REFERENCES
- Massachusetts Turnpike Authority (2000), Project Summary, http://www.bigdig.com/thtml/ summary.htm.
- Massachusetts Turnpike Authority (2000), Project Contract Lists, http://www.bigdig.com/ thtml/contlist.htm.
- Massachusetts Turnpike Authority (2000), Maps and Plans, http://www.bigdig.com/thtml/ maps01.htm.
- GZA GeoEnvironmental, Inc. (1991), Central Artery (I-93)/Tunnel (I-90) Project, Geotechnical Data Report, South Bay Interchange, Design Sections D009B/D009C, Boston, MA.
- GZA GeoEnvironmental, Inc. (1992), Central Artery (I-93)/Tunnel (I-90) Project, Geotechnical Data Report, South Bay Interchange, Design Section D009A, Boston, MA.
- Haley and Aldrich, Inc. (1991), Final Geotechnical Data Report, Central Artery (I-;93)/Tunnel (I-90) Project, Design Sections D007C and D007D (C07D2), Boston, MA.
- Haley and Aldrich, Inc. (1996), Final Geotechnical Report, Central Artery (I-93)/Tunnel (I-;90) Project, Design Section D008A, Boston, MA.
- Maguire Group, Inc., and Frederic R. Harris, Inc. (1995), Final Report on Soil Stabilization and Testing Program, Central Artery (I-93)/Tunnel (I-90) Project, D009A, Boston, MA.
- Maguire Group, Inc., and Frederic R. Harris, Inc. (1995), Supplemental Geotechnical Data Report, Central Artery (I-93)/Tunnel (I-90) Project, Design Section D009A, Boston, MA.
- Stone and Webster, Inc. (1996), Final Geotechnical Data Report, Central Artery (I-;93)/Tunnel (I-90) Project, Design Section D019B, I-93 Viaducts and Ramps North of Charles River, Boston, MA.
- Barosh, P.J.; Kaye, C.A.; and Woodhouse, D. (1989), "Geology of the Boston Basin and Vicinity." Civil Engineering Practice: Journal of the Boston Society of Civil Engineers, 4(1), 39-52.
- McGinn, A.J., and O'Rourke, T.D. (2003), Performance of Deep Mixing Methods at Fort Point Channel, Cornell University, Ithaca, NY.
- Commonwealth of Massachusetts (1997), The Massachusetts State Building Code, Users Guide to 780 CMR (6th Edition), William F. Galvin, Boston, MA.
- Massachusetts Highway Department (1996), MHD Supplemental Specifications and CA/T Supplemental Specifications to Construction Details of the Standard Specifications for Highways and Bridges (Division II) for Central Artery (I-93)/Tunnel (I-90) Project in the City of Boston [Section 940 covers driven piles], September 3, 1996.
- Massachusetts Highway Department (1998), Special Provisions to Construction Details for the Standard Specifications for Highways and Bridges and the Supplemental Specifications (Division II) for Central Artery/Tunnel Project I-93 Viaducts and Ramps North of Charles River (C19B1) in the City of Boston [Section 940 covers driven piles], April 29, 1998.
- AASHTO (2002), Standard Specifications for Highway Bridges, Washington, DC.
- FHWA (1998), Design and Construction of Driven Foundations, Report No. FHWA-HI-97-013, Washington, DC.
- Massachusetts Highway Department (1996), Pile Layout Plan: I-90 Logan Airport Interchange Arrivals Road, Tunnel, Contract C07D2, Drawing No. S-1162.
- Geosciences Testing and Research, Inc. (1997), Letter to RDA Construction Regarding Dynamic Load Test Results, Arrivals Tunnel: Round 1, May 5, 1997.
- Massachusetts Highway Department (1995), Interoffice Memorandum to File Regarding Hilton Heave, June 5, 1995.
- Massachusetts Highway Department (1995), Interoffice Memorandum to Lauren Cragg Regarding Hilton Heave, June 28, 1995.
- Massachusetts Highway Department (1995), Interoffice Memorandum to File Regarding Hilton Heave, August 3, 1995.
- Massachusetts Highway Department (1995), Interoffice Memorandum to File Regarding Hilton Heave, August 23, 1995.
- GZA GeoEnvironmental, Inc. (1995), Letter to FST/TYLI Regarding D007D (C07D1) I-90 Logan Airport Interchange, Contract No. 93096, East Approach to Ramp E-T Pile Driving, July 10, 1995.
- Field Measurements, Inc. (2000), Letter to R.A. Francoeur Marine, Inc., Regarding Pile Load Test Program, Dynamic Load Test Results, CA/T Contract C08A1, August 24, 2000.
- Geosciences Testing and Research, Inc. (1997), Letter to RDA Construction Regarding Arrivals Tunnel Test Program, Dynamic Test Results (Piles 258 and 375), C07D2, May 30, 1997.
- Geosciences Testing and Research, Inc. (1997), Letter to RDA Construction Regarding Ramp 1AA Test Program, Dynamic Test Results (Piles 923, 955, and 999), C07D2, October 9, 1997.
- Geosciences Testing and Research, Inc. (1998), Letter to P.A. Frisco Regarding Dynamic Pile Testing Results, NS-SN Transition Structure, CA/T C19B1 Project, October 7, 1998.
- Geosciences Testing and Research, Inc. (2000), Letter to P.A. Frisco Regarding Dynamic Pile Testing Results, LT Wall Structure Indicator Piles, CA/T C19B1 Project, September 27, 2000.
- Geosciences Testing and Research, Inc. (2001), Letter to Modern Continental Construction Regarding Dynamic Pile Testing Results, CT Wall Structure Indicator Pile IPW, CA/T C19B1 Project, March 23, 2001.
