RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | 358,628.66 | 448,285.82 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 124,800.00 | 156,000.00 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 1,102,468.32 | 1,378,085.40 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 122,480.40 | 153,100.50 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 4,107,953.18 | 5,134,941.48 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 114,400.00 | 143,000.00 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 9,698,468.11 | 12,123,085.13 |
Georgia | 0000297 | Upson | >= 5,000 AND < | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 335,908.81 | 419,886.01 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,657,960.44 | 2,072,450.55 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 611,051.49 | 763,814.37 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 8,136,166.35 | 10,170,207.94 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 301,261.11 | 376,576.39 |
Georgia | 0000297 | Upson | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 985,995.57 | 1,232,494.46 |
Georgia | 0000425 | Hall | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 4,319,523.00 | 5,399,403.75 |
Georgia | 0000425 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 678,516.84 | 848,146.05 |
Georgia | 0000425 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 27,947,137.58 | 34,933,921.98 |
Georgia | 0000425 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 5,253,277.00 | 6,566,596.25 |
Georgia | 0000425 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 557,061.60 | 696,327.00 |
Georgia | 0000544 | Brooks | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 1,799,799.91 | 2,249,749.89 |
Georgia | 0000544 | Brooks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 25,713,347.46 | 32,141,684.33 |
Georgia | 0000544 | Brooks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 534,168.36 | 667,710.45 |
Georgia | 0000544 | Brooks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 735,557.44 | 919,446.80 |
Georgia | 0000544 | Brooks | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 508,000.00 | 635,000.00 |
Georgia | 0000544 | Brooks | >= 5,000 AND < | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 2,096,000.00 | 2,620,000.00 |
Georgia | 0000544 | Brooks | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 277,560.03 | 346,950.04 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Preliminary Engineering | 3,761,674.40 | 4,702,093.00 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Right of Way | 1,024,439.80 | 1,280,549.75 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 18,136,021.73 | 22,670,027.17 |
Georgia | 0000545 | Colquitt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 12,363,853.98 | 15,454,817.47 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 465,449.89 | 581,812.35 |
Georgia | 0000545 | Colquitt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 181,621.36 | 227,026.71 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 460,800.00 | 576,000.00 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 359,114.79 | 448,893.48 |
Georgia | 0000545 | Colquitt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 105,698.55 | 132,123.19 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 823,000.52 | 1,028,750.65 |
Georgia | 0000545 | Colquitt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 242,234.43 | 302,793.04 |
Georgia | 0000545 | Colquitt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 142,932.23 | 178,665.29 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 867,872.00 | 1,084,840.00 |
Georgia | 0000545 | Brooks | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 415,614.97 | 519,518.71 |
Georgia | 0000546 | Colquitt | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 25,104,486.90 | 31,380,608.63 |
Georgia | 0000546 | Colquitt | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 437,016.77 | 546,270.96 |
Georgia | 0000546 | Colquitt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 138,587.61 | 173,234.51 |
Georgia | 0000546 | Colquitt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 79,519.20 | 99,399.00 |
Georgia | 0000546 | Colquitt | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 1,788,110.22 | 2,235,137.77 |
Georgia | 0000546 | Colquitt | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,801,759.20 | 2,252,199.00 |
Georgia | 0000546 | Colquitt | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 767,384.42 | 959,230.53 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 692,389.23 | 865,486.54 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 6,696,586.36 | 8,370,732.95 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,615,521.69 | 2,019,402.11 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 44,666,293.83 | 56,363,848.83 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,065,564.79 | 1,331,955.99 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,060,000.00 | 1,325,000.00 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 903,632.64 | 1,129,540.80 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 2,450,613.64 | 3,063,267.05 |
Georgia | 0000566 | Bibb | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,636,554.14 | 2,045,692.67 |
Georgia | 0000762 | Lowndes | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 38,545,178.43 | 48,181,473.03 |
Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 969,423.35 | 1,211,779.19 |
Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 16,000,000.00 | 20,000,000.00 |
Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,307,609.67 | 1,634,512.09 |
Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 1,117,729.80 | 1,844,991.31 |
Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 943,970.77 | 1,179,963.46 |
Georgia | 0000762 | Lowndes | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | 1,977,569.20 | 2,471,961.50 |
Georgia | 0001216 | Toombs | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 0.00 | 4,895,235.00 |
Georgia | 0001216 | Toombs | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 69,685.20 | 10,116,654.38 |
Georgia | 0001216 | Appling | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 69,685.20 | 10,116,654.38 |
Georgia | 0001216 | Appling | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 58,705.53 | 79,989.64 |
Georgia | 0001216 | Toombs | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 496,692.09 | 676,771.38 |
Georgia | 0001216 | Toombs | >= 5,000 AND < 50,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 0.00 | 9,204.30 |
Georgia | 0001216 | Upson | >= 5,000 AND < 50,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 617,600.00 | 784,032.00 |
Georgia | 0001216 | Upson | >= 5,000 AND < 50,000 | State | BRIDGE REP & REHAB-65% ON SYS | Right of Way | 144,000.00 | 180,000.00 |
Georgia | 0001216 | Upson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 690,450.94 | 863,063.68 |
Georgia | 0001216 | Appling | >= 5,000 AND < | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 971,266.76 | 1,214,083.45 |
Georgia | 0001298 | Fulton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 25,874,386.38 | 32,342,982.99 |
Georgia | 0001298 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 30,439,010.58 | 38,048,763.22 |
Georgia | 0001298 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 7,158,581.53 | 8,948,226.92 |
Georgia | 0001298 | Fulton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 2,147,454.79 | 2,684,318.49 |
Georgia | 0001298 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 5,428,901.12 | 6,824,676.76 |
Georgia | 0001298 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 1,276,757.38 | 1,605,012.91 |
Georgia | 0001298 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,024,166.26 | 1,280,207.82 |
Georgia | 0001298 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 240,861.24 | 301,076.55 |
Georgia | 0001298 | Fulton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 42,948,456.86 | 53,685,571.04 |
Georgia | 0001298 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 32,202,375.27 | 40,252,969.10 |
Georgia | 0001298 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Debt Service | 7,573,285.89 | 9,466,607.35 |
Georgia | 0001298 | Fulton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 13,293.18 | 16,616.47 |
Georgia | 0001298 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 11,229,805.00 | 14,037,256.25 |
Georgia | 0001298 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Right of Way | 2,887,389.87 | 3,609,237.34 |
Georgia | 0001298 | Fulton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 6,318,374.69 | 7,897,968.36 |
Georgia | 0001298 | Fulton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,485,941.87 | 1,857,427.34 |
Georgia | 0001298 | Fulton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 7,887,231.42 | 9,859,039.31 |
Georgia | 0001757 | Fulton | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 719,921.00 | 899,901.25 |
Georgia | 0001757 | Fulton | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 4,984,903.98 | 5,538,782.20 |
Georgia | 0001757 | Fulton | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 2,700,000.00 | 3,000,000.00 |
Georgia | 0001757 | Fulton | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | 164,231,796.98 | 205,289,746.23 |
Georgia | 0001757 | Forsyth | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | 19,792,650.02 | 24,740,812.52 |
Georgia | 0001757 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 366,008,234.18 |
Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 3,036,995,548.07 |
Georgia | 0001757 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 7,174,508.63 | 51,563,767.81 |
Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 12,321,918.22 | 73,783,955.69 |
Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 25,801,622.83 | 39,312,281.55 |
Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 14,150,211.52 | 17,687,764.40 |
Georgia | 0001757 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,705,788.48 | 2,132,235.60 |
Georgia | 0001757 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,327,351.41 | 1,659,189.26 |
Georgia | 0001817 | Clayton | >= 200,000 | Local | HIGHWAY INFRA PROGRAM APPORT | Rail/Hwy Crossing | 9,213,956.12 | 11,517,445.14 |
Georgia | 0001817 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 69,711.10 | 87,138.87 |
Georgia | 0001817 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,237,539.32 | 1,546,924.16 |
Georgia | 0001817 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 1,076,163.26 | 1,345,204.08 |
Georgia | 0001817 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 27,775,350.08 | 34,719,187.59 |
Georgia | 0001817 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,964,000.00 | 6,100,000.00 |
Georgia | 0001817 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 4,840,349.60 | 6,050,437.00 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 16,456,631.07 | 20,772,075.84 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 1,060,705.91 | 1,387,915.12 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 1,345.26 | 1,774.77 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 755,646.60 | 944,558.25 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 33,600.00 | 42,000.00 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 455,150.77 | 568,938.46 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 677,984.32 | 847,480.40 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 761,553.50 | 951,941.87 |
Georgia | 0002392 | Forsyth | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 13,409,135.26 | 16,761,419.08 |
Georgia | 0002626 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 864,272.75 | 1,080,340.93 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 25,236,897.54 | 31,546,121.92 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 3,642,741.54 | 4,553,426.94 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 993,539.21 | 1,241,924.01 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,261,844.88 | 1,577,306.10 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 21,999.60 | 27,499.50 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 6,000.40 | 7,500.50 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,511,738.75 | 1,889,673.44 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 12,992,000.00 | 16,240,000.00 |
Georgia | 0002626 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,792,794.57 | 2,240,993.21 |
Georgia | 0002923 | Chatham | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Right of Way | 2,142,593.00 | 2,142,593.00 |
Georgia | 0002923 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 10,685,644.06 | 13,357,055.07 |
Georgia | 0002923 | Chatham | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 1,512,590.06 | 1,890,737.58 |
Georgia | 0002923 | Chatham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 215,273.33 | 269,091.66 |
Georgia | 0002923 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 71,741.54 | 89,676.93 |
Georgia | 0002923 | Chatham | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 10,158.09 | 12,697.61 |
Georgia | 0002923 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 8,275,177.95 | 10,343,972.44 |
Georgia | 0002923 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 675,146.63 | 843,933.28 |
Georgia | 0002923 | Chatham | >= 200,000 | Other | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 95,568.70 | 119,460.88 |
Georgia | 0002923 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 71,200.00 | 89,000.00 |
Georgia | 0002923 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 183,777.06 | 229,721.33 |
Georgia | 0002923 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 345,190.66 | 431,488.33 |
Georgia | 0002923 | Chatham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 22,258.90 | 27,823.62 |
Georgia | 0002923 | Chatham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,750,090.29 | 2,187,612.86 |
Georgia | 0003161 | Coweta | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 3,618,969.92 | 4,523,712.40 |
Georgia | 0003161 | Meriwether | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 1,254,407.29 | 1,568,009.11 |
Georgia | 0003161 | Coweta | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 1,748,526.14 | 2,185,657.67 |
Georgia | 0003161 | Meriwether | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 605,965.62 | 757,457.03 |
Georgia | 0003161 | Coweta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 83,911,279.13 | 104,889,098.96 |
Georgia | 0003161 | Meriwether | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 10,266,837.21 | 12,833,546.50 |
Georgia | 0003161 | Coweta | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 42,196,348.81 | 52,745,436.02 |
Georgia | 0003161 | Coweta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 29,619,865.24 | 37,024,831.52 |
