U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000


Skip to content U.S. Department of Transportation/Federal Highway AdministrationU.S. Department of Transportation/Federal Highway Administration

Pavements

Construction of a Precast Prestressed Concrete Pavement Demonstration Project on Interstate 57 Near Sikeston, Missouri

Appendix B: Agenda from MODOT/FHWA Showcasing Workshop

"National Rollout of Precast Prestressed Concrete Pavement (PPCP) Technology"

August 15-16, 2006

AGENDA

OBJECTIVES
  • To showcase the precast prestressed concrete pavement constructed on I-57.
  • To discuss how MoDOT can utilize PPCP technology.
  • To familiarize paving contractors, precasters, state DOTs, and others with PPCP technology.
AUDIENCE
  • MoDOT
  • Contractors and Industry
  • FHWA and DOTs from other states
WORKSHOP LOCATION

Best Western Coach House Inn - Sikeston, Missouri

PRECAST PANEL INSTALLATION DEMONSTRATION

Transportation provided from hotel

SITE VISIT TO I-57 PRECAST PAVEMENT INSTALLATION

Transportation provided from hotel

WORKSHOP SCHEDULE
Moderator: John Donahue (MoDOT)
Day 1 (Tues., Aug. 15) 10:30 a.m. Session 1 - MoDOT Perspective (David Nichols)
10:50 a.m. Session 2 - FHWA Perspective (Tommy Beatty)
11:10 a.m. Session 3 - Background of FHWA Precast Pavement Demonstration Projects (Sam Tyson)
11:30 a.m. Session 4 - I-57 Project Background and Design (Eric Krapf)
12:00 p.m. Lunch and Presentation on the AASHTO TIG for the Precast Concrete Pavement systems (Tim LaCoss)
1:30 p.m. Session 5 - Design and Construction Considerations (David Merritt)
1:50 p.m. Session 6 - Project Instrumentation and Monitoring (Dr. Gopalaratnam)
2:20 p.m. Session 7 - Panel Fabrication (Andrew Maybee)
2:50 p.m. Session 8 - Pavement Construction (John Donahue)
3:20 p.m. Session 9 - Highways for Life Perspective
3:30 p.m. Break
3:45 p.m. Roundtable Discussion
5:00 p.m. Adjourn
Day 2 (Wed., Aug. 16) 8:30 a.m. Bus leaves hotel for installation demonstration at MoDOT
9:00 a.m. Panel installation demonstration
11:00 a.m. Bus leaves for I-57 project site
11:30 a.m. Walking tour of I-57 project site
12:00 p.m. Bus returns to hotel
12:30 p.m. Adjourn

logos

PDF files can be viewed with the Acrobat® Reader®
Updated: 09/23/2015
Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000