- Geosciences Testing and Research, Inc. (2002), Letter to R.A. Francoeur Marine, Inc., Regarding Static Load Test Report for Pile 14, C08A1, 1ANB-A/D West Abutment, September 6, 2002.
- GZA GeoEnvironmental, Inc. (1998), Letter to Slattery/Interbeton/J.F. White/Perini Regarding Dynamic Pile Testing Results, October 9, 1998.
- GZA GeoEnvironmental, Inc. (1999), Letter to Slattery/Interbeton/J.F. White/Perini Regarding Dynamic Pile Testing Results, CA/T Contract C09A4, Approach No. 5, July 26, 1999.
- Perini Corporation (1994), Letter of Transmittal Containing CAPWAP Results, Contract C07D1, May 2, 1994.
- ASTM (1996a), "Standard Test Method for High-Strain Dynamic Testing of Piles"; D4945-89, 1996 Annual Book of ASTM Standards, ASTM International, West Conshohocken, PA.
- ASTM (1996b), "Standard Test Method for Piles Under Static Axial Compression Load"; D1143-81, 1996 Annual Book of ASTM Standards, ASTM International, West Conshohocken, PA.
- Field Measurements, Inc. (2000), Letter to R.A. Francoeur Marine, Inc., Regarding Pile Load Test Program, Compression Pile Load Test Results, Pile I90EB South, CA/T C08A1, September 19, 2000.
- Geosciences Testing and Research, Inc. (1997), Letter to RDA Construction Regarding Static Load Test Report, Pile 375, C07D2 Arrivals Tunnel, East Boston, MA, June 10, 1997.
- Geosciences Testing and Research, Inc. (1997), Letter to RDA Construction Regarding Static Load Test Report, Pile 923, C07D2 Ramp 1A-A, East Boston, MA, November 4, 1997.
- Geosciences Testing and Research, Inc. (1998), Letter to P.A. Frisco, Inc., Regarding Static Load Test Report, Test Pile NS-SN Transition Bridge, C19B1, November 4, 1998.
- Geosciences Testing and Research, Inc. (2000), Letter to Modern Continental Construction Regarding Static Load Test Results, CA/T C19B1, LT Retaining Wall, December 20, 2000.
- Geosciences Testing and Research, Inc. (2001), Letter to Modern Continental Construction Regarding Static Load Test Results for Pile IPW, CA/T C19B1, CT Retaining Wall, April 3, 2001.
- Geosciences Testing and Research, Inc. (2002), Letter to R.A. Francoeur Marine, Inc., Regarding Static Load Test Report for Pile 14, C08A1, 1ANB-A/D West Abutment, September 6, 2002.
- GZA GeoEnvironmental, Inc. (1998), Letter to Slattery/Interbeton/J.F. White/Perini Regarding Compression Load Test Pile, Utility Foundations (Test Pile 3), July 13, 1998.
- GZA GeoEnvironmental, Inc. (1998), Letter to Slattery/Interbeton/J.F. White/Perini Regarding Compression Load Test Pile, Utility Foundations (Test Pile 7), July 26, 1998.
- GZA GeoEnvironmental, Inc. (1998), Letter to Slattery/Interbeton/J.F. White/Perini Regarding Compression Load Test Pile, Approach 1 (Pile 12A1-1), November 9, 1998.
- GZA GeoEnvironmental, Inc. (1998), Letter to Slattery/Interbeton/J.F. White/Perini Regarding Compression Load Test Pile, Approach 2 (Pile 12A2-1), November 2, 1998.
- GZA GeoEnvironmental, Inc. (1999), Letter to Slattery/Interbeton/J.F. White/Perini Regarding Compression Load Test Pile, Approach 5 (Indicator Pile 2), August 11, 1999.
- McPhail Associates, Inc. (1994), Pile Load Test Report, Pier ET2, Logan Airport Egress Ramps, Contract C07D1, East Boston, Massachusetts.
- McPhail Associates, Inc. (1994), Pile Load Test Report, Pier ET4, Logan Airport Egress Ramps, Contract C07D1, East Boston, Massachusetts.
- Geosciences Testing and Research, Inc. (1997), Letter to RDA Construction Regarding Static Load Test Frame/Instrumentation, Contract C07D2, January 13, 1997.
- Davisson, M.T. (1972), "High-Capacity Piles." Proceedings of Lecture Series on Innovations in Foundation Construction, Chicago, IL, 81-112.
- Rausche, M.F.; Goble, G.G.; and Likins, G. (1985), "Dynamic Determination of Pile Capacity." Journal of Geotechnical Engineering, 111(3), 367-383.
- Fellenius, B.H.; Riker, R.E.; O'Brien, A.J.; and Tracy, G.R. (1989), "Dynamic and Static Testing in Soil Exhibiting Set-Up"; Journal of Geotechnical Engineering, 115(7).
- Authier, J., and Fellenius, B.H. (1980), "Quake Values Determined From Dynamic Measurements"; Proceedings of the First International Conference on the Application of Stress-Wave Theory to Piles, Stockholm, Sweden, 197-216.
- Likins, G.E. (1983), "Pile Installation Difficulties in Soils With Large Quakes"; Symposium on Dynamic Measurements of Piles and Piers, Philadelphia, PA, May 1983.
- Liang, R.Y., and Zhou, J. (1997), "Probability Method Applied to Dynamic Pile-Driving Control"; Journal of Geotechnical and Geoenvironmental Engineering, 123(2), 137-144.
|
Contact:
|