U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-3
North Carolina

DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2021
RECIPIENT PROJECT
NUMBER
COUNTY POPULATION
RANGE
OWNERSHIP PROGRAM TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
North Carolina 000S425 Statewide N/A N/A SURFACE TRANSP BLOCK GRNT PRGM Landscaping and Other Scenic Beautification 31,026,558.00 39,192,285.00
North Carolina 000S781 Statewide N/A State CONGESTION AIR QUALITY Safety 29,342,564.00 54,264,000.00
North Carolina 0012056 Dare >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP Bridge Rehabilitation - Added Capacity 1,868,616.00 2,335,770.00
North Carolina 0012056 Dare >= 5,000 AND < 50,000 State HIGHWAY INFRA PROGRAM APPORT Right of Way 2,441,367.00 3,051,709.00
North Carolina 0012056 Dare >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity 70,292,202.00 97,765,610.00
North Carolina 0012056 Dare >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 672,000.00 840,000.00
North Carolina 0012056 Dare >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity 26,203,487.00 32,754,359.00
North Carolina 0012063 Dare >= 5,000 AND < State HIGHWAY INFRA PROGRAM APPORT Bridge Rehabilitation - 13,521,726.00 16,902,159.00
North Carolina 0012063 Dare >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity 20,122,443.00 25,153,053.00
North Carolina 0012063 Dare >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - Added Capacity 168,677,557.00 210,846,947.00
North Carolina 0012063 Dare >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - Added Capacity 28,925,227.00 58,950,000.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 501,487.00 626,859.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Preliminary Engineering 407,185.00 508,981.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 N/A REPURPOSED EARMARK SUBJ TO LIM Preliminary Engineering 167,119.00 208,899.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 N/A REPURPOSED EARMARK SUBJ TO LIM Right of Way 385,449.00 481,812.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 N/A REPURPOSED SPECIAL Right of Way 1,101,374.00 1,376,718.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 6,308,686.00 30,269,476.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 11,000,000.00 13,750,001.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 809,911.00 1,017,912.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 12,681,041.00 15,851,301.00
North Carolina 0016052 Catawba >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 1,280,000.00 1,600,000.00
North Carolina 0017054 Beaufort >= 5,000 AND < 50,000 State EQUITY BONUS EXEMPT LIM New Construction Roadway 25,624,484.00 32,030,605.00
North Carolina 0017054 Beaufort >= 5,000 AND < 50,000 State EQUITY BONUS SP LIMITATION New Construction Roadway 925,420.00 1,156,775.00
North Carolina 0017054 Beaufort >= 5,000 AND < State NATIONAL HIGHWAY SYSTEM Construction Engineering 3,543,281.00 4,429,101.00
North Carolina 0017054 Beaufort >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway 137,687,435.00 173,868,008.00
North Carolina 0017054 Beaufort >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Right of Way 17,710,798.00 22,280,433.00
North Carolina 0017054 Beaufort >= 5,000 AND < 50,000 State NATIONAL HIGHWAY SYSTEM Utilities 3,104,521.00 3,880,651.00
North Carolina 0017093 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 1,996,550.00 1,996,550.00
North Carolina 0017093 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 15,390,419.00 20,520,560.00
North Carolina 0017093 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 6,899,685.00 6,899,685.00
North Carolina 0017093 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway 13,433,938.00 17,192,906.00
North Carolina 0017096 Brunswick >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 3,562,898.00 3,562,898.00
North Carolina 0017096 Brunswick >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 49,084,565.00 65,446,088.00
North Carolina 0017096 Brunswick >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 3,107,504.00 3,107,504.00
North Carolina 0017096 Brunswick >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway 3,295,942.00 4,394,589.00
North Carolina 0017124 Brunswick >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity 18,580,688.00 23,225,860.00
North Carolina 0017124 Brunswick >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 5,326,275.00 64,346,126.00
North Carolina 0017124 Brunswick >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 13,807,634.00 23,499,886.00
North Carolina 0017124 Brunswick >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 1,539,512.00 2,052,683.00
North Carolina 0017124 Brunswick >= 50,000 AND < State SURFACE TRANSP BLOCK GRNT PRGM Debt Service 2,535,584.00 2,535,584.00
North Carolina 0017131 Brunswick >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT Debt Service 875,272.00 875,272.00
North Carolina 0017131 Brunswick >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT New Construction Roadway 670,434.00 893,912.00
North Carolina 0017131 Brunswick >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 18,360,207.00
North Carolina 0017131 Brunswick >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 27,811,063.00 46,278,920.00
North Carolina 0017131 Brunswick >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 6,526,146.00 98,052,217.00
North Carolina 0017131 Brunswick >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 4,762,991.00 6,350,656.00
North Carolina 0018011 Burke >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Restoration & Rehabilitation 1,805,946.00 2,257,433.00
North Carolina 0018011 Burke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 16,631,805.00 22,020,050.00
North Carolina 0018011 Burke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 2,568,588.00 3,210,735.00
North Carolina 0024024 Cumberland >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 240,000.00 300,000.00
North Carolina 0024024 Cumberland >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering 400,000.00 500,000.00
North Carolina 0024024 Cumberland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Bridge Replacement - No Added Capacity 1,284,624.00 1,605,780.00
North Carolina 0024024 Cumberland >= 200,000 N/A HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 69,600.00 87,000.00
North Carolina 0024024 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 18,700,612.00 23,375,765.00
North Carolina 0024024 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Environmental Only 481,104.00 601,380.00
North Carolina 0024024 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,195,200.00 1,494,000.00
North Carolina 0024024 Cumberland >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 3,747,831.00
North Carolina 0024024 Cumberland >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities 1,671,137.00 2,860,000.00
North Carolina 0024024 Cumberland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity 3,182,400.00 3,978,000.00
North Carolina 0024024 Cumberland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 244,800.00 306,000.00
North Carolina 0024024 Cumberland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 3,463,446.00 8,377,169.00
North Carolina 0026015 Madison >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 1,370,267.29 35,199,780.34
North Carolina 0026015 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 2,740,945.71 70,410,121.66
North Carolina 0026015 Madison >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 676,708.99 676,708.99
North Carolina 0026015 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 2,967,631.01 17,930,614.01
North Carolina 0026015 Madison >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 0.00 0.00
North Carolina 0026015 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,200,500.00 1,500,625.00
North Carolina 0040033 Davie >= 5,000 AND < 50,000 State FAST ACT NATIONAL FREIGHT 4R - Restoration & Rehabilitation 24,070,000.00 30,087,500.00
North Carolina 0040033 Davie >= 5,000 AND < 50,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Restoration & Rehabilitation 5,678,622.00 7,098,278.00
North Carolina 0040033 Davie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 0.00 1,574,721.00
North Carolina 0040033 Davie >= 5,000 AND < State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 4,951,142.00 8,391,202.00
North Carolina 0040033 Davie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 13,744,684.00 17,180,855.00
North Carolina 0040033 Davie >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 612,936.00 766,171.00
North Carolina 0040063 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 0.00 30,173,994.00
North Carolina 0040063 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 4,301,099.00
North Carolina 0040063 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 5,166,000.00
North Carolina 0040063 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 120,000.00 150,000.00
North Carolina 0040068 McDowell >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 29,736,266.00 37,170,331.00
North Carolina 0040068 McDowell >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 4,319,255.00 5,399,069.00
North Carolina 0040068 McDowell >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Restoration & Rehabilitation 2,163,186.00 2,703,983.00
North Carolina 0040074 Burke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 26,829,228.00 33,879,869.00
North Carolina 0040074 Burke >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 5,169,061.00
North Carolina 0040074 Burke >= 50,000 AND < 200,000 State REPURPOSED EARMARKS EXEMPT 4R - Restoration & Rehabilitation 464,434.00 580,543.00
North Carolina 0040075 Pender >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 0.00 0.00
