RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | 494,323.00 | 617,904.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | 907,321.00 | 1,134,151.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 16,728,369.00 | 23,410,461.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 3,200,000.00 | 4,000,000.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,920,000.00 | 2,650,000.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 81,184.00 | 101,480.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 38,020.00 | 47,525.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 836,301.00 | 1,145,377.00 |
Arkansas | 0002031 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,009,891.00 | 1,392,364.00 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 60,808.00 | 67,565.00 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 45,954,133.93 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 3,544,206.00 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,765,256.80 | 5,956,571.00 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 2,237,483.00 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 294,745.00 |
Arkansas | 0002032 | Ashley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 2,000,000.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 806,228.00 | 1,007,785.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Construction Engineering | 493,740.00 | 617,174.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | 40,000.00 | 50,000.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 17,661,676.00 | 22,077,096.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 215,644.00 | 269,555.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Utilities | 431,762.00 | 539,702.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 164,490.00 | 205,612.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 4,172,384.00 | 5,215,481.00 |
Arkansas | 0004031 | Benton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 756,786.00 | 945,982.00 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | 67,275.00 | 84,093.75 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Utilities | 194,708.00 | 243,385.00 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | Bridge New Construction | 101,278.00 | 126,597.50 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | New Construction Roadway | 7,940,804.14 | 9,926,005.18 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 4,609,446.00 | 5,761,807.50 |
Arkansas | 0004045 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 613,364.38 | 766,705.47 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 368,316.00 | 460,395.00 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,171,761.25 | 3,964,701.56 |
Arkansas | 0004045 | Benton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 130,190.00 | 162,737.50 |
Arkansas | 0004045 | Benton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 3,242,843.00 | 4,053,553.75 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Construction Engineering | 89,055.00 | 98,950.00 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Safety | 890,546.00 | 989,496.00 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 4,360,136.00 | 5,450,170.00 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,121,282.00 | 2,651,603.00 |
Arkansas | 0004072 | Benton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 16,852,692.00 | 21,065,865.00 |
Arkansas | 0007024 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 27,081,671.00 |
Arkansas | 0007024 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 2,400,000.00 |
Arkansas | 0007024 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,737,849.00 | 2,172,311.00 |
Arkansas | 0007024 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 0.00 | 331,705.00 |
Arkansas | 0007024 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 150,000.00 |
Arkansas | 0007024 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 340,000.00 |
Arkansas | 0007024 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 232,126.00 |
Arkansas | 0007025 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 26,873,085.63 |
Arkansas | 0007025 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 4,550,751.00 |
Arkansas | 0007025 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,676,873.60 | 2,096,092.00 |
Arkansas | 0007025 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Mitigation of Water Pollution due to Highway Runoff | 0.00 | 14,450.00 |
Arkansas | 0007025 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 240,000.00 |
Arkansas | 0007025 | Calhoun | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 220,000.00 |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 31,206,132.20 |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 8,916,725.00 |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,053,323.00 | 2,566,653.75 |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 300,000.00 |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 275,000.00 |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 365,543.75 |
Arkansas | 0014028 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 100,000.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Bridge New Construction | 4,322,218.99 | 5,402,773.74 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 1,497,600.00 | 1,872,000.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | New Construction Roadway | 9,524,947.04 | 11,906,183.80 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | 3,814,022.00 | 4,237,802.22 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | RAIL HWY CROSSING HAZ ELI | Preliminary Engineering | 22,500.00 | 25,000.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 80,000.00 | 100,000.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 3,800,000.00 | 4,750,000.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 508,848.80 | 636,061.00 |
Arkansas | 0023044 | Faulkner | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 2,400,000.00 | 3,000,000.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 512,077.00 | 640,096.56 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 70,764.00 | 88,454.63 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 11,365,423.40 | 14,206,779.86 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 6,248,616.00 | 7,810,770.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 892,860.00 | 1,116,074.54 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 21,601.00 | 27,001.67 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 47,035.00 | 58,793.78 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 107,133.60 | 133,917.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 209,160.00 | 261,450.00 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 141,643.00 | 177,053.57 |
Arkansas | 0025014 | Fulton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 417,286.00 | 521,608.46 |
Arkansas | 0027022 | Grant | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Construction Engineering | 427,946.00 | 534,932.50 |
Arkansas | 0027022 | Grant | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | New Construction Roadway | 4,279,463.00 | 5,349,328.75 |
Arkansas | 0027022 | Grant | >= 5,000 AND < | State | EQUITY BONUS EXEMPT LIM | Other | 24,874.00 | 31,092.50 |
Arkansas | 0027022 | Grant | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | 10,402,636.00 | 13,003,295.00 |
Arkansas | 0027022 | Grant | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Safety | 343,894.00 | 429,867.50 |
Arkansas | 0027022 | Grant | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 208,441.00 | 260,551.25 |
Arkansas | 0027022 | Grant | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 5,883,748.00 | 7,354,685.00 |
Arkansas | 0032022 | Independence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 15,270,774.50 | 19,088,468.13 |
Arkansas | 0032022 | Independence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 1,196,160.00 | 1,495,200.00 |
Arkansas | 0032022 | Independence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 698,972.00 | 873,715.00 |
Arkansas | 0032022 | Independence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 153,180.00 | 191,475.00 |
Arkansas | 0032022 | Independence | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 2,245,333.00 | 2,806,666.25 |
Arkansas | 0032022 | Independence | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 3,720,909.00 | 4,651,136.25 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | 4R - Added Capacity | 2,875,983.00 | 3,594,978.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | 26,359,134.00 | 32,948,917.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 638,150.00 | 797,688.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 1,001,504.00 | 1,251,880.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 198,400.00 | 248,000.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 832,427.00 | 1,040,534.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 22,978.00 | 28,722.00 |
Arkansas | 0038045 | Lawrence | >= 5,000 AND < 50,000 | State | SAFETEA-LU MISC. 1900 & UP | 4R - Added Capacity | 1,553,704.00 | 1,942,130.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 7,176,942.00 | 9,764,525.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,314,760.00 | 2,143,450.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 14,558,371.00 | 18,197,964.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 10,000.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 50,724.00 | 63,405.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 10,000.00 |
