RECIPIENT | PROJECT NUMBER |
COUNTY | POPULATION RANGE |
OWNERSHIP | PROGRAM | TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | 1,200,964.81 | 1,200,964.81 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 86,393,550.47 | 105,895,727.21 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 46,283,896.80 | 46,283,896.80 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 63,092,770.75 | 67,107,795.56 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,305,956.61 | 2,882,445.76 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | 45,408,600.00 | 47,592,888.00 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 2,770,827.94 | 211,407,848.86 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 2,284,265.74 | 2,917,784.18 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | 267,862.64 | 334,828.30 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 18,408,600.00 | 18,408,600.00 |
Indiana | 0201296 | Clark | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 2,581,782.41 | 3,227,228.01 |
Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Utilities | 647,327.48 | 809,159.34 |
Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Utilities | 8,127.64 | 10,159.56 |
Indiana | 0500430 | Monroe | >= 50,000 AND < | State | NAT COR PL DV/COOR BDR INF-TEA | Utilities | 220.23 | 275.28 |
Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NAT COR PL DV/COOR BDR INF-TEA | Utilities | 17,539.77 | 21,924.72 |
Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,008,310.27 | 5,637,780.07 |
Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 50,327.10 | 70,786.18 |
Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 494,414.22 | 1,598,727.04 |
Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 39,377,700.49 | 127,330,874.23 |
Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 119,278.82 | 322,024.91 |
Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 9,499,981.18 | 25,647,726.03 |
Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 186,691.33 | 247,154.80 |
Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 14,869,060.78 | 19,684,686.78 |
Indiana | 0500430 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 434,544.00 | 543,180.00 |
Indiana | 0500430 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 5,456.00 | 6,820.00 |
Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Utilities | 57,245.07 | 71,556.35 |
Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Utilities | 16,134.98 | 20,168.72 |
Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 3,332,062.29 | 4,242,036.71 |
Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 11,821,432.41 | 15,049,831.66 |
Indiana | 0500431 | Monroe | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,543,814.78 | 3,177,428.47 |
Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 717,124.29 | 895,745.37 |
Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 38,479.42 | 1,996,014.83 |
Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 136,520.58 | 7,081,539.20 |
Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 613,430.86 | 1,205,771.96 |
Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 2,176,382.27 | 4,277,882.47 |
Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 7,488.00 | 7,488.00 |
Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 2,112.00 | 2,112.00 |
Indiana | 0500431 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 4,231,887.55 | 5,289,859.44 |
Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 59,210.10 | 74,012.63 |
Indiana | 0500431 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,192,791.55 | 1,490,989.44 |
Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 397,222.20 | 397,222.20 |
Indiana | 0500432 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 341,516.42 | 341,516.42 |
Indiana | 0500432 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 16,441,874.37 | 69,404,218.98 |
Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 19,123,759.24 | 80,724,955.26 |
Indiana | 0500432 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 100,819.36 | 9,891,255.66 |
Indiana | 0500432 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 86,680.64 | 8,504,124.16 |
Indiana | 0500446 | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | New Construction Roadway | 63,401.16 | 79,251.45 |
Indiana | 0500446 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 2,172,328.43 | 2,715,410.55 |
Indiana | 0500446 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 707,754.68 | 884,693.35 |
Indiana | 0500446 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 851,401.80 | 853,552.80 |
Indiana | 0500446 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 27,391,994.29 | 31,195,959.93 |
Indiana | 0500446 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 0.00 | 80,319.38 |
Indiana | 0500446 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 1,937,102.36 | 2,421,377.95 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Utilities | 285,195.44 | 356,494.30 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | New Construction Roadway | 1,886.73 | 2,358.41 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | 1,032,466.09 | 1,290,582.61 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 833.22 | 833.22 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 6,201,305.45 | 7,751,631.82 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 155,600.44 | 194,500.55 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 1,714,341.75 | 1,714,341.75 |
Indiana | 0500448 | Greene | >= 5,000 AND < | State | NATIONAL HIGHWAY SYSTEM | New Construction | 469,180.54 | 61,926,992.57 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 850,734.48 | 1,063,418.10 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | 32,128.13 | 40,160.16 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 213,906.31 | 267,382.89 |
