FY 2006 Interstate Maintenance Discretionary (IMD) Awards (as of August 12, 2008)
This table is also available in the following formats:
| State |
Project |
Designated Amount In Conf. Rept. 109-307 (1) |
Award Amount After Rescission & Lop-Off (2) |
Funds Allocated To State |
Funds Yet To Be Allocated To State |
| California |
Highway 156, Monterey County - preliminary engineering for widening roadway from two-lane highway to four-lane expressway |
$500,000 |
$430,650 |
$430,650.00 |
|
| California |
I-10 Cypress Avenue Overcrossing, Fontana, San Bernardino County - right-of-way acquisition for construction new four-lane overcrossing at Cypress Avenue over Interstate 10 and widening Cypress Avenue from two lanes to four lanes from Slover Avenue to Valley Boulevard |
$1,000,000 |
$861,300 |
|
$861,300.00 |
| California |
I-15/Base Line Road Interchange, Rancho Cucamonga, San Bernardino County - interchange reconstruction, including two new bridges, and widening two existing bridges |
$1,000,000 |
$861,300 |
|
$861,300.00 |
| California |
I-80 Colfax Narrows Project from Illinois Town Road to the Magra Overhead, Placer County - roadway reconstruction [This project is located in California, however is listed in the Conference Report under Nevada] |
$5,000,000 |
$4,306,500 |
|
$4,306,500.00 |
| California |
Louise Avenue I-5 Interchange Improvements Project, within the City of Lathrop, San Joaquin County - interchange improvements |
$750,000 |
$645,975 |
|
$645,975.00 |
| California |
Reyes Adobe Interchange Project, Agoura Hills, at U.S. 101, Los Angeles County - interchange reconstruction |
$850,000 |
$732,105 |
|
$732,105.00 |
| California |
State Route 180 E Improvements, in and near Fresno, from Clovis Avenue to Locan Avenue, Fresno County - construction of 6-lane freeway |
$900,000 |
$775,170 |
|
$775,170.00 |
| Colorado |
I-25 Corridor through the Pikes Peak Region, SH 16 at I-25 at the east entrance to Fort Carson, El Paso County - reconstruction of SH 16 and its interchanges at I-25 and SH 85, including widening SH 16 to 4 lanes |
$1,250,000 |
$1,076,625 |
$1,076,625.00 |
|
| Connecticut |
Pearl Harbor Bridge (Q Bridge) Replacement Project, on I-95 in the City of New Haven, New Haven County - bridge replacement |
$1,250,000 |
$1,076,625 |
$1,076,625.00 |
|
| Connecticut |
Widen Route 82 in Norwich, at I-395 Exit 80 E, in the Town of Norwich, New London County - interchange operational improvements, including widening of CT 82 |
$625,000 |
$538,313 |
$538,313.00 |
|
| Indiana |
I-64 Harrison County Interchange, west of State Road 135 - interchange study |
$1,000,000 |
$861,300 |
|
$861,300.00 |
| Indiana |
Ohio River Bridges, in Louisville metropolitan area, Clark County, Indiana and Jefferson County, Kentucky - construction and reconstruction of several bridges including approach work |
$2,000,000 |
$1,722,600 |
$1,722,600.00 |
|
| Iowa |
I-235 storm water management project, from Crocker Street to 7th Street in Des Moines, Polk County - replacement and upgrade of the storm sewers in the Birds Run Basin |
$800,000 |
$689,040 |
$689,040.00 |
|
| Kansas |
I-235/US 54 design and construction and I-235/Central Avenue Interchange, Wichita, Sedgwick County - preliminary engineering for reconstruction of the Kellogg (US-54) and Central Avenue interchanges on I-235, and preliminary engineering for expansion of I-235 to 6 lanes between the interchanges |
$2,000,000 |
$1,722,600 |
|
$1,722,600.00 |
| Kansas |