Arkansas | 0043028 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,993.00 | 2,491.00 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NAT COR PL DV/COOR BDR INF-TEA | Construction Engineering | 8,362.00 | 10,452.50 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NAT COR PL DV/COOR BDR INF-TEA | New Construction Roadway | 83,624.00 | 104,530.00 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | 1,106,581.00 | 1,383,226.25 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 882,802.00 | 1,103,502.50 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 947,235.00 | 1,184,043.75 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Mitigation of Water Pollution due to Highway Runoff | 121,417.00 | 151,771.25 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 16,291,305.00 | 20,364,131.25 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,428,975.00 | 1,786,218.75 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 3,674,482.00 | 4,593,102.50 |
Arkansas | 0044005 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 1,628,900.00 | 2,036,125.00 |
Arkansas | 0046043 | Miller | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 664,208.00 | 830,260.00 |
Arkansas | 0046043 | Miller | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 19,147,381.00 | 23,934,226.25 |
Arkansas | 0046043 | Miller | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | 1,033,398.00 | 1,291,747.50 |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 12,170,714.00 |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 15,000,000.00 | 24,000,000.00 |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 7,811,289.00 |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 749,894.60 |
Arkansas | 0047051 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 649,685.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Bridge Replacement - Added Capacity | 15,911,000.00 | 19,888,750.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM ALLOC | Construction Engineering | 250,000.00 | 312,500.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 6,811,250.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 1,690,000.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 107,875.82 | 3,750,384.78 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 385,000.00 |
Arkansas | 0047081 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 200,000.00 |
Arkansas | 0062032 | Saline | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 11,849,659.49 | 14,812,074.36 |
Arkansas | 0062032 | Saline | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 834,038.00 | 1,042,547.50 |
Arkansas | 0062032 | Saline | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | 149,578.00 | 186,972.50 |
Arkansas | 0062032 | Saline | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 972,782.00 | 1,215,977.50 |
Arkansas | 0062032 | Saline | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,695,245.50 | 5,869,056.88 |
Arkansas | 0062032 | Saline | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 200,191.00 | 250,238.75 |
Arkansas | 0062032 | Saline | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,737,302.01 | 2,171,627.52 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 8,924,090.00 | 11,155,112.50 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 1,440,069.00 | 1,800,086.25 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,620,706.00 | 2,025,882.50 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 141,419.00 | 176,773.75 |
Arkansas | 0070033 | Union | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,217,719.00 | 1,522,148.75 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 25,720.00 | 32,150.00 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 257,200.00 | 321,500.00 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 542,684.00 | 678,355.00 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 624,482.00 | 780,602.50 |
Arkansas | 0070033 | Union | >= 5,000 AND < 50,000 | State | SURFACE TRANSPORTATION PROJECT | 4R - Added Capacity | 1,363,367.00 | 1,363,367.00 |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 31,675,854.25 |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 1,800,000.00 |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,000,000.00 | 2,500,000.00 |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 340,000.00 |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 1,300,000.00 |
Arkansas | 0070036 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 875,000.00 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 24,949,686.00 | 31,187,108.00 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 1,077,227.00 | 1,346,534.00 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,600,000.00 | 2,000,000.00 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 952,900.00 | 1,191,125.00 |
Arkansas | 0071030 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 2,188,506.00 | 2,735,634.00 |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 36,544,760.00 |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,080,000.00 | 2,600,000.00 |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 494,525.00 |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 2,827,295.00 |
Arkansas | 0071031 | Van Buren | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 2,983,169.00 |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 0.00 | 49,985.00 |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 0.00 | 50,015.00 |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 10,895,767.03 | 12,106,407.81 |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 17,364,232.97 | 19,293,592.19 |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | 604,800.00 | 672,000.00 |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | 115,200.00 | 128,000.00 |
Arkansas | 0076244 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 667,855.64 | 742,061.82 |
Arkansas | 0076244 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,505,644.36 | 1,672,938.18 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - | 48,620.00 | 60,775.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | HIGH RISK RURAL ROAD | Safety | 931,843.00 | 1,035,381.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 23,947.00 | 23,947.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 673,785.00 | 673,785.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 24,933,038.00 | 27,703,376.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 1,041,203.00 | 1,156,892.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 385,956.00 | 428,840.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 395,413.00 | 439,347.00 |
Arkansas | 0301152 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 243,084.00 | 303,856.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE 4R | Preliminary Engineering | 44,127.00 | 49,030.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 19,628,457.00 | 21,809,397.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - Added Capacity | 17,853.00 | 19,837.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 14,157.00 | 15,731.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | 259,813.00 | 288,681.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 2,365,347.00 | 2,628,163.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 154,186.00 | 171,319.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 545,400.00 | 606,000.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | Other | INTERSTATE MAINTENANCE | Safety | 357,511.00 | 397,234.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 99,000.00 | 110,000.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 7,105,663.00 | 8,882,079.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 7,467.00 | 9,334.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | 5,923.00 | 7,404.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 108,678.00 | 135,848.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 984,876.00 | 1,231,095.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 194,203.00 | 242,753.00 |
Arkansas | 0302251 | Saline | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY SYSTEM | Safety | 149,547.00 | 186,934.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - Added Capacity | 2,892,061.00 | 3,615,075.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | 1,307,690.00 | 1,634,613.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 33,590,835.00 | 37,323,149.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge New Construction | 2,196,183.00 | 2,440,203.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 435,939.00 | 484,377.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 3,463,660.00 | 3,848,510.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Other | 123,528.00 | 137,253.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 1,135,853.00 | 1,262,059.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 502,228.00 | 558,031.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Safety | 883,008.00 | 981,120.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 18,898.00 | 20,998.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 11,758,369.00 | 14,697,962.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | 918,665.00 | 1,148,331.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 182,354.00 | 227,942.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 37,423.00 | 46,779.00 |