North Carolina 0040075 Duplin >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 1,145,537.00 30,750,000.00
North Carolina 0040075 Pender >= 50,000 AND < State SURFACE TRANSP BLOCK GRNT PRGM Debt Service 0.00 0.00
North Carolina 0040097 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 155,046.00 22,271,239.00
North Carolina 0040097 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 3,340,685.00
North Carolina 0040097 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 200,851.00 1,435,000.00
North Carolina 0052057 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 20,122,500.00
North Carolina 0052057 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 11,846,757.00 29,655,000.00
North Carolina 0052057 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 17,041,874.00 120,816,667.00
North Carolina 0054031 Wake >= 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Added Capacity 19,900,000.00 24,875,000.00
North Carolina 0054031 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 3,000,000.00 29,066,831.00
North Carolina 0054031 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 2,894,853.00 14,714,000.00
North Carolina 0055020 Durham >= 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering 1,653,702.00 5,068,916.00
North Carolina 0055020 Durham >= 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 2,857,512.00 3,571,891.00
North Carolina 0055020 Durham >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 Preliminary Engineering 138,688.00 173,360.00
North Carolina 0055020 Durham >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 Utilities 101,312.00 126,640.00
North Carolina 0055020 Durham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 18,187,235.00 22,805,036.00
North Carolina 0055020 Durham >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 25,464,849.00 31,831,062.00
North Carolina 0055020 Durham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 513,095.00 641,438.00
North Carolina 0055020 Durham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 6,578,868.00 8,223,586.00
North Carolina 0055020 Durham >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 2,282,604.00 2,853,255.00
North Carolina 0059005 Cumberland >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Preliminary Engineering 16,121.00 20,152.00
North Carolina 0059005 Cumberland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Bridge Replacement - No Added Capacity 1,645,586.00 2,056,983.00
North Carolina 0059005 Cumberland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Bridge Replacement - No Added Capacity 2,429,290.00 3,036,613.00
North Carolina 0059005 Cumberland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 730,076.00 912,595.00
North Carolina 0059005 Cumberland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Right of Way 5,032,428.00 6,290,535.00
North Carolina 0059005 Cumberland >= 200,000 State HSIP LIMITING FLEXIBLE Right of Way 2,880,000.00 3,200,000.00
North Carolina 0059005 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 7,890,710.00 9,863,387.00
North Carolina 0059005 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity 2,960,000.00 3,700,000.00
North Carolina 0059005 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,048,000.00 1,310,000.00
North Carolina 0063001 Buncombe >= 200,000 N/A REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 390,048.00 487,560.00
North Carolina 0063001 Buncombe >= 200,000 N/A REPURPOSED SPECIAL 4R - Added Capacity 1,034.00 1,293.00
North Carolina 0063001 Buncombe >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 25,918,646.00 39,610,178.00
North Carolina 0063001 Buncombe >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 810,000.00 1,012,500.00
North Carolina 0063001 Buncombe >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,280,000.00 1,600,000.00
North Carolina 0063001 Buncombe >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 5,200,000.00 6,500,000.00
North Carolina 0063001 Buncombe >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 1,090,876.00 3,100,000.00
North Carolina 0069007 Clay >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY 4R - Added Capacity 45,727,228.00 45,727,228.00
North Carolina 0069007 Clay >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Construction Engineering 6,859,084.00 6,859,084.00
North Carolina 0069007 Clay >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering 950,500.00 1,100,625.00
North Carolina 0069007 Clay >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Preliminary Engineering 2,300,000.00 2,300,000.00
North Carolina 0069007 Clay >= 5,000 AND < 50,000 State APPALACHIAN DEVEL HWY Right of Way 9,030,000.00 9,030,000.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 Other HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 12,117,988.00 15,147,486.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 5,085,733.00 60,151,766.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 24,336,558.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 9,175,863.00 11,890,404.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,049,194.00 1,311,492.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,840,000.00 2,300,000.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Right of Way 156,904.00 11,741,667.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Utilities 125,165.00 6,223,334.00
North Carolina 0070049 Craven >= 50,000 AND < 200,000 Other NATIONAL HIGHWAY SYSTEM Preliminary Engineering 926,596.00 1,158,245.00
North Carolina 0070106 Wayne >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 6,264,631.00 6,264,631.00
North Carolina 0070106 Wayne >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 39,386,411.00 39,386,411.00
North Carolina 0070106 Wayne >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 13,086,834.00 13,266,084.00
North Carolina 0070106 Wayne >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway 22,250,085.00 26,025,587.00
North Carolina 0070117 Johnston >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Preliminary Engineering 2,097,684.00 2,330,855.00
North Carolina 0070117 Johnston >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Right of Way 8,417,825.00 9,353,141.00
North Carolina 0070117 Johnston >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Safety 19,851,422.00 22,322,225.00
North Carolina 0070117 Johnston >= 50,000 AND < 200,000 Other HSIP LIMITING FLEXIBLE Utilities 393,290.00 436,989.00
North Carolina 0070119 Wake >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 80,000.00 100,000.00
North Carolina 0070119 Wake >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Bridge Replacement - No Added Capacity 600,472.00 750,590.00
North Carolina 0070119 Wake >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 392,364.00 490,455.00
North Carolina 0070119 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 31,132,344.00 38,915,431.00
North Carolina 0070119 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 2,133,544.00 2,667,105.00
North Carolina 0070119 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 13,822,043.00 17,277,553.00
North Carolina 0070119 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 2,399,481.00 14,095,922.00
North Carolina 0070119 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity 1,500,000.00 1,875,000.00
North Carolina 0070119 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,040,000.00 1,300,000.00
North Carolina 0070119 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 4,624,620.00 5,780,775.00
North Carolina 0070132 Carteret >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION 4R - Added Capacity 1,782,920.00 2,228,650.00
North Carolina 0070132 Carteret >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 31,206,448.00 39,008,059.00
North Carolina 0070132 Carteret >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 30,140,691.00 37,675,465.00
North Carolina 0070132 Carteret >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 1,391,362.00 1,739,603.00
North Carolina 0070147 Wayne >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 36,096,322.00 45,120,402.00
North Carolina 0070147 Wayne >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 32,301,734.00 40,738,594.00
North Carolina 0070147 Wayne >= 50,000 AND < 200,000 State NATIONAL HIGHWAY SYSTEM New Construction Roadway 22,519,283.00 34,217,935.00
North Carolina 0070154 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 24,155,330.00 30,194,163.00
North Carolina 0070154 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,160,010.00 1,450,012.00
North Carolina 0070154 Craven >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 449,035.00 561,294.00
North Carolina 0070154 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 6,111,085.00 7,638,857.00
North Carolina 0070154 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities 257,600.00 322,000.00
North Carolina 0070154 Craven >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 1,280,000.00 1,600,000.00
North Carolina 0070163 Johnston >= 50,000 AND < 200,000 N/A HSIP LIMITING FLEXIBLE Preliminary Engineering 1,800,000.00 4,117,200.00
North Carolina 0070163 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 4,414.80
North Carolina 0070163 Johnston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 8,825,185.20
North Carolina 0070163 Johnston >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 4,000,000.00 5,000,000.00
North Carolina 0070163 Johnston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 2,583,500.00
North Carolina 0070163 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety 0.00 58,864.03
North Carolina 0070163 Johnston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety 0.00 58,805,139.97
