|
|
FY 2000 Ferry Boat Discretionary (FBD) Program Awards
This table is also available in the following formats:
| State |
Project |
Award Amount |
| Alabama | Hokes Bluff Ferry - To construct a ferry boat, upgrade ferry landing, and to acquire a motor, tower, and necessary elements of a guidance system, Etowah County1 | $304,850 |
| Alaska | Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System 2 | $10,000,000 |
| Arkansas | Peel Ferry - Replace wooden dock with a steel dock and upgrade barge aprons for vehicle access, Arkansas State Highway and Transportation Department | $181,000 |
| California | Downtown Ferry Terminal (DFT) - North Terminal procurement of a new float and ramp designed to accommodate canopies to protect passengers from inclement weather (canopies not included), Port of San Francisco | $1,175,000 |
| Connecticut | New London High-Speed Ferry Terminal -Construction of high-speed ferry passenger facility improvements including a covered passenger waiting area with observation deck, bulk heading, pedestrian facilities, and vehicle access, City of New London, Cross Sound Ferry Services, Inc.(CSFS)1 | $696,800 |
| Delaware | Operation Upgrades on the MV Delaware and MV Cape Henelopen - Purchase a new generator and install an emergency switchboard for incident response on the car deck for the MV Delaware required by U.S. Coast Guard. Add a bow thruster on the MV Cape Henelopen to increase boat maneuverability to protect ferry and cargo, Delaware River and Bay Authority (DRBA) | $656,000 |
| Georgia | Savannah, Georgia Water Taxi Ferry System -- The preparations of specifications for acquisition of passenger ferry boats and design of land and sea side supporting facilities, Chatham County1 | $435,500 |
| Hawaii | Honolulu Harbor Pier 19 Ferry Terminal Improvements -- ingress/egress improvements, demolition of cargo facilities, comfort station improvements, landscaping, utility and other site work improvements, Honolulu County1 | $1,306,500 |
| Illinois | Beacon Harbor Water Taxi Dock for the Channel Cat - Design and construction of a ferry dock. Rock Island County Metropolitan Mass Transit District (MetroLINK) | $149,000 |
| Iowa | Water Taxi Docking Facility for the Channel Cat -Construction of a docking facility to accommodate 2 ferry boats | $139,000 |
| Kentucky | Valley View Ferry - Design and construction of a new car barge including engineering, ramps, deck apparatus, painting, coating shipping and launching. Valley View Ferry Authority | $137,000 |
| Maine | Bass Harbor Ferry Pier - Construction and construction administration of a new ferry pier facility to include selective demolition of existing pier, new fender systems, lighting, and service expansion. Maine State Ferry Service | $1,150,000 |
| Massachusetts | New Bedford, "Quick-Start" Ferry Terminal --Development of a roll off-roll on freight ferry facility, New Bedford Harbor Development Commission1 | $435,500 |
| Michigan | Dock modifications for Drummond Island Ferry Services - Dock modification to the existing docks on Drummond Island and the Village of DeTour to accommodate a new ferry vessel. Eastern Upper Peninsula Transportation Authority (EUPTA) | $449,000 |
| Missouri | Canton Ferry Missouri Approach and Ramp -Construction of a concrete approach apron with a concrete docking ramp with chain and tie downs. Lewis County/Canton Missouri Port Authority (MCPA) | $50,000 |
| Montana | McClelland, Virgelle, and Carter ferry sites --upgrades to terminals, approaches, towers and boats, Blaine, Chouteau, and Fergus Counties1 | $1,306,500 |
| New Jersey | Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System 2 | $5,000,000 |
| New York | Village of Ocean Beach Basin Rehabilitation -Design and construction elevation of existing ferry terminal onto wood piling, structural support system, freight/passenger area enhancements, and reconstruction of bulk heads. Village of Ocean Beach | $243,000 |
| North Carolina | Hatteras Ferry Terminal Building - Construct a new Ferry Terminal at Hatteras Village. NCDOT1 | $1,742,000 |
| Ohio | Jet Express III Ferry Boat - Purchase a 425-passenger jet-powered catamaran ferry, Put-in Bay Township Port Authority (PBTPA) and Ottawa County Board of Commissioners 1 | $871,000 |
| Pennsylvania | RiverLink Ferry System Trunk Line - Purchase used ferry identical in size to the current vessel and its conversion from a car and passenger ferry to a passenger only ferry. Penn's Landing Corporation (PLC)1 | $1,306,500 |
| Rhode Island | East Greenwich Ferry/Water Taxi Dock - Design and construction of a town dock for the Town of East Greenwich and a comfort station at the site. RIDOT Town of East Greenwich | $232,000 |
| Texas | Port Aransas Ferry Operations - Replace existing docking ramps and terminal improvements to construct an additional dock to provide auxiliary landing area. | $1,393,000 |
| Virginia | Feasibility study for a passenger ferry service on the Potomac River linking Cherry Hill, Virginia and the District of Columbia and points in between, with remaining funds used for service development and implementation. Fairfax, Arlington, Prince William, City of Alexandria and District of Columbia1 | $435,500 |
| Washington | Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System 2 | $5,000,000 |
| Washington | Elliott Bay Water Taxi -- Design and construct a permanent dock facility to allow regular, year-round, on-going ferry operation. King County, City of Seattle and the Port of Seattle cooperatively1 | $435,500 |
| Wisconsin | Winter Passenger Ferry Service for Madeline Island and the City of Bayfield - Acquire three windsleds, electronic and navigational equipment for windsleds, terminal building and site work. Town of La Pointe1 | $500,825 |
| TOTAL | | $35,730,975 |
- The funding for these projects was designated by Congress in the conference report (House Report 106-355) accompanying the FY 2000 DOT Appropriations Act (Public Law 106-69). The amounts are reduced because of the FY 2000 obligation limitation of 87.1 percent, under the provisions of Section 1102(f) of TEA-21.
- These set-aside amounts for Alaska, New Jersey, and Washington are required under the provisions of Section 1207(b)(3) of TEA-21.
|
Contact
Bob Wright
Office of Program Administration 202-366-4630 E-mail Bob
|