I-35/Lone Elm Rd./159th St. Interchange, Olathe, Johnson County - preliminary engineering and right-of-way for new interchange and roadway widening |
$2,600,000 |
$2,239,380 |
$2,239,380.00 |
|
| Kentucky |
I-66 Northern Bypass around Somerset, Pulaski County - roadway construction |
$2,000,000 |
$1,722,600 |
|
$1,722,600.00 |
| Kentucky |
I-66 Pike County, from US 23 south of Pikeville to KY 194 near Kimper - design and right-of-way for Phase II |
$1,000,000 |
$861,300 |
|
$861,300.00 |
| Kentucky |
I-66 Somerset to London, from KY 80 east of Somerset, in Pulaski County, to I-75 at London, in Laurel County - roadway construction |
$2,000,000 |
$1,722,600 |
|
$1,722,600.00 |
| Kentucky |
I-75 Corridor between Exit 38 and Exit 41, Laurel County - preliminary engineering and environmental phase for construction of a frontage road |
$1,000,000 |
$861,300 |
|
$861,300.00 |
| Kentucky |
KY 52 project in the City of Beattyville, Lee County - roadway realignment and reconstruction |
$700,000 |
$602,910 |
|
$602,910.00 |
| Kentucky |
KY 9 Extension from existing KY 9 north to existing KY 8 near the 4th Street Bridge, Campbell County - roadway construction along new route |
$400,000 |
$344,520 |
|
$344,520.00 |
| Kentucky |
Ohio River Bridges, in Louisville metropolitan area, Clark County, Indiana and Jefferson County, Kentucky - construction and reconstruction of several bridges including approach work |
$4,000,000 |
$3,445,200 |
|
$3,445,200.00 |
| Kentucky |
Renovate I-65/Brook Street Ramp, Louisville, Jefferson County - reconstruction of I-65 southbound exit ramp |
$500,000 |
$430,650 |
|
$430,650.00 |
| Kentucky |
US 68, between North Cooper Lane and the Glasgow Outer Loop, at Highland Glen Industrial Park, Glasgow, Barren County - roadway reconstruction and widening |
$200,000 |
$172,260 |
|
$172,260.00 |
| Louisiana |
Frontage Road Construction, along I-10, Lake Charles, Calcasieu Parish - construction of contiguous two-way frontage road system |
$1,500,000 |
$1,291,950 |
|
$1,291,950.00 |
| Maine |
Route 116 Modernization in Medway, Penobscot County - bridge replacement |
$500,000 |
$430,650 |
$430,650.00 |
|
| Maryland |
I-70 Improvement Project, from Mt. Phillip Road to MD 144, Frederick County - roadway reconstruction and widening, and reconstruction of interchanges |
$1,000,000 |
$861,300 |
$300,000.00 |
$561,300.00 |
| Mississippi |
I-20 from Mississippi River Bridge through Vicksburg, Warren County - roadway reconstruction, including additional lanes, interchange improvements, frontage roads, and vertical alignment corrections |
$5,500,000 |
$4,737,150 |
$3,000,000.00 |
$1,737,150.00 |
| Mississippi |
I-55 South Nissan Interchange, near Canton, Madison County - construction of interchange for auxiliary connectors to aid traffic flow in support of the Main Nissan Interchange |
$3,500,000 |
$3,014,550 |
$3,014,550.00 |
|
| Nevada |
Cactus Avenue/ I-15 Interchange Project, Clark County - interchange construction |
$1,000,000 |
$861,300 |
|
$861,300.00 |
| Nevada |
I-215/I-515 Interchange, Clark County - construction of system-to-system interchange at the junction of I-215 and I-515, including extension of I-215 from west of Gibson Road to I-515 |
$1,000,000 |
$861,300 |
|
$861,300.00 |
| Nevada |
Interchange at Interstate 80 at Fernley, Lyon County - construction of full diamond interchange |
$450,000 |
$387,585 |
$387,585.00 |
|
| New Mexico |
I-25, Tramway north to Bernalillo, from Tramway Road in Sandia Pueblo to US 550, Bernalillo County - roadway reconstruction, including widening to three lanes in each direction |
