FY 2000 IMD Program Awards
This table is also available in the following formats:
| State |
Project |
Fed-Aid Project No. |
Award Amount |
| Arkansas | I I-30, bet. Hwy. 53 & Hwy. 26; Rehabilitation of 6.41 miles of I-30 & widening of 4 sets of twin bridges | MD-030-1(136) | $10,000,000 |
| Colorado | I-70/I-25 (Mousetrap) Interchange: Completion of the multi-year reconstruction of this Interchange. | IMD-070-4(191) | $10,000,000 |
| Illinois | I-55, from Kedzie Ave. to west of Damen Ave. (WB); Roadway reconstruction & Bridge rehabilitation on a segment of I-55. | IMD-055-7(213) | $6,000,000 |
| Indiana | I-65, 0.76 mile north of Eastern Blvd to 1.07 miles north of SR 131; Addition of northbound and southbound lanes on I-65 for a total length of 2.07 miles. | IMD-065-1(135) | $10,000,000 |
| Kentucky | I-75, from 0.4 mile north of I-75/KY 32 Interchange to south of Pokeberry Road; Widening of 1.8 miles of I-75 from two to three lanes in each direction. | IMD-075-7-29.00 | $2,600,000 |
| Maryland | I-70/MD 355 Interchange in Frederick County; Replacement of the Interchange with new ramps & configurations. | IMD-070-3(045) | $4,000,000 |
| Mississippi | I-55, Interchange at Jackson Street; Addition of lanes on I-55, reconstruction of the Old Agency Rd/Jackson St Interchange & replacing the Natchez Trace Bridge over I-55. | IMD-055-2(160) | $2,000,000 |
| Nevada | I-15, south of Las Vegas from near the Union Pacific Grade Separation to the Sloan Interchange; Widening of I-15 southbound to provide a truck climbing lane. | IMD-015-1(111) | $4,000,000 |
| New Mexico | I-25/I-40 (Big I) Interchange in downtown Albuquerque; Reconstruction of the north & south approaches to this Interchange. | IMD-025-4(078) | $10,000,000 |
| Tennessee | I-40/I-240 Interchange east of Memphis; Reconstruction of this Interchange. | MD-040-1(263) | $4,000,000 |
| Utah | I-15, from 10800 South to 600 North; Reconstruction of I-15 including the construction of one HOV lane and one general purpose lane in each direction as needed. | IMD-015-7(200) | $6,281,952 |
| Utah | I-215 at 3500 South: Operational improvements to the I-215 off ramps. | IMD-215-9(104) | $1,600,000 |
| Utah | 144 Kimballs Junction Interchange, I-80 & SR 244; Interchange reconstruction and bridge replacement. | IMD-080-4(80) | $6,000,000 |
| Utah | 148 Silver Creek Junction Interchange, I-80 & US 40; Interchange reconstruction and bridge replacement. | IMD-080-4(80) | $10,000,000 |
| Utah | Cornia Dr. & I-94/US 89 Interchange; Improvements to Cornia Drive & modifications to the I-84/US 89 Interchange. | IMD-089-x(030) | $2,000,000 |
| TOTAL | | | $88,481,952 |
|