Georgia | 0003161 | Coweta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,410,036.12 | 1,762,545.15 |
Georgia | 0003161 | Meriwether | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 488,659.22 | 610,824.02 |
Georgia | 0004086 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 11,278,228.44 | 14,097,785.55 |
Georgia | 0004086 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 569,600.00 | 712,000.00 |
Georgia | 0004086 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,270,779.16 | 1,588,473.95 |
Georgia | 0004086 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,600.00 | 2,000.00 |
Georgia | 0004086 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 33,054,154.93 | 41,317,693.67 |
Georgia | 0004086 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 1,829,129.95 | 2,327,683.07 |
Georgia | 0004086 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 934,388.72 | 1,167,985.90 |
Georgia | 0004086 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,421,669.09 | 1,777,086.36 |
Georgia | 0004086 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 41,176,000.00 | 51,470,000.00 |
Georgia | 0004086 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 13,858,634.84 | 17,323,293.55 |
Georgia | 0004166 | Fulton | >= 200,000 | N/A | HSIP LIMITING FLEXIBLE | Construction Engineering | 9,540.00 | 10,600.00 |
Georgia | 0004166 | Fulton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | 1,071,000.00 | 1,190,000.00 |
Georgia | 0004166 | Fulton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | 46,699.00 | 51,887.78 |
Georgia | 0004166 | Fulton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | 66,677.62 | 74,086.24 |
Georgia | 0004166 | Fulton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | 2,083,743.10 | 2,315,270.11 |
Georgia | 0004166 | Fulton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | 8,886,859.29 | 29,060,280.36 |
Georgia | 0004166 | Fulton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | 704,425.50 | 782,695.00 |
Georgia | 0004166 | Fulton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 197,100.00 | 219,000.00 |
Georgia | 0004166 | Fulton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 2,902,256.90 | 3,224,729.89 |
Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | N/A | EXTENSION OF ALLOC PROGRAMS | Right of Way | 4,800,000.00 | 6,000,000.00 |
Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 10,400,000.00 | 22,525,105.00 |
Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 0.00 | 20,000.00 |
Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 503,107.43 | 1,080,546.48 |
Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 240,000.00 | 300,000.00 |
Georgia | 0004428 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,930,644.80 | 8,100,000.00 |
Georgia | 0004430 | Gwinnett | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | 4R - Added Capacity | 250,467.00 | 250,467.00 |
Georgia | 0004430 | Gwinnett | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | Utilities | 241,498.00 | 241,498.00 |
Georgia | 0004430 | Gwinnett | >= 200,000 | State | HIGHWAY PRIORITY PROJECTS | 4R - Added Capacity | 1,094,592.00 | 1,094,592.00 |
Georgia | 0004430 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 22,792,476.18 | 28,490,595.22 |
Georgia | 0004430 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,145,136.54 | 1,431,420.67 |
Georgia | 0004430 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 193,198.40 | 241,498.00 |
Georgia | 0004430 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 22,800,000.00 | 28,500,000.00 |
Georgia | 0004430 | Gwinnett | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | 4R - Added Capacity | 3,968,091.47 | 3,968,091.47 |
Georgia | 0004430 | Gwinnett | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | Utilities | 757,678.27 | 757,678.27 |
Georgia | 0004430 | Gwinnett | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 968,965.52 | 2,174,205.24 |
Georgia | 0004430 | Gwinnett | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 8,800,000.00 | 11,000,000.00 |
Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | 2,690,092.33 | 3,362,615.41 |
Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | 3,757,875.87 | 4,697,344.84 |
Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 21,112,643.75 | 26,390,804.69 |
Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 20,807,949.56 | 26,009,936.96 |
Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,697,332.52 | 2,121,665.65 |
Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,697,332.52 | 2,121,665.65 |
Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 2,704,238.10 | 3,380,297.62 |
Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 91,700.23 | 114,625.29 |
Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 66,441.90 | 83,052.37 |
Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 10,296,000.00 | 12,870,000.00 |
Georgia | 0004915 | Floyd | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,413,112.88 | 1,766,391.10 |
Georgia | 0004915 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,900,164.67 | 2,375,205.84 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 1,467,276.06 | 1,834,095.08 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 745,555.16 | 931,943.95 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 294,464.51 | 368,080.64 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Utilities | 153,196.16 | 191,495.20 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 24,517,407.94 | 30,646,759.92 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 3,174,463.36 | 4,018,079.20 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 3,700,683.28 | 4,625,854.10 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 162,155.93 | 202,694.91 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 15,564,712.16 | 19,455,890.19 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 7,542,658.47 | 9,428,323.09 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 101,115.07 | 126,393.84 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 12,693,464.80 | 15,866,831.00 |
Georgia | 0005071 | Glynn | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 6,586,293.35 | 8,232,866.69 |
Georgia | 0005088 | Glynn | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - Added Capacity | 101,552.90 | 126,941.13 |
Georgia | 0005088 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 60,895,644.76 | 76,119,555.93 |
Georgia | 0005088 | Camden | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 2,196,817.99 | 2,746,022.49 |
Georgia | 0005088 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 4,019.20 | 5,024.00 |
Georgia | 0005088 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 725,636.93 | 907,046.16 |
Georgia | 0005088 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 37,311,906.88 | 46,639,883.63 |
Georgia | 0005088 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 11,986,046.47 | 14,982,558.09 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 319,636.70 | 399,545.87 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 15,776,551.97 | 19,720,689.96 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 394,275.20 | 492,844.01 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 3,776,400.00 | 4,720,500.00 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 147,427.25 | 184,284.06 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 69,598.39 | 86,997.99 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 960,449.34 | 1,200,561.68 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,227,354.52 | 1,534,193.15 |
Georgia | 0005320 | Dooly | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 660,000.00 | 825,000.00 |
Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | 213,557.69 | 266,947.11 |
Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | Other | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | 750.08 | 937.60 |
Georgia | 0006049 | Cobb | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | 219,601.47 | 274,501.84 |
Georgia | 0006049 | Cobb | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | 5,644,699.43 | 7,061,522.67 |
Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Right of Way | 5,266,857.49 | 6,588,842.49 |
Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 173,244.32 | 216,555.40 |
Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | Other | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 608.48 | 760.60 |
Georgia | 0006049 | Cobb | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 2,653,121.97 | 3,316,402.46 |
Georgia | 0006049 | Cobb | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 178,147.20 | 222,684.00 |
Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 230,075.92 | 287,594.90 |
Georgia | 0006049 | Cobb | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 246,636.86 | 308,296.07 |
Georgia | 0006049 | Cobb | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 11,538,047.15 | 14,422,558.94 |
Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 37,230,463.11 | 46,538,078.89 |
Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,164,203.63 | 1,455,254.54 |
Georgia | 0006049 | Cobb | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 655,816.02 | 819,770.03 |
Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 814,492.15 | 1,018,115.19 |
Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 760,013.72 | 950,017.15 |
Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 101,251.28 | 126,564.10 |
Georgia | 0006049 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 94,479.02 | 118,098.78 |
Georgia | 0006049 | Cobb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 637,333.26 | 6,730,025.58 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 735,459.69 | 919,324.61 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 797,185.77 | 996,482.21 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 6,441,526.06 | 8,051,907.58 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 24,541,816.01 | 30,677,270.01 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 136,870.09 | 171,087.61 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 6,245,499.32 | 7,806,874.14 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 8,300,135.48 | 10,375,169.35 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 78,905.30 | 98,631.63 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 80,494.25 | 100,617.81 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 0.00 | 54,581.47 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 26,223,332.49 | 32,779,165.61 |
Georgia | 0006073 | Tift | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 4,164,877.92 | 5,206,097.40 |
Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | 1,967,855.00 | 1,967,855.00 |
Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 980,735.82 | 1,225,919.78 |
Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 9,986,680.24 | 13,717,791.30 |
Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 16,955,317.04 | 21,194,146.30 |
Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 393,969.10 | 492,461.38 |
Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 9,136,000.00 | 11,435,237.79 |
Georgia | 0006900 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 3,711,419.39 | 4,639,274.24 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | 4,853,261.95 | 6,066,577.44 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 880,000.00 | 1,100,000.00 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 4,879,360.00 | 6,099,200.00 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 603,963.93 | 754,954.91 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 472,457.37 | 590,571.71 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 14,814,903.14 | 18,518,628.93 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,114,935.56 | 1,393,669.45 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 12,279,840.00 | 17,830,800.00 |
Georgia | 0006901 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 173,928.11 | 217,410.14 |
Georgia | 0007037 | Montgomery | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 180,051.97 | 225,064.96 |
Georgia | 0007037 | Jeff Davis | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 360,157.95 | 450,197.44 |
Georgia | 0007037 | Jeff Davis | >= 5,000 AND < 50,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 76,061.28 | 95,076.60 |
Georgia | 0007037 | Montgomery | >= 5,000 AND < 50,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 38,024.93 | 47,531.16 |
Georgia | 0007037 | Montgomery | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 189,983.39 | 237,479.24 |
Georgia | 0007037 | Jeff Davis | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 321,784.38 | 402,230.47 |
Georgia | 0007037 | Jeff Davis | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | 15,967.75 | 2,930,853.96 |
Georgia | 0007037 | Montgomery | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | 9,426.25 | 1,730,173.32 |
Georgia | 0007037 | Montgomery | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | 53,814.72 | 7,243,007.61 |
Georgia | 0007037 | Jeff Davis | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | 91,160.28 | 12,269,405.11 |
Georgia | 0007037 | Jeff Davis | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Construction Engineering | 50,304.00 | 229,512.00 |
Georgia | 0007037 | Montgomery | >= 5,000 AND < 50,000 | State | REPURPOSED SPECIAL | Construction Engineering | 29,696.00 | 135,488.00 |
Georgia | 0007037 | Montgomery | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 133,632.00 | 167,040.00 |
Georgia | 0007037 | Jeff Davis | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 226,368.00 | 282,960.00 |
Georgia | 0007037 | Jeff Davis | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 681,324.80 | 851,656.00 |
Georgia | 0007037 | Montgomery | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 340,611.30 | 425,764.13 |
Georgia | 0007128 | Chatham | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Preliminary Engineering | 863,632.04 | 863,632.04 |
Georgia | 0007128 | Chatham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 48,199,453.96 | 60,502,817.45 |
Georgia | 0007128 | Chatham | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,197,800.00 | 1,497,250.00 |
Georgia | 0007128 | Chatham | >= 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 3,164,896.60 | 3,956,120.75 |
Georgia | 0007128 | Chatham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 56,987.80 | 71,234.75 |
Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 10,600,000.00 | 13,250,000.00 |
Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 12,617.60 | 15,772.00 |
Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 5,530,705.23 | 6,951,366.14 |
Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,549.03 | 1,946.93 |
Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 22,424,519.36 | 28,030,649.20 |
Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 546,954.60 | 683,693.25 |