$775,000 |
$667,507 |
|
$667,507.00 |
| New Mexico |
New I-25 Interchange near milepost 217, Albuquerque, Bernalillo County - construction of new Interchange to provide access to Mesa del Sol Development |
$2,000,000 |
$1,722,600 |
|
$1,722,600.00 |
| New Mexico |
Paseo del Volcan I-40 Interchange, Albuquerque, Bernalillo County - interchange reconstruction |
$5,000,000 |
$4,306,500 |
|
$4,306,500.00 |
| New York |
Niagara River Gorge, Niagara Falls, Niagara County - planning, environmental assessment, and preliminary engineering for reconstruction of Whirlpool Street into a newly re-configured Gorge-view Drive |
$800,000 |
$689,040 |
|
$689,040.00 |
| North Carolina |
I-40/77 Interchange in Iredell County - interchange reconstruction |
$1,750,000 |
$1,507,275 |
$1,507,275.00 |
|
| Ohio |
Mahoning County US-224, Ohio Safety Improvements - project development at IR 680 and US 224, as part of the US 224 safety study from IR 680 to SR 11 |
$1,000,000 |
$861,300 |
$861,300.00 |
|
| Oklahoma |
Pickens-Battiest Road, McCurtain County - grading, drainage, surfacing, and bridge construction |
$900,000 |
$775,170 |
$775,170.00 |
|
| Oregon |
I-205, between I-5 and Stafford Interchange, Clackamas County - construction of an additional travel lane in each direction |
$1,000,000 |
$861,300 |
$861,300.00 |
|
| Oregon |
I-205/Highway 213 Interchange, Clackamas County - planning and NEPA process for interchange reconstruction |
$500,000 |
$430,650 |
$430,650.00 |
|
| Pennsylvania |
I-70 Interchange Improvements, Bentleyville, Washington County - new interchange or reconstruction of existing interchanges |
$500,000 |
$430,650 |
|
$430,650.00 |
| Pennsylvania |
Pennsylvania Turnpike I-95 Interchange Project, Bucks County - interchange design and construction, including toll facility modifications, widening of both highways to six lanes, and new bridge across Delaware River |
$2,000,000 |
$1,722,600 |
$1,722,600.00 |
|
| Pennsylvania |
SR 19 Improvements, Morrisville, from just east of SR 21 intersection to west of the intersection of High Street and Greene Street, Franklin Township and Waynesburg Borough, Greene County - roadway reconstruction, including widening and bridges |
$1,000,000 |
$861,300 |
$861,300.00 |
|
| South Carolina |
I-95/SC-327 Interchange Improvements, Florence County - interchange reconstruction, including roadway widening and bridge reconstruction |
$1,000,000 |
$861,300 |
$861,300.00 |
|
| South Carolina |
Lee County I-20 Frontage Road, U.S. 15 to SC-341, south of Bishopville - design and construction of approximately 3 miles of three-lane roadway |
$400,000 |
$344,520 |
$344,520.00 |
|
| South Dakota |
Reconstruct Interchange at South Dakota Highway 42 and Interstate 29, Exit 79 on I-29, Sioux Falls, Minnehaha County - interchange reconstruction, including reconstruction of portion of I-29 main line |
$3,000,000 |
$2,583,900 |
$2,583,900.00 |
|
| Texas |
El Paso's Great Streets, at various locations on State system, including Mesa Street (SH 20), Montana Ave. (US 62/180), and Alameda Ave. (SH 20), El Paso County - corridor transit improvements, including pedestrian access, amenities and safety at bus stops (3) |
$300,000 |
$258,390 |
$258,390.00 |
|
| Texas |
Laredo - Scott and Sanchez Streets Grade Separation Project, Webb County - construction of railroad grade separation and aproaches |
$400,000 |
$344,520 |
$344,520.00 |
|
| Texas |
Texas DOT - I-69 Environmental Studies - environmental documentation necessary to determine the preferred alignment |