North Carolina 0070163 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 269.45 4,872.61
North Carolina 0070163 Johnston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 560,230.55 5,191,127.39
North Carolina 0070241 Craven >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 86,666,668.00
North Carolina 0070241 Craven >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 18,655,000.00
North Carolina 0073025 Guilford >= 200,000 N/A INTERSTATE MAINTENANCE New Construction Roadway 9,132,381.00 11,415,476.00
North Carolina 0073025 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Environmental Only 176,592.00 220,740.00
North Carolina 0073025 Guilford >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 34,005,641.00 44,192,774.00
North Carolina 0073025 Guilford >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 271,200.00 339,000.00
North Carolina 0073025 Guilford >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 6,478,226.00 8,097,782.00
North Carolina 0073025 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 20,414,341.00 46,177,219.00
North Carolina 0073025 Guilford >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities 279,835.00 4,000,000.00
North Carolina 0073025 Guilford >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 1,439,433.00 1,799,968.00
North Carolina 0073025 Guilford >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way 20,000.00 25,000.00
North Carolina 0074137 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 5,632,185.00 57,876,551.99
North Carolina 0074137 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 758,102.00 768,464.00
North Carolina 0074137 Mecklenburg >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 244,129.00 325,506.00
North Carolina 0074142 Cleveland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 16,073,503.00 23,841,879.00
North Carolina 0074142 Cleveland >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 16,479,574.00 20,599,469.00
North Carolina 0074213 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 12,841,267.66 24,559,038.77
North Carolina 0074213 Stokes >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 1,843,789.34 1,844,961.23
North Carolina 0074213 Stokes >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 2,081,817.56 2,787,328.35
North Carolina 0074213 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 13,035,550.44 133,081,688.65
North Carolina 0077016 Surry >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 36,535,269.50 45,669,087.00
North Carolina 0077016 Yadkin >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 3,064,730.50 3,830,913.00
North Carolina 0077016 Surry >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 2,762,013.00 3,972,483.50
North Carolina 0077016 Yadkin >= 5,000 AND < State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 2,762,013.00 3,452,516.50
North Carolina 0085003 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 20,071,628.00 25,152,773.00
North Carolina 0085003 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 107,173.00 133,980.00
North Carolina 0095031 Johnston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 55,706,350.00 69,632,938.00
North Carolina 0095031 Johnston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 6,363,563.00 7,954,453.00
North Carolina 0095031 Johnston >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,600,000.00 2,000,000.00
North Carolina 0095057 Cumberland >= 200,000 State NAT SIG FREIGHT AND HWY PROJ 4R - Added Capacity 119,264,000.00 418,500,000.00
North Carolina 0095071 Cumberland >= 200,000 State NAT SIG FREIGHT AND HWY PROJ Other 2,793,650.64 4,656,084.44
North Carolina 0095071 Robeson >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ Other 3,557,664.34 5,929,440.66
North Carolina 0095071 Halifax >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ Other 2,116,666.00 3,527,776.71
North Carolina 0095071 Johnston >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ Other 2,791,169.10 4,651,948.55
North Carolina 0095071 Nash >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ Other 2,322,310.39 3,870,517.36
North Carolina 0095071 Northampton >= 5,000 AND < 50,000 State NAT SIG FREIGHT AND HWY PROJ Other 690,228.00 1,150,380.01
North Carolina 0095071 Harnett >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ Other 816,127.48 1,360,212.48
North Carolina 0095071 Wilson >= 50,000 AND < 200,000 State NAT SIG FREIGHT AND HWY PROJ Other 1,512,184.05 2,520,306.79
North Carolina 0095078 Robeson >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT 4R - Restoration & Rehabilitation 16,930,000.00 183,700,000.00
North Carolina 0095078 Robeson >= 50,000 AND < State NATL INTRASTRUCTURE INVESTMENT Preliminary Engineering 500,000.00 625,000.00
North Carolina 0095078 Robeson >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Right of Way 2,470,000.00 3,087,500.00
North Carolina 0095078 Robeson >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Utilities 2,600,000.00 3,250,000.00
North Carolina 0095079 Robeson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 0.00 162,600,000.00
North Carolina 0107010 Jackson >= 5,000 AND < 50,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering 650,000.00 3,312,500.00
North Carolina 0107010 Jackson >= 5,000 AND < 50,000 N/A HIGHWAY INFRA PROGRAM APPORT Right of Way 2,670,380.00 3,337,976.00
North Carolina 0107010 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 16,277,797.00 36,147,246.00
North Carolina 0107010 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 305,714.00 382,763.00
North Carolina 0107010 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 4,707,867.00 5,884,834.00
North Carolina 0107010 Jackson >= 5,000 AND < 50,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 800,000.00 1,000,000.00
North Carolina 0133007 Brunswick >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH New Construction Roadway 3,298,217.00 4,122,771.00
North Carolina 0133007 Brunswick >= 50,000 AND < 200,000 State REDISTRIBUTION OF TIFIA FUNDS New Construction Roadway 3,323,723.00 4,154,654.00
North Carolina 0133007 Brunswick >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 15,385,388.00 19,231,735.00
North Carolina 0209006 Haywood >= 50,000 AND < 200,000 State EQUITY BONUS SP LIMITATION Right of Way 2,000,500.00 2,500,625.00
North Carolina 0209006 Haywood >= 50,000 AND < 200,000 N/A REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 1,153,891.00 1,442,364.00
North Carolina 0209006 Haywood >= 50,000 AND < N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 13,556,628.00 16,979,982.00
North Carolina 0209006 Haywood >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 2,609,028.00 3,261,285.00
North Carolina 0209006 Haywood >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Environmental Only 184,537.00 230,672.00
North Carolina 0209006 Haywood >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 7,115,869.00 8,894,837.00
North Carolina 0209006 Haywood >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 1,768,000.00 2,210,000.00
North Carolina 0209006 Haywood >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 240,000.00 300,000.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PRGM - COVID APP Utilities 5,968,808.00 7,461,010.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 800,000.00 1,000,000.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 13,000,000.00 16,250,000.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM Preliminary Engineering 325,038.00 406,297.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 State REPURPOSED EARMARKS EXEMPT Preliminary Engineering 19,805.00 24,756.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 0.00 141,300,000.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 5,600,000.00 7,000,000.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 2,000,000.00 2,500,000.00
North Carolina 0211021 Brunswick >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 1,898,833.00 2,373,541.00
North Carolina 0211021 Brunswick >= 50,000 AND < State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 13,029,600.00 16,287,000.00
North Carolina 0220025 Guilford >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 15,360,934.00 19,201,145.00
North Carolina 0220025 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 15,754,494.00 19,693,118.00
North Carolina 0220025 Guilford >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 8,268,851.00 10,336,087.00
North Carolina 0220025 Guilford >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 282,010.00 352,512.00
North Carolina 0220025 Guilford >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 152,000.00 190,000.00
North Carolina 0220065 Richmond >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 16,093,200.00 20,276,678.00
North Carolina 0220065 Richmond >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 26,976,626.00 33,720,782.00
North Carolina 0220065 Richmond >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 975,120.00 1,218,900.00
North Carolina 0220065 Richmond >= 5,000 AND < 50,000 State REPURPOSED SPECIAL 4R - Added Capacity 1,281,498.00 1,601,873.00
North Carolina 0220072 Pitt >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 2,317,175.00 2,908,095.00
North Carolina 0220072 Pitt >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 25,841,698.00 34,798,690.00
North Carolina 0220072 Pitt >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 1,606,119.00 2,007,649.00
North Carolina 0221041 Watauga >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 319,905.00 399,882.00
North Carolina 0221041 Watauga >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT Right of Way 170,040.00 212,550.00
North Carolina 0221041 Ashe >= 5,000 AND < State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 38,805,016.00 66,506,272.00