Indiana | 0500448 | Greene | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 187,996.80 | 234,996.00 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | 32,000.00 | 40,000.00 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Construction Engineering | 517,558.49 | 517,558.49 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | N/A | HIGHWAY INFRASTRUCTURE | Utilities | 1,120,000.00 | 1,400,000.00 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | New Construction Roadway | 0.00 | 1,235,289.48 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Right of Way | 0.00 | 112.87 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Utilities | 8,520.79 | 10,650.99 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 519,176.87 | 648,971.10 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 48,149,211.63 | 51,949,624.13 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 40,302.76 | 50,378.44 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 20,468.00 | 25,585.00 |
Indiana | 0500449 | Greene | >= 5,000 AND < | State | NATIONAL HIGHWAY SYSTEM | New Construction | 20,266,209.16 | 20,266,209.16 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 80,662.72 | 100,828.40 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Construction Engineering | 33,694.00 | 42,117.50 |
Indiana | 0500449 | Greene | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 930,832.76 | 1,163,540.95 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Utilities | 419,691.36 | 524,614.20 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS SP LIMITATION | Utilities | 182,888.76 | 228,610.95 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 3,800.00 | 3,800.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | New Construction Roadway | 163,169.10 | 362,598.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | 4,000.00 | 5,000.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 195,868.00 | 244,835.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 271,939.92 | 339,924.91 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 37,291,377.27 | 46,614,221.59 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 7,754,363.66 | 9,692,954.58 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,672,383.77 | 2,090,917.21 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,420,198.79 | 1,775,293.98 |
Indiana | 0500450 | Monroe | >= 50,000 AND < | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 137,267.10 | 171,583.87 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 65,887.84 | 82,359.80 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 3,606,414.88 | 4,508,018.60 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 52,000.00 | 65,000.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 6,960.00 | 8,700.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | 0.00 | 3,450,506.47 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | 0.00 | 277,600.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | 234,400.00 | 293,000.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | 0.00 | 15,498.00 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Utilities | 1,222,210.15 | 1,527,762.68 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 52,318.97 | 65,398.72 |
Indiana | 0500450 | Monroe | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 677,236.15 | 846,545.19 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Utilities | 294,939.09 | 368,673.86 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | HIGHWAY INFRASTRUCTURE | Rail/Hwy Crossing | 267,642.71 | 334,553.39 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 120,076.20 | 120,076.20 |
Indiana | 0500599 | Carroll | >= 5,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction | 406,890.75 | 508,613.44 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 772.00 | 965.00 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 19,828.34 | 24,785.43 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 13,298.86 | 16,623.57 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 336,724.26 | 336,724.26 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 100,000.00 | 20,668,044.61 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 38,171.54 | 47,714.42 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 74,714.15 | 93,392.70 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 61,243.51 | 76,554.39 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Rail/Hwy Crossing | 11,999.99 | 14,999.99 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 3,353,634.62 | 4,192,043.28 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 462,584.46 | 752,138.57 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 1,338,687.20 | 1,673,359.00 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 824,696.29 | 1,030,870.36 |
Indiana | 0500599 | Carroll | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 12,080.00 | 15,100.00 |
Indiana | 0501212 | Jackson | >= 5,000 AND < | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | 49,373,363.79 | 49,377,193.53 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 2,114,480.91 | 2,643,101.13 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | 2,480,015.89 | 3,100,019.86 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | 5,006,884.58 | 6,076,743.38 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | 4,269,433.92 | 5,181,716.07 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Rail/Hwy Crossing | 3,643.30 | 5,397.48 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | Rail/Hwy Crossing | 3,106.70 | 4,602.52 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 4,083,871.65 | 4,537,635.17 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM APPORT | 4R - Added Capacity | 3,481,385.42 | 3,868,206.02 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 12,426.77 | 13,190,793.55 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 14,573.23 | 15,469,482.92 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 207,112.90 | 460,250.89 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 242,887.10 | 539,749.11 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,068,198.72 | 1,853,137.03 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 89.62 | 99.58 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,252,811.66 | 2,173,363.39 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 1.26 | 1.40 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 9,715.48 | 13,493.72 |
Indiana | 0501212 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 13,115.90 | 14,573.22 |
