Techbrief: Curing Practice for Slipformed Concrete PavementsView PDF Version (0.3 mb) This technical brief identifies best practices for curing portland cement concrete pavements. It provides important concepts in pavement curing, discusses the use of curing compounds and evaporation retarders, and describes how to estimate evaporation and bleeding rates and manage temperature. IntroductionCuring has long been recognized as an important process in constructing durable concrete pavements. Curing of concrete is defined as the maintenance of adequate moisture and temperature conditions to allow the development of required physical properties. Curing can consist of both initial and final measures. Initial curing measures include fogging and evaporation retarders where critical drying is likely, and final curing measures typically include white pigmented curing compounds, as shown in Figure 1. Poor curing practices can result in excessive curling, early-age cracking, surface deterioration, low early strengths, and reduced durability. Most of the damage caused by poor curing is irreversible. Figure 1. Properly applied curing compound.
Important ConceptsIn hot weather, the concrete needs to be cooled and protected from early drying for proper hydration and to minimize cracking (ACI 1999; National Cooperative Highway Research Program [NCHRP] 2004). In cold weather, the concrete should be kept warm to minimize cracking and allow proper hydration and acceptable setting times (ACI 1988; NCHRP 2004). The time until initial setting under field conditions can be estimated based on placing temperatures (see FHWA-RD-02-099 for the calculation [Federal Highway Administration 2005]). HIPERPAV™ software provides information on the effects of temperature as it relates to curing, strength development, and cracking potential. Curing should be initiated as soon as possible after placing the concrete to prevent excessive water loss and drying of the surface. The meaning of "as soon as possible" depends on the particular situation. Where critical drying is likely, initial curing should be initiated immediately following placement. Where critical drying is not likely, final curing can be initiated after texturing has been completed. Curing compounds work by sealing the concrete surface and reducing the rate of moisture loss. Rising bleed water can become trapped under a prematurely finished surface layer (National Ready Mixed Concrete Association [NRMCA] 2005). Bleed water that rises after the application of a curing compound can disrupt the curing membrane and can form a lens that causes spalling or delaminations. Bleeding typically stops at about the time of initial setting (American Society for Testing and Materials [ASTM] 1999b), when solid particles interlock with cement hydration products. For slipformed concrete, finishing and texturing are completed well before the initial setting; therefore the concrete is still plastic, and bleeding may not have stopped when the curing compound is applied. Slipform paving concrete typically does not bleed until 20 minutes after concrete placement and may never bleed. For slipform paving concrete, the evaporation rate almost always exceeds the bleed rate of the concrete, which is approximately 0.025 kg/m2/hr (0.05 lb/ft2/hr) or less. Plastic shrinkage occurs when the rate of evaporation exceeds the rate of bleeding. Under these conditions, the concrete surface may appear dry even under modest drying conditions. Moisture loss can be slowed before texturing by the use of evaporation retarders that provide a monomolecular film on the surface. Small to moderate amounts of bleeding help protect the concrete surface from early-age drying. The time it takes for bleeding to begin and the bleeding rate are determined by factors such as cementitious material and content, aggregate grading and fines content, water content, admixtures, and the concrete temperature (Kosmatka 1994). At low water to cementitious material ratio (w/cm), bleeding is slow to develop after placing the concrete, and may slow down significantly near the time of initial setting. A low w/cm (less than 0.45) contributes to low bleeding rates. Fine cements (Blaine >400) and some supplementary cementitious materials can also reduce bleeding rates. The bleeding behavior of concrete affects texturing and when a curing compound can be applied. High bleeding rates will delay the application of the curing compound. Low bleeding rates can result in a loss of moisture and increased risk of plastic shrinkage cracking. The ASTM C 232 procedure (ASTM 1999a), using a covered container that simulates pavement thickness (a 15 x 30 cm [6 x 12 in.] cylinder mold is ideal for <30 cm [12 in.] pavements), can indicate the mixture's bleeding behavior. Figure 2 shows an example of the bleeding behavior of a paving concrete mixture and the crucial times (the first hour after placing, and the last hour before initial setting) at which cracking may occur unless loss of water is minimized. Figure 2. Typical bleeding pattern of low w/cm (0.40) paving mixture (1.0 kg/m2/hr = 0.2 lb/ft2/hr).
Curing MethodsThe most common method of curing in paving is the application of a curing compound right after texturing the fresh concrete. If, as demonstrated in Figure 3 (ACI 2001), a high rate of evaporation >1.0 kg/m2/hr (0.2 lb/ft2/hr) exists, then preventive measures (initial curing) such as fogging or the application of an evaporation retarder may be needed. These measures reduce the risk of plastic shrinkage cracking and maintain proper hydration of the surface. Similarly, delays in texturing will require preventive measures until curing is initiated. Figure 3. Chart to estimate evaporation rate (reprinted from ACI 2001; Kosmatka et al. 2002).
A liquid-membrane-forming compound that meets ASTM C 309 (ASTM 2003) and American Association of State Highway and Transportation Officials (AASHTO) M 148 material requirements (<0.55 kg/m2 [0.11 lb/ft2] at 72 hours) is adequate for most situations. Different curing compounds provide different levels of protection from moisture loss and daylight reflectance. ACI 305R (ACI 1999) recommends <0.39 kg/m2 (0.08 lb/ft2) for concrete placed in hot weather. Some States have a more stringent maximum water retention limit; for instance, the Virginia Department of Transportation specifies 0.30 kg/m2 (0.06 lb/ft2).
