Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Pavements

<<PreviousContents 

Precast Concrete Panel Systems for Full-Depth Pavement Repairs: Field Trials

References

ASTM International. Oct 1, 2004.ASTM D 1621 REV A: Standard Test Method for Compressive Properties of Rigid Cellular Plastics. ASTM International, West Conshohocken, PA.

Bull, J. W. 1988. "The Use of Precast Concrete Raft Units for Roads."Highways, vol. 56, no. 1936, London, England, U.K., April, pp. 35–36.

Correa, A. L., and B. Wong. 2003.Concrete pavement rehabilitation guide for full-depth repairs. Federal Highway Administration, FHWA-RC Atlanta 1/10–03 (5M), August.

Davids, Bill. 2003.EverFE Theory Manual. University of Maine, Orono.

FHWA. 1994.Accelerated Rigid Paving Techniques, State-of-the-Art Report, Special Project 201. (FHWA-SA-94-080). Federal Highway Administration, Washington, DC.

FHWA. 2003.LTPP Distress Identification Manual for the Long-Term Pavement Performance Program (FHWA-RD-03-031). Federal Highway Administration, Washington, DC.

Grimsley, R. F., and B. G. Morris. 1975.An Approach to Concrete Pavement Replacement That Minimizes Disruption of Traffic. Special Report 153. Transportation Research Board, National Research Council, Washington, DC, pp. 107–110.

Hachiya, Y., F. Akamine, O. Takahashi, and Y. Miyaji. 2001. "Rapid Repair With Precast Prestressed Concrete Slab Pavements Using Compression Joint System."Proceedings of 7th International Conference on Concrete Pavements. International Society for Concrete Pavements, Orlando, FL, September, pp. 891–905.

Lane, R., and T. Kazmierowski. 2005. "Use of Innovative Pre-Cast Concrete Slab Repair Technology in Canada."Proceedings, 8th International Conference on Concrete Pavements, Colorado Springs, Colorado, August 2005, pp. 771–789.

Merritt, D. K., B. F. McCullough, and N. H. Burns. 2003. "Precast Prestressed Concrete Pavement Pilot Project Near Georgetown, Texas."Transportation Research Record 1823. Transportation Research Board, National Research Council, Washington, DC, pp. 11–17.

Meyer, A. H., and B. F. McCullough. 1983. "Precast Repair of CRC Pavement."Journal of Transportation Engineering, vol. 109, no. 5, American Society of Civil Engineers, New York, NY, pp. 615–630.

Overacker, J. W. 1974. "Thruway Repairs Concrete Slabs Overnight."Public Works, vol. 105, no. 3, New York, NY, March 1974, pp. 63.

Sharma, A. K. 1990. "Experimental Rehabilitation of Jointed Portland Cement Concrete Pavement."Transportation Research Record 1272. Transportation Research Board, National Research Council, Washington, DC, pp. 27–34.

Simonsen, J. E. 1971.Concrete Pavement Joint Repair With Pre-cast Slabs, Progress Report. Research project 68 F-102, Research report R-762. Michigan State Highway Commission, Lansing. April 1971.

Simonsen, J. E. 1972.Concrete Pavement Joint Repair With Pre-cast Slabs, Construction Report. Research project 68 F-102, Research report R-804, Michigan State Highway Commission, Lansing. February 1972.

Speir, R. H., S. D. Tayabji, G. R. Rada, Y. S. Chen, and S. Murrell. 2001. "Feasibility Study for the Use of Precast Portland Cement Concrete Panels for Rehabilitation of Airfield Pavements."Proceedings of 7th International Conference on Concrete Pavements, International Society for Concrete Pavements, Orlando, FL, pp. 907–922.

Tyson, S. S. 1976.Full-depth Repair of Jointed PCC Pavements Cast-in-place and Precast Procedures. Virginia Highway and Transportation Research Council, VHTRC 76-R44, Charlottesville.

<<PreviousContents 
 
 
Updated: 04/07/2011
 

FHWA
United States Department of Transportation - Federal Highway Administration