Georgia | 0007386 | Lowndes | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 288,692.00 | 360,865.00 |
Georgia | 0007414 | Camden | >= 50,000 AND < 200,000 | Local | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 12,599,041.34 | 15,748,801.66 |
Georgia | 0007414 | Camden | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 128,000.00 | 160,000.00 |
Georgia | 0007414 | Camden | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 719,921.00 | 899,901.25 |
Georgia | 0007414 | Camden | >= 50,000 AND < 200,000 | Local | REPURPOSED SPECIAL | 4R - Added Capacity | 746,395.78 | 932,994.73 |
Georgia | 0007414 | Camden | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 21,079,747.74 | 26,891,524.62 |
Georgia | 0007414 | Camden | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 836,692.41 | 1,045,865.51 |
Georgia | 0007414 | Camden | >= 50,000 AND < | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 121,938.74 | 152,423.42 |
Georgia | 0007414 | Camden | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 5,224,000.00 | 6,530,000.00 |
Georgia | 0007414 | Camden | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 2,799,026.40 | 3,679,396.31 |
Georgia | 0007526 | Fulton | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 583,320.15 | 729,150.18 |
Georgia | 0007526 | Fulton | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 562,048.65 | 702,560.80 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 533,815.00 | 667,268.75 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 1,102,781.18 | 1,378,476.48 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 25,723.02 | 32,153.79 |
Georgia | 0007526 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 274,114.34 | 342,642.92 |
Georgia | 0007526 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 69,816.20 | 87,270.25 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 494,174.36 | 617,717.95 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 43,263.34 | 54,079.18 |
Georgia | 0007526 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 9,072,501.44 | 11,340,626.79 |
Georgia | 0007526 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 13,007,637.81 | 16,259,547.30 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 9,445,491.23 | 11,806,864.03 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 4,399,810.89 | 5,499,763.60 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 2,309,175.42 | 2,886,469.27 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 409,262.96 | 511,578.69 |
Georgia | 0007526 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,289,352.58 | 1,611,690.73 |
Georgia | 0007526 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 712,209.04 | 890,261.31 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,951,454.66 | 2,439,318.33 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 694,498.34 | 868,122.92 |
Georgia | 0007526 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,644,281.93 | 2,055,352.41 |
Georgia | 0007526 | Fulton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,986,658.76 | 2,483,323.45 |
Georgia | 0007526 | Forsyth | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,000,000.00 | 9,330,000.00 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 39,050.38 | 48,812.98 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 175,411.77 | 219,264.71 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | 2,276,181.60 | 2,845,227.00 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | 399,141.30 | 498,926.63 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | 85,543.96 | 106,929.95 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Right of Way | 380,158.09 | 475,197.62 |
Georgia | 0007691 | Paulding | >= 50,000 AND < | State | EQUITY BONUS EXEMPT LIM | Right of Way | 3,064,000.35 | 3,830,000.44 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 804,095.64 | 1,009,730.62 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 178,864.36 | 224,606.15 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 7,922,893.37 | 9,903,616.71 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 35,642,002.86 | 44,552,503.59 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 180,596.63 | 225,745.78 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 842,870.38 | 1,053,587.98 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 511,809.98 | 639,762.48 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 2,388,690.64 | 2,985,863.29 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | 29,578.64 | 36,973.30 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | 132,941.36 | 166,176.70 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 2,882.89 | 3,603.60 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 12,957.11 | 16,196.40 |
Georgia | 0007691 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 167,858.66 | 209,823.33 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 300,000.00 | 375,000.00 |
Georgia | 0007691 | Paulding | >= 50,000 AND < | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 783,420.47 | 979,275.58 |
Georgia | 0007691 | Paulding | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 9,986,646.50 | 12,483,308.11 |
Georgia | 0007885 | Chatham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 3,352,000.00 | 4,190,000.00 |
Georgia | 0007885 | Chatham | >= 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,250,663.92 | 1,563,329.90 |
Georgia | 0007885 | Chatham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 480,000.00 | 600,000.00 |
Georgia | 0007885 | Chatham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 14,448,676.72 | 16,054,085.23 |
Georgia | 0007885 | Chatham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 293,884.08 | 326,537.87 |
Georgia | 0007885 | Chatham | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 6,939,166.05 | 7,710,184.50 |
Georgia | 0008219 | Columbia | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 253,837.47 | 317,296.84 |
Georgia | 0008219 | Columbia | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Construction Engineering | 240,816.71 | 301,020.89 |
Georgia | 0008219 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 1,902,780.52 | 2,378,475.66 |
Georgia | 0008219 | Columbia | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 4,170,642.81 | 5,213,303.47 |
Georgia | 0008219 | Columbia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 1,900,603.42 | 2,375,754.28 |
Georgia | 0008219 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 661,460.08 | 826,825.11 |
Georgia | 0008219 | Columbia | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 2,159,790.81 | 2,699,738.51 |
Georgia | 0008219 | Columbia | >= 50,000 AND < | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 660,703.27 | 825,879.10 |
Georgia | 0008219 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 1,053,016.43 | 1,316,270.54 |
Georgia | 0008256 | Cobb | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 1,331,851.95 | 1,664,814.95 |
Georgia | 0008256 | Cobb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 48,017,391.19 | 53,352,656.88 |
Georgia | 0008256 | Cobb | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,400,000.00 | 3,000,000.00 |
Georgia | 0008256 | Cherokee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 17,923,605.33 | 24,649,129.47 |
Georgia | 0008256 | Cobb | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 37,600,000.00 | 47,000,000.00 |
Georgia | 0008256 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 74,736,868.36 | 102,775,921.50 |
Georgia | 0008256 | Cobb | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 27,795.31 | 39,385.78 |
Georgia | 0008256 | Cobb | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 15,437,351.24 | 19,296,689.05 |
Georgia | 0008256 | Cobb | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | 43,212.80 | 54,016.01 |
Georgia | 0008256 | Cobb | >= 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | 55,865.50 | 69,831.87 |
Georgia | 0008256 | Cherokee | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | 12,652.70 | 15,815.87 |
Georgia | 0008256 | Cherokee | >= 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | 953,388.68 | 1,191,735.84 |
Georgia | 0008256 | Cobb | >= 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | 3,981,335.31 | 4,976,669.16 |
Georgia | 0008256 | Cobb | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 19,987,391.20 | 24,984,239.00 |
Georgia | 0008256 | Cobb | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 31,500,000.00 | 35,000,000.00 |
Georgia | 0008406 | Houston | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,748,787.23 | 2,185,984.04 |
Georgia | 0008406 | Houston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 4,627,930.79 | 25,293,355.41 |
Georgia | 0008406 | Houston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 982,768.74 | 1,228,460.92 |
Georgia | 0008406 | Houston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 686,748.36 | 858,435.45 |
Georgia | 0008406 | Houston | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 12,344,000.00 | 15,430,000.00 |
Georgia | 0008406 | Houston | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 490,498.76 | 613,123.45 |
Georgia | 0008407 | Houston | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 26,341,447.65 | 32,926,809.57 |
Georgia | 0008407 | Houston | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,239,668.53 | 1,549,585.66 |
Georgia | 0008407 | Houston | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 18,032.12 | 22,540.15 |
Georgia | 0008407 | Houston | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 341,039.59 | 426,299.49 |
Georgia | 0008407 | Houston | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 142,642.64 | 178,303.30 |
Georgia | 0008407 | Houston | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 702,400.00 | 878,000.00 |
Georgia | 0008407 | Houston | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 16,368,000.00 | 20,460,000.00 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 960,000.00 | 1,200,000.00 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 3,308,585.86 | 4,135,732.32 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 400,000.00 | 500,000.00 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 39,846.98 | 49,808.72 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 0.00 | 755,164.68 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | 24,821,050.00 | 30,360,785.53 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Utilities | 0.00 | 1,288,878.24 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Right of Way | 101,575.04 | 126,968.80 |
Georgia | 0008430 | Barrow | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Right of Way | 3,797,839.10 | 4,747,298.88 |
Georgia | 0009156 | Henry | >= 200,000 | N/A | HIGHWAY INFRASTRUCTURE | Preliminary Engineering | 1,600,000.00 | 2,000,000.00 |
Georgia | 0009156 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 3,333,973.93 | 4,167,467.41 |
Georgia | 0009156 | Henry | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 60,141,556.64 | 75,176,945.81 |
Georgia | 0009156 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,536,424.65 | 4,420,530.81 |
Georgia | 0009156 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,469,235.36 | 1,836,544.20 |
Georgia | 0009156 | Henry | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 935,539.83 | 1,169,424.79 |
Georgia | 0009156 | Henry | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 830,180.17 | 1,037,725.21 |
Georgia | 0009156 | Henry | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 29,853,918.11 | 37,317,397.65 |
Georgia | 0009156 | Henry | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 17,280.00 | 21,600.00 |
Georgia | 0009156 | Henry | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 797,859.73 | 997,324.66 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | DONOR STATE BONUS | 4R - Added Capacity | 2,109,929.98 | 2,637,412.48 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 1,488,390.50 | 1,860,488.13 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | 140,981.15 | 176,226.44 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 1,495,940.64 | 1,869,925.80 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | HIGHWAY INFRASTRUCTURE | Preliminary Engineering | 1,200,000.00 | 1,500,000.00 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 19,739,428.14 | 24,674,285.16 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,030,707.45 | 2,538,384.31 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 8,160,400.33 | 10,200,500.41 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | 2,028,980.86 | 2,536,226.08 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 21,842,670.40 | 27,303,338.00 |
Georgia | 0009157 | Henry | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 634,949.64 | 793,687.05 |
Georgia | 0009157 | Henry | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 13,372.64 | 16,715.80 |
Georgia | 0009157 | Clayton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 12,163.56 | 15,204.45 |
Georgia | 0009316 | Forsyth | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 30,925,171.04 | 38,656,463.81 |
Georgia | 0009316 | Forsyth | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 738,288.76 | 922,860.95 |
Georgia | 0009316 | Forsyth | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 145,600.00 | 182,000.00 |
Georgia | 0009316 | Forsyth | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 10,328,000.00 | 12,910,000.00 |
Georgia | 0009316 | Forsyth | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 0.00 | 3,420,590.00 |
Georgia | 0009323 | Coweta | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 47,250.00 | 52,500.00 |
Georgia | 0009323 | Coweta | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 159,700.97 | 177,445.52 |
Georgia | 0009323 | Coweta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 576,118.82 | 720,148.52 |
Georgia | 0009323 | Coweta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 23,436,108.58 | 29,295,135.73 |
Georgia | 0009323 | Coweta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 52,284.80 | 727,715.19 |
Georgia | 0009323 | Coweta | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 24,179.74 | 30,224.67 |
Georgia | 0009827 | Bibb | >= 50,000 AND < 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Added Capacity | 31,168,949.25 | 31,168,949.25 |
Georgia | 0009827 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 23,366,834.56 | 29,208,543.23 |
Georgia | 0009827 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,003,977.30 | 2,504,971.62 |
Georgia | 0009827 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,008.00 | 1,260.00 |
Georgia | 0010212 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 16,855,880.46 | 21,069,850.57 |
Georgia | 0010212 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 416,812.46 | 521,015.57 |
Georgia | 0010212 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,295,897.65 | 1,619,872.06 |