Arkansas | 0302254 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | 369,363.00 | 461,704.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | 2,093,142.00 | 2,616,428.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 24,092,714.00 | 26,769,682.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - Added Capacity | 119,456.00 | 132,729.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | 854,851.00 | 949,834.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 3,244,070.00 | 3,604,523.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 800,389.00 | 889,321.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 575,778.00 | 639,753.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Safety | 82,643.00 | 91,826.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 91,257.00 | 101,396.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 11,363,628.00 | 14,204,535.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 49,968.00 | 62,460.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 357,585.00 | 446,981.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 161,799.00 | 202,250.00 |
Arkansas | 0302255 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | 34,570.00 | 43,212.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - Added Capacity | 1,767,591.00 | 2,209,489.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Right of Way | 99,938.00 | 124,923.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 21,086,860.00 | 23,429,845.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 350,220.00 | 389,133.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 1,447,037.00 | 1,607,819.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 332,433.00 | 369,371.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 7,708,805.00 | 9,636,007.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 147,029.00 | 183,786.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 602,799.00 | 753,499.00 |
Arkansas | 0302256 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 4,436.00 | 5,545.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 53,311,410.00 | 66,639,262.50 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 630,000.00 | 700,000.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 411,945.09 | 67,681,387.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 48,693,833.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 15,518,206.60 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 3,210,814.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 4,675,000.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 4,659,185.00 |
Arkansas | 0302267 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 2,468,912.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 1,079,880.00 | 1,349,850.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 8,000,000.00 | 62,216,500.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 36,828,523.00 | 235,943,575.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 1,000,000.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 177,364,979.39 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 81,215,020.61 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 12,100,000.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 20,000.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 8,482,540.00 | 10,603,175.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 22,200,000.00 | 30,250,000.00 |
Arkansas | 0302268 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 20,600,000.00 | 50,170,678.00 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | 8,003,553.91 | 8,892,837.68 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | 1,803,521.09 | 2,003,912.32 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 0.00 | 26,085.66 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 0.00 | 115,761.34 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 420,347.22 | 467,052.49 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 1,865,390.78 | 2,072,656.51 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 23,118,783.57 | 25,687,536.67 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 5,209,587.43 | 5,788,430.33 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 3,337,564.25 | 3,708,404.71 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 6,000,891.75 | 6,667,657.29 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,955,414.77 | 2,172,683.44 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 440,633.23 | 489,592.56 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 119,663.73 | 132,959.70 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 531,036.27 | 590,040.30 |
Arkansas | 0401094 | Sebastian | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | 174,647.99 | 218,309.89 |
Arkansas | 0401094 | Crawford | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Restoration & Rehabilitation | 775,042.01 | 968,802.11 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | 374,342.52 | 415,936.13 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | 60,939.48 | 67,710.54 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 22,023.07 | 24,470.08 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 22,051.73 | 24,501.92 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 22,047.30 | 24,497.00 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 7,965.54 | 8,850.60 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 7,955.20 | 8,839.11 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 7,963.97 | 8,848.86 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 3,525,107.75 | 3,916,786.40 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 3,254,077.52 | 3,615,641.69 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 4,196,470.73 | 4,662,745.24 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 442,944.00 | 492,160.00 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 2,437,056.00 | 2,707,840.00 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | 56,250.00 | 62,500.00 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | 168,750.00 | 187,500.00 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 209,832.01 | 233,146.68 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 210,063.00 | 233,403.33 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 210,104.99 | 233,449.99 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 582,780.74 | 647,534.17 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 371,292.10 | 412,546.76 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 1,098,046.16 | 1,220,051.29 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 16,924,531.26 | 18,805,034.73 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 6,586,824.43 | 7,318,693.81 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 2,335,395.31 | 2,594,883.68 |
Arkansas | 0401266 | Crawford | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 391,069.08 | 434,521.19 |
Arkansas | 0401266 | Johnson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 268,130.98 | 297,923.33 |
Arkansas | 0401266 | Franklin | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 690,799.94 | 767,555.48 |
Arkansas | 0402076 | Johnson | >= 5,000 AND < 50,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Bridge Replacement - No Added Capacity | 5,086,800.00 | 6,358,500.00 |
Arkansas | 0402076 | Johnson | >= 5,000 AND < 50,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Construction Engineering | 217,923.00 | 272,403.00 |
Arkansas | 0402076 | Johnson | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 16,592,570.00 | 18,436,189.00 |
Arkansas | 0402076 | Johnson | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 564,214.00 | 626,905.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Bridge Replacement - No Added Capacity | 1,451,168.00 | 1,813,960.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Construction Engineering | 483,053.00 | 603,816.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 10,410,085.00 | 11,566,761.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 560,081.00 | 622,313.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Safety | 112,407.00 | 124,897.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 24,910,963.00 | 31,138,704.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 859,460.00 | 1,074,325.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 408,529.00 | 510,660.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Safety | 102,721.00 | 128,401.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 364,743.00 | 455,929.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 15,195,225.00 | 16,883,584.00 |
Arkansas | 0403117 | Pulaski | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 463,231.00 | 514,701.00 |
Arkansas | 0403125 | Faulkner | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | 3,409,091.00 | 3,787,878.89 |
Arkansas | 0403125 | Faulkner | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | 340,909.00 | 378,787.78 |
Arkansas | 0403125 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 22,336,184.00 | 27,920,230.00 |
Arkansas | 0403125 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 11,154,610.00 | 13,943,262.50 |
Arkansas | 0403125 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 756,607.00 | 945,758.75 |
Arkansas | 0403125 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 357,393.00 | 446,741.25 |
Arkansas | 0403138 | Pope | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 31,327.79 | 34,808.66 |
Arkansas | 0403138 | Conway | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 31,240.21 | 34,711.34 |
Arkansas | 0403138 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 13,395,629.00 | 14,884,032.22 |
Arkansas | 0403138 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 13,358,177.04 | 14,842,418.94 |
Arkansas | 0403138 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 900,000.00 | 1,000,000.00 |
Arkansas | 0403138 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | 450,000.00 | 500,000.00 |
