Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Discretionary

FY 2007 Ferry Boat Discretionary (FBD) Awards (as of February 20, 2008)

This table is also available in the following formats:

State Project Award Amount Funds Allocated to State Funds yet to be Allocated to State
California Larkspur Ferry Terminal - environmental, design, engineering and construction to rehabilitate the terminal facilities (2) $12,800,000 $12,800,000.00  
New York Ferry transportation improvements on East River and Upper New York Bay, New York City - reconstruction of Battery Maritime Building Slip #5 and East 34th Street Ferry Landing; capacity and passenger flow enhancements and shelter improvements at Wall Street Ferry Landing Pier 11; system-wide passenger shelter improvements and intermodal connectivity improvements; and Staten Island Ferry Rack study $15,800,000   $15,800,000.00
Washington Mukilteo Multimodal Terminal - preliminary engineering/NEPA for the multimodal terminal (2) $1,325,000 $1,325,000.00  
Washington High-Speed, Ultra Low-Wake Passenger-Only Ferry Design, Development, Procurement and Testing For Rich Passage, Puget Sound, Washington - boat design, SEPA and NEPA activities (2) $2,000,000 $2,000,000.00  
Washington Vashon Island Passenger-Only Ferry Vessel - purchase a new vessel to replace boat currently in service (2) $1,000,000 $1,000,000.00  
Washington Puget Sound New Vessel construction - construction of four passenger-auto vessels to replace five vessels that are functionally obsolete (2) $1,039,000 $1,039,000.00  
Washington Kingston Express - lease or buy an existing 80 passenger foot ferry (2) $3,500,000 $3,500,000.00  
Washington Pierce County Ferry System - improvement of the Steilacoom Ferry landing by constructing a second ferry slip to include a short bridge trestle, transfer span, apron, pontoon, wing walls, dolphins, electrical, hydraulic, water & sewer work $2,000,000 $2,000,000.00  
Washington Guemes Island Ferry Dock Repair - remove and replace existing Guemes Island terminal dock; repair cap beam at channel end of the dock; remove and replace the existing concrete cap, form and place epoxy coated reinforcing steel, and pour new corrosion resistant concrete; and replace 118 feet of steel guard rail $736,000 $736,000.00  
TOTAL FY2007 SELECTED PROJECTS $40,200,000 $24,400,000.00 $15,800,000.00
Alaska (1) Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System $10,000,000 $10,000,000.00  
New Jersey (1) Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System ($1,295,482.83 of NJ's $5M was transferred to FTA for the Hoboken Ferry Terminal project) $5,000,000 $5,000,000.00  
Washington (1) Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System $5,000,000 $5,000,000.00  
TOTAL SET-ASIDES IN 23 U.S.C. 147(d) $20,000,000 $20,000,000.00 $0.00
GRAND TOTAL   $60,200,000 $44,400,000.00 $15,800,000.00
  1. These set-aside amounts for Alaska, New Jersey, and Washington are required under the provisions of 23 U.S.C. 147(d).
  2. The funds for these projects were transferred to FTA at the request of the State.
Excel files can be viewed with the Excel Viewer 2003
PDF files can be viewed with the Acrobat® Reader®

Contact

Bob Wright
Office of Program Administration
202-366-4630
E-mail Bob

 
 
This page last modified on 02/20/08
 

FHWA
United States Department of Transportation - Federal Highway Administration