Indiana | 0501212 | Jackson | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 11,184.10 | 12,426.78 |
Indiana | 0710056 | Lake | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 449,949.95 | 562,437.44 |
Indiana | 0710056 | Lake | >= 200,000 | Local | SURFACE TRANS PRIORITIES S129 | New Construction Roadway | 48,210.44 | 48,210.44 |
Indiana | 0710056 | Lake | >= 200,000 | N/A | SURFACE TRANS PRIORITIES S129 | Preliminary Engineering | 1,175,000.00 | 1,175,000.00 |
Indiana | 0710056 | Lake | >= 200,000 | Local | SURFACE TRANS PRIORITIES S129 | Rail/Hwy Crossing | 1,789.56 | 1,789.56 |
Indiana | 0710056 | Lake | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | 6,079,358.70 | 7,599,198.37 |
Indiana | 0710056 | Adams | >= 5,000 AND < 50,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 57,876.00 | 72,345.00 |
Indiana | 0710056 | Lake | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 10,692,494.56 | 13,365,618.21 |
Indiana | 0710056 | Lake | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | 1,597,467.20 | 1,996,834.00 |
Indiana | 0710056 | Lake | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 200,000.00 | 250,000.00 |
Indiana | 0710056 | Lake | >= 200,000 | Local | URGENT SUPPLEMENTAL BRIDGES | New Construction Roadway | 0.00 | 1,328,800.04 |
Indiana | 0710056 | Lake | >= 200,000 | Local | URGENT SUPPLEMENTAL BRIDGES | Preliminary Engineering | 1,974,779.82 | 2,424,943.63 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Construction Engineering | 24,480.00 | 30,600.00 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | 100,000.00 | 100,000.00 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | 3,101,033.24 | 3,876,291.54 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | 1,156,235.50 | 1,445,294.38 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Utilities | 716,416.00 | 895,520.00 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | INDIANA INDUST CORR SFTY DEMO | New Construction Roadway | 0.00 | 198,222.34 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | INDIANA INDUST CORR SFTY DEMO | Preliminary Engineering | 25,539.57 | 44,024.46 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Preliminary Engineering | 242,750.00 | 303,437.50 |
Indiana | 0715010 | Carroll | >= 5,000 AND < 50,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Preliminary Engineering | 242,750.00 | 303,437.50 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 1,015,123.06 | 1,268,903.82 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 20,449.63 | 25,562.04 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 38,474.60 | 48,093.25 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 3,840.00 | 4,800.00 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 529.76 | 662.20 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 644,691.25 | 651,237.38 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < | State | NATIONAL HIGHWAY SYSTEM | New Construction | 20,074,264.27 | 20,180,165.53 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 160,996.80 | 201,246.00 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 2,440,832.73 | 3,051,040.91 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 3,557,247.56 | 4,446,559.45 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 612,716.13 | 765,895.16 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | 5,691,940.00 | 5,691,940.00 |
Indiana | 0715010 | Tippecanoe | >= 50,000 AND < 200,000 | State | SURFACE TRANSPORTATION PROJECT | Preliminary Engineering | 314.04 | 392.55 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Construction Engineering | 13,360.00 | 16,700.00 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | 3,095,176.00 | 3,868,970.00 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,000.00 | 5,000.00 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 42,320.00 | 52,900.00 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 300.24 | 375.30 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 117,697.30 | 147,121.63 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 788,266.39 | 985,332.99 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 21,680.00 | 27,100.00 |
Indiana | 0715016 | Carroll | >= 5,000 AND < | N/A | NATIONAL HIGHWAY SYSTEM | New Construction | 11,260,948.46 | 14,076,185.58 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 183,400.00 | 203,000.00 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 337,699.76 | 422,124.70 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 2,688,000.00 | 3,360,000.00 |
Indiana | 0715016 | Carroll | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 384,000.00 | 480,000.00 |
Indiana | 0800272 | White | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 793,270.00 | 2,199,950.37 |
Indiana | 0800272 | White | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | 0.00 | 38,147,501.00 |
Indiana | 0800272 | White | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 900,000.00 | 1,800,000.00 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 1,114.89 | 1,393.61 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | GRANTS SUP PLAN SECTION 117 | New Construction Roadway | 331,015.16 | 331,015.16 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY CORRIDOR ON NHS | New Construction Roadway | 499.88 | 624.85 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | HIGHWAY PRIORITY PROJECTS | New Construction Roadway | 459,455.29 | 459,455.29 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 70,476.76 | 77,918.75 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 190,157.84 | 237,697.31 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 1,371,144.31 | 1,713,930.40 |
Indiana | 1006075 | Monroe | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction | 16,492,820.65 | 20,616,025.82 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 71,676.84 | 89,596.05 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 435,341.22 | 544,176.53 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 67,848.83 | 84,811.04 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 472,224.91 | 492,521.29 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 15,980.85 | 19,976.06 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 122,323.55 | 315,483.37 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 400,000.00 | 500,000.00 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 1,572,368.04 | 1,965,460.05 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | 438,052.96 | 547,566.20 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 0.00 | 5,118.90 |
