FY 2005 Interstate Maintenance Discretionary (IMD) Awards (as of June 25, 2008)
This table is also available in the following formats:
| State |
Project |
Designated Amount In Conf. Rept. 108-792 (1) |
Award Amount After Obligation Limitation Lop-Off (2) |
Funds Allocated To State |
Funds Yet To Be Allocated To State |
| Alabama |
Valleydale Road from US-31 to I-65 in Hoover, Shelby County - widening from 3 lanes to 5 lanes |
$3,000,000 |
$2,565,000 |
$520,000.00 |
$2,045,000.00 |
| Alabama |
University of Alabama, Aging Infrastructure System Center of Excellence (AISCE), Tuscaloosa - continued development of methodical and organized approaches to prolonging infrastructure life and performance |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Arkansas |
I-430/I630 Interchange in Pulaski County - upgrading interchange between two major urban Interstates |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| California |
Interstate 10 at Riverside Avenue in the City of Rialto, from Post Miles 18.7 to 20.8, San Bernardino County - interchange reconstruction and widening of Riverside Avenue |
$1,250,000 |
$1,068,750 |
$1,068,750.00 |
|
| California |
Interstate 215 at Barton Road overcrossing, City of Grand Terrace, San Bernardino County - interchange reconstruction, including redesign of northbound Barton Road on and off ramps and widening of Barton Road bridge structure |
$2,000,000 |
$1,710,000 |
|
$1,710,000.00 |
| California |
Interstate 5, from Coast Highway to Avenida Pico in Orange County - preliminary planning for extending HOV lane |
$500,000 |
$427,500 |
|
$427,500.00 |
| California |
Interstate 10 in the City of Fontana, milepost 15.73, San Bernardino County - construct new four-lane overcrossing at Cypress Avenue over Interstate 10, and widen Cypress Avenue from two lanes to four lanes from Slover Avenue to Valley Boulevard |
$500,000 |
$427,500 |
$427,500.00 |
|
| California |
I-5, from 0.1km south of I-8 to DeAnza Off-Ramp undercrossing; and I-8 from the I-8/I-5 separation to 0.6km east of Morena Blvd. undercrossing, San Diego County - construct auxiliary lanes and widen connector |
$1,200,000 |
$1,026,000 |
|
$1,026,000.00 |
| California |
Laval Road Interchange at Interstate I-5, Kern County - constructing a new 3-lane overcrossing |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Colorado |
I-25 through Colorado Springs, from MP 132 to MP 161, El Paso County - roadway reconstruction |
$750,000 |
$641,250 |
$641,250.00 |
|
| Colorado |
I-70 and SH-58 Interchange, Jefferson County - interchange improvements |
$1,500,000 |
$1,282,500 |
$1,282,500.00 |
|
| Colorado |
I-70 Tunnel Improvements (Twin Tunnels in Clear Creek County, Eisenhower Johnson Memorial Tunnels in Clear Creek and Summit Counties, and No-Name Tunnels in Garfield County) - various tunnel improvements, including enhanced lighting and wall panels |
$2,000,000 |
$1,710,000 |
$1,710,000.00 |
|
| Colorado |
I-76, Ft. Morgan to Brush, MP 80.52-88.32, Morgan County - roadway reconstruction |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Colorado |
I-76 Northeast Gateway, from Sedgwick to Julesburg, MP 80.52-88.32, Sedgwick County - design of concrete overlay and reconstruction |
$1,500,000 |
$1,282,500 |
$1,282,500.00 |
|
| Delaware |
I-95 (Delaware Turnpike), from Maryland line through the SR-141 Interchange, New Castle County - roadway reconstruction, including additional thru lane in each direction |
$5,000,000 |
$4,275,000 |
$4,275,000.00 |
|
| Florida |
I-95 Interchange in Pineda, Brevard County - interchange construction |
$1,200,000 |
$1,026,000 |
$1,026,000.00 |
|
| Florida |
I-75/C.R. 54 Interchange in Pasco county - interchange reconstruction, including widening lanes and constructing turning lanes on CR-54 under I-75 |
$1,500,000 |
$1,282,500 |
|
$1,282,500.00 |
| Georgia |
I-85, from SR 154 to Collinsworth Road, Coweta County - noise barriers |
$750,000 |
$641,250 |
$641,250.00 |
|
| Illinois |
I-55 at various locations from Lemont Road to Illinois 83 in Darien, DuPage County - construction of sound barriers |
$1,400,000 |
$1,197,000 |
$1,197,000.00 |
|
| Illinois |
I-64 from Illinois 157 to Greenmount Road at O'Fallon, St. Clair County - roadway reconstruction, including widening and bridge replacement |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Indiana |
I-64, 2.3 miles west of SR 135, Harrison County - interchange justification study, environmental documentation, and design of new interchange |
$1,000,000 |
$855,000 |
|
$855,000.00 |
| Kansas |
Interchanges at I-235 and US-54 (Kellogg) and I-235 and Central Avenue in Sedgwick County - preliminary engineering for reconstruction of interchanges and widening I-235 to 6 lanes between the interchanges |
