|
|
||
| Bridge Technology | ||
|
FHWA >
Infrastructure >
Bridge >
Steel >
Heat Straightening
|
||
FHWA Demonstration Project
Heat Straightening Repair for Damaged Steel Bridges
December 10 & 11, 2001
INDOT District Office
201 W. C.R. 300 N.
Crawfordsville, IN 47933Monday, December 10, 2001
9:30 am Welcome and Introductions 9:45 am Historical perspective, types of damage and basic concept of heat straightening 10:45 am Video on the fundamentals of heat straightening 11:15 am Heat straightening basics 12:00 noon Lunch 1:00 pm Heat straightening basics (continued) 1:45 pm Techniques, design and management of heat-straightening repairs 2:30 pm Break 2:45 pm Techniques, design and management of heat-straightening repairs (continued) 4:30 pm Adjourn Tuesday, December 11, 2001
8:00 am Laboratory demonstration of heat-straightening repair techniques 10:00 am Break 10:15 am Case study: repair of bridge girder in lake Charles, LA 12:00 noon Lunch 1:00 pm Behavior of steel during and after heat straightening 3:00 pm Break 3:20 pm Questions and answers 3:40 pm Closing comments 4:00 pm Adjourn