Indiana | 1006075 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 40,798.16 | 50,997.70 |
Indiana | 1172430 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 386,146.23 | 24,538,968.13 |
Indiana | 1172430 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,324,995.12 | 3,660,920.12 |
Indiana | 1172430 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 4,601,424.63 | 5,752,531.13 |
Indiana | 1172430 | Lake | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | 756,043.94 | 945,054.92 |
Indiana | 1172430 | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 63,902.50 | 71,002.78 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | 970,540.00 | 1,213,175.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 453,338.98 | 566,673.72 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,253,600.00 | 1,567,000.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 2,253,431.04 | 2,848,177.29 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 11,331,391.66 | 14,164,239.57 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,026,251.20 | 2,532,814.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 49,200.00 | 61,500.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 72,014.40 | 90,018.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 269,600.00 | 337,000.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 578,137.60 | 722,672.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 59,549.86 | 74,437.32 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 3,840.00 | 4,800.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Historic Preservation | 0.00 | 110,000.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 0.00 | 1,000.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 727,926.46 | 1,013,425.72 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 0.00 | 53,500.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 1,568,400.00 | 1,960,500.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Rail/Hwy Crossing | 20,000.00 | 25,000.00 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 0.00 | 531,245.76 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 0.00 | 545,902.48 |
Indiana | 1173374 | Jennings | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 257,080.00 | 321,350.00 |
Indiana | 1296427 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 55,488,631.63 | 61,654,035.15 |
Indiana | 1296427 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 9,623.32 | 10,692.58 |
Indiana | 1296427 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 659,856.00 | 793,570.00 |
Indiana | 1296427 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,191,060.27 | 1,404,363.15 |
Indiana | 1296427 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 208.74 | 245.31 |
Indiana | 1296427 | Marion | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 25.61 | 28.94 |
Indiana | 1296427 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 33,780.06 | 42,225.08 |
Indiana | 1296427 | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 144,198.64 | 163,584.01 |
Indiana | 1296427 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 1,138.80 | 1,415.51 |
Indiana | 1296427 | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 6,154,541.88 | 7,688,902.25 |
Indiana | 1296427 | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 27,330,172.13 | 33,078,768.27 |
Indiana | 1296427 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 9.93 | 28.27 |
Indiana | 1296427 | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 53,646.07 | 157,600.94 |
Indiana | 1296429 | Allen | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 1,900.00 | 1,900.00 |
Indiana | 1296429 | Allen | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 123,642.00 | 137,380.00 |
Indiana | 1296429 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 13,337,789.27 | 24,008,968.16 |
Indiana | 1296429 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 439,865.39 | 439,865.39 |
Indiana | 1296429 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 13,500.00 | 15,000.00 |
Indiana | 1296429 | Allen | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,037,889.00 | 1,153,210.00 |
Indiana | 1296429 | Allen | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | 674,865.39 | 749,850.44 |
Indiana | 1296429 | Allen | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 10,687.52 | 10,687.52 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 508,616.55 | 635,770.69 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,400,000.00 | 1,750,000.00 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,849,879.48 | 2,312,349.34 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Historic Preservation | 10,014,720.00 | 12,518,400.00 |
Indiana | 1297885 | Morgan | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction | 4,759,619.19 | 5,949,523.99 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 17,347,595.39 | 21,684,494.24 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 628.46 | 785.58 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 5,547,452.27 | 6,934,315.34 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 6,797,291.42 | 8,496,614.28 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,868,886.56 | 2,336,108.18 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 690.45 | 863.06 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 2,511.21 | 3,139.02 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 2,596,099.34 | 3,245,124.13 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 9,442,167.92 | 11,802,709.94 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 30,042,899.97 | 37,553,624.98 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 27.63 | 34.54 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,413,677.00 | 1,767,096.25 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 5,141,657.56 | 6,427,071.95 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 11,187,590.00 | 13,984,487.51 |