Arkansas | 0403138 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,055,375.46 | 1,172,639.40 |
Arkansas | 0403138 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,052,424.54 | 1,169,360.60 |
Arkansas | 0404077 | Monroe | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 220,704.47 | 245,227.19 |
Arkansas | 0404077 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 43,920,188.53 | 48,800,209.81 |
Arkansas | 0404077 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 244,088.00 | 271,209.00 |
Arkansas | 0404077 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 4,340,172.00 | 4,822,413.00 |
Arkansas | 0404077 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 1,333,407.46 | 1,481,564.94 |
Arkansas | 0404077 | Monroe | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 6,700.54 | 7,445.06 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 50,000.00 | 50,000.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 3,189,645.00 | 3,544,050.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Right of Way | 12,370.00 | 13,744.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Utilities | 13,500.00 | 15,000.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 8,349,562.00 | 9,277,292.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 82,154,296.00 | 93,782,551.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,704,711.00 | 1,894,123.00 |
Arkansas | 0404081 | Prairie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,962,632.00 | 2,180,702.00 |
Arkansas | 0405143 | Crittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge New Construction | 5,307,953.00 | 5,897,726.00 |
Arkansas | 0405143 | Crittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 522,112.00 | 580,124.00 |
Arkansas | 0405143 | Crittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | New Construction Roadway | 17,976,388.00 | 19,973,764.00 |
Arkansas | 0405143 | Crittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 27,641.00 | 30,712.00 |
Arkansas | 0405143 | Crittenden | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Safety | 1,391,900.00 | 1,546,556.00 |
Arkansas | 0405153 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 241,705.29 | 268,561.43 |
Arkansas | 0405153 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 38,805,057.00 | 43,116,730.00 |
Arkansas | 0405153 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 409,211.00 | 454,678.89 |
Arkansas | 0405153 | St. Francis | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 3,551,447.00 | 4,439,308.75 |
Arkansas | 0405153 | St. Francis | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 510,212.00 | 637,765.00 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 40,000.00 | 40,000.00 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 130,979.00 | 145,532.22 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 694,590.00 | 694,590.00 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 22,372.00 | 24,857.78 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 23,327,288.00 | 25,919,208.89 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | 3,351,074.00 | 3,723,415.56 |
Arkansas | 0405158 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,786,887.00 | 1,985,430.00 |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 29,681,167.37 |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 7,693,860.00 |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,373,317.39 | 1,718,978.31 |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 3,318.23 |
Arkansas | 0491017 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 2,288,487.41 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 6,117,859.71 | 7,647,324.64 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 13,209,727.29 | 16,512,159.11 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 2,577,198.60 | 3,221,498.25 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - Added Capacity | 1,718,132.40 | 2,147,665.50 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 461,598.39 | 576,997.98 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 996,686.61 | 1,245,858.27 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 14,792.22 | 18,490.27 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 31,943.78 | 39,929.73 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 168,532.18 | 210,665.23 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 363,900.82 | 454,876.02 |
Arkansas | 1320001 | Cleveland | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 109,441.07 | 136,801.33 |
Arkansas | 1320001 | Dallas | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 236,305.93 | 295,382.42 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 11,493,407.64 | 14,366,759.55 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 4,715,036.36 | 5,893,795.45 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 684,553.00 | 855,691.00 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 497,695.57 | 622,119.32 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,213,186.43 | 1,516,482.68 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,140,232.80 | 1,425,291.00 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 467,767.20 | 584,709.00 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 153,037.25 | 191,296.74 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 62,781.75 | 78,477.26 |
Arkansas | 2373002 | Faulkner | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 483,881.31 | 604,851.49 |
Arkansas | 2373002 | White | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 1,179,512.69 | 1,474,390.51 |
Arkansas | 2662007 | Garland | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 43,501.10 | 43,501.10 |
Arkansas | 2662007 | Saline | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 29,636.90 | 29,636.90 |
Arkansas | 2662007 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 14,165,250.01 | 28,036,382.48 |
Arkansas | 2662007 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 20,791,774.99 | 41,151,843.77 |
Arkansas | 2662007 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 3,450,000.00 |
Arkansas | 2662007 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 3,450,000.00 |
Arkansas | 2662007 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,557,145.31 | 3,317,997.33 |
Arkansas | 2662007 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,753,381.69 | 4,870,161.42 |
Arkansas | 2662007 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 43,965.46 |
Arkansas | 2662007 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 29,953.29 |
Arkansas | 2662007 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 178,434.31 |
Arkansas | 2662007 | Saline | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 121,565.69 |
Arkansas | 2662007 | Saline | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | 791,023.51 | 988,779.41 |
Arkansas | 2662007 | Garland | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | 1,161,065.49 | 1,451,331.84 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 10,680.00 | 10,680.00 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 23,507,370.00 | 26,119,300.00 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,428,116.00 | 1,586,858.06 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 9,479.00 | 11,848.75 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 53,819.41 | 67,274.26 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 328,755.00 | 365,283.33 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 211,979.00 | 264,973.75 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 386,019.00 | 482,523.75 |
Arkansas | 4302265 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 160,015.00 | 200,018.75 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 10,363,026.00 | 12,953,782.50 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 118,718.00 | 148,397.50 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 1,702,775.00 | 2,128,468.75 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Construction Engineering | 2,351.00 | 2,938.75 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 5,900,429.00 | 7,375,536.25 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 166,719.00 | 208,398.75 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 9,494.00 | 10,548.89 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 50,137.00 | 55,707.78 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | 1,737,521.00 | 2,171,901.25 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | INTERSTATE MAINT DISC | Construction Engineering | 265,529.00 | 331,911.25 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 117,699.00 | 147,123.75 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 3,420,614.00 | 4,275,767.50 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,305,041.00 | 1,631,301.25 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 1,125,662.00 | 1,407,077.50 |
Arkansas | 4302267 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Special Bridge | 8,174,421.00 | 10,218,026.25 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Traffic Management/Engineering - HOV | 405,000.00 | 450,000.00 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 64,778.40 | 71,976.00 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 11,311,820.73 | 12,568,689.70 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 16,851,923.18 | 18,724,359.09 |