$3,000,000 |
$2,565,000 |
$500,000.00 |
$2,065,000.00 |
| Kansas |
I-35 interchange at 159th Street and Lone Elm Road, Olathe, Johnson County - construction of new interchange, including widening I-35 to three lanes in each direction |
$1,000,000 |
$855,000 |
$855,000.00 |
$0.00 |
| Kentucky |
I-75, milepoint 55.74 to 69.0, Rockcastle County - roadway widening from 4 to 6 lanes |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Kentucky |
I-264 and Manslick Road, Jefferson County - feasibility study for new interchange |
$300,000 |
$256,500 |
$198,400.00 |
$58,100.00 |
| Kentucky |
I-265/I-64 Interchange, Jefferson County - preliminary engineering, environmental work, design, and right-of-way activities for widening exit ramp |
$750,000 |
$641,250 |
$641,250.00 |
|
| Louisiana |
I-12 at SH-1088 Interchange, St. Tammany Parish - interchange construction |
$500,000 |
$427,500 |
|
$427,500.00 |
| Louisiana |
LA37/US 190 Connector (Central Thruway), from Florida Blvd. to S Choctaw Drive, East Baton Rouge Parish - constructing new 2 lane roadway |
$1,250,000 |
$1,068,750 |
$826,667.00 |
$242,083.00 |
| Maine |
Exit 3, I-295 in Cumberland County - construct new on ramp |
$800,000 |
$684,000 |
$684,000.00 |
|
| Maryland |
I-695, from I-83 to MD 147, Baltimore County - widening I-695 to 4 lanes in each direction, including interchange improvements |
$1,000,000 |
$855,000 |
$661,333.00 |
$193,667.00 |
| Maryland |
I-70, from Mt. Philip Road to MD 144, Frederick County - widening existing four-lane section to six lanes, adding ramps, and reconstructing several interchanges |
$5,000,000 |
$4,275,000 |
$3,306,667.00 |
$968,333.00 |
| Michigan |
I-94 from I-196 to Friday Road (Exits 34-39), Berrien County - resurfacing maintenance crossovers |
$100,000 |
$85,500 |
$66,134.00 |
$19,366.00 |
| Michigan |
I-96/Wixom Road Interchange, Oakland County - making geometric and operational improvements to interchange and Wixom Road |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Minnesota |
I-94 and 34th Street Interchange in Moorhead, Clay County - roadway and interchange reconstruction |
$4,000,000 |
$3,420,000 |
$3,420,000.00 |
|
| Mississippi |
I-20/59 Interchange between Hawkins Crossing Road and Murphy Road, Lauderdale County - construct new interchange, and approximately 3.5 miles of four lane connector roads on new location |
$250,000 |
$213,750 |
$213,750.00 |
|
| Missouri |
I-635 and Van De Populier Interchange, Platte County - new interchange, including bridge replacements, and roadway widening |
$5,000,000 |
$4,275,000 |
$4,275,000.00 |
|
| Nebraska |
US-26, L-26A and US-385 from Minatare to Alliance - preliminary engineering for the Heartland Expressway |
$1,000,000 |
$855,000 |
$855,000.00 |
$0.00 |
| Nevada |
I-80 east of Fernley, Lyon and Churchill Counties - new interchange construction |
$500,000 |
$427,500 |
$427,500.00 |
|
| Nevada |
Clark County Beltway (I-215) Interchanges at McCarran International Airport Connector - interchange reconstruction, including auxiliary lanes from the Airport connector to Warm Springs Road and from Warm Springs Road to Windmill Lane, and a 4th through lane in each direction between I-15 and Windmill Lane |
$1,000,000 |
$855,000 |
|
$855,000.00 |
| Nevada |
I-580 /Meadowood Complex Improvements, between the South Virginia Street southbound ramp (Exit 63) and Neil Road (Exit 62) in Reno, Washoe County - interchange improvements |
$1,000,000 |
$855,000 |
|
$855,000.00 |
| New Jersey |
I-280 Interchange at Harrison, Hudson County - planning study for interchange improvements |
$1,000,000 |
$855,000 |
|
$855,000.00 |
| New Jersey |
I-295 and Route 42/I-76 Interchange, Bellmawr & Mount Ephraim Boroughs, Camden County - interchange improvements, including direct connection |
$1,250,000 |
$1,068,750 |
$826,667.00 |
$242,083.00 |
| New York |
I-87, Exit 18, Corinth Road in Warren County - widening Corinth Rd. between I-87 Exit 18 ramps to accommodate a fourth lane for turns |
$1,000,000 |
$855,000 |
|
$855,000.00 |
| North Dakota |
I-29 northbound from Main Ave in Fargo, north to Cass County 20, MP 65 to MP 69, Cass County - roadway reconstruction |
$2,000,000 |
$1,710,000 |
$1,322,667.00 |
$387,333.00 |
| Ohio |
I-75, 0.1 mile south of Harrison Avenue to 0.1 mile south of Paddock Road, Hamilton County - conduct study for access improvements |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Ohio |
I-75/I-475 North Interchange in Toledo, Lucas County - freeway management study |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Oklahoma |