Indiana | 1297885 | Morgan | >= 50,000 AND < | State | NATIONAL HIGHWAY SYSTEM | New Construction | 0.00 | 6,609,153.89 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 545,840.67 | 682,300.83 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | 0.00 | 155.73 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 0.00 | 108,257.29 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 0.00 | 393,656.71 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 0.00 | 285,578.00 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY SYSTEM | Right of Way | 0.00 | 0.01 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 0.00 | 78,518.49 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 0.00 | 2,602,314.57 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 0.00 | 715,495.44 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 8,254,074.34 | 10,317,592.92 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 400,000.00 | 500,000.00 |
Indiana | 1297885 | Morgan | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 450.77 | 563.47 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 1,639.51 | 2,049.38 |
Indiana | 1297885 | Monroe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 3,613,661.60 | 4,517,077.00 |
Indiana | 1382656 | Clinton | >= 5,000 AND < | State | INTERSTATE MAINTENANCE | 4R - Maintenance | 1,196,989.67 | 1,329,988.53 |
Indiana | 1382656 | Clinton | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 167,016.33 | 244,380.15 |
Indiana | 1382656 | Tippecanoe | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 104,643.28 | 153,115.19 |
Indiana | 1382656 | Clinton | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 68,606.15 | 76,229.06 |
Indiana | 1382656 | Tippecanoe | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 42,984.85 | 47,760.94 |
Indiana | 1382656 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 14,509,067.98 | 16,255,686.41 |
Indiana | 1382656 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 9,090,587.16 | 10,184,922.59 |
Indiana | 1382656 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 40,057.38 | 44,508.18 |
Indiana | 1382656 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 63,933.70 | 71,037.46 |
Indiana | 1382656 | Tippecanoe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 120,644.63 | 134,049.59 |
Indiana | 1382656 | Clinton | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 192,551.16 | 213,945.73 |
Indiana | 1382656 | Clinton | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 4.21 | 4.68 |
Indiana | 1383650 | Grant | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 500.00 | 500.00 |
Indiana | 1383650 | Grant | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 196.04 | 435.64 |
Indiana | 1383650 | Grant | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 26,635,152.09 | 29,642,537.69 |
Indiana | 1383650 | Grant | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,582,801.15 | 1,743,356.84 |
Indiana | 1383650 | Grant | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 41,727.67 | 46,364.08 |
Indiana | 1383650 | Grant | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 593,448.75 | 1,318,775.00 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 79,200.00 | 713,865.62 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 225,900.00 | 330,200.00 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 88,707.60 | 98,564.00 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | HIGHWAY BRIDGE PROGRAM (PLUS) | Right of Way | 455.00 | 700.00 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 961,426.50 | 1,068,251.67 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | 16,155.00 | 35,900.00 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Utilities | 10,080.00 | 22,400.00 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 0.00 | 14,438,046.80 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 521,283.00 | 579,203.33 |
Indiana | 1400034 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 68,206.50 | 11,164,167.90 |
Indiana | 1400034 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 2,160.00 | 4,800.00 |
Indiana | 1400597 | Clark | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 99,450.00 | 110,500.00 |
Indiana | 1400597 | Clark | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 400,000.00 |
Indiana | 1400597 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 3,720,000.00 | 3,734,000.00 |
Indiana | 1400597 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | 75,800.00 | 221,430.00 |
Indiana | 1400597 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 497,150.00 |
Indiana | 1400597 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 1,002,580.00 |
Indiana | 1400597 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 39,000.00 |
Indiana | 1400597 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 0.00 | 148,038.96 |
Indiana | 1400597 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 32,111.01 |
Indiana | 1592349 | Hamilton | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | 134,047.80 | 134,047.80 |
Indiana | 1592349 | Hamilton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 775,000.00 | 775,000.00 |
Indiana | 1592349 | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 25,124,799.74 | 25,124,799.74 |
Indiana | 1592349 | Hamilton | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 0.00 | 1,195.00 |
Indiana | 1592397 | Decatur | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 32,265.84 | 64,752.46 |
Indiana | 1592397 | Franklin | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 70,921.16 | 142,325.98 |
Indiana | 1592397 | Ripley | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 115,437.66 | 231,661.88 |
Indiana | 1592397 | Ripley | >= 5,000 AND < | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 30,915.66 | 34,350.74 |
Indiana | 1592397 | Decatur | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 7,264.87 | 8,072.07 |
Indiana | 1592397 | Decatur | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 8,006,554.68 | 8,927,971.32 |
Indiana | 1592397 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 17,598,297.49 | 19,623,558.31 |