Evaporation retarders may be applied immediately after placing and before texturing work to limit the risk of early drying in hot and high-evaporation conditions. ASTM is developing a specification for evaporation retarders. Other available curing methods include water spray or fog, wet burlap sheets, plastic sheets, and insulating blankets in cold weather. When moist curing, maintain the moist condition over the entire concrete surface for the entire curing period (typically 7 days) or until a curing compound is applied. Before ConstructionEstimate the expected bleeding rates. Compare bleed-rate estimates with drying-rate estimates to determine whether critical drying is probable. If critical drying is likely, or delays in texturing are expected, consider the following precautions:
Precautions During ConstructionIt is important to monitor and compensate for the conditions on site. Specific steps include:
When curing compounds and evaporation retarders are used as recommended and a proper temperature is managed, curing may be assumed to be adequate. ReferencesAmerican Concrete Institute. 1988. "Cold Weather Concreting." ACI 306R-88. ACI Manual of Concrete Practice. ACI International, Farmington Hills, MI. American Concrete Institute. 1999. "Hot Weather Concreting." ACI 305R-99. ACI Manual of Concrete Practice. ACI International, Farmington Hills, MI. American Concrete Institute. 2001. "Guide to Curing Concrete." ACI 308R-01. ACI Manual of Concrete Practice. ACI International, Farmington Hills, MI. American Concrete Pavement Association. 1994. Fast Track Concrete Pavements. TB004P. ACPA, Skokie, IL. American Society for Testing and Materials. 1998. "Practice for Estimating Concrete Strength by the Maturity Method." ASTM C 1074. Annual Book of ASTM Standards, vol. 04.02. ASTM, West Conshohocken, PA. American Society for Testing and Materials. 1999a. "Test Methods for Bleeding of Concrete." ASTM C 232. Annual Book of ASTM Standards, vol. 04.02. ASTM, West Conshohocken, PA. American Society for Testing and Materials. 1999b. "Test Methods for Time of Setting of Concrete Mixtures by Penetration Resistance." ASTM C 403. Annual Book of ASTM Standards, vol. 04.02. ASTM, West Conshohocken, PA. American Society for Testing and Materials. 2003. "Standard Specification for Liquid Membrane Forming Compounds for Curing Concrete." ASTM C 309. Annual Book of ASTM Standards, vol. 04.02. ASTM, West Conshohocken, PA. Federal Highway Administration. 2005. Guide for Curing of Portland Cement Concrete Pavements, vol. 1. FHWA-RD-02-099. U.S. Department of Transportation, McLean, VA. Kosmatka, S. H. 1994. "Bleeding." ASTM STP 169C. Concrete and Concrete Making Materials. American Society for Testing and Materials, West Conshohocken, PA. pp. 88–111. Kosmatka, S.H., Kerkhoff, B., and Panarese, W.C. 2002. Design and Control of Concrete Mixtures, EB001.14. Portland Cement Association, Skokie, IL. National Cooperative Highway Research Program. 2004. Guide for Mechanistic-Empirical Design of New and Rehabilitated Pavements. NCHRP Project 1-37a. Transportation Research Board, Washington, DC. National Ready Mixed Concrete Association. 2005. "Concrete Blisters." NRMCA CIP 13. NRMCA, Silver Spring, MD. HIPERPAV™ Software—The software can be downloaded from the following Federal Highway Administration (FHWA) Web site: www.fhwa.dot.gov/pavement/pccp/hipemain.cfm. Contacts
Research—This TechBrief was developed by Peter Taylor, Ph.D., P.E., CTLGroup, and Celik Ozyildirim, Ph.D., P.E., Virginia Transportation Research Council, as part of the FHWA Concrete Pavement Technology Program (CPTP) Task 65 CPTP Product Implementation Activity. The TechBrief incorporates findings from a CPTP Task 60 project performed by the Structures Laboratory, U.S. Army Corps of Engineers Research and Development Center, 3909 Halls Ferry Road, Vicksburg, MS 39180-6199, under contract number DTFH61-98-Y-50030. Distribution—This TechBrief is being distributed according to a standard distribution. Direct distribution is being made to FHWA's field offices. Availability—The publication from which this TechBrief was developed, Guide for Curing of Portland Cement Concrete Pavements (FHWA-RD-02-099), is available from the National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22161 (www.ntis.gov). A limited number of copies are available from the Research and Technology Product Distribution Center, HRTS-03, FHWA, 9701 Philadelphia Court, Unit Q, Lanham, MD 20706 (phone: 301-577-0818; fax: 301-577-1421). Key Words—concrete pavement, curing, pavement performance Notice—This TechBrief is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. This TechBrief does not establish policies or regulations, nor does it imply FHWA endorsement of the conclusions or recommendations. The U.S. Government assumes no liability for the contents or their use. Quality Assurance Statement—FHWA provides high-quality information to serve Government, industry, and the public in a manner that promotes public understanding. Standards and policies are used to ensure and maximize the quality, objectivity, utility, and integrity of its information. FHWA periodically reviews quality issues and adjusts its programs and processes to ensure continuous quality improvement. |
||
|