RECIPIENT | PROJECT NUMBER |
PROJECT TITLE | TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Vermont | 0134013 | WATERBURY, US 2, .14ME INT/VT 100 E.84M, PENG & RECONSTRUCT HIGHWAY | 28,067,897.66 | 31,747,928.20 |
Vermont | 0193496 | BRANDON, US7, BEGINNING AT MM 3.351 EXT. NORTH 1.149 MILES; PENG, ROWA, CONST., RECONSTRUCT EXISTING HIGHWAY. | 25,993,039.45 | 33,313,663.11 |
Vermont | 0281026 | NORTH HERO-GRAND ISLE, US2, BRIDGE NO. 8; PENG, CONST., REPLACE BRIDGE. | 60,092,182.85 | 72,906,007.73 |
Vermont | 0283026 | CABOT-DANVILLE, US 2, 3.93 MILES, PENG, ROWA, CONST., RECONSTRUCT HIGHWAY | 24,910,840.85 | 27,901,212.63 |
Vermont | 0893066 | MILTON, I-89, BRIDGE NO. 81 N&S; PENG, CONST., REPLACE DEFICIENT BRIDGES. | 25,038,055.99 | 29,461,995.00 |
Vermont | 0911065 | BRATTLEBORO, I-91, BRIDGE NOS. 8 N&S AND 9 N&S; PENG, CONST., REPLACE BRIDGES. | 60,263,999.99 | 66,959,999.99 |
Vermont | 0911066 | ROCKINGHAM, I-91, BRIDGE NO. 24 N&S; PENG, CONST., REHAB BRIDGES. | 44,559,424.22 | 49,510,471.36 |
Vermont | 2945001 | WATERBURY-STOWE, VT100, BEGINNING AT MM 0.000 IN WATERBURY EXT NORTHERLY 9.688 MILES; PENG, RESURFACING. | 20,782,967.44 | 27,369,635.75 |
Vermont | 2971001 | WILMINGTON-BRATTLEBORO, VT9, BEGINNING AT MM 7.077 IN WILMINGTON EXT. EASTERLY 12.565 MILES; PENG, RESURFACING. | 4,538,506.81 | 28,306,283.85 |
Vermont | 5000001 | BURLINGTON, SO. CONN., I-189 INTERCHG. W&N, CONSTR. NEW HIGHWAY | 42,517,898.25 | 47,000,788.69 |
Vermont | A004152 | BRATTLEBORO-HINSDALE, NH, BRIDGE ST.; PENG, REPLACE CONNECTICUT RIVER BRIDGE. | 7,214,000.00 | 25,950,258.73 |
Vermont | WCRS023 | MIDDLEBURY, VERMONT RAILWAY; PENG, ROWA, CONST., LOWER GRADE OF RAILS UNDER VT30/MERCHANTS ROW, TO 21-FT CLEARANCE. | 78,177,806.05 | 93,167,850.49 |