Indiana | 1592397 | Ripley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 28,644,428.90 | 31,940,909.02 |
Indiana | 1592397 | Ripley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 617,352.33 | 723,377.32 |
Indiana | 1592397 | Decatur | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 172,560.24 | 202,195.97 |
Indiana | 1592397 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 379,283.60 | 444,422.33 |
Indiana | 1592397 | Ripley | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 66,896.35 | 74,329.28 |
Indiana | 1592397 | Franklin | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 43,373.77 | 48,193.08 |
Indiana | 1592397 | Franklin | >= 5,000 AND < 50,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 9.93 | 11.03 |
Indiana | 1592397 | Decatur | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 15,719.95 | 17,466.61 |
Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | 31,700.71 | 35,223.01 |
Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 37,271.65 | 37,271.65 |
Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | 4,500.00 | 10,000.00 |
Indiana | 1592426 | Madison | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 15,803,604.17 | 58,280,959.96 |
Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 2,935,891.68 | 4,068,955.90 |
Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 68,863.15 | 76,514.62 |
Indiana | 1592426 | Madison | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | 42,362.27 | 47,069.19 |
Indiana | 1592433 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 4,446,719.57 | 4,940,799.52 |
Indiana | 1592433 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 15,881.94 | 17,646.60 |
Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 30,909,603.33 | 34,344,003.70 |
Indiana | 1592433 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,411.65 | 2,679.61 |
Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,693,572.33 | 5,215,080.36 |
Indiana | 1592433 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 675,227.04 | 750,252.27 |
Indiana | 1592433 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 3,626.71 | 168,170.25 |
Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 25,209.56 | 1,169,002.41 |
Indiana | 1592433 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 12.95 | 605.54 |
Indiana | 1592433 | Hendricks | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 3,069,675.00 | 3,410,750.00 |
Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 87,608.48 | 97,342.76 |
Indiana | 1592546 | Wayne | >= 50,000 AND < | State | HIGHWAY INFRA PROGRAM APPORT | Construction Engineering | 29,391.52 | 32,657.24 |
Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 13,478.23 | 14,975.81 |
Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 24,188,641.03 | 26,921,670.88 |
Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 8,114,977.44 | 9,031,876.45 |
Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 133,334.66 | 145,042.99 |
Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 397,436.00 | 432,335.52 |
Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 239,828.35 | 551,282.12 |
Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 80,464.93 | 184,954.30 |
Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 16.72 | 18.58 |
Indiana | 1592546 | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 101,739.87 | 113,044.31 |
Indiana | 1592546 | Henry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 303,260.13 | 336,955.69 |
Indiana | 1600808 | Marion | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | 149,317,455.20 | 149,317,455.20 |
Indiana | 1600808 | Marion | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Utilities | 87,300.00 | 97,000.00 |
Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 68,425,883.27 | 133,221,278.06 |
Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 14,870,580.11 | 16,648,109.61 |
Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,155,430.16 | 48,568,488.04 |
Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 12,000.00 | 411,230.00 |
Indiana | 1600808 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 4,751,118.00 |
Indiana | 1600808 | Marion | >= 200,000 | State | REPURPOSED SPECIAL | 4R - No Added Capacity | 2,605,932.54 | 2,605,932.54 |
Indiana | 1600808 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | 15,470,307.90 | 17,189,231.00 |
Indiana | 1700897 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 9,414,822.02 | 10,460,913.35 |
Indiana | 1700897 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 15,270,665.25 | 16,967,405.84 |
Indiana | 1700897 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 505,181.87 | 551,886.85 |
Indiana | 1700897 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 311,459.73 | 340,254.75 |
Indiana | 1700897 | Henry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 161,060.97 | 228,294.45 |
Indiana | 1700897 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 261,399.03 | 370,471.65 |
Indiana | 1700897 | Hancock | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 83,505.96 | 92,784.40 |
Indiana | 1700897 | Henry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | 51,494.04 | 57,215.60 |
Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | 2,481,060.28 | 137,045,226.00 |
Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 5,767,557.96 |
Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 297,200.00 | 14,182,140.00 |
Indiana | 1702255 | Floyd | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 17,623.80 |
Indiana | 1801695 | Marion | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | New Construction Roadway | 29,282,322.74 | 36,602,903.43 |
Indiana | 1801695 | Marion | >= 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Utilities | 897,929.67 | 1,122,412.09 |
Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 100,000.00 | 5,450,504.94 |
Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | 0.00 | 103,485.46 |
Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 59,045,250.53 | 451,377,369.61 |
Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 15,000.00 |
Indiana | 1801695 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 2,411,112.50 | 116,405,351.16 |