Arkansas | 4302269 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,102,169.20 | 2,335,743.55 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 96,768.00 | 107,520.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 59,749.00 | 66,388.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 34,862.00 | 38,735.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 30,971,977.00 | 34,413,308.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 949,196.00 | 1,054,662.00 |
Arkansas | 4401007 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 350,229.00 | 389,143.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 21,723,526.90 | 24,137,252.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 1,170,000.00 | 1,300,000.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 900,000.00 | 1,000,000.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 4,975,216.00 | 5,528,018.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 810,000.00 | 900,000.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 1,005,715.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | 2,288,117.00 | 2,860,147.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 3,330,000.00 | 3,700,000.00 |
Arkansas | 4928001 | Washington | >= 200,000 | State | TRANSP ALTERNATIVES MAP-21 | Bridge New Construction | 332,000.00 | 415,000.00 |
Arkansas | 5301004 | Grant | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 24,139,867.00 | 26,822,074.00 |
Arkansas | 5301004 | Jefferson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 0.00 |
Arkansas | 5301004 | Grant | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 499,500.00 | 555,000.00 |
Arkansas | 5301004 | Jefferson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 0.00 | 0.00 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | 13,116,379.00 | 14,573,754.44 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 450,000.00 | 500,000.00 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 29,807.21 | 33,119.12 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 52,025,870.27 | 57,806,522.52 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,520,000.00 | 2,800,000.00 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 91,428.76 | 101,587.51 |
Arkansas | 5305004 | Jefferson | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | 2,282,521.00 | 2,853,151.25 |
Arkansas | 5401078 | Benton | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | 2,884,390.00 | 3,605,487.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 8,398,902.00 | 10,498,627.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | 74,090.00 | 92,612.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 124,650.00 | 155,812.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 1,051,938.00 | 1,314,922.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 4,083,410.00 | 5,104,262.50 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 3,445,849.00 | 4,307,311.25 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,680,000.00 | 2,100,000.00 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 272,895.00 | 341,118.75 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 3,840,000.00 | 4,800,000.00 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 1,292,361.00 | 1,615,451.25 |
Arkansas | 5401078 | Benton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 516,000.00 | 2,382,000.00 |
Arkansas | 5401078 | Benton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | 1,214,398.00 | 1,517,997.50 |
Arkansas | 5401078 | Benton | >= 200,000 | N/A | TRANSP ALTERNATIVES MAP-21 | Facilities for Pedestrians and Bicycles | 212,047.00 | 265,058.75 |
Arkansas | 5401262 | Washington | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 13,094,089.21 | 14,548,988.01 |
Arkansas | 5401262 | Washington | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 30,400.00 | 30,400.00 |
Arkansas | 5401262 | Washington | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 2,664,821.00 | 2,960,912.22 |
Arkansas | 5401262 | Washington | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 1,486,760.00 | 1,651,955.55 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 50,472,754.70 | 56,080,838.56 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 9,959,950.00 | 11,066,611.11 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 2,328,023.00 | 2,586,692.22 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 2,700,881.00 | 3,000,978.89 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,569,312.49 | 3,965,902.77 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,171,112.62 | 1,301,236.24 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 7,067,290.98 | 7,852,545.53 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 606,879.00 | 674,310.00 |
Arkansas | 5401262 | Washington | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 4,351,020.11 | 4,834,466.79 |
Arkansas | 5439001 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 2,491,435.49 | 3,114,294.32 |
Arkansas | 5439001 | Phillips | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 14,863,589.51 | 18,579,486.68 |
Arkansas | 5439001 | Phillips | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 987,227.00 | 1,234,034.00 |
Arkansas | 5439001 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 987,227.00 | 1,234,034.00 |
Arkansas | 5439001 | Lee | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 62,832.61 | 78,540.76 |
Arkansas | 5439001 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 19,941.18 | 24,926.55 |
Arkansas | 5439001 | Phillips | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 119,084.82 | 148,856.45 |
Arkansas | 5439001 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 74,368.43 | 92,960.46 |
Arkansas | 5439001 | Phillips | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 443,661.57 | 554,576.54 |
Arkansas | 5439001 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 13,141.52 | 16,426.87 |
Arkansas | 5439001 | Phillips | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 78,383.48 | 97,979.13 |
Arkansas | 5439001 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 92,871.77 | 116,089.68 |
Arkansas | 5439001 | Phillips | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 554,061.23 | 692,576.32 |
Arkansas | 5439001 | Phillips | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 38,967.30 | 48,709.34 |
Arkansas | 5439001 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 6,531.70 | 8,164.66 |
Arkansas | 5439001 | Phillips | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 68,645.62 | 85,807.02 |
Arkansas | 5439001 | Lee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 11,506.38 | 14,382.98 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 135,643.00 | 150,715.00 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 25,888,280.20 | 28,764,755.44 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Resurfacing | 1,280,248.34 | 1,422,498.14 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,284,022.70 | 2,537,803.00 |
Arkansas | 5553001 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 4,199,931.00 | 4,666,590.00 |
Arkansas | 6043002 | Lonoke | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 93,782.51 | 95,649.33 |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 352,529.49 | 365,450.67 |
Arkansas | 6043002 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 11,540,265.87 |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 79,876,926.13 |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 2,500,000.00 |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,862,768.68 | 6,340,583.72 |
Arkansas | 6043002 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 702,553.32 | 916,069.28 |
Arkansas | 6043002 | Lonoke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 94,274.31 |
Arkansas | 6043002 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 652,402.69 |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 363,095.63 | 403,439.59 |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 24,000,000.00 | 72,992,659.00 |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 0.00 | 22,060,472.00 |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 2,500,000.00 |
Arkansas | 6301001 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 0.00 | 1,470,628.00 |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 8,728,834.50 | 10,911,043.00 |
Arkansas | 7007001 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 8,728,834.50 | 10,911,043.00 |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 0.00 |
Arkansas | 7007001 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,541,150.00 | 3,176,437.00 |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 0.00 | 0.00 |
Arkansas | 7007001 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 8,827,104.00 | 11,033,880.00 |
Arkansas | 7007001 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 406,080.00 | 507,600.00 |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 0.00 |
Arkansas | 7007001 | Union | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 0.00 | 0.00 |
Arkansas | 7007001 | Calhoun | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 56,000.00 | 70,000.00 |
Arkansas | 9036020 | Benton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 14,337,191.00 | 20,188,652.00 |
Arkansas | 9036020 | Benton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | 4,000,000.00 | 5,000,000.00 |
Arkansas | 9036020 | Benton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 1,600,000.00 | 2,010,000.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Utilities | 696,034.00 | 870,042.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 12,567,806.00 | 15,709,757.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 1,347,935.00 | 1,684,919.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,376,000.00 | 1,720,000.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 9,176,000.00 | 11,470,000.00 |
