Manual for Abandoned Underground Mine Inventory and Risk Assessment
Figure 5.2: Site Monitoring Guidelines For The Mine Opening Group
Forms of Monitoring | Different Stages of Site Monitoring | ||||
---|---|---|---|---|---|
Before Priority Site Investigations | After Priority Site Investigations | ||||
Remediation Deferred | During Construction Document Development | During Remediation Construction | Post Remediation Construction | ||
I. Visual | |||||
- Driving | M | M | M | M | |
- On the Ground: Particular Features | M | M | M | M | M |
- On the Ground: Ground Photography | S | S | S | M | S |
II. Non - Intrusive | |||||
- Profilometer | S | S | S | S,T | S |
- Dynaflect | |||||
- FWD | S | S | S | S,T | S |
- HWD | |||||
- Ground Survey Techniques | M | M | M | S | M |
- Aerial Photography: Conventional (B/W & Color) |
S | ||||
- Aerial Photography: Infrared (B/W & Color) | S | ||||
- Surface GPR | S | S | S | S | |
- Other ** | |||||
III. Intrusive (Borings Required) | |||||
- Borehole GPR | |||||
- TDR | S | S | S | S | S |
- Slope Inclinometer | |||||
- Borehole Seismic | |||||
- Borehole Camera | S | S | S | S | |
- Piezometers | |||||
- Observation wells |
Notes:
"M" indicates a general monitoring guideline for the site group.
"T" indicates where traffic is maintained during construction
"S" indicates determined on a site specific basis
** Other forms of monitoring may be specified on a site-by-site basis as needed.
See Table 5.2 for Listing of "Other forms of Monitoring."
Back to Site Monitoring |