U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
Vermont

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
PROJECT TITLE TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Vermont 0134013 WATERBURY, US 2, .14ME INT/VT 100 E.84M, PENG & RECONSTRUCT HIGHWAY 28,067,897.66 31,747,928.20
Vermont 0193496 BRANDON, US7, BEGINNING AT MM 3.351 EXT. NORTH 1.149 MILES; PENG, ROWA, CONST., RECONSTRUCT EXISTING HIGHWAY. 25,993,039.45 33,313,663.11
Vermont 0281026 NORTH HERO-GRAND ISLE, US2, BRIDGE NO. 8; PENG, CONST., REPLACE BRIDGE. 60,092,182.85 72,906,007.73
Vermont 0283026 CABOT-DANVILLE, US 2, 3.93 MILES, PENG, ROWA, CONST., RECONSTRUCT HIGHWAY 24,910,840.85 27,901,212.63
Vermont 0893066 MILTON, I-89, BRIDGE NO. 81 N&S; PENG, CONST., REPLACE DEFICIENT BRIDGES. 25,038,055.99 29,461,995.00
Vermont 0911065 BRATTLEBORO, I-91, BRIDGE NOS. 8 N&S AND 9 N&S; PENG, CONST., REPLACE BRIDGES. 60,263,999.99 66,959,999.99
Vermont 0911066 ROCKINGHAM, I-91, BRIDGE NO. 24 N&S; PENG, CONST., REHAB BRIDGES. 44,559,424.22 49,510,471.36
Vermont 2945001 WATERBURY-STOWE, VT100, BEGINNING AT MM 0.000 IN WATERBURY EXT NORTHERLY 9.688 MILES; PENG, RESURFACING. 20,782,967.44 27,369,635.75
Vermont 2971001 WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. 4,538,506.81 28,306,283.85
Vermont 5000001 BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY 42,517,898.25 47,000,788.69
Vermont A004152 BRATTLEBORO-HINSDALE, NH, BRIDGE ST.; PENG, REPLACE CONNECTICUT RIVER BRIDGE. 7,214,000.00 25,950,258.73
Vermont WCRS023 MIDDLEBURY, VERMONT RAILWAY; PENG, ROWA, CONST., LOWER GRADE OF RAILS UNDER VT30/MERCHANTS ROW, TO 21-FT CLEARANCE. 78,177,806.05 93,167,850.49