Georgia | 0010212 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | 1,526,772.42 | 1,908,465.52 |
Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 6,102,187.21 | 27,072,734.02 |
Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 522,208.18 | 652,760.23 |
Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 453,040.87 | 566,301.09 |
Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 942,836.00 | 1,178,545.00 |
Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 9,840,000.00 | 12,300,000.00 |
Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 41,103.41 | 51,379.26 |
Georgia | 0010297 | Lowndes | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,241,952.00 | 1,552,440.00 |
Georgia | 0012683 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 20,455.87 | 22,728.75 |
Georgia | 0012683 | Statewide | N/A | N/A | INTERSTATE MAINTENANCE | Vehicle Weight Enforcement Program | 409,117.50 | 454,575.00 |
Georgia | 0012683 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,344,438.00 | 1,493,820.00 |
Georgia | 0012683 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 200,146.55 | 222,385.05 |
Georgia | 0012683 | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Vehicle Weight Enforcement Program | 23,188,017.22 | 25,764,463.59 |
Georgia | 0012698 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 30,000.00 |
Georgia | 0012698 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 14,998,752.04 | 20,998,440.05 |
Georgia | 0012698 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 535,228.02 | 669,035.03 |
Georgia | 0012698 | Gwinnett | >= 200,000 | State | REPURPOSED SPECIAL | Right of Way | 2,159,760.00 | 2,699,700.00 |
Georgia | 0012698 | Gwinnett | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 40,000.00 | 50,000.00 |
Georgia | 0012698 | Gwinnett | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,580,460.00 | 4,475,575.00 |
Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 44,580,952.70 | 55,726,190.87 |
Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,229,872.11 | 1,537,340.14 |
Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 3,419,993.21 | 5,788,583.42 |
Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 924,291.84 | 1,155,364.80 |
Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | 487,561.19 | 609,451.49 |
Georgia | 0012700 | Bibb | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | 4,820,257.81 | 6,025,322.27 |
Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 47,621,053.00 | 59,526,316.25 |
Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 20,953,934.06 | 26,192,417.57 |
Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,702,699.10 | 2,128,373.88 |
Georgia | 0012701 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 504,511.28 | 630,639.10 |
Georgia | 0012757 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 49,954,961.00 | 68,918,701.25 |
Georgia | 0012757 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 85,040,000.00 | 229,425,000.00 |
Georgia | 0012757 | Chatham | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | 3,129,681.00 | 3,912,101.25 |
Georgia | 0012757 | Chatham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 4,250,912.00 | 5,313,640.00 |
Georgia | 0012955 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 37,120,000.00 | 46,400,000.00 |
Georgia | 0012956 | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Other | 38,216,000.00 | 47,770,000.00 |
Georgia | 0012957 | Statewide | N/A | State | EQUITY BONUS SP LIMITATION | Other | 4,000,000.00 | 5,000,000.00 |
Georgia | 0012957 | Statewide | N/A | State | REDISTRIBUTION OF CERTAIN AUTH | Other | 2,057,103.97 | 2,571,379.96 |
Georgia | 0012957 | Statewide | N/A | State | REDISTRIBUTION OF TIFIA FUNDS | Other | 1,142,896.03 | 1,428,620.04 |
Georgia | 0012957 | Statewide | N/A | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | 20,000,000.00 | 25,000,000.00 |
Georgia | 0013545 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 81,628,806.34 | 102,036,007.93 |
Georgia | 0013545 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 400,000.00 | 500,000.00 |
Georgia | 0013545 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 4,500,000.00 | 5,625,000.00 |
Georgia | 0013546 | DeKalb | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 13,857,035.87 | 17,321,294.84 |
Georgia | 0013546 | Fulton | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 130,111,749.13 | 162,639,686.41 |
Georgia | 0013546 | Fulton | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 29,700,830.80 | 37,126,038.50 |
Georgia | 0013546 | DeKalb | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 3,163,169.20 | 3,953,961.50 |
Georgia | 0013546 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 88,856,774.34 | 139,203,387.35 |
Georgia | 0013546 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 9,463,338.38 | 15,387,490.14 |
Georgia | 0013546 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 13,832,504.91 | 15,145,531.93 |
Georgia | 0013546 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 129,884,184.74 | 142,212,957.23 |
Georgia | 0013546 | Fulton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | 178,548.54 | 223,185.67 |
Georgia | 0013546 | DeKalb | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | 24,601.46 | 30,751.83 |
Georgia | 0013546 | DeKalb | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 303,196.62 | 303,196.62 |
Georgia | 0013546 | Fulton | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 2,200,491.38 | 2,200,491.38 |
Georgia | 0013546 | Fulton | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | 1,626,568.75 | 2,033,210.94 |
Georgia | 0013546 | DeKalb | >= 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | 173,231.25 | 216,539.06 |
Georgia | 0013546 | DeKalb | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 52,349,395.80 | 65,436,744.75 |
Georgia | 0013727 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 27,205,818.40 | 34,007,273.00 |
Georgia | 0013727 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 280,000.00 | 350,000.00 |
Georgia | 0013727 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,193,600.00 | 1,492,000.00 |
Georgia | 0013727 | Chatham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 2,330,476.00 | 2,913,095.00 |
Georgia | 0013727 | Chatham | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 400,000.00 | 980,494.00 |
Georgia | 0013727 | Chatham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 80,000.00 | 100,000.00 |
Georgia | 0013727 | Chatham | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 257,600.00 | 322,000.00 |
Georgia | 0015245 | Banks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 2,887,456.00 | 3,811,240.00 |
Georgia | 0015245 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 111,512,544.00 | 147,188,760.00 |
Georgia | 0015245 | Banks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 12,620.00 |
Georgia | 0015245 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 487,380.00 |
Georgia | 0015245 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 3,899,040.00 | 5,370,927.60 |
Georgia | 0015245 | Banks | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 100,960.00 | 139,072.40 |
Georgia | 0017129 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - No Added Capacity | 1,212,356.00 | 21,973,204.00 |
Georgia | 0017129 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - No Added Capacity | 27,829,792.80 | 34,787,241.00 |
Georgia | 0017129 | DeKalb | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 240,000.00 | 300,000.00 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | State | DONOR STATE BONUS | 4R - Added Capacity | 228,760.68 | 285,950.85 |
Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | DONOR STATE BONUS | 4R - Added Capacity | 198,900.27 | 248,625.34 |
Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | N/A | DONOR STATE BONUS | Preliminary Engineering | 104,000.00 | 130,000.00 |
Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 6,033,000.36 | 7,541,250.45 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 10,159,696.19 | 12,699,620.24 |
Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 412,546.63 | 515,683.29 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 412,546.63 | 515,683.29 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 498,573.96 | 738,612.83 |
Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 498,573.96 | 738,612.84 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 13,270,738.03 | 16,588,422.54 |
Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 6,804,187.09 | 8,505,233.86 |
Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 135,263.75 | 169,079.69 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,757,924.97 | 2,197,406.22 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 306,285.85 | 382,857.31 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 800,800.00 | 1,001,000.00 |
Georgia | 0026051 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 279,388.45 | 15,173,289.33 |
Georgia | 0026051 | Jackson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 120,611.55 | 6,550,285.02 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | 359,799.91 | 449,749.89 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 3,527,768.00 | 4,409,710.00 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 679,660.12 | 849,575.15 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 1,092,882.70 | 1,366,103.37 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 13,183,995.39 | 16,587,111.38 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 984,349.45 | 1,230,436.81 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,049,718.37 | 1,312,147.97 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 14,137,032.00 | 17,671,290.00 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 901,655.01 | 1,127,068.76 |
Georgia | 0027023 | White | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,018,889.60 | 3,773,612.00 |
Georgia | 0042031 | Jones | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | 1,080,626.03 | 1,350,782.54 |
Georgia | 0042031 | Jones | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | 1,348,958.62 | 1,693,938.28 |
Georgia | 0042031 | Jones | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 1,026,502.37 | 1,283,127.99 |
Georgia | 0042031 | Jones | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 505,680.23 | 632,100.29 |
Georgia | 0042031 | Jones | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 34,773,303.70 | 43,466,629.62 |
Georgia | 0042031 | Jones | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,497,683.84 | 1,872,104.81 |
Georgia | 0042031 | Jones | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 8,656,000.00 | 10,828,148.45 |
Georgia | 0042031 | Jones | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,896,545.44 | 2,370,681.80 |
Georgia | 0072039 | Madison | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | 198,763.69 | 248,454.61 |
Georgia | 0072039 | Elbert | >= 5,000 AND < | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | 4,139.22 | 5,174.03 |
Georgia | 0072039 | Madison | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | 13,234.57 | 16,543.21 |
Georgia | 0072039 | Madison | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 52,488.00 | 65,610.00 |
Georgia | 0072039 | Elbert | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Right of Way | 2,373,337.62 | 2,966,672.03 |
Georgia | 0072039 | Elbert | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 861,928.29 |
Georgia | 0072039 | Elbert | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 27,182.92 | 989,128.30 |
Georgia | 0072039 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 2,478,145.67 | 46,836,327.44 |
Georgia | 0072039 | Elbert | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 956,148.95 | 1,195,186.19 |
Georgia | 0072039 | Elbert | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 776,236.38 |
Georgia | 0072039 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 2,012,127.04 | 2,515,158.82 |
Georgia | 0072039 | Elbert | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 41,902.20 | 52,377.75 |
Georgia | 0072039 | Elbert | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 2,709.49 | 3,386.86 |
Georgia | 0072039 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 130,108.66 | 162,635.83 |
Georgia | 0072039 | Madison | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,453,495.72 | 1,816,869.65 |
Georgia | 0072039 | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 307,676.81 | 384,596.01 |
Georgia | 0072039 | Elbert | >= 5,000 AND < | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 6,718.94 | 8,398.68 |
Georgia | 0084023 | Ware | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - Restoration & Rehabilitation | 1,577,700.13 | 1,753,000.14 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - Restoration & Rehabilitation | 2,887,910.20 | 3,208,789.11 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 733,942.44 | 917,428.05 |
Georgia | 0084023 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 16,311,999.49 | 18,124,443.88 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 29,858,392.51 | 33,175,991.68 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,208,060.34 | 1,342,289.27 |
Georgia | 0084023 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,199,453.50 | 1,499,316.88 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,195,546.50 | 2,744,433.12 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 493,612.66 | 548,458.51 |
Georgia | 0084023 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 269,666.54 | 299,629.49 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 2,030,372.79 | 2,255,969.76 |
Georgia | 0084023 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Restoration & Rehabilitation | 1,567,240.42 | 1,741,378.25 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 400,000.00 | 500,000.00 |
Georgia | 0084023 | Clinch | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 5,968,000.00 | 7,460,000.00 |
Georgia | 0084026 | Ware | >= 5,000 AND < | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & | 14,772,997.13 | 16,414,441.25 |
Georgia | 0084026 | Ware | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 2,504,000.00 | 3,130,000.00 |
Georgia | 0084026 | Ware | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 6,202,847.29 | 6,892,052.55 |
Georgia | 0084026 | Ware | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 459,903.84 | 511,004.27 |
Georgia | 0084027 | Ware | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 1,515,819.90 | 1,894,774.88 |
Georgia | 0084027 | Ware | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | 420,000.00 | 525,000.00 |
Georgia | 0084027 | Ware | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | 3,680,397.00 | 4,600,496.25 |
Georgia | 0084027 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 24,890,447.41 | 27,656,052.68 |