I-35, from Texas State line north approximately 3.0 miles to Rogers Road, Love County - reconstruction of I-35 Interchange at MP 1 near Thackerville, reconstruction of frontage road (Merle Wolfe Road) from Interchange 1 north to Rogers Road, and improvements to Rogers Road from Merle Wolfe Road west to US-77 |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Oklahoma |
I-40/Morgan Road Interchange in western Oklahoma City metropolitan area, Canadian County - interchange improvements |
$500,000 |
$427,500 |
|
$427,500.00 |
| Oklahoma |
I-40 Oklahoma City Cross town Expressway from I-44 to I-235, Oklahoma County - roadway reconstruction and widening from 6 lanes to 10 lanes |
$5,000,000 |
$4,275,000 |
$4,275,000.00 |
|
| Oregon |
I-205 between I-5 and the Stafford Interchange, Clackamas County - preliminary engineering for addition of one auxiliary lane in each direction |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Pennsylvania |
I-79/I-279 (Parkway West) Interchange, Collier and Robinson Townships, Allegheny County - completion of interchange, including construction of missing ramps, and widening US 22 from interchange west to Campbell's Run Road |
$2,000,000 |
$1,710,000 |
$1,710,000.00 |
|
| Pennsylvania |
I-95 and the Pennsylvania Turnpike Interchange - construction of direct interchange between PA Turnpike and I-95, including widening both highways to six lanes |
$500,000 |
$427,500 |
$427,500.00 |
|
| Rhode Island |
I-195, Providence and East Providence, Providence County - roadway reconstruction, including replacement of Washington Bridge |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Rhode Island |
I-195 in Providence, Providence County - roadway relocation and reconstruction |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| South Carolina |
I-520 (Palmetto Parkway-Phase 2) extension, from US Route 1 to Interstate 20, in North Augusta, Aiken County - right-of-way acquisition and construction for extension of I-520 as 4-lane divided facility |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Tennessee |
I-40 Connector Roads, Cocke County - construction of two connector roads, one with State Route 32 and one with State Route 73 |
$1,000,000 |
$855,000 |
$661,333.00 |
$193,667.00 |
| Texas |
I-30 at Trinity River in Dallas, Dallas County - roadway reconstruction and widening |
$500,000 |
$427,500 |
$427,500.00 |
|
| Texas |
I-30/I-635 Interchange, with connection to Town East Blvd., Dallas County - reconstruction of interchange |
$1,000,000 |
$855,000 |
$855,000.00 |
|
| Texas |
Barbours Cut Boulevard in La Porte, Harris County - roadway reconstruction |
$1,500,000 |
$1,282,500 |
$1,282,500 |
|
| Utah |
I-15, from SR-92 to University Parkway, Utah County - preliminary engineering, including environmental study, to add additional travel lane in each direction |
$1,000,000 |
$855,000 |
|
$855,000.00 |
| Utah |
I-15 and 24th Street Interchange in Ogden - environmental study for replacement of existing partial interchange with a full interchange |
$500,000 |
$427,500 |
$427,500.00 |
|
| Utah |
I-15 North Commuter Rail Coordination, Davis County - capital improvements to enhance coordination of I-15 with regional commuter rail |
$2,500,000 |
$2,137,500 |
$2,137,500.00 |
|
| Virginia |
I-66/Route 29 Interchange, Gainesville, Prince William County - preliminary engineering for interchange reconstruction |
$250,000 |
$213,750 |
$213,750.00 |
|
| Washington |
I-5 Blaine Exit Interchange, Whatcom County - Exit 276 interchange improvements |
$2,500,000 |
$2,137,500 |
$2,137,500.00 |
$0.00 |
| Washington |
I-5/SR-18 Interchange, in vicinity of Federal Way, King County - interchange improvements |
$1,000,000 |
$855,000 |
$855,000.00 |
$0.00 |
| Wisconsin |
Interstate 94/43/794 (Marquette Interchange) in Milwaukee County - interchange reconstruction |
$5,000,000 |
$4,275,000 |
$4,275,000.00 |
|
| Wyoming |
I-80, from MP 258.95 to 263.63, Carbon County - pavement reconstruction, including dowel bar retrofit and concrete slab replacement |
$500,000 |
$427,500 |
$427,500.00 |
$0.00 |
| TOTALS |
|
$96,000,000 |
$82,080,000 |
$65,234,368.00 |
$16,845,632.00 |
- All FY2005 available IMD funds were designated for specific projects by Congress in the conference report accompanying the FY2005 Transportation Appropriations Act (Division H of Public Law 108-447).
- SAFETEA-LU (Public Law 109-59) authorized $100 million for IMD for FY2005. After takedown of 14.5% for the obligation limitation lop-off, $85,500,000 is available to fund these designated projects.
|
Contact
Bob Wright
Office of Program Administration 202-366-4630 E-mail Bob
|