONDALE- HASLET ROAD, HASLET PARKWAY AND FM 156. 25,303,248.01 49,088,603.58
Texas 2B20250 HIGWAY IMPROVEMENT ON SH 302. 1,000,000.00 47,343,520.93
Texas 2B20255 WIDEN ROAD (ADD LANES) ON FM 2478. 23,494,713.75 29,368,392.19
Texas 2B20260 SH 121 - CONSTRUCT NEW ROADWAY LANES. 32,000,000.00 101,958,550.50
Texas NBIS019 STATEWIDE INVENTORY AND INSPECTION OF ON AND OFF-SYSTEM BRIDGES FOR FISCAL YEARS 2019 AND 2020 52,800,000.00 66,000,000.00
Texas SB97001 STATEWIDE, STATE INFRASTRUCTURE BANK-ADV CAP. 99,562,057.00 285,168,019.00
Texas X597001 US 181; FROM N. OF THE CORPUS CHRISTI SHIP CHANNEL TO S. OF THE CORPUS CHRISTI SHIP CHANNEL. CONST NEW HARBOR BR OVER SHIP CHANNEL 716,823,258.92 845,039,286.84