Georgia | 0084027 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 767,176.70 | 852,418.55 |
Georgia | 0084027 | Ware | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 733,676.98 | 815,196.65 |
Georgia | 0084027 | Ware | >= 5,000 AND < 50,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | 3,813,528.10 | 4,237,253.45 |
Georgia | 0084027 | Ware | >= 5,000 AND < 50,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | 3,856,964.28 | 4,285,515.87 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | 395,815.70 | 494,769.63 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 870,800.00 | 1,088,500.00 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 3,160,000.00 | 3,950,000.00 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < | State | EQUITY BONUS SP LIMITATION | Right of Way | 970,000.00 | 1,212,500.00 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 680,000.00 | 850,000.00 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 883,983.90 | 1,104,979.87 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 36,181,737.00 | 45,227,171.24 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 2,283,094.05 | 2,853,867.57 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,548,000.00 | 4,435,000.00 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 310,000.00 | 387,500.00 |
Georgia | 00MS007 | Gordon | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,687,927.38 | 2,109,909.23 |
Georgia | 0111053 | Muscogee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 12,172,358.48 | 16,320,734.71 |
Georgia | 0111053 | Muscogee | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 563,914.61 | 704,893.26 |
Georgia | 0111053 | Muscogee | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,493,948.87 | 1,867,436.09 |
Georgia | 0111053 | Muscogee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 38,902.86 | 48,628.58 |
Georgia | 0111053 | Muscogee | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 487,805.08 | 609,756.35 |
Georgia | 0111053 | Muscogee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 14,840,200.00 | 18,550,250.00 |
Georgia | 0121071 | Bartow | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 13,991,284.52 | 17,489,105.64 |
Georgia | 0121071 | Bartow | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 48,320.00 | 60,400.00 |
Georgia | 0121071 | Bartow | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,880,837.67 | 2,351,047.09 |
Georgia | 0121071 | Bartow | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 242,280.36 | 302,850.45 |
Georgia | 0121071 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 155,099.46 | 193,874.32 |
Georgia | 0121071 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 13,040.00 | 16,300.00 |
Georgia | 0121071 | Bartow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 393,115.32 | 491,394.15 |
Georgia | 0121071 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 135,626.66 | 169,533.32 |
Georgia | 0121071 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 12,132,000.00 | 15,165,000.00 |
Georgia | 0121080 | Hall | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 400,126.18 | 500,157.73 |
Georgia | 0121080 | Forsyth | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 311,842.12 | 389,802.65 |
Georgia | 0121080 | Forsyth | >= 50,000 AND < 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 120,000.00 | 150,000.00 |
Georgia | 0121080 | Hall | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 516,137.36 | 645,171.71 |
Georgia | 0121080 | Forsyth | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 60,000.00 | 75,000.00 |
Georgia | 0121080 | Forsyth | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 416,964.66 | 521,205.82 |
Georgia | 0121080 | Forsyth | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | 329,450.56 | 411,813.20 |
Georgia | 0121080 | Forsyth | >= 50,000 AND < | State | REPURPOSED SPECIAL | Bridge Replacement - | 2,676,188.68 | 28,343,596.12 |
Georgia | 0121080 | Forsyth | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | 518,903.66 | 648,629.57 |
Georgia | 0131063 | Gwinnett | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 6,637,581.24 | 8,296,976.55 |
Georgia | 0131063 | Hall | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 6,885,737.13 | 8,607,171.41 |
Georgia | 0131063 | Gwinnett | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 163,441.41 | 204,301.77 |
Georgia | 0131063 | Hall | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 163,441.41 | 204,301.76 |
Georgia | 0131063 | Hall | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 53,600.00 | 67,000.00 |
Georgia | 0131063 | Hall | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 14,800.00 | 18,500.00 |
Georgia | 0131063 | Hall | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 7,816,000.00 | 11,770,000.00 |
Georgia | 0131063 | Hall | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 2,160,400.00 | 2,700,500.00 |
Georgia | 0131063 | Gwinnett | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 1,839,600.00 | 2,299,500.00 |
Georgia | 0131063 | Gwinnett | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,395,310.56 | 1,744,138.20 |
Georgia | 0131063 | Hall | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,395,310.57 | 1,744,138.21 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Right of Way | 1,563,416.57 | 1,563,416.57 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | INTERSTATE 4R | Preliminary Engineering | 27,000.00 | 30,000.00 |
Georgia | 0161092 | Bibb | >= 50,000 AND < | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 4,967,106.46 | 5,532,896.07 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,253,607.07 | 1,567,008.84 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 3,640,000.00 | 4,550,000.00 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 8,518,550.52 | 10,648,188.15 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 98,169.58 | 122,711.98 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 4,490,159.68 | 5,066,965.09 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 9,240,000.00 | 11,550,000.00 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | 235,654.09 | 294,567.61 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 3,370,050.91 | 4,212,563.64 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 3,092,000.00 | 3,865,000.00 |
Georgia | 0161092 | Bibb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 922,800.00 | 1,153,516.04 |
Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Right of Way | 2,551,606.65 | 2,551,606.65 |
Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | 181,914.68 | 227,393.35 |
Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 4,002,675.86 | 5,003,344.83 |
Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 71,817,199.03 | 89,771,498.79 |
Georgia | 0161104 | Bibb | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,745,051.67 | 2,181,314.59 |
Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 2,792,472.31 | 3,490,590.39 |
Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 1,020,188.93 | 1,275,236.16 |
Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 60,000.00 | 75,000.00 |
Georgia | 0161104 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 758,314.68 | 947,893.35 |
Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Right of Way | 722,580.52 | 722,580.52 |
Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 115,425,319.81 | 144,281,649.77 |
Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,876,217.59 | 3,595,271.99 |
Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 903,403.41 | 1,534,043.36 |
Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 326,000.00 | 407,500.00 |
Georgia | 0161131 | Bibb | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 660,800.00 | 826,000.00 |
Georgia | 0201073 | Douglas | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 1,700,165.73 | 1,889,073.03 |
Georgia | 0201073 | Douglas | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | 2,904,646.93 | 3,227,385.48 |
Georgia | 0201073 | Douglas | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 320,889.82 | 356,544.24 |
Georgia | 0201073 | Douglas | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 11,727,938.97 | 13,031,043.30 |
Georgia | 0201073 | Douglas | >= 50,000 AND < | State | INTERSTATE MAINTENANCE | Debt Service | 3,426,420.99 | 3,807,134.46 |
Georgia | 0201073 | Douglas | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 23,872,883.09 | 26,525,425.65 |
Georgia | 0201073 | Douglas | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 567,130.92 | 630,145.47 |
Georgia | 0201073 | Douglas | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 4,374,138.75 | 4,860,154.16 |
Georgia | 0201073 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 5,733,752.35 | 6,370,835.95 |
Georgia | 0202117 | Richmond | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Bridge Replacement - Added Capacity | 142,181.41 | 177,726.76 |
Georgia | 0202117 | Richmond | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 314,729.91 | 349,699.90 |
Georgia | 0202117 | Richmond | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 1,870,922.02 | 2,078,802.25 |
Georgia | 0202117 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 45,550,738.17 | 49,978,354.94 |
Georgia | 0202117 | Haralson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | 22,093,609.78 | 26,521,226.54 |
Georgia | 0202117 | Haralson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,676,171.25 | 2,095,214.06 |
Georgia | 0202117 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,460,178.43 | 4,879,221.24 |
Georgia | 0202117 | Richmond | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - Added Capacity | 325,039.00 | 406,298.75 |
Georgia | 0202117 | Richmond | >= 200,000 | State | REPURPOSED SPECIAL | Preliminary Engineering | 2,879,681.00 | 3,599,601.25 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 102,148.78 | 127,685.98 |
Georgia | 0202141 | Newton | >= 50,000 AND < | State | EQUITY BONUS SP LIMITATION | Utilities | 25,545.62 | 89,777.49 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 138,365.47 | 153,739.41 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 347,670.00 | 386,300.00 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | 80,751.69 | 100,939.62 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 5,646,906.15 | 7,058,632.70 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 3,359,237.26 | 4,199,046.57 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 3,130,542.67 | 3,913,178.34 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 3,311,796.77 | 4,139,745.98 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 518,448.31 | 648,060.38 |
Georgia | 0202141 | Newton | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 1,411,707.98 | 1,764,634.96 |
Georgia | 0202145 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 31,630,112.87 | 39,537,641.08 |
Georgia | 0202145 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 3,564,216.94 | 4,455,271.17 |
Georgia | 0202145 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 41,255.74 | 51,569.68 |
Georgia | 0202145 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 12,989,380.13 | 16,236,725.18 |
Georgia | 0202145 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 1,971,710.12 | 2,464,637.67 |
Georgia | 0202145 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,277,579.20 | 1,596,974.00 |
Georgia | 0202145 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 59,916.80 | 74,896.00 |
Georgia | 0202145 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 4,249,849.65 | 5,312,312.06 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 2,690,245.13 | 3,362,806.41 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Utilities | 311,703.34 | 448,846.17 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 13,619,923.71 | 17,024,904.65 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 9,262,707.20 | 11,578,384.01 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 66,622.81 | 83,278.51 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 3,331.14 | 4,163.92 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 7,503,242.58 | 9,379,053.23 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 3,515,764.08 | 4,394,705.10 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,171,594.90 | 1,464,493.63 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 3,251,392.80 | 4,064,241.00 |
Georgia | 0202167 | Newton | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 3,350,892.81 | 4,188,616.00 |
Georgia | 0441005 | Laurens | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,733,924.67 | 2,167,405.83 |
Georgia | 0441005 | Laurens | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 44,553,847.71 | 55,692,309.63 |
Georgia | 0441005 | Laurens | >= 5,000 AND < | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 1,666,678.48 | 2,083,348.10 |
Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 15,104,823.00 | 18,881,028.75 |
Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Right of Way | 2,480,000.00 | 3,100,000.00 |
Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 363,600.00 | 363,600.00 |
Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,891,197.20 | 2,363,996.49 |
Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 410,349.61 | 512,937.01 |
Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 578,795.18 | 1,468,628.26 |
Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 6,000,000.00 | 7,500,000.00 |
Georgia | 0511023 | Clarke | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,346,340.62 | 1,682,925.78 |
Georgia | 0540029 | Washington | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 636,598.15 | 795,747.69 |
Georgia | 0540029 | Washington | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 6,312.00 | 7,890.00 |
Georgia | 0540029 | Washington | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 276,445.78 | 345,557.22 |
Georgia | 0540029 | Washington | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 37,304,457.44 | 46,630,571.80 |
Georgia | 0540029 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 104,000.00 | 130,000.00 |
Georgia | 0540029 | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,365,518.69 | 1,706,898.36 |
Georgia | 0540029 | Screven | >= 5,000 AND < | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 106,990.88 | 133,738.60 |
Georgia | 0540029 | Washington | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 435,586.12 | 544,482.65 |
Georgia | 0540029 | Washington | >= 5,000 AND < 50,000 | N/A | TRAN COMM SYS PRES PILOT-TEA21 | 4R - Added Capacity | 452,270.00 | 565,337.50 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 1,509,526.09 | 1,886,907.61 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 18,161,383.74 | 26,946,561.67 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 561,101.27 | 701,376.58 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 6,705.10 | 8,381.37 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 356,646.18 | 445,807.73 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 119,422.44 | 149,278.05 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 491,282.59 | 614,103.24 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 160,666.90 | 1,619,394.19 |