North Carolina 0221041 Watauga >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 12,000,000.00 15,000,000.00
North Carolina 0221041 Watauga >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 576,000.00 720,000.00
North Carolina 0221042 Ashe >= 5,000 AND < 50,000 State HIGHWAY INFRA PROGRAM APPORT Right of Way 465,398.00 581,748.00
North Carolina 0221042 Ashe >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 20,924,713.00 26,155,892.00
North Carolina 0221042 Ashe >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 320,501.00 401,118.00
North Carolina 0221042 Ashe >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 320,000.00 400,000.00
North Carolina 0221042 Ashe >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 70,400.00 88,000.00
North Carolina 0261191 Buncombe >= 200,000 N/A HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 554,413.00 693,017.00
North Carolina 0261191 Buncombe >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering 450,500.00 500,556.00
North Carolina 0261191 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 49,579,706.00 61,974,633.00
North Carolina 0261191 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 8,036,371.00 11,268,750.00
North Carolina 0261199 Madison >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 3,307,332.23 88,717,227.06
North Carolina 0261199 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 3,308,324.54 88,743,844.88
North Carolina 0261199 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 3,307,332.23 88,717,227.06
North Carolina 0261199 Henderson >= 50,000 AND < State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 5,397,120.88
North Carolina 0261199 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 5,395,502.06
North Carolina 0261199 Madison >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 2,620,170.95 10,153,317.89
North Carolina 0261199 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 2,620,957.10 10,156,364.22
North Carolina 0261199 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 2,620,170.95 10,153,317.89
North Carolina 0261199 Madison >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,133,220.00 1,416,525.00
North Carolina 0261199 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,133,560.00 1,416,950.00
North Carolina 0261199 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,133,220.00 1,416,525.00
North Carolina 0261200 Transylvania >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 924,014.44 50,562,777.20
North Carolina 0261200 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 923,737.28 50,547,611.40
North Carolina 0261200 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 923,737.28 50,547,611.40
North Carolina 0261200 Buncombe >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 853,176.75 2,846,797.83
North Carolina 0261200 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 853,176.75 2,846,797.83
North Carolina 0261200 Transylvania >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 862,370.50 2,916,404.34
North Carolina 0261200 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 586,774.65 733,468.31
North Carolina 0261200 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 600,000.00 750,000.00
North Carolina 0261200 Transylvania >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 586,950.70 733,688.38
North Carolina 0261202 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 26,666,667.00
North Carolina 0261202 Madison >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 0.00 0.00
North Carolina 0261202 Madison >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 1,913,142.00
North Carolina 0261202 Henderson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 3,826,858.00
North Carolina 0264067 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 747,331.26 6,855,232.74
North Carolina 0264067 Pitt >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 1,494,886.74 13,712,522.26
North Carolina 0264067 Pitt >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 1,706,860.67
North Carolina 0264067 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 853,302.33
North Carolina 0264067 Pitt >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Debt Service 1,178,590.93 2,300,115.00
North Carolina 0264067 Greene >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Debt Service 589,207.07 1,149,885.00
North Carolina 0273001 Gaston >= 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 400,000.00 500,000.00
North Carolina 0273001 Gaston >= 200,000 N/A HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 606,640.00 758,300.00
North Carolina 0273001 Gaston >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Right of Way 440,390.00 550,488.00
North Carolina 0273001 Gaston >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Utilities 81,259.00 101,574.00
North Carolina 0273001 Gaston >= 200,000 State REPURPOSED SPECIAL Utilities 390,186.00 487,733.00
North Carolina 0273001 Gaston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 6,491,038.00 9,442,414.00
North Carolina 0273001 Gaston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 0.00 2,241,362.00
North Carolina 0273001 Gaston >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 789,516.00 1,738,953.00
North Carolina 0273001 Gaston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 36,421.00 45,527.00
North Carolina 0273001 Gaston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 5,378,185.00 6,722,732.00
North Carolina 0273001 Gaston >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 608,555.00 760,694.00
North Carolina 0277019 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 0.00 26,700,000.00
North Carolina 0277020 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 18,544,043.00 32,403,454.00
North Carolina 029B002 Rockingham >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION 4R - Added Capacity 2,500,000.00 3,125,000.00
North Carolina 029B002 Rockingham >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Right of Way 4,178,422.00 5,223,028.00
North Carolina 029B002 Rockingham >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way 3,600,000.00 4,500,000.00
North Carolina 029B002 Rockingham >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity 974,726.00 1,218,407.00
North Carolina 029B002 Rockingham >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 10,620,000.00 13,275,000.00
North Carolina 029B002 Rockingham >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 41,138,771.00 55,264,812.00
North Carolina 029B002 Rockingham >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 1,841,918.00 2,313,350.00
North Carolina 0301028 Nash >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 22,795,727.00 31,088,243.00
North Carolina 0301028 Nash >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 3,889,566.00 4,861,958.00
North Carolina 0301028 Nash >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 514,861.00 643,576.00
North Carolina 0301028 Nash >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,000,000.00 1,250,000.00
North Carolina 0301028 Nash >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,480,420.00 1,850,526.00
North Carolina 0301028 Nash >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 1,960,993.00 3,475,000.00
North Carolina 0301028 Nash >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 11,929.00 1,800,000.00
North Carolina 0311023 Randolph >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway 1,300,159.00 1,733,546.00
North Carolina 0311023 Randolph >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 7,498,750.00 7,498,750.00
North Carolina 0311023 Randolph >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 63,888,144.00 84,658,728.00
North Carolina 0311023 Randolph >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 10,890,082.00 10,947,582.00
North Carolina 0311023 Randolph >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway 14,710,758.00 21,147,677.00
North Carolina 0311032 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 4,880,109.00 23,218,493.00
North Carolina 0311032 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,593,000.00 1,991,250.00
North Carolina 0311032 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 2,324,600.00 2,905,750.00
North Carolina 0311032 Guilford >= 200,000 State NATIONAL HIGHWAY SYSTEM Preliminary Engineering 160,000.00 200,000.00
North Carolina 0401155 Buncombe >= 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity 26,095,226.00 28,994,695.00
North Carolina 0401155 Buncombe >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 11,850,714.00 19,699,225.00
North Carolina 0401155 Buncombe >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Construction Engineering 809,787.00 1,012,234.00
North Carolina 0401230 Cumberland >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way 9,521,124.00 11,901,406.00
North Carolina 0401230 Cumberland >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Utilities 2,820,400.00 3,525,500.00
North Carolina 0401230 Cumberland >= 200,000 State REPURPOSED SPECIAL Right of Way 931,460.00 1,164,325.00
North Carolina 0401230 Cumberland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 361,528.00 451,910.00
North Carolina 0401230 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 2,398,472.00 2,998,090.00
North Carolina 0401230 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 21,396,248.00 26,745,310.00
North Carolina 0401230 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 13,423,631.00 20,474,500.00
North Carolina 0401249 Harnett >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity 81,251.87 101,564.84
North Carolina 0401249 Wake >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity 162,528.13 203,160.16
North Carolina 0401249 Wake >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Right of Way 4,386,054.00 5,482,568.00