Arkansas | 9061006 | Saline | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,674,796.00 | 2,093,495.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 12,202,159.00 | 15,252,699.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Bridge New Construction | 6,246,625.00 | 7,808,282.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Bridge Replacement - Added Capacity | 990,213.00 | 1,237,766.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 1,933,726.00 | 2,417,157.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 238,663.00 | 820,000.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 0.00 | 3,400,000.00 |
Arkansas | 9065024 | Lonoke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 0.00 | 500,000.00 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 1,507,467.00 | 1,884,333.75 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 12,694,099.41 | 15,867,624.26 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,328,000.00 | 1,660,000.00 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 2,480,000.00 | 4,600,000.00 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 240,000.00 | 300,000.00 |
Arkansas | 9210035 | Garland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 816,000.00 | 3,420,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | 8,000,000.00 | 10,000,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | 12,000,000.00 | 15,000,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | Bridge New Construction | 1,211,083.00 | 1,513,853.75 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 9,188,917.00 | 11,486,146.25 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,000,000.00 | 3,750,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | 1,044,800.00 | 1,306,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 11,435,366.76 | 39,294,208.45 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 5,040,000.00 | 7,700,000.00 |
Arkansas | 9210038 | Garland | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 80,000.00 | 4,800,000.00 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 1,134,888.55 | 1,418,610.69 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 24,568.45 | 30,710.56 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | DONOR STATE BONUS | 4R - Added Capacity | 1,627,702.62 | 2,034,628.27 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | DONOR STATE BONUS | Bridge Replacement - Added Capacity | 648,473.00 | 810,591.25 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | DONOR STATE BONUS | Construction Engineering | 499,620.38 | 624,525.48 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 12,505,359.19 | 15,631,698.99 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 3,702,080.00 | 4,627,600.00 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 617,067.67 | 771,334.58 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 716,497.14 | 895,621.43 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 169,256.00 | 211,570.00 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | 1,019,967.95 | 1,274,959.94 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - Added Capacity | 210,734.00 | 263,417.50 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | 101,995.02 | 127,493.77 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | 4,987.03 | 6,233.79 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 15,484,433.60 | 19,355,542.01 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 2,694,296.00 | 3,367,870.00 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 262,277.12 | 327,846.39 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 896,857.41 | 1,121,071.76 |
Arkansas | 9222010 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 143,984.00 | 179,980.00 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,510,974.00 | 1,888,717.00 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 11,675,014.00 | 14,593,768.00 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 693,910.00 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | RAIL HWY CROSSING HAZ ELI | Bridge New Construction | 8,699,999.00 | 9,666,667.00 |
Arkansas | 9227080 | Craighead | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | 182,835.00 | 228,544.00 |
Arkansas | 9227086 | Craighead | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 0.00 | 37,000,000.00 |
Arkansas | 9227086 | Craighead | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 2,700,000.00 |
Arkansas | 9227086 | Craighead | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,782,000.00 | 1,980,000.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 3,288,806.00 | 4,111,007.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 16,000.00 | 20,000.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 28,510,019.00 | 40,623,897.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 679,555.00 | 849,444.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,695,638.00 | 3,369,548.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 2,402,000.00 | 3,002,500.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 3,200,000.00 | 4,000,000.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 6,025,245.00 | 10,223,500.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 31,325,518.00 | 51,407,943.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,016,607.00 | 2,520,759.00 |
Arkansas | 9253063 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 232,214.00 | 360,905.00 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 33,930,308.59 | 41,918,010.11 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,445,385.38 | 4,053,394.57 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,762,252.65 | 3,249,709.00 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 17,000,000.00 | 30,000,000.00 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 2,403,890.00 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 17,970,317.70 | 21,141,550.24 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 17,000,000.00 | 20,000,000.00 |
Arkansas | 9253087 | Pulaski | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 2,550,000.00 | 3,000,000.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 16,641,920.00 | 20,802,400.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 1,103,717.20 | 1,379,646.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,213,040.00 | 1,516,300.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 37,372.00 | 46,715.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 141,600.00 | 177,000.00 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | 555,466.00 | 694,332.50 |
Arkansas | 9271010 | Columbia | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 376,492.80 | 470,616.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 138,266.00 | 172,833.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 16,000.00 | 20,000.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 21,357,506.00 | 26,696,882.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,529,993.00 | 3,162,492.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 3,731,687.00 | 4,664,608.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 192,000.00 | 240,000.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 291,200.00 | 364,000.00 |
Arkansas | 9309002 | Jackson | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 423,872.00 | 529,840.00 |
Arkansas | 9332011 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | 10,802,050.00 | 13,502,562.50 |
Arkansas | 9332011 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 604,176.00 | 755,220.00 |
Arkansas | 9332011 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 5,835,202.00 | 7,294,002.50 |
Arkansas | 9332011 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 423,248.00 | 529,060.00 |
Arkansas | 9332011 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 4,584,228.00 | 5,730,285.00 |
Arkansas | 9332011 | Greene | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 2,359,568.00 | 2,949,460.00 |
Arkansas | 9386022 | White | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 2,414,582.00 | 3,018,227.50 |
Arkansas | 9386022 | White | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 652,133.00 | 815,166.25 |
Arkansas | 9386022 | White | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Mitigation of Water Pollution due to Highway Runoff | 15,680.00 | 19,600.00 |
Arkansas | 9386022 | White | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 11,312,783.00 | 14,140,978.75 |
Arkansas | 9386022 | White | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 448,787.00 | 560,983.75 |
Arkansas | 9386022 | White | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 1,497,744.00 | 1,872,180.00 |
Arkansas | 9386022 | White | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Safety | 170,301.00 | 212,876.25 |
Arkansas | 9386022 | White | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 3,588,982.76 | 4,486,228.45 |
Arkansas | B300001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 6,165,607.00 | 6,850,674.00 |
Arkansas | B300001 | Clark | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 11,597,891.00 | 12,886,546.00 |
Arkansas | B300001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 2,758,619.00 | 3,065,132.00 |
Arkansas | B300001 | Clark | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 8,173,879.00 | 9,082,087.00 |
Arkansas | B300001 | Hot Spring | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 25,979,044.00 | 28,865,605.00 |
Arkansas | B300001 | Nevada | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 11,132,346.00 | 12,369,273.00 |
Arkansas | B300001 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 3,125,363.00 | 3,472,626.00 |