Georgia | 0545040 | McDuffie | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 3,376,000.00 | 4,220,000.00 |
Georgia | 0545053 | Wilkes | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 15,890,389.76 | 22,890,007.20 |
Georgia | 0545053 | McDuffie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 14,557,572.91 | 20,969,946.14 |
Georgia | 0545053 | McDuffie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 425,657.98 | 532,072.48 |
Georgia | 0545053 | Wilkes | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 426,682.02 | 533,352.52 |
Georgia | 0545053 | Wilkes | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 14,980.90 | 18,726.13 |
Georgia | 0545053 | McDuffie | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 13,723.10 | 17,153.87 |
Georgia | 0545053 | Wilkes | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 585,303.41 | 2,896,928.00 |
Georgia | 0545053 | Wilkes | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 3,368,000.00 | 4,210,000.00 |
Georgia | 0561059 | Fulton | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Debt Service | 4,419,617.33 | 5,524,521.66 |
Georgia | 0561059 | Fulton | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | 26,545.18 | 33,181.47 |
Georgia | 0561059 | Fulton | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 17,027.06 | 21,283.83 |
Georgia | 0561059 | Fulton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 19,641,240.50 | 24,551,550.67 |
Georgia | 0561059 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 7,121,234.37 | 8,901,542.96 |
Georgia | 0561059 | Fulton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 17,997,999.22 | 22,497,499.03 |
Georgia | 0561059 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 5,007,252.82 | 6,259,065.98 |
Georgia | 0561059 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 2,382.34 | 2,977.92 |
Georgia | 0561059 | Fulton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 4,997,147.10 | 6,246,433.88 |
Georgia | 0630010 | Bryan | >= 5,000 AND < 50,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | 615,209.79 | 769,012.24 |
Georgia | 0630010 | Bryan | >= 5,000 AND < | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 22,459,849.72 | 28,074,812.16 |
Georgia | 0630010 | Bryan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 836,457.91 | 1,045,572.39 |
Georgia | 0630010 | Bryan | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 557,941.60 | 697,427.00 |
Georgia | 0630010 | Bryan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 5,130,570.40 | 6,433,484.00 |
Georgia | 0630010 | Bryan | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 822,521.81 | 1,028,152.26 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 2,432,860.34 | 3,041,075.43 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Construction Engineering | 390,942.64 | 488,678.30 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | 3,822,000.00 | 4,777,500.00 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | 4,635,070.00 | 5,793,837.50 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | N/A | INTERSTATE 4R | Preliminary Engineering | 61,112.58 | 67,902.87 |
Georgia | 0751156 | Dooly | >= 5,000 AND < 50,000 | N/A | INTERSTATE 4R | Preliminary Engineering | 61,111.80 | 67,902.00 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 640,970.92 | 712,189.91 |
Georgia | 0751156 | Dooly | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 1,957,509.00 | 2,175,010.00 |
Georgia | 0751156 | Dooly | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation (Obsolete) | 412,027.20 | 457,808.00 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 373,484.70 | 414,983.00 |
Georgia | 0751156 | Dooly | >= 5,000 AND < | N/A | INTERSTATE MAINTENANCE | Other | 456,873.30 | 507,637.00 |
Georgia | 0751156 | Dooly | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 9,900.00 | 11,000.00 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 67,027,906.64 | 83,784,883.30 |
Georgia | 0751156 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 9,960,288.14 | 12,450,360.18 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 9,794,000.06 | 12,242,500.08 |
Georgia | 0751156 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 970,910.40 | 1,213,638.00 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 22,016,477.42 | 27,520,596.77 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 18,296,620.00 | 22,870,775.02 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 521,619.33 | 652,024.16 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 11,734,397.89 | 14,667,997.36 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 9,835,383.84 | 12,294,229.80 |
Georgia | 0751156 | Crisp | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 9,829,571.26 | 12,286,964.05 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - Added Capacity | 23,438.66 | 26,042.96 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | 2,343.87 | 2,604.30 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | N/A | INTERSTATE 4R | 4R - Added Capacity | 1,143,579.68 | 1,270,644.09 |
Georgia | 0751192 | Bibb | >= 50,000 AND < | N/A | INTERSTATE 4R | Right of Way | 1,890,000.00 | 2,100,000.00 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 756,586.18 | 840,651.31 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Bridge Replacement - Added Capacity | 11,809,974.21 | 13,122,193.56 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | 5,326.02 | 5,917.80 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 640,194.89 | 711,327.65 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 29,038,733.70 | 32,265,259.67 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 11,404,696.34 | 12,671,884.85 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 27,000.00 | 30,000.00 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | Local | INTERSTATE MAINTENANCE | Preliminary Engineering | 2,626,524.90 | 2,918,361.00 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | Local | INTERSTATE MAINTENANCE | Right of Way | 773,931.58 | 859,923.97 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 0.00 | 269,557.90 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Right of Way | 7,065,000.00 | 7,850,000.00 |
Georgia | 0751192 | Bibb | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 55,777,423.93 | 61,974,915.46 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 52,798,057.80 | 65,997,572.24 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 31,508,192.42 | 39,385,240.52 |
Georgia | 0751205 | Cook | >= 5,000 AND < | Local | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 1,329,944.55 | 1,662,430.69 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 24,379.43 | 30,474.29 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 30,408,631.98 | 38,010,789.98 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 6,395,367.93 | 7,994,209.94 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 648,341.29 | 810,426.61 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 27,366.15 | 34,207.69 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 136,038.40 | 170,048.00 |
Georgia | 0751205 | Cook | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 2,740.99 | 3,426.24 |
Georgia | 0751206 | Cook | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 4,028,103.54 | 5,035,129.44 |
Georgia | 0751206 | Cook | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 6,732,758.81 | 8,415,948.53 |
Georgia | 0751206 | Cook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 7,630,062.66 | 9,537,578.33 |
Georgia | 0751206 | Cook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 1,351,736.82 | 1,689,671.02 |
Georgia | 0751206 | Cook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 260,449.50 | 325,561.87 |
Georgia | 0751206 | Cook | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 5,082,830.90 | 6,353,538.63 |
Georgia | 0751206 | Cook | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 1,139,309.98 | 1,424,137.46 |
Georgia | 0751206 | Cook | >= 5,000 AND < | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 481,281.94 | 601,602.43 |
Georgia | 0751206 | Cook | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 2,244,214.52 | 2,805,268.14 |
Georgia | 0751215 | Turner | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 14,561,641.04 | 18,202,051.31 |
Georgia | 0751215 | Turner | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 3,592.94 | 4,491.18 |
Georgia | 0751215 | Tift | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 0.64 | 0.80 |
Georgia | 0751215 | Tift | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 0.29 | 0.36 |
Georgia | 0751215 | Turner | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,608.83 | 2,011.04 |
Georgia | 0751215 | Turner | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 8,217,155.49 | 10,271,444.34 |
Georgia | 0751215 | Turner | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 5,291,434.49 | 6,614,293.09 |
Georgia | 0751215 | Tift | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 1,058.50 | 1,323.12 |
Georgia | 0751215 | Turner | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 905,927.86 | 1,132,409.83 |
Georgia | 0751215 | Turner | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 71,570.88 | 89,463.60 |
Georgia | 0751215 | Turner | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 2,592,110.11 | 3,240,137.65 |
Georgia | 0751227 | Dooly | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 1,114,296.07 | 1,238,106.75 |
Georgia | 0751227 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 41,684.90 | 52,106.12 |
Georgia | 0751227 | Dooly | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No | 20,821,839.05 | 26,027,298.81 |
Georgia | 0751227 | Dooly | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 187,000.30 | 233,750.38 |
Georgia | 0751227 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 127,542.00 | 159,427.50 |
Georgia | 0751227 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,054,132.59 | 1,317,665.74 |
Georgia | 0751227 | Dooly | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 6,317.60 | 7,897.00 |
Georgia | 0751227 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 88,000.00 | 110,000.00 |
Georgia | 0751227 | Dooly | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 2,092,000.00 | 2,615,000.00 |
Georgia | 0752213 | Henry | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Right of Way | 8,759,774.56 | 10,949,718.20 |
Georgia | 0752213 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 12,589,446.23 | 15,894,110.39 |
Georgia | 0752213 | Henry | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 646,838.00 | 808,547.50 |
Georgia | 0752213 | Henry | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 635,046.27 | 793,807.84 |
Georgia | 0752213 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,214,337.71 | 1,517,922.14 |
Georgia | 0752213 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 11,022,625.44 | 13,778,281.80 |
Georgia | 0752213 | Henry | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 99,324.00 | 124,155.00 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | State | INTERSTATE - 56 | 4R - No Added Capacity | 111,570.32 | 139,462.90 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < | N/A | INTERSTATE - 56 | Preliminary Engineering | 194,080.57 | 215,645.08 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 241,493.55 | 268,326.17 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | 1,414,999.17 | 1,572,221.30 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 619,748.13 | 688,609.03 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 14,326,685.58 | 17,908,356.98 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 329,215.88 | 411,519.85 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 85,761.83 | 107,202.29 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 399,911.72 | 499,889.65 |
Georgia | 0753208 | Whitfield | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | 3,624,555.86 | 4,530,694.83 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 25,913,025.34 | 32,391,281.69 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 320,092.81 | 400,116.01 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 616,614.76 | 770,768.44 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 7,643.98 | 9,554.98 |
Georgia | 0791042 | Ben Hill | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 135,500.81 | 169,376.02 |
Georgia | 0791042 | Irwin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 62,694.41 | 78,368.01 |
Georgia | 0791042 | Coffee | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 324,631.59 | 405,789.49 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 257,019.15 | 321,273.94 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 250.95 | 313.69 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 754,896.12 | 943,620.16 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 2,913,669.37 | 3,642,086.71 |
Georgia | 0791042 | Coffee | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,448,000.00 | 4,310,000.00 |
Georgia | 0852164 | Gwinnett | >= 200,000 | N/A | CONGESTION AIR QUALITY | 4R - Added Capacity | 33,422,416.74 | 41,778,020.93 |
Georgia | 0852164 | Gwinnett | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | 33,062,854.00 | 41,328,567.50 |
Georgia | 0852164 | Gwinnett | >= 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | 2,676,083.84 | 3,345,104.80 |
Georgia | 0852164 | Gwinnett | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | 800.00 | 1,000.00 |
Georgia | 0852164 | Gwinnett | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 2,764,321.08 | 3,455,401.35 |
Georgia | 0852164 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 6,192,405.26 | 7,740,506.57 |
Georgia | 0852164 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 52,912,551.11 | 66,140,688.88 |
Georgia | 0852164 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,696,286.65 | 3,370,358.31 |
Georgia | 0852164 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 19,667,152.00 | 24,583,940.00 |
Georgia | 0852164 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 60,763.20 | 75,954.00 |
Georgia | 0852164 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,795,678.92 | 2,244,598.65 |
Georgia | 0852165 | Barrow | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 2,930,270.70 | 3,662,838.38 |
Georgia | 0852165 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 6,531,864.00 | 8,164,830.00 |
Georgia | 0852165 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 23,948,136.00 | 29,935,170.00 |