North Carolina 0401249 Wake >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Utilities 809,755.00 1,012,194.00
North Carolina 0401249 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 2,341,120.53 15,044,539.07
North Carolina 0401249 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 4,682,943.47 30,093,591.93
North Carolina 0401249 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 3,136,722.16 4,209,543.80
North Carolina 0401249 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 1,568,125.84 2,104,456.20
North Carolina 0401249 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,204,578.23 1,505,723.29
North Carolina 0401249 Harnett >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 602,198.77 752,748.71
North Carolina 0401249 Harnett >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 742,592.40 928,240.50
North Carolina 0401249 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 1,485,407.60 1,856,759.50
North Carolina 0401249 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 5,983,198.00 7,478,998.00
North Carolina 0401249 Harnett >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 234,643.20 293,304.00
North Carolina 0401249 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 0.00 2,487,806.00
North Carolina 0401249 Wake >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 469,356.80 586,696.00
North Carolina 0401259 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 1,125,238.00 42,672,705.00
North Carolina 0401259 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 1,052,817.00 2,870,000.00
North Carolina 0401259 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 3,040,000.00 3,800,000.00
North Carolina 0401259 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 3,149,000.00
North Carolina 0401259 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 186,000.00
North Carolina 0401300 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 0.00 27,300,000.00
North Carolina 0401300 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 0.00 500,000.00
North Carolina 0402134 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation 0.00 1,564,706.00
North Carolina 0402134 Catawba >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation 13,851,574.00 15,719,112.00
North Carolina 0402134 Catawba >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Debt Service 4,922,101.00 4,988,601.00
North Carolina 0402134 Catawba >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 1,389,045.00 1,634,171.00
North Carolina 0402134 Iredell >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 5,948,107.00 6,997,773.00
North Carolina 0402134 Catawba >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 501,341.00 501,341.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way 1,599,601.00 1,999,501.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Right of Way 21,321,011.00 23,690,015.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Utilities 170,199.00 189,110.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 2,417,933.00 2,686,592.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 2,034,022.00 2,260,025.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 8,295,625.00 10,369,532.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A HIGHWAY INFRASTRUCTURE 4R - Added Capacity 17,620,967.00 22,026,209.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINT DISC 4R - Added Capacity 7,091,000.00 7,878,889.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity 47,561.00 7,593,122.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Debt Service 0.00 227,716.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 43,089,233.00 54,399,972.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 13,579,796.00 13,579,796.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 5,365,326.00 6,312,149.00
North Carolina 0403112 Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 42,710,174.00 81,552,560.00
North Carolina 0403112 Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,564,000.00 1,955,000.00
North Carolina 0403112 Davie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 480,000.00 600,000.00
North Carolina 0403112 Davie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 840,000.00 1,050,000.00
North Carolina 0403112 Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 195,000.00
North Carolina 0403112 Forsyth >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 300,000.00 375,000.00
North Carolina 0403112 Davie >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 100,000.00 125,000.00
North Carolina 0404139 Wake >= 200,000 N/A FAST ACT NATIONAL FREIGHT Preliminary Engineering 4,101,208.00 5,126,510.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity 19,876,020.00 24,845,025.00
North Carolina 0404139 Wake >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity 19,876,020.00 24,845,025.00
North Carolina 0404139 Wake >= 200,000 N/A INTERSTATE MAINT DISC Preliminary Engineering 835,000.00 1,043,750.00
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 86,758,743.50 231,617,122.50
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 53,258,743.50 66,573,429.50
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,056,286.00 51,400,250.00
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 2,152,500.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 2,152,500.00
North Carolina 0404139 Wake >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,730,500.00 2,163,125.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 0.00
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 36,250,000.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 0.00
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 1,945,000.00
North Carolina 0404139 Wake >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 453,500.00 566,875.00
North Carolina 0404139 Wake >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 690,708.50 863,386.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 690,708.50 863,386.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity 3,277,451.00 4,096,814.00
North Carolina 0404139 Wake >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity 3,277,451.00 4,096,814.00
North Carolina 0404139 Wake >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 4,000,000.00 5,000,000.00
North Carolina 0404140 Wake >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 23,765,508.00 31,687,345.00
North Carolina 0404140 Wake >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 4,434,217.00 4,434,217.00
North Carolina 0404140 Wake >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 12,107,704.00 18,807,462.00
North Carolina 0404140 Wake >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 7,064,413.00 7,064,413.00
North Carolina 0404148 Orange >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 338,079.00 422,599.00
North Carolina 0404148 Orange >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering 225,000.00 250,000.00
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 0.00 235,724,849.61
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 0.00 733,019.39
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 109,952.90
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 35,358,726.10
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 45,374.70
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 14,591,625.30
North Carolina 0404148 Alamance >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,062,827.04 1,328,533.80
North Carolina 0404148 Orange >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 800,000.00 1,000,000.00
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 2,125,972.96 2,657,466.20
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 36,611.33
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 11,835,721.67
North Carolina 0401300 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 0.00 500,000.00
North Carolina 0402134 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation 0.00 1,564,706.00
North Carolina 0402134 Catawba >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation 13,851,574.00 15,719,112.00
North Carolina 0402134 Catawba >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Debt Service 4,922,101.00 4,988,601.00
North Carolina 0402134 Catawba >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 1,389,045.00 1,634,171.00
North Carolina 0402134 Iredell >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 5,948,107.00 6,997,773.00
North Carolina 0402134 Catawba >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 501,341.00 501,341.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 N/A HIGH PRIORITY PROJECT SEC 1702 Right of Way 1,599,601.00 1,999,501.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Right of Way 21,321,011.00 23,690,015.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Utilities 170,199.00 189,110.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 2,417,933.00 2,686,592.00
North Carolina 0402141 Iredell >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 2,034,022.00 2,260,025.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 8,295,625.00 10,369,532.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A HIGHWAY INFRASTRUCTURE 4R - Added Capacity 17,620,967.00 22,026,209.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINT DISC 4R - Added Capacity 7,091,000.00 7,878,889.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity 47,561.00 7,593,122.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Debt Service 0.00 227,716.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 43,089,233.00 54,399,972.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 13,579,796.00 13,579,796.00
North Carolina 0402145 Iredell >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 5,365,326.00 6,312,149.00
