|
|
FY 2007 Ferry Boat Discretionary (FBD) Awards (as of August 26, 2009)
This table is also available in the following formats:
| State |
Project |
Award Amount |
Funds Allocated to State |
Funds yet to be Allocated to State |
| California |
Larkspur Ferry Terminal - environmental, design, engineering and construction to rehabilitate the terminal facilities (2) |
$12,800,000 |
$12,800,000.00 |
|
| Washington |
Washington State Vessel Construction and Preservation: Purchase of owner-furnished equipment (propulsion systems and diesel generators) in up to four new vessels that are a part of WSF new vessel construction program -$10,000,000; System-wide vessel preservation activities on WSF's existing fleet - $5,800,000 Total = $15,800,000
FTA Transfer |
$15,800,000 |
$15,800,000.00 |
|
| Washington |
Mukilteo Multimodal Terminal - preliminary engineering/NEPA for the multimodal terminal (2) |
$1,325,000 |
$1,325,000.00 |
|
| Washington |
High-Speed, Ultra Low-Wake Passenger-Only Ferry Design, Development, Procurement and Testing For Rich Passage, Puget Sound, Washington - boat design, SEPA and NEPA activities (2) |
$2,000,000 |
$2,000,000.00 |
|
| Washington |
Vashon Island Passenger-Only Ferry Vessel - purchase a new vessel to replace boat currently in service (2) |
$1,000,000 |
$1,000,000.00 |
|
| Washington |
Puget Sound New Vessel construction - construction of four passenger-auto vessels to replace five vessels that are functionally obsolete (2) |
$1,039,000 |
$1,039,000.00 |
|
| Washington |
Kingston Express - lease or buy an existing 80 passenger foot ferry (2) |
$3,500,000 |
$3,500,000.00 |
|
| Washington |
Pierce County Ferry System - improvement of the Steilacoom Ferry landing by constructing a second ferry slip to include a short bridge trestle, transfer span, apron, pontoon, wing walls, dolphins, electrical, hydraulic, water & sewer work |
$2,000,000 |
$2,000,000.00 |
|
| Washington |
Guemes Island Ferry Dock Repair - remove and replace existing Guemes Island terminal dock; repair cap beam at channel end of the dock; remove and replace the existing concrete cap, form and place epoxy coated reinforcing steel, and pour new corrosion resistant concrete; and replace 118 feet of steel guard rail |
$736,000 |
$736,000.00 |
|
| TOTAL |
FY2007 SELECTED PROJECTS |
$40,200,000 |
$40,200,000 |
$0.00 |
| Alaska (1) |
Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System |
$10,000,000 |
$10,000,000.00 |
$0.00 |
| New Jersey (1) |
Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System ($1,388,247.20 of NJ's $5M was transferred to FTA for the Hoboken Ferry Terminal project) |
$5,000,000 |
$5,000,000.00 |
$0.00 |
| Washington (1) |
Set-aside for construction or refurbishment of ferry boats and ferry terminal facilities and approaches to such facilities within marine highway systems that are part of the National Highway System |
$5,000,000 |
$5,000,000.00 |
|
| TOTAL |
SET-ASIDES IN 23 U.S.C. 147(d) |
$20,000,000 |
$20,000,000.00 |
$0.00 |
| GRAND TOTAL |
|
$60,200,000 |
$60,200,000.00 |
$0.00 |
- These set-aside amounts for Alaska, New Jersey, and Washington are required under the provisions of 23 U.S.C. 147(d).
- The funds for these projects were transferred to FTA at the request of the State.
|
Contact
Tony DeSimone
Office of Program Administration
317-226-5307
E-mail Tony
|