Arkansas | B300001 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 2,761,688.00 | 3,068,542.00 |
Arkansas | B300001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 2,372,676.00 | 2,636,306.00 |
Arkansas | B300001 | Hot Spring | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 146,293.00 | 162,548.00 |
Arkansas | B300001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 1,691,865.00 | 1,879,850.00 |
Arkansas | B300001 | Clark | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 625,710.00 | 695,233.00 |
Arkansas | B300001 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 1,090,398.00 | 1,211,553.00 |
Arkansas | B300001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 2,492,369.00 | 2,769,300.00 |
Arkansas | B300001 | Hot Spring | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 984,887.00 | 1,094,319.00 |
Arkansas | B300001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 29,343.00 | 32,603.00 |
Arkansas | B300001 | Nevada | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 320,357.00 | 355,952.00 |
Arkansas | B300001 | Hot Spring | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 13,278,858.00 | 14,754,286.00 |
Arkansas | B300001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 2,595,734.00 | 2,884,149.00 |
Arkansas | B300001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Debt Service | 8,859,510.00 | 9,843,900.00 |
Arkansas | B300001 | Saline | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 4,035,749.00 | 4,484,166.00 |
Arkansas | B300001 | Clark | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 5,654,495.00 | 6,282,772.00 |
Arkansas | B300001 | Nevada | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 34,785.00 | 38,650.00 |
Arkansas | B300001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 291,856.00 | 324,284.00 |
Arkansas | B300001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 39,631.00 | 44,034.00 |
Arkansas | B300001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 153,499.00 | 170,555.00 |
Arkansas | B300001 | Statewide | N/A | State | INTERSTATE MAINTENANCE | Safety | 75,550.00 | 83,945.00 |
Arkansas | B300001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Utilities | 17,453.00 | 19,392.00 |
Arkansas | B300001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 6,842,128.00 | 7,602,365.00 |
Arkansas | B300001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 3,039,863.40 | 3,377,626.00 |
Arkansas | B300001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 1,474,420.50 | 1,638,245.00 |
Arkansas | B300001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,137,573.53 | 4,597,304.26 |
Arkansas | B300001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 879,710.00 | 977,455.00 |
Arkansas | B300001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,393,073.85 | 1,547,859.83 |
Arkansas | B300001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 851,917.45 | 946,574.95 |
Arkansas | B300001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 71,158.50 | 79,065.00 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 11,359.00 | 11,359.00 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 35,212.59 | 35,212.59 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 78,376.41 | 78,376.41 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 13,044,771.08 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 5,860,781.92 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 0.00 | 9,192,368.50 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 0.00 | 9,192,368.50 |
Arkansas | B300203 | Miller | >= 5,000 AND < | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 3,448,350.72 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 7,675,361.28 |
Arkansas | B300203 | Miller | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 411,250.03 | 456,944.48 |
Arkansas | B300203 | Hempstead | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 915,349.97 | 1,017,055.52 |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 0.00 | 18,989.00 |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 0.00 | 71,353.84 |
Arkansas | B300216 | Clark | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Other | 0.00 | 18,259.09 |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 0.00 | 27,084,407.28 |
Arkansas | B300216 | Clark | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 0.00 | 6,930,759.50 |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 0.00 | 7,207,823.34 |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Resurfacing | 0.00 | 1,278,589.40 |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Resurfacing | 0.00 | 2,812,896.60 |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 0.00 | 279,759.36 |
Arkansas | B300216 | Nevada | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 0.00 | 1,051,235.04 |
Arkansas | B300216 | Clark | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 0.00 | 269,005.60 |
Arkansas | B300216 | Clark | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 1,736,124.62 |
Arkansas | B300216 | Nevada | >= 5,000 AND < | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 6,784,524.37 |
Arkansas | B300216 | Hempstead | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 1,805,527.90 |
Arkansas | B400001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 11,344,812.00 | 12,605,347.00 |
Arkansas | B400001 | Franklin | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 11,973,900.00 | 13,304,333.00 |
Arkansas | B400001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 21,560,459.00 | 23,956,066.00 |
Arkansas | B400001 | Lonoke | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 35,155,085.00 | 39,061,205.00 |
Arkansas | B400001 | Franklin | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 15,541,837.00 | 17,268,708.00 |
Arkansas | B400001 | Lonoke | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 4,373,504.00 | 4,859,449.00 |
Arkansas | B400001 | Crawford | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 32,721,458.00 | 36,357,176.00 |
Arkansas | B400001 | St. Francis | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 23,297,407.00 | 25,886,007.00 |
Arkansas | B400001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 22,564,783.00 | 25,071,981.00 |
Arkansas | B400001 | Conway | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 8,848,170.00 | 9,831,300.00 |
Arkansas | B400001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 41,986,997.00 | 46,652,218.00 |
Arkansas | B400001 | Monroe | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 389,882.00 | 433,201.00 |
Arkansas | B400001 | Crawford | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 741,062.00 | 823,402.00 |
Arkansas | B400001 | St. Francis | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 200,265.00 | 222,517.00 |
Arkansas | B400001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 370,638.00 | 411,820.00 |
Arkansas | B400001 | St. Francis | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 359,868.00 | 399,853.00 |
Arkansas | B400001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 974,517.00 | 1,082,796.00 |
Arkansas | B400001 | Conway | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 543,035.68 | 603,372.68 |
Arkansas | B400001 | Franklin | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 1,235,813.00 | 1,373,125.00 |
Arkansas | B400001 | Lonoke | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 434,115.00 | 482,351.00 |
Arkansas | B400001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 1,910,561.00 | 2,122,846.00 |
Arkansas | B400001 | St. Francis | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 651,634.00 | 724,038.00 |
Arkansas | B400001 | Prairie | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 782,658.00 | 869,620.00 |
Arkansas | B400001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 3,160,142.00 | 3,505,292.00 |
Arkansas | B400001 | Crawford | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 1,779,688.00 | 1,977,432.00 |
Arkansas | B400001 | Crawford | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 199,753.00 | 221,948.00 |
Arkansas | B400001 | Monroe | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 5,591,324.00 | 6,212,583.00 |
Arkansas | B400001 | Franklin | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 12,021,715.00 | 13,357,461.00 |
Arkansas | B400001 | Conway | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 1,137,411.00 | 1,263,790.00 |
Arkansas | B400001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Debt Service | 13,787,764.00 | 15,319,739.00 |
Arkansas | B400001 | St. Francis | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 10,722,406.00 | 11,913,785.00 |
Arkansas | B400001 | Crawford | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 13,873,604.00 | 15,415,116.00 |
Arkansas | B400001 | Pulaski | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 3,135,393.00 | 3,483,770.00 |
Arkansas | B400001 | Lonoke | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 41,191.00 | 45,748.00 |
Arkansas | B400001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 546,025.00 | 606,694.00 |
Arkansas | B400001 | Crawford | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 133,420.00 | 148,245.00 |
Arkansas | B400001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Training | 6,517.00 | 7,241.00 |
Arkansas | B400001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 52,274,933.00 | 58,083,259.00 |
Arkansas | B400001 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 23,782,275.58 | 26,424,751.09 |