North Carolina 0403112 Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 42,710,174.00 81,552,560.00
North Carolina 0403112 Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,564,000.00 1,955,000.00
North Carolina 0403112 Davie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 480,000.00 600,000.00
North Carolina 0403112 Davie >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 840,000.00 1,050,000.00
North Carolina 0403112 Forsyth >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 195,000.00
North Carolina 0403112 Forsyth >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 300,000.00 375,000.00
North Carolina 0403112 Davie >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 100,000.00 125,000.00
North Carolina 0404139 Wake >= 200,000 N/A FAST ACT NATIONAL FREIGHT Preliminary Engineering 4,101,208.00 5,126,510.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity 19,876,020.00 24,845,025.00
North Carolina 0404139 Wake >= 200,000 State HIGHWAY INFRA PRGM - COVID APP 4R - Added Capacity 19,876,020.00 24,845,025.00
North Carolina 0404139 Wake >= 200,000 N/A INTERSTATE MAINT DISC Preliminary Engineering 835,000.00 1,043,750.00
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 86,758,743.50 231,617,122.50
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 53,258,743.50 66,573,429.50
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 1,056,286.00 51,400,250.00
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 2,152,500.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 2,152,500.00
North Carolina 0404139 Wake >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,730,500.00 2,163,125.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 0.00
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 36,250,000.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 0.00
North Carolina 0404139 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 1,945,000.00
North Carolina 0404139 Wake >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 453,500.00 566,875.00
North Carolina 0404139 Wake >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 690,708.50 863,386.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 690,708.50 863,386.00
North Carolina 0404139 Harnett >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity 3,277,451.00 4,096,814.00
North Carolina 0404139 Wake >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity 3,277,451.00 4,096,814.00
North Carolina 0404139 Wake >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 4,000,000.00 5,000,000.00
North Carolina 0404140 Wake >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 23,765,508.00 31,687,345.00
North Carolina 0404140 Wake >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 4,434,217.00 4,434,217.00
North Carolina 0404140 Wake >= 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 12,107,704.00 18,807,462.00
North Carolina 0404140 Wake >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 7,064,413.00 7,064,413.00
North Carolina 0404148 Orange >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PROGRAM APPORT Preliminary Engineering 338,079.00 422,599.00
North Carolina 0404148 Orange >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering 225,000.00 250,000.00
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 0.00 235,724,849.61
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity 0.00 733,019.39
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 109,952.90
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 35,358,726.10
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 45,374.70
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 14,591,625.30
North Carolina 0404148 Alamance >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 1,062,827.04 1,328,533.80
North Carolina 0404148 Orange >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 800,000.00 1,000,000.00
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 2,125,972.96 2,657,466.20
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 36,611.33
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 11,835,721.67
North Carolina 0404148 Orange >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 1,867,193.70
North Carolina 0404148 Durham >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 5,806.30
North Carolina 0421087 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 97,361,629.00 121,702,036.00
North Carolina 0421087 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 12,521,600.00 15,652,000.00
North Carolina 0421087 Forsyth >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Replacement - No Added Capacity 162,778.00 203,472.00
North Carolina 0421087 Forsyth >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Right of Way 1,192,420.00 1,490,525.00
North Carolina 0421087 Forsyth >= 200,000 State REPURPOSED SPECIAL Bridge Replacement - No Added Capacity 1,632,526.00 2,040,658.00
North Carolina 0421087 Forsyth >= 200,000 State REPURPOSED SPECIAL Right of Way 109,498.00 136,873.00
North Carolina 0421087 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity 9,578,164.00 11,972,706.00
North Carolina 0421088 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 49,122,503.00 61,403,129.00
North Carolina 0421088 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 17,566,129.00 25,105,364.00
North Carolina 0431024 Nash >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Debt Service 7,449,206.00 7,449,206.00
North Carolina 0431024 Nash >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 23,995,224.00 31,993,753.00
North Carolina 0440010 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 4,190,628.00 289,257,867.00
North Carolina 0440010 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 49,433,296.00
North Carolina 0440010 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 4,675,953.00 42,879,087.00
North Carolina 0440010 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 4,400,000.00 5,500,000.00
North Carolina 0440010 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 81,393,000.00
North Carolina 0440010 Wake >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Preliminary Engineering 800,000.00 1,000,000.00
North Carolina 0440013 Wake >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering 1,026,420.00 1,140,468.00
North Carolina 0440013 Wake >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 185,277,987.00 205,864,431.00
North Carolina 0485026 Mecklenburg >= 200,000 N/A INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation 50,538,533.00 60,198,753.00
North Carolina 0485026 Mecklenburg >= 200,000 N/A INTERSTATE MAINTENANCE Debt Service 17,889.00 218,618.00
North Carolina 0485026 Mecklenburg >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 20,140,308.00 23,295,507.00
North Carolina 0485026 Mecklenburg >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 11,176,244.00 11,176,244.00
North Carolina 0485026 Mecklenburg >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 11,433,846.00 13,451,585.00
North Carolina 0485027 Mecklenburg >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 3,928,583.00 3,928,583.00
North Carolina 0485027 Mecklenburg >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 19,784,612.00 25,387,373.00
North Carolina 0485027 Mecklenburg >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 17,879.00 82,464.00
North Carolina 0485027 Mecklenburg >= 200,000 N/A NATIONAL HIGHWAY SYSTEM New Construction Roadway 97,142,715.00 128,301,217.00
North Carolina 0485027 Mecklenburg >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 1,521,715.00 2,028,954.00
North Carolina 0507003 Wake >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 4,100,000.00 17,083,334.00
North Carolina 0507003 Wake >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,200,000.00 1,500,000.00
North Carolina 0507003 Wake >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 3,350,000.00 6,700,000.00
North Carolina 0540041 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 20,670,000.00
North Carolina 0540041 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 0.00 108,828,000.00
North Carolina 0540041 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 10,000,000.00
North Carolina 0540042 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 13,848,900.00
North Carolina 0540042 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 6,821,100.00
North Carolina 0540042 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 0.00 76,636,610.00
North Carolina 0540042 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 0.00 37,746,390.00
North Carolina 0540042 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 6,600,000.00
North Carolina 0540042 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 3,400,000.00
North Carolina 0540045 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 21,952,500.00
North Carolina 0540045 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 21,952,500.00
North Carolina 0540045 Harnett >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 0.00 116,613,500.00
North Carolina 0540045 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 0.00 116,613,500.00
North Carolina 0540045 Harnett >= 50,000 AND < State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 5,000,000.0
North Carolina 0540045 Wake >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 5,000,000.00
North Carolina 0620031 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity 92,199,062.00 122,491,960.00
North Carolina 0620031 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 800,000.00 1,000,000.00
North Carolina 0620031 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 6,704,000.00 8,380,000.00
North Carolina 0708053 Randolph >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 61,957,186.00 77,446,483.00