Georgia | 0852165 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 824,832.00 | 1,031,040.00 |
Georgia | 0852165 | Gwinnett | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 3,015,168.00 | 3,768,960.00 |
Georgia | 0852165 | Barrow | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 2,098,209.30 | 2,622,761.62 |
Georgia | 0852165 | Gwinnett | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 791,427.20 | 989,284.00 |
Georgia | 0852165 | Gwinnett | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | 159,622.80 | 199,528.49 |
Georgia | 0852165 | Barrow | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | 43,527.29 | 54,409.12 |
Georgia | 0852165 | Gwinnett | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 1,414,102.79 | 18,657,281.22 |
Georgia | 0852165 | Barrow | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 385,697.12 | 5,088,781.17 |
Georgia | 0951117 | Glynn | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 110,000.00 | 137,500.00 |
Georgia | 0951117 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 44,235,342.04 | 55,294,177.67 |
Georgia | 0951117 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 40,323,732.29 | 50,404,665.36 |
Georgia | 0951117 | Glynn | >= 50,000 AND < | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 743,930.30 | 929,912.88 |
Georgia | 0951117 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 2,318,996.41 | 2,898,745.37 |
Georgia | 0951117 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 694,717.18 | 868,396.48 |
Georgia | 0951117 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 129,152.34 | 161,440.43 |
Georgia | 0951117 | Glynn | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 5,886,504.65 | 7,358,130.88 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 9,413.34 | 11,766.68 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 127,285.27 | 159,106.59 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 2,153,740.23 | 2,692,175.29 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Utilities | 423,829.12 | 529,786.40 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 13,073,596.69 | 16,341,995.84 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 7,091,865.68 | 8,864,832.10 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 6,357,099.60 | 7,946,374.53 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 842,077.64 | 1,052,597.06 |
Georgia | 0951118 | Glynn | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 2,644,552.11 | 3,305,690.13 |
Georgia | 0951120 | McIntosh | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | 2,321,525.89 | 2,901,907.36 |
Georgia | 0951120 | McIntosh | >= 5,000 AND < | N/A | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | 600,564.36 | 750,705.45 |
Georgia | 0951120 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 15,675,363.66 | 19,594,204.55 |
Georgia | 0951120 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 12,510,506.65 | 15,638,133.31 |
Georgia | 0951120 | McIntosh | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 1,554,309.77 | 1,942,887.23 |
Georgia | 0951120 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 550,481.59 | 688,101.99 |
Georgia | 0951120 | McIntosh | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 14,875,275.42 | 18,594,094.27 |
Georgia | 0951120 | McIntosh | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 52,365.36 | 65,456.70 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | 3,036,231.07 | 3,795,288.84 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 937,321.51 | 1,171,651.89 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 28,631,657.70 | 35,789,572.13 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 15,810.13 | 19,762.66 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 1,627,585.72 | 2,034,482.15 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 622,482.15 | 778,102.69 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 12,477,915.05 | 15,597,393.82 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 1,577,905.46 | 1,972,381.81 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 194,400.00 | 243,000.00 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 16,517,581.87 | 20,646,977.34 |
Georgia | 0951121 | McIntosh | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,018.45 | 2,523.06 |
Georgia | 0951150 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 2,977,964.19 | 3,722,455.23 |
Georgia | 0951150 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,844,186.12 | 2,305,232.66 |
Georgia | 0951150 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 17,500,082.38 | 21,875,102.94 |
Georgia | 0951150 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | 1,086,156.06 | 1,357,695.07 |
Georgia | 0951150 | McIntosh | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 9,547,883.68 | 11,934,854.61 |
Georgia | 0951150 | McIntosh | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 1,234,514.84 | 1,543,143.57 |
Georgia | 0951150 | McIntosh | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | 8,048,961.57 | 10,061,201.98 |
Georgia | 1105004 | Richmond | >= 200,000 | N/A | DONOR STATE BONUS | Preliminary Engineering | 4,000.00 | 5,000.00 |
Georgia | 1105004 | Richmond | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | 14,330,427.66 | 19,429,548.01 |
Georgia | 1105004 | Richmond | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 610,570.13 | 763,212.66 |
Georgia | 1105004 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 195,426.91 | 244,283.64 |
Georgia | 1105004 | Richmond | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 105,945.60 | 132,432.00 |
Georgia | 1105004 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 4,792,000.00 | 5,990,000.00 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 10,051,395.53 | 12,564,244.41 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 8,135,579.12 | 10,169,473.90 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | HIGHWAY INFRASTRUCTURE | Right of Way | 2,410,100.88 | 3,012,626.10 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | N/A | MIN ALLOC 90%-SUB TO LIM-STEA | 4R - Added Capacity | 44,320.09 | 55,400.11 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | N/A | MINIMUM ALLOCATION-EXEMPT 90% | Right of Way | 4,341.00 | 5,426.25 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | 232,461.91 | 290,577.39 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 705,346.84 | 881,683.55 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | 3,069,407.00 | 3,885,075.97 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 10,954,189.78 | 14,495,735.25 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 418,592.17 | 523,240.21 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 200,000.00 | 250,000.00 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,755,853.48 | 2,332,196.71 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | State | TRANSPORTATION IMP PROJ | 4R - Added Capacity | 128,160.00 | 160,200.00 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM ATTRIBUTABLE | 4R - Added Capacity | 86,872.25 | 115,829.67 |
Georgia | 1111007 | Catoosa | >= 50,000 AND < 200,000 | N/A | URBAN SYSTEM ATTRIBUTABLE | Preliminary Engineering | 126,000.42 | 168,000.56 |
Georgia | 1111024 | Chatham | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 899,899.95 | 1,124,874.95 |
Georgia | 1111024 | Chatham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 931,717.56 | 1,164,646.95 |
Georgia | 1111024 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 22,199,343.32 | 27,749,179.16 |
Georgia | 1111024 | Chatham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 832,788.03 | 1,040,985.04 |
Georgia | 1111024 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 80,000.00 | 100,000.00 |
Georgia | 1111024 | Chatham | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 24,900.80 | 31,126.00 |
Georgia | 1111024 | Chatham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 640,000.00 | 800,000.00 |
Georgia | 1111024 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 3,880,328.15 | 4,850,550.99 |
Georgia | 1111024 | Chatham | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 6,305,415.38 | 7,954,381.85 |
Georgia | 1111024 | Chatham | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 0.00 | 3,005,942.00 |
Georgia | 1111024 | Chatham | >= 200,000 | N/A | TRANSPORTATION IMP PROJ | Right of Way | 3,624,555.85 | 4,530,694.82 |
Georgia | 1267008 | Oconee | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,108,386.54 | 1,385,483.17 |
Georgia | 1267008 | Oconee | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 5,633,091.57 | 26,548,312.24 |
Georgia | 1267008 | Oconee | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,055,496.13 | 1,319,370.16 |
Georgia | 1267008 | Oconee | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 148,681.66 | 185,852.08 |
Georgia | 1267008 | Oconee | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 7,224,000.00 | 9,030,000.00 |
Georgia | 1267008 | Oconee | >= 5,000 AND < | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 0.00 | 590,103.20 |
Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,984,000.00 | 2,480,000.00 |
Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 26,975,689.49 | 33,719,611.88 |
Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 691,938.32 | 864,922.90 |
Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,729,414.40 | 2,161,768.00 |
Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 191,578.07 | 239,472.59 |
Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 11,208,000.00 | 14,010,000.00 |
Georgia | 1801006 | Catoosa | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,781,196.58 | 2,226,495.72 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 182,455.12 | 228,068.90 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 4,954,283.91 | 6,192,854.89 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 9,844.92 | 12,306.15 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Debt Service | 2,434,870.74 | 3,043,588.43 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 21,668,468.20 | 27,085,585.20 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 4,993,256.99 | 6,241,571.24 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 3,945,718.16 | 4,932,147.70 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 517,502.73 | 646,878.41 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 6,012,494.93 | 7,515,618.67 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 1,580,880.80 | 1,976,101.05 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 666,635.76 | 833,294.70 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 311,035.14 | 388,793.93 |
Georgia | 1851317 | Muscogee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 2,886,680.78 | 3,608,350.97 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 282,923.84 | 353,654.80 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 245,875.15 | 307,343.94 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 1,760.00 | 2,200.00 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 302,661.43 | 336,290.48 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 79,782.14 | 88,646.82 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 5,046,855.54 | 5,607,617.28 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 4,493,377.19 | 4,992,641.32 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 595,049.81 | 661,166.46 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 1,806,300.00 | 2,007,000.00 |
Georgia | 1851326 | Muscogee | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 10,175,491.60 | 11,306,101.78 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | 576,975.38 | 576,975.38 |
Georgia | 1861011 | Douglas | >= 50,000 AND < | Local | GRANTS SUP PLAN SECTION 117 | Preliminary Engineering | 406,952.62 | 406,952.62 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 492,135.31 | 615,169.14 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 347,113.17 | 433,891.46 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 12,601,052.83 | 15,751,316.05 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 8,103,634.76 | 10,129,543.44 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 400,000.00 | 500,000.00 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 504,952.71 | 631,190.89 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 323,762.43 | 404,703.04 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 6,184,000.00 | 7,734,256.58 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 98,649.56 | 123,311.95 |
Georgia | 1861011 | Douglas | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 69,579.56 | 86,974.45 |
Georgia | 2851346 | Clayton | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 2,667,512.32 | 2,963,902.58 |
Georgia | 2851346 | Clayton | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 294,835.00 | 327,594.44 |
Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 50,144,608.35 | 62,680,760.44 |
Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,528,264.63 | 1,910,330.79 |
Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 199,988.22 | 222,209.13 |
Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 3,361,920.00 | 4,202,400.00 |
Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 104,002.28 | 130,002.85 |
Georgia | 2851346 | Clayton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 1,777,724.38 | 2,222,155.47 |
Georgia | 2851346 | Clayton | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - No Added Capacity | 121,891.00 | 152,363.75 |
Georgia | 2851346 | Clayton | >= 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | 5,836,736.74 | 7,295,920.92 |
Georgia | 2851346 | Clayton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | 5,600,000.00 | 7,000,000.00 |
Georgia | 2851347 | DeKalb | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 10,080,000.00 | 12,600,000.00 |
Georgia | 2851347 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | 272,811.03 | 303,123.36 |
Georgia | 2851347 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 610,999.82 | 678,888.69 |
Georgia | 2851347 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 182,399.70 | 202,666.33 |
Georgia | 2851347 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 13,919,602.08 | 15,466,224.54 |
Georgia | 2851347 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 2,704,722.04 | 3,005,246.72 |
Georgia | 2851347 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 512,101.00 | 569,001.11 |
Georgia | 2851347 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 13,500.00 | 15,000.00 |
Georgia | 2851347 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 0.00 | 82,086.28 |
Georgia | 2851347 | DeKalb | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 273,558.60 | 303,954.00 |
Georgia | 2851347 | DeKalb | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | 1,283,932.33 | 1,604,915.41 |
Georgia | 2851347 | DeKalb | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 8,007,110.30 | 8,896,789.22 |