$1,750,000 |
$1,507,275 |
$1,507,275.00 |
|
| Texas |
US 67 Super Two Design, La Entrada al Pacifico Trade Corridor, from 1.5 miles south of I-10, south to Brewster County Line, Pecos County - addition of passing lanes |
$1,250,000 |
$1,076,625 |
$1,076,625.00 |
|
| Texas |
US 77 Highway Overpass Reconstruction, from SH 186 north to Bus 77, Willacy County - expansion from 4-lane divided rural highway to 4-lane freeway, including reconstruction of highway overpass |
$500,000 |
$430,650 |
$430,650.00 |
|
| Texas |
Widening of Interstate Highway 10, El Paso, from south of Sunland Park Drive to Executive Center Blvd., El Paso County - roadway widening by adding travel lane in each direction |
$1,000,000 |
$861,300 |
$861,300.00 |
|
| Utah |
Bluff Street and I-15 Interchange near St. George, Washington County - interchange improvements |
$1,400,000 |
$1,205,820 |
$1,205,820.00 |
|
| Utah |
I-15 Bluff Street Interchange, St. George, Washington County - interchange improvements |
$2,200,000 |
$1,894,860 |
$1,894,860.00 |
|
| Utah |
I-15 Reconstruction, Salt Lake County - conversion of advance construction project for reconstruction of 17 miles of I-15 completed in July 2001 |
$4,000,000 |
$3,445,200 |
$3,445,200.00 |
|
| Washington |
I-5 Blaine Exit Interchange and Border Crossing Improvements, Whatcom County - interchange relocation and reconstruction |
$2,500,000 |
$2,153,250 |
$2,153,250.00 |
|
| Washington |
Lynnwood I-5 City Center Exit, from just north of the I-405 bridge over I-5 to Alderwood Mall Pkwy/Alderwood Mall Blvd. intersection, Snohomish County - preliminary engineering and environmental work for construction of southbound off-ramp |
$650,000 |
$559,845 |
$559,845.00 |
|
| Washington |
SR 704/I-5 Cross Base Highway, from I-5 at Thorne Lane to SR 7 at 176th Street, Pierce County - preliminary engineering, right of way acquisition, and construction of new route |
$2,500,000 |
$2,153,250 |
$2,153,250.00 |
|
| Washington |
Triangle Project, I-5/SR 18/SR 161, Federal Way Interchange, King County - interchange reconstruction |
$3,000,000 |
$2,583,900 |
$2,583,900.00 |
|
| West Virginia |
Fairmont Gateway Connector System, near I-79, Marion County - right-of-way acquisition |
$3,000,000 |
$2,583,900 |
$2,583,900.00 |
|
| Wisconsin |
I-94 Marquette Interchange, Milwaukee County - interchange reconstruction |
$4,000,000 |
$3,445,200 |
$3,445,200.00 |
|
| Wyoming |
Rock Springs I-80 Marginal, from the Dewar Drive Interchange to the Pilot Butte Interchange, Sweetwater County - preliminary engineering for roadway reconstruction |
$500,000 |
$430,650 |
$430,650.00 |
|
| TOTAL |
|
$98,350,000 |
$84,708,855 |
$50,649,968.00 |
$34,058,887.00 |
- All FY2006 available IMD funds were designated for specific projects by Congress in the conference report accompanying the FY2006 Transportation Appropriations Act (Public Law 109-115).
- SAFETEA-LU authorized $100 million for IMD for FY 2006. After the 1% across-the-board rescission in Section 3801 of the FY2006 Defense Appropriations Act, and 13.0% for FY2006 obligation limitation lop-off under SAFETEA-LU Section 1102(f), $86,130,000 is available for these designated projects. All of these projects were designated for funding in the Statement of Managers of the conference report (H.Rept. 109-307) accompanying the FY 2006 Transportation Appropriations Act.
- These funds have been transferred to the Federal Transit Administration (FTA) at the request of the State.
|