North Carolina 0708053 Guilford >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 16,615,811.00 20,782,293.00
North Carolina 0708053 Guilford >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Right of Way 860,800.00 1,076,000.00
North Carolina 0708053 Guilford >= 200,000 N/A NATIONAL HIGHWAY SYSTEM Right of Way 1,432,896.00 1,791,120.00
North Carolina 0708067 Guilford >= 200,000 State HIGHWAY INFRA PROGRAM APPORT New Construction Roadway 2,191,185.00 2,921,581.00
North Carolina 0708067 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 18,411,629.00
North Carolina 0708067 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 28,389,692.00 47,335,040.00
North Carolina 0708067 Guilford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 21,618,762.00 121,856,689.00
North Carolina 0708067 Guilford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 2,600,000.00 3,250,000.00
North Carolina 0771171 Yadkin >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation 47,925,323.00 64,620,823.00
North Carolina 0771171 Yadkin >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Debt Service 9,964,535.00 10,159,285.00
North Carolina 0771171 Yadkin >= 5,000 AND < N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & 1,999,058.00 2,347,758.00
North Carolina 0771171 Yadkin >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 517,846.00 517,846.00
North Carolina 0771229 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Environmental Only 115,440.00 144,300.00
North Carolina 0771229 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 101,684,568.00 127,682,725.00
North Carolina 0771230 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 29,600,000.00 37,000,000.00
North Carolina 0771230 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 3,325,000.00
North Carolina 0771231 Mecklenburg >= 200,000 State HIGHWAY INFRA PRGM - COVID APP New Construction Roadway 7,071,282.00 8,839,103.00
North Carolina 0771231 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 20,128,718.00 25,160,897.00
North Carolina 0771231 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 250,000.00
North Carolina 0851113 Gaston >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Preliminary Engineering 900.00 1,000.00
North Carolina 0851113 Gaston >= 200,000 N/A HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 2,700,000.00 3,375,000.00
North Carolina 0851113 Gaston >= 200,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering 900,000.00 1,000,000.00
North Carolina 0851113 Gaston >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 12,751,924.00 15,939,906.00
North Carolina 0851113 Gaston >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Right of Way 2,172,415.00 4,700,000.00
North Carolina 0851113 Gaston >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Utilities 964,418.00 2,600,000.00
North Carolina 0851113 Gaston >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Preliminary Engineering 1,045,122.00 1,306,403.00
North Carolina 0851113 Gaston >= 200,000 N/A REPURPOSED SPECIAL 4R - Added Capacity 1,028,190.00 1,285,238.00
North Carolina 0851113 Gaston >= 200,000 State REPURPOSED SPECIAL Preliminary Engineering 736,718.00 920,898.00
North Carolina 0852062 Cabarrus >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity 58,800,000.00 65,333,333.00
North Carolina 0852062 Mecklenburg >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 8,600,000.00 10,750,000.00
North Carolina 0852062 Cabarrus >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 46,886,219.00 62,514,960.00
North Carolina 0852062 Cabarrus >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 16,586,116.00 16,586,116.00
North Carolina 0852062 Cabarrus >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 3,301,935.00 12,992,148.00
North Carolina 0852062 Cabarrus >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM Debt Service 2,622,763.00 2,944,872.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity 11,378,462.00 14,223,078.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT Utilities 4,352,783.00 5,440,979.00
North Carolina 0852077 Rowan >= 50,000 AND < 200,000 State HIGH PRIORITY PROJECT SEC 1702 Utilities 650,080.00 812,600.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 1,510,035.00 1,887,544.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 85,013,771.00 106,267,214.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 121,948,575.00 152,435,720.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 22,762,275.00 28,452,845.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 1,920,000.00 2,400,000.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State REPURPOSED SPECIAL 4R - Added Capacity 25,267.00 31,584.00
North Carolina 0852077 Cabarrus >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 4,489,965.00 5,612,457.00
North Carolina 0852078 Rowan >= 50,000 AND < 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity 88,462,636.00 110,578,295.00
North Carolina 0852078 Rowan >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 37,411,249.00 46,764,062.00
North Carolina 0852078 Rowan >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 20,576,935.00 25,721,168.00
North Carolina 0852078 Rowan >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 6,128,306.00 12,767,500.00
North Carolina 0852078 Rowan >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 822,810.00 2,752,500.00
North Carolina 0852078 Rowan >= 50,000 AND < 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 74,336.00 92,920.00
North Carolina 0853197 Davidson >= 50,000 AND < 200,000 N/A ARRA AMERICAN RECOV & REINV AC 4R - Added Capacity 10,000,000.00 10,056,519.00
North Carolina 0853197 Davidson >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity 10,806,540.00 12,712,164.00
North Carolina 0853197 Rowan >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE 4R - Added Capacity 2,418,487.00 2,418,487.00
North Carolina 0853197 Rowan >= 50,000 AND < 200,000 N/A INTERSTATE MAINTENANCE Debt Service 9,983,871.00 9,983,871.00
North Carolina 0853197 Davidson >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 12,667,364.00 16,889,819.00
North Carolina 0853197 Rowan >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity 70,027,907.00 87,398,830.00
North Carolina 0853197 Rowan >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 12,157,506.00 12,157,506.00
North Carolina 0853197 Rowan >= 50,000 AND < 200,000 N/A NATIONAL HIGHWAY SYSTEM 4R - Added Capacity 0.00 20,320,001.00
North Carolina 0854104 Vance >= 5,000 AND < 50,000 N/A HIGH PRIORITY PROJECT SEC 1702 4R - Restoration & Rehabilitation 80,899.00 101,124.00
North Carolina 0854104 Vance >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation 15,735,404.00 19,972,630.00
North Carolina 0854104 Vance >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Debt Service 5,643,743.00 5,658,493.00
North Carolina 0854104 Vance >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 7,559,678.00 8,893,743.00
North Carolina 0854104 Vance >= 5,000 AND < 50,000 N/A NATIONAL HIGHWAY PERF PROGRAM Debt Service 802,258.00 802,258.00
North Carolina 0854116 Warren >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering 630,000.00 1,584,664.00
North Carolina 0854116 Vance >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 80,257,650.00 100,322,063.00
North Carolina 0854116 Warren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 960,000.00 1,200,000.00
North Carolina 0854116 Warren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 0.00 198,898.00
North Carolina 0854116 Warren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 0.00 736,000.00
North Carolina 0854116 Vance >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 5,000,000.00 6,250,000.00
North Carolina 0854117 Warren >= 5,000 AND < 50,000 N/A INTERSTATE MAINTENANCE Preliminary Engineering 292,500.00 325,000.00
North Carolina 0854117 Warren >= 5,000 AND < 50,000 State INTERSTATE MAINTENANCE Preliminary Engineering 157,500.00 175,000.00
North Carolina 0854117 Warren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 1,011,463.00 1,264,329.00
North Carolina 0854117 Vance >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation 48,287,589.00 60,359,486.00
North Carolina 0854117 Warren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Preliminary Engineering 480,000.00 600,000.00
North Carolina 0854117 Warren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Right of Way 31,798.00 100,000.00
North Carolina 0854117 Warren >= 5,000 AND < 50,000 State NATIONAL HIGHWAY PERF PROGRAM Utilities 31,188.00 229,000.00
North Carolina 0854117 Vance >= 5,000 AND < 50,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Restoration & Rehabilitation 4,612,948.00 5,766,185.00
North Carolina 0854117 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation 2,966,616.00 3,708,270.00
North Carolina 0854117 Warren >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 311,349.00 389,813.00
North Carolina 0918016 Forsyth >= 200,000 State EQUITY BONUS SP LIMITATION New Construction Roadway 2,648,322.00 3,310,402.00
North Carolina 0918016 Forsyth >= 200,000 State MINIMUM GUARANTEE - TEA-21 New Construction Roadway 555.00 694.00
North Carolina 0918016 Forsyth >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH New Construction Roadway 638,397.00 797,996.00
North Carolina 0918016 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Environmental Only 0.00 3,668.00
North Carolina 0918016 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Environmental Only 429,027.00 536,284.00
North Carolina 0918016 Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 24,450,207.00 30,562,759.00
North Carolina 0918016 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 17,824,890.00 34,781,113.00