Georgia | 2851347 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 6,526,619.31 | 7,251,799.24 |
Georgia | 2851347 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 269,388.10 | 336,735.12 |
Georgia | 2851353 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 4,921,470.70 | 5,468,300.78 |
Georgia | 2851353 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 261,419.06 | 290,465.62 |
Georgia | 2851353 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | 14,200,998.38 | 15,778,887.09 |
Georgia | 2851353 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | 5,883,676.07 | 6,537,417.89 |
Georgia | 2851353 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 211,548.43 | 235,053.81 |
Georgia | 2851353 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | 247,500.00 | 275,000.00 |
Georgia | 2851353 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | 24,330,934.96 | 27,034,372.18 |
Georgia | 2851353 | DeKalb | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | 198,966.12 | 501,830.55 |
Georgia | 2851353 | DeKalb | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | 323,435.30 | 359,372.55 |
Georgia | 2851353 | DeKalb | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 1,805,483.46 | 2,006,092.73 |
Georgia | 2851353 | DeKalb | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | 953,178.34 | 1,059,087.04 |
Georgia | 2851353 | DeKalb | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 18,452,665.60 | 20,502,961.75 |
Georgia | 2851353 | DeKalb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 16,769,840.03 | 18,633,155.60 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 298,274.90 | 372,843.63 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 1,253,180.69 | 1,566,475.87 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 1,251,431.58 | 1,564,289.47 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | 2,028,215.66 | 2,535,269.57 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | 10,000,000.00 | 12,500,000.00 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 48,025,349.50 | 60,031,686.88 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,437,186.44 | 1,796,483.05 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 179,668.52 | 224,585.65 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 1,826,484.20 | 2,283,105.26 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 9,150,603.65 | 11,438,254.57 |
Georgia | 2946001 | Bartow | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 2,964,302.72 | 3,705,378.40 |
Georgia | 5201015 | Richmond | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 241,800.62 | 302,250.78 |
Georgia | 5201015 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 1,487,236.24 | 1,859,045.30 |
Georgia | 5201015 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 4,890,555.89 | 6,113,194.86 |
Georgia | 5201015 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,211,323.78 | 1,514,154.72 |
Georgia | 5201015 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 54,543,480.96 | 68,179,351.21 |
Georgia | 5201015 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 38,605,435.11 | 48,256,793.88 |
Georgia | 5201015 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 200,000.00 | 250,000.00 |
Georgia | 5201015 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,411,393.58 | 1,764,241.98 |
Georgia | 5201015 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | 2,379,769.19 | 2,974,711.49 |
Georgia | 5201015 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 48,828,369.54 | 61,035,461.94 |
Georgia | 5201015 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 17,995,810.71 | 22,494,763.37 |
Georgia | 5201015 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,719,200.00 | 2,149,000.00 |
Georgia | 5201015 | Richmond | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,813,015.58 | 2,266,269.47 |
Georgia | 5201015 | Richmond | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 15,845,543.00 | 28,037,473.22 |
Georgia | 7001009 | Richmond | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 14,277,081.04 | 21,652,763.88 |
Georgia | 7001009 | Richmond | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | 747,579.09 | 934,473.86 |
Georgia | 7001009 | Richmond | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 1,950,443.15 | 2,438,053.94 |
Georgia | 7001009 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 228,022.32 | 285,027.90 |
Georgia | 7001009 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 11,200.00 | 14,000.00 |
Georgia | 7001009 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 193,812.07 | 242,265.09 |
Georgia | 7001009 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 7,934,836.85 | 9,918,546.06 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | DONOR STATE BONUS | Preliminary Engineering | 8,559.48 | 10,699.35 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | 192,085.75 | 771,532.38 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Construction Engineering | 1,963.11 | 132,453.89 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Right of Way | 2,402.93 | 3,003.67 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | MINIMUM ALLOCATION-EXEMPT 90% | Preliminary Engineering | 365,819.25 | 457,274.06 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | 18,356,823.36 | 22,946,029.24 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | 309,963.72 | 387,454.64 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 80,000.00 | 100,000.00 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Right of Way | 10,149,006.98 | 12,686,258.73 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 452,952.13 | 566,190.16 |
Georgia | 7006006 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 828,102.36 | 1,035,127.95 |
Georgia | 7007006 | Richmond | >= 200,000 | N/A | DONOR STATE BONUS | Preliminary Engineering | 4,000.00 | 5,000.00 |
Georgia | 7007006 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 5,081,021.54 | 6,351,276.92 |
Georgia | 7007006 | Richmond | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 13,248,715.73 | 22,373,769.67 |
Georgia | 7007006 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,034,248.42 | 1,292,810.53 |
Georgia | 7007006 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 79,861.22 | 99,826.52 |
Georgia | 7007006 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 7,976,504.00 | 9,970,630.00 |
Georgia | 7007006 | Richmond | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,817,710.40 | 2,272,138.00 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | Local | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 5,438,139.58 | 6,797,674.47 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 633,240.99 | 791,551.25 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | 3,779,580.96 | 4,724,476.20 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | MIN ALLOC 90%-SUB TO LIM-STEA | Right of Way | 88,000.00 | 110,000.00 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,105,684.02 | 1,382,105.03 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 251,343.39 | 23,307,662.24 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 1,367,334.10 | 1,709,167.62 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 2,011,791.20 | 2,514,739.00 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 17,072,077.38 | 21,340,096.74 |
Georgia | 7063001 | Columbia | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 2,478,877.19 | 3,098,596.49 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | 689,779.35 | 862,224.18 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 6,800.00 | 8,500.00 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | 10,694,760.00 | 13,368,450.00 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRASTRUCTURE | Right of Way | 563,640.00 | 704,550.00 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | MINIMUM ALLOCATION-EXEMPT 90% | Preliminary Engineering | 423,200.00 | 529,000.00 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | 38,986.27 | 48,732.84 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | 71,141.99 | 88,927.49 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | 440,000.00 | 550,000.00 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 7,323,039.06 | 9,155,930.63 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 358,473.77 | 448,092.21 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 299,070.78 | 373,838.47 |
Georgia | 8060002 | Muscogee | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 365,139.99 | 456,424.99 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 5,925,769.91 | 7,407,212.39 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 453,781.96 | 567,227.46 |
Georgia | 9004008 | Cobb | >= 200,000 | Local | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 333,379.88 | 416,724.85 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 2,946,601.49 | 3,683,251.86 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 1,025,567.48 | 1,281,959.35 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | 36,000.00 | 45,000.00 |
Georgia | 9004008 | Cobb | >= 200,000 | Local | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | 314,697.24 | 393,371.55 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | BRIDGE REP & REHAB-20% ON/OFF | Right of Way | 5,223,095.03 | 6,528,868.79 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 227,061.68 | 283,827.10 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Right of Way | 555,103.48 | 693,879.35 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | 4,985,326.51 | 6,231,658.13 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 36,482.34 | 45,602.93 |
Georgia | 9004008 | Cobb | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,209,969.64 | 1,512,462.06 |
Georgia | 9108004 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 0.00 | 7,251,111.00 |
Georgia | 9108004 | Clayton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 0.00 | 21,991,590.80 |
Georgia | 9108004 | Clayton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 108,000.00 | 135,000.00 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | State | DONOR STATE BONUS | 4R - No Added Capacity | 14,949.81 | 18,687.26 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | N/A | DONOR STATE BONUS | Preliminary Engineering | 2,068,936.98 | 2,586,171.23 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | 196,217.86 | 245,272.33 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 58,118.56 | 72,648.20 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Utilities | 321,319.20 | 401,649.00 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 27,210,108.35 | 34,012,635.43 |
Georgia | 9851322 | Hall | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | 14,025,261.18 | 17,531,576.48 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | 1,154,125.57 | 1,442,656.96 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 52,891.41 | 66,114.26 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | 20,523,205.30 | 25,654,006.63 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | 12,142,061.79 | 15,177,577.24 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 242,799.22 | 303,499.03 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 21,308,000.00 | 26,635,000.00 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 1,446,751.09 | 1,808,438.86 |
Georgia | 9851322 | Hall | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | 6,802,448.59 | 8,503,060.73 |
Georgia | M003308 | Carroll | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 4,668,499.98 | 5,187,222.20 |
Georgia | M003308 | Carroll | >= 50,000 AND < 200,000 | Local | INTERSTATE MAINTENANCE | 4R - Restoration & Rehabilitation | 1,868.15 | 2,075.72 |
Georgia | M003308 | Carroll | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | 90,000.00 | 100,000.00 |
Georgia | M003308 | Carroll | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 58,382.29 | 64,869.21 |
Georgia | M003308 | Carroll | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 81,573,523.34 | 90,637,248.16 |
Georgia | M003308 | Carroll | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 31,716.85 | 35,240.94 |
Georgia | M003308 | Carroll | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,825,290.11 | 2,028,100.12 |
Georgia | M003308 | Carroll | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 135,000.00 | 150,000.00 |
Georgia | M004921 | Troup | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 400,766.48 | 445,296.08 |
Georgia | M004921 | Harris | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 24,472.50 | 27,191.67 |
Georgia | M004921 | Troup | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 24,737,412.53 | 27,486,013.92 |
Georgia | M004921 | Harris | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 3,216,170.42 | 3,573,522.69 |
Georgia | M004921 | Troup | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 246,422.25 | 273,802.50 |
Georgia | M004921 | Harris | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 32,037.95 | 35,597.72 |
Georgia | M005198 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 8,569,495.06 | 9,521,661.18 |
Georgia | M005198 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 1,873,299.84 | 2,081,444.26 |
Georgia | M005198 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 23,284,307.73 | 25,871,453.05 |
Georgia | M005198 | Fulton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 215,241.40 | 239,157.11 |
Georgia | M005198 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 79,065.09 | 87,850.10 |
Georgia | M005198 | Douglas | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 17,096.00 | 18,995.56 |
Georgia | M005713 | Cobb | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Maintenance Resurfacing | 1,806,082.80 | 2,006,758.67 |
Georgia | M005713 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 41,119,424.63 | 45,688,249.59 |
Georgia | M005713 | Cobb | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 313,728.04 | 348,586.71 |
Georgia | M005874 | Butts | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 12,487.26 | 13,874.73 |
Georgia | M005874 | Lamar | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 182,708.91 | 203,009.90 |
Georgia | M005874 | Monroe | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 645,007.70 | 716,675.23 |
Georgia | M005874 | Lamar | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 4,686,168.26 | 5,206,853.62 |
Georgia | M005874 | Butts | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 320,276.63 | 355,862.92 |
Georgia | M005874 | Monroe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 16,543,335.11 | 18,381,483.46 |
Georgia | M005874 | Lamar | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 46,861.68 | 52,068.54 |
Georgia | M005874 | Monroe | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 165,433.35 | 183,814.83 |
Georgia | M005874 | Butts | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 3,202.77 | 3,558.63 |