Arkansas | B400001 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 28,412,613.42 | 31,569,569.91 |
Arkansas | B400001 | Crittenden | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 12,383,175.60 | 13,759,084.00 |
Arkansas | B400001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 1,335,221.00 | 1,483,579.00 |
Arkansas | B400001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 4,571,052.00 | 5,078,947.00 |
Arkansas | B400001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,589,634.01 | 2,877,370.56 |
Arkansas | B400001 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,117,861.98 | 1,242,068.76 |
Arkansas | B400001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 5,602,010.00 | 6,224,456.00 |
Arkansas | B400001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 5,063,912.06 | 5,626,568.73 |
Arkansas | B400001 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 70,100.00 | 77,889.00 |
Arkansas | B400001 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 85,937.00 | 95,486.00 |
Arkansas | B400001 | Faulkner | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 88,879.28 | 98,754.75 |
Arkansas | B400001 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | 1,125,000.00 | 1,250,000.00 |
Arkansas | B400001 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 1,426.76 | 1,585.29 |
Arkansas | B400001 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Training | 2,686.24 | 2,984.71 |
Arkansas | B400001 | Conway | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 2,133.00 | 2,370.00 |
Arkansas | B400001 | Faulkner | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 637,150.76 | 707,945.29 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 5,034,324.00 | 5,593,693.00 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 9,525,377.00 | 10,583,752.00 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 561,300.00 | 623,666.00 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 1,497,340.00 | 1,663,711.00 |
Arkansas | B400201 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Maintenance Resurfacing | 11,785,625.00 | 13,095,138.00 |
Arkansas | B400201 | Monroe | >= 5,000 AND < | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 6,406,257.00 | 7,118,064.00 |
Arkansas | B400207 | Crittenden | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 96,697.00 | 96,697.00 |
Arkansas | B400207 | Crittenden | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 1,578,057.00 | 1,578,057.00 |
Arkansas | B400207 | Crittenden | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 30,623,325.00 |
Arkansas | B400207 | Crittenden | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | 0.00 | 469,855.00 |
Arkansas | B400207 | Crittenden | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 0.00 | 7,805,315.00 |
Arkansas | B400207 | Crittenden | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 2,571,105.00 | 2,856,783.00 |
Arkansas | B400207 | Crittenden | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 11,669,549.00 |
Arkansas | B400207 | Crittenden | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 827,026.00 | 918,918.00 |
Arkansas | B400223 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 32,515,646.00 |
Arkansas | B400223 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 12,728,748.00 |
Arkansas | B400223 | Pope | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 341,608.00 | 379,564.22 |
Arkansas | B400229 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 10,990,230.30 | 12,211,367.00 |
Arkansas | B400229 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 13,580,568.69 | 15,089,520.76 |
Arkansas | B400229 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 869,330.00 | 965,922.00 |
Arkansas | B400229 | St. Francis | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 7,371,239.69 | 8,190,266.33 |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 0.00 | 19,359,409.00 |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 9,254,083.00 |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,828,979.00 | 3,143,311.00 |
Arkansas | B400230 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 30,779.00 | 34,199.00 |
Arkansas | B400231 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 6,876,382.00 |
Arkansas | B400231 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | 0.00 | 20,857,850.00 |
Arkansas | B400231 | St. Francis | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 8,320,269.00 |
Arkansas | B400231 | St. Francis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 811,518.00 | 901,686.00 |
Arkansas | B440202 | Pulaski | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Other | 136,033.00 | 151,147.78 |
Arkansas | B440202 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 43,280,257.79 |
Arkansas | B440202 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 12,984,007.34 |
Arkansas | B440202 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,044,913.00 | 2,272,125.56 |
Arkansas | B530201 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 22,476,983.00 | 24,974,426.00 |
Arkansas | B530201 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 380,303.00 | 422,559.00 |
Arkansas | B530201 | Jefferson | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 6,743,094.00 | 7,492,327.00 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 81,001.00 | 90,001.11 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 531,259.00 | 590,287.78 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 0.00 | 21,495,768.11 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 5,951,982.00 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 8,421,850.71 | 9,357,611.89 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 211,686.00 | 235,206.67 |
Arkansas | B530202 | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 2,526,555.20 | 2,807,283.56 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 3,382,239.00 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 57,376,325.00 | 63,751,473.00 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | 2,486,933.00 | 2,763,258.00 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,299,459.00 | 1,443,843.00 |
Arkansas | B530203 | Pulaski | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 8,895,480.00 | 9,883,867.00 |
Arkansas | B540230 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 29,802,294.09 | 33,113,660.17 |
Arkansas | B540230 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 19,627,765.91 | 21,808,628.83 |
Arkansas | B540230 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 16,023,348.00 | 17,803,720.00 |
Arkansas | B540230 | Crawford | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,172,995.89 | 1,303,328.68 |
Arkansas | B540230 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,781,031.11 | 1,978,923.32 |
Arkansas | B540230 | Sebastian | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 8,781,885.18 | 9,757,650.26 |
Arkansas | B540230 | Crawford | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 5,783,742.21 | 6,426,380.28 |
Arkansas | B550001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 26,343,904.00 | 29,271,004.00 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 19,656,028.00 | 21,840,031.00 |
Arkansas | B550001 | Crittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 9,931,295.00 | 11,034,772.00 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 837,478.00 | 930,531.00 |
Arkansas | B550001 | Crittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 64,181.00 | 71,312.00 |
Arkansas | B550001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 1,166,229.00 | 5,026,496.00 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 8,397,194.00 | 9,390,215.00 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 3,334,922.22 |
Arkansas | B550001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Debt Service | 9,140,327.00 | 11,481,086.00 |
Arkansas | B550001 | Crittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 0.00 | 6,079,977.00 |
Arkansas | B550001 | Crittenden | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 75,612.00 | 84,013.00 |
Arkansas | B550001 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 49,987.00 | 55,541.00 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 279,331.00 | 310,368.00 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 7,946.00 | 8,829.00 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 13,704,973.00 | 15,227,747.78 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 685,249.00 | 761,387.78 |
Arkansas | B550001 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 46,843.00 | 52,047.78 |
Arkansas | B550206 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 26,094,977.00 | 28,994,419.00 |
Arkansas | B550206 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 519,216.00 | 576,907.00 |
Arkansas | B550206 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 203,118.00 | 225,686.00 |
Arkansas | B550206 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 7,984,258.00 | 8,871,398.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 19,872.00 | 19,872.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | Safety | 607,705.00 | 607,705.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 21,597,787.00 | 23,997,541.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 1,136,725.00 | 1,263,028.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 244,930.00 | 272,145.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 6,948,022.00 | 7,720,024.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 4,163.00 | 4,626.00 |
Arkansas | B550209 | Mississippi | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | 425,559.00 | 472,844.00 |