Indiana | 1801695 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | 95,205,275.34 | 119,006,594.17 |
Indiana | 1801695 | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | 2,800,000.00 | 3,500,000.00 |
Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PROGRAM APPORT | Utilities | 450,400.00 | 563,000.00 |
Indiana | 1801697 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,780,218.27 | 2,298,227.71 |
Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 5,559,781.73 | 7,177,571.71 |
Indiana | 1801697 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 4,454,214.93 | 14,590,970.78 |
Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 13,910,913.65 | 45,568,913.28 |
Indiana | 1801697 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 65,069.81 | 1,928,207.74 |
Indiana | 1801697 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 151,337.89 | 5,570,615.28 |
Indiana | 1801697 | Johnson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 472,640.22 | 17,397,496.60 |
Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | 0.00 | 65,928,546.00 |
Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 6,300,000.00 |
Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 0.00 | 20,000.00 |
Indiana | 1802075 | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 608,579.84 | 930,030.93 |
Indiana | 1901381 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 50,000.00 |
Indiana | 1901381 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 1,099,678.40 | 58,372,635.20 |
Indiana | 1901383 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 0.00 | 453,369.61 |
Indiana | 1901383 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 22,843,853.20 | 90,685,901.48 |
Indiana | 1902139 | Wayne | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | 9,375.19 | 10,416.88 |
Indiana | 1902139 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | 23,071,532.98 | 25,697,767.88 |
Indiana | 1902139 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 627,410.97 | 734,301.07 |
Indiana | 1902139 | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 0.00 | 78,092.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | 0.00 | 400,000.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < | State | EQUITY BONUS SP LIMITATION | New Construction | 0.00 | 10,378,778.23 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | Local | EQUITY BONUS SP LIMITATION | New Construction Roadway | 0.00 | 103,704.97 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 0.00 | 242,869.93 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | 2,050,963.34 | 2,639,503.18 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 227,975.16 | 238,101.92 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 90,245.85 | 96,639.09 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Historic Preservation | 64,416.00 | 80,520.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 1,169,281.88 | 1,178,476.88 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 23,220.00 | 29,025.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 24,520.00 | 30,650.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 73,120.00 | 91,400.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 15,480.00 | 19,350.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 16,000.00 | 20,000.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 340,000.00 | 425,000.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 3,097,731.89 | 3,872,164.86 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,341,331.09 | 1,676,663.87 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 82,444.31 | 82,444.31 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 40,248.00 | 40,248.00 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 812,429.89 | 1,015,443.73 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY SYSTEM | Right of Way | 310,943.54 | 389,018.05 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 5,312.48 | 6,640.60 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,704,186.25 | 4,630,232.82 |
Indiana | 2195018 | Elkhart | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 3,353.88 | 4,192.35 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 1,164,678.13 | 1,179,000.46 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 6,150,637.95 | 6,162,304.85 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 2,256,538.75 | 2,322,683.13 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | 1,180,480.96 | 1,441,262.99 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | 176,280.00 | 220,350.00 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | 1,171,712.00 | 1,301,902.22 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 188,817.70 | 236,022.12 |
Indiana | 2652002 | Clark | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 4,372,371.42 | 5,465,464.28 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,398,199.01 | 1,744,823.75 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 558,412.04 | 698,015.05 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 4,293,010.80 | 5,347,513.50 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 50,780.00 | 63,475.00 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | 7,625.79 | 9,532.24 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | N/A | SURF TRANS PROJ | Preliminary Engineering | 30,017.40 | 30,017.40 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | SURF TRANS PROJ | Preliminary Engineering | 0.00 | 35,500.00 |
Indiana | 2652002 | Clark | >= 50,000 AND < 200,000 | State | SURF TRANS PROJ | Utilities | 37,607.15 | 47,008.94 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,515,653.93 | 1,909,224.12 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Historic Preservation | 146,100.86 | 182,626.08 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 27,503,737.70 | 34,379,672.13 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,690,795.89 | 2,113,494.87 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 787,187.38 | 983,984.24 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 294,697.12 | 368,371.39 |
Indiana | 2911006 | Vigo | >= 50,000 AND < | State | NATIONAL HIGHWAY SYSTEM | New Construction | 0.00 | 1,111,745.52 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | 2,866,432.84 | 3,583,041.05 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 247,969.59 | 309,961.98 |