North Carolina 0918016 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 19,924,408.00 24,905,510.00
North Carolina 0918016 Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 2,120,695.00 3,288,452.00
North Carolina 0918016 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 9,708,703.00 12,135,879.00
North Carolina 0918016 Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 2,720,000.00 3,400,000.00
North Carolina 0918062 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 40,565.00 50,707.00
North Carolina 0918062 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 15,095,794.00 28,121,271.00
North Carolina 0918062 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering 3,945,032.00 4,931,290.00
North Carolina 0918062 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 4,215,886.00 5,269,858.00
North Carolina 0918093 Forsyth >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 New Construction Roadway 406,299.00 507,874.00
North Carolina 0918093 Forsyth >= 200,000 State HIGHWAY INFRA PRGM - COVID APP New Construction Roadway 18,000,000.00 22,500,000.00
North Carolina 0918093 Forsyth >= 200,000 State HIGHWAY INFRA PROGRAM APPORT New Construction Roadway 2,747,847.00 3,663,796.00
North Carolina 0918093 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 14,326,872.00 25,298,916.00
North Carolina 0918093 Forsyth >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 5,796,250.00 118,175,967.00
North Carolina 0918093 Forsyth >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM New Construction Roadway 2,002,950.00 2,503,688.00
North Carolina 0918093 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM New Construction Roadway 12,000,000.00 15,000,001.00
North Carolina 1118011 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering 0.00 19,462,350.00
North Carolina 1118011 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 13,499,219.00 23,722,716.00
North Carolina 1118011 Cumberland >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 19,628,023.00 76,415,668.00
North Carolina 1118012 Robeson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Debt Service 0.00 11,480,000.00
North Carolina 1118012 Robeson >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM New Construction Roadway 0.00 53,333,334.00
North Carolina 1121009 Harnett >= 50,000 AND < 200,000 N/A EQUITY BONUS SP LIMITATION Preliminary Engineering 159,000.00 198,750.00
North Carolina 1121009 Harnett >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 905,133.00 1,131,417.00
North Carolina 1121009 Harnett >= 50,000 AND < 200,000 N/A HIGHWAY INFRA PROGRAM APPORT Right of Way 2,328,134.00 2,910,168.00
North Carolina 1121009 Harnett >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 17,065,302.00 22,362,720.00
North Carolina 1121009 Harnett >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,000.00 1,250.00
North Carolina 1121009 Harnett >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 1,987,807.00 2,490,256.00
North Carolina 1121009 Harnett >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 7,963,914.00 9,954,893.00
North Carolina 1121009 Harnett >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 1,000,000.00 1,250,000.00
North Carolina 1132007 Cumberland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 1,612,887.00 2,016,109.00
North Carolina 1132007 Cumberland >= 200,000 State HIGHWAY INFRA PROGRAM APPORT Construction Engineering 803,480.00 1,004,350.00
North Carolina 1132007 Cumberland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 6,157,000.00 7,696,250.00
North Carolina 1132007 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 4,091,074.00 10,007,429.00
North Carolina 1132007 Cumberland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 4,822,549.00 6,028,187.00
North Carolina 1132007 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 974,074.00 1,232,197.00
North Carolina 1132007 Cumberland >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 150,400.00 188,000.00
North Carolina 1132007 Cumberland >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 582,400.00 728,000.00
North Carolina 1175010 New Hanover >= 200,000 N/A HIGHWAY INFRA PROGRAM APPORT 4R - No Added Capacity 262,482.00 328,103.00
North Carolina 1175010 New Hanover >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH Right of Way 1,791,342.00 2,239,178.00
North Carolina 1175010 New Hanover >= 200,000 N/A REDISTRIBUTION OF CERTAIN AUTH Utilities 149,802.00 187,252.00
North Carolina 1175010 New Hanover >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity 24,021,496.00 30,026,870.00
North Carolina 1175010 New Hanover >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 13,245,000.00 16,556,250.00
North Carolina 1175010 New Hanover >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 12,996,539.00 16,245,674.00
North Carolina 1335004 Carteret >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 4,200,000.00 5,250,000.00
North Carolina 1335004 Carteret >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Right of Way 960,000.00 7,200,000.00
North Carolina 1335004 Carteret >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities 400,000.00 500,000.00
North Carolina 1335004 Carteret >= 50,000 AND < 200,000 State TECHNOLOGY DEPLOYMENT GRANTS T Bridge Replacement - No Added Capacity 1,000,000.00 41,150,000.00
North Carolina 1406007 Onslow >= 50,000 AND < 200,000 State HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 6,851,063.00 8,563,829.00
North Carolina 1406007 Onslow >= 50,000 AND < 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity 1,002,161.00 1,252,701.00
North Carolina 1406007 Onslow >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 1,802,000.00 2,252,500.00
North Carolina 1406007 Onslow >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 28,801,972.00 46,125,477.00
North Carolina 1820005 Guilford >= 200,000 N/A HIGHWAY INFRA PROGRAM APPORT 4R - Added Capacity 1,617,088.00 2,021,360.00
North Carolina 1820005 Guilford >= 200,000 N/A HIGHWAY INFRA PROGRAM APPORT Right of Way 2,129,316.00 2,661,645.00
North Carolina 1820005 Guilford >= 200,000 N/A REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity 64,748.00 80,935.00
North Carolina 1820005 Guilford >= 200,000 N/A REPURPOSED SPECIAL 4R - Added Capacity 383,252.00 479,065.00
North Carolina 1820005 Guilford >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 33,899,301.00 43,906,336.00
North Carolina 1820005 Guilford >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 12,092,955.00 15,220,095.00
North Carolina 1820005 Guilford >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 586,800.00 733,500.00
North Carolina 1922001 Burke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 13,524,594.00 17,442,134.00
North Carolina 1922001 Burke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Environmental Only 90,400.00 113,000.00
North Carolina 1922001 Burke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Preliminary Engineering 3,036,878.00 3,796,097.00
North Carolina 1922001 Burke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Right of Way 10,471,000.00 13,088,750.00
North Carolina 1922001 Burke >= 50,000 AND < 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Utilities 1,040,000.00 1,300,000.00
North Carolina 2020001 Beaufort >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 500,000.00 7,500,000.00
North Carolina 2020001 Edgecombe >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 7,750,000.00 7,750,000.00
North Carolina 2020001 Sampson >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 1,900,000.00 1,900,000.00
North Carolina 2020001 Surry >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 875,000.00 875,000.00
North Carolina 2020001 Halifax >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 1,400,000.00 1,400,000.00
North Carolina 2020001 Iredell >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 1,900,000.00 1,900,000.00
North Carolina 2020001 Northampton >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 1,300,000.00 1,300,000.00
North Carolina 2020001 Pitt >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 1,175,000.00 1,175,000.00
North Carolina 2020001 Wilkes >= 50,000 AND < 200,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 5,700,000.00 5,700,000.00
North Carolina 2020001 Yadkin >= 5,000 AND < 50,000 State NATL INTRASTRUCTURE INVESTMENT Bridge Replacement - No Added Capacity 500,000.00 500,000.00
North Carolina 2601005 Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 25,496,301.00 31,870,376.00
North Carolina 2601005 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 8,613,350.00 11,230,874.00
North Carolina 2601005 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Environmental Only 76,440.00 95,550.00
North Carolina 2601005 Forsyth >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Landscaping and Other Scenic Beautification 260,448.00 325,560.00
North Carolina 2643005 Forsyth >= 200,000 Other EXTENSION OF ALLOC PROGRAMS 4R - Added Capacity 295,039.00 368,799.00
North Carolina 2643005 Forsyth >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 10,515,970.00 13,144,962.00
North Carolina 2643005 Forsyth >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 15,848,182.00 21,254,610.00
North Carolina 4121007 Guilford >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 10,459,050.00 13,073,820.00
North Carolina 4121007 Guilford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 11,511,832.00 24,514,791.00
North Carolina 5238005 Mecklenburg >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity 32,201,654.00 42,057,709.00
North Carolina ER19005 Bladen >= 5,000 AND < 50,000 State EMERGENCY RELIEF Other 21,386,214.00 26,732,768.00
North Carolina ER19005 Bladen >= 5,000 AND < 50,000 State SURFACE TRANSP BLOCK GRNT PRGM Other 0.00 2,137,232.00