Indiana | 2911006 | Vigo | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | 11,250.00 | 25,000.00 |
Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 44,437,026.91 |
Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 1,544,202.60 |
Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | 0.00 | 8,344,651.47 |
Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 0.00 | 4,188,220.17 |
Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 0.00 | 29,930.54 |
Indiana | 70BG020 | Hancock | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | 22,500,000.00 | 38,803,103.45 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | 669,011.37 | 1,455,659.07 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | 183,941.86 | 400,274.72 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 0.00 | 102,792.71 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | 0.00 | 28,270.29 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 0.00 | 49,287.45 |
Indiana | I69S518 | Monroe | >= 50,000 AND < | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | 0.00 | 179,212.55 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Utilities | 0.00 | 29,088.61 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 6,153,953.62 | 7,692,442.01 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 534,973.52 | 668,716.90 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 22,382,426.81 | 27,978,033.53 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 28,010,561.52 | 35,013,201.89 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 60,600,818.43 | 75,751,023.04 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 101,876,677.04 | 127,345,846.31 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 1,762,028.21 | 2,202,535.27 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 936,450.98 | 1,170,563.72 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | 6,408,639.06 | 8,010,798.83 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 288,759.44 | 360,949.30 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 1,050,241.36 | 1,312,801.70 |
Indiana | I69S518 | Morgan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 1,154,868.60 | 1,443,585.75 |
Indiana | I69S518 | Monroe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 408,733.98 | 510,917.48 |
Indiana | I69S518 | Monroe | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | 4,200,350.46 | 5,250,438.08 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 280,000.00 | 350,000.00 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | 13,975,676.28 | 17,469,595.35 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 28,000.00 | 35,000.00 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | 71,068.97 | 71,068.97 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | 724,691.47 | 905,864.34 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 32,000.00 | 40,000.00 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Right of Way | 65,500.00 | 81,875.00 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Safety | 528,695.05 | 528,695.05 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | 165,047.75 | 206,309.69 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Construction Engineering | 59,656.25 | 59,656.25 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 0.01 | 0.01 |
Indiana | N881008 | Lake | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | 416,120.00 | 520,150.00 |
Indiana | N881008 | Lake | >= 200,000 | State | HIGHWAY BRIDGE PROGRAM | Construction Engineering | 32,030.19 | 32,030.19 |
Indiana | N881008 | Lake | >= 200,000 | State | HIGHWAY INFRASTRUCTURE | Right of Way | 178,532.00 | 223,165.00 |
Indiana | N881008 | Lake | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Bridge Replacement - No Added Capacity | 401,414.10 | 501,767.62 |
Indiana | N881008 | Lake | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Construction Engineering | 12,394.24 | 15,492.80 |
Indiana | N881008 | Lake | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Safety | 10,905.60 | 13,632.00 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 100,888.70 | 126,110.87 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | 191,276.71 | 239,095.89 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 84,257.08 | 84,257.08 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | 508,098.83 | 635,123.54 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 818.65 | 1,023.31 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | 2,704,672.61 | 3,380,840.76 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | 22,868.90 | 28,586.13 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | 31,600.00 | 39,500.00 |
Indiana | N881008 | Lake | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | 31,800.00 | 39,750.00 |
Indiana | NCBG018 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 0.00 | 34,080,884.59 |
Indiana | NCBG018 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 2,113,830.00 | 2,759,340.46 |
Indiana | NCBG018 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | 20,000,000.00 | 41,747,207.40 |
Indiana | SCBG018 | Bartholomew | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | 675,745.27 | 1,151,128.08 |
Indiana | SCBG018 | Bartholomew | >= 50,000 AND < | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 4,400,038.24 | 5,125,243.14 |
Indiana | SCBG018 | Bartholomew | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 0.00 | 1,079,922.54 |
Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 2,136,434.91 | 10,646,957.43 |
Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | 0.00 | 3,981.12 |
Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | 0.00 | 290,942.42 |
Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | 1,188,240.18 | 1,269,764.52 |
Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | 1,223,834.62 | 9,957,819.02 |
Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | 1,097,068.84 | 3,316,904.67 |
Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | 0.00 | 64,500.00 |
Indiana | WTBG019 | Boone | >= 50,000 AND < 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | 14,902,931.16 | 38,683,095.33 |