Pavement Preservation Compendium IIPrinciples of Pavement PreservationDefinitions, Benefits, Issues, and Barriers
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Jurisdiction | Miles (Thousands) | Percentage |
|---|---|---|
| Federal | 118 | 3.0 |
| States | 775 | 19.6 |
| Local | 3,055 | 77.4 |
| Total | 3,948 | 100.0 |
Every highway agency must deal with the effects of regional environments on pavement performance, in addition to the effects of traffic. Pavement sections originally projected to last many years can accumulate distress at an accelerated rate and fail prematurely. Most highway agencies experience and understand this problem but are daunted when budget allocations do not keep pace with the needs of highway pavement upkeep.
In the past, many maintenance practices have not been effective, because they were applied reactively to roads in poor condition instead of proactively to roads still in good condition. Succinctly stated, the correct approach to preventive maintenance is to "place the right treatment on the right road at the right time."
Preservation became a topic in the early 1990s, when highway agencies examined effective maintenance practices. The preservation concept - whether for pavements or for bridges - is a departure from traditional approaches, which wait until deficiencies are evident and until reconstruction or major rehabilitation are the only means to correct the problem.
Preservation, however, addresses minor deficiencies early, before the defects become major problems, and extends the life of the asset at a relatively low cost. A strong preservation program is essential to asset management.
Because preservation activities include so many kinds of treatments, agencies should build their own preservation toolboxes to serve their particular needs. Just as a mechanic's toolbox contains many different tools, each designed for a specific job, a preservation toolbox should include a host of treatments to address specific conditions.
No treatment will be suitable for every location. For example, a chip seal may be a long-lasting, cost-effective surface treatment in a rural area, but not in a large urban area. Conversely, concrete ultrathin whitetopping may be cost-effective in a large urban area, but not in a rural area. Similarly, performance and cost-effectiveness should be evaluated in the context of the areas in which the preservation treatments are applied.
| Pavement preservation gives highway agencies an economical alternative for addressing pavement needs. Moreover, with pavement preservation, highway agencies gain the ability to improve pavement conditions and extend pavement life and performance without increasing expenditures. |
A clear presentation of pavement preservation in the United States requires the development and adoption of standard definitions:
Asset Management
FHWA and the American Association of State Highway and Transportation Officials (AASHTO) define asset management as a systematic process of maintaining, upgrading, and operating physical assets cost-effectively.2 Asset management combines engineering principles with sound business practices and economic theory and provides tools to facilitate an organized, logical approach to decision-making. Asset management provides a framework for both short- and long-range planning.
Asset management is important to state and local governments because of the Governmental Accounting Standards Board's (GASB) Policy Statement 34, "Basic Financial Statements for State and Local Governments," issued in June 1999. GASB 34 encourages government agencies to promote asset management practices and to report the value of capital assets such as utilities, roadways, and other infrastructure.3
The value and maintenance of these assets eventually affects the bond ratings of government agencies, which in turn affect the government's ability to borrow the money to repair and replace the investments. The objective of an asset management program, therefore, is to
Preventive Maintenance
According to AASHTO, preventive maintenance is a planned strategy of cost-effective treatments that preserves and maintains or improves a roadway system and its appurtenances and retards deterioration, but without substantially increasing structural capacity.3 Preventive maintenance is a tool for pavement preservation - nonstructural treatments are applied early in the life of a pavement to prevent deterioration. In other words, preventive maintenance applies the right treatment to the right pavement at the right time.
Pavement Preservation
Pavement preservation is the sum of all the activities to provide and maintain serviceable roadways, including corrective and preventive maintenance, as well as minor rehabilitation. The strategy does not include new pavements or pavements that require major rehabilitation or reconstruction.
A pavement preservation program aims at preserving investment in the pavement network, extending pavement life, enhancing pavement performance, ensuring cost-effectiveness, and reducing user delays. In short, the goal is to meet customer needs.
Reactive Maintenance
Reactive maintenance comprises activities that respond to conditions beyond an agency's control - -activities such as pothole patching, rut filling, or unplugging drainage facilities. Reactive maintenance, therefore, is unscheduled; sometimes immediate response is necessary, to avoid serious consequences.
Emergency Maintenance
Extreme conditions, when life and property are at risk, require emergency maintenance. Examples include washouts, rigid pavement blowups (the shattering or upward buckling of concrete slabs along a joint), and rockslides or earthslides.
Understanding the costs and benefits of pavement preservation is important because the nation's highway system has matured - that is, the system has begun to deteriorate. Preservation requires a customer-focused program to provide and maintain serviceable roadways cost-effectively, encompassing preventive and corrective maintenance, as well as minor rehabilitation (Figure 1).
Figure 1. Pavement preservation concept.

The concept is gaining acceptance - initiatives in the business arena also are focusing on asset preservation, like the GASB policy emphasizing the preservation of infrastructure. GASB establishes requirements for the annual financial reports of state and local governments. Since June 1999, GASB 34 has required state and local agencies to provide more specific information in annual financial statements, following the model of the reports by private-sector companies and governmental utilities.
GASB recommends that state, county, and city government agencies apply historical costs to establish values for the transportation infrastructure. Agencies must identify the annual cost of maintaining and preserving the infrastructure assets at - or above - an established condition level. Pavement preservation, therefore, becomes integral to investment decision-making at highway agencies.
The benefits of implementing a pavement preservation program are not immediate and dramatic but accrue over time. Roads that generally are in good condition do not register a major change in condition rating after a treatment is applied - the rating continues as good. What is important, however, is the condition rating several years later - roads that receive preservation treatments are in better condition than those left without treatments.
A comparison of the project life-cycle costs of identical pavement sections with and without treatments illustrates the benefits of pavement preservation. In the example of a traditional alternative, shown in Table 2, a highway is constructed for $508,000 per lane-mile to last 25 years without any preservation activity. After 25 years, the highway must be completely reconstructed at a cost of $490,000 per lane-mile.
| ACTIVITY | D.I. (Before) | D.I. (After) | AGE | LIFE EXTENDED (Years) | R.S.L. (Years) | COST (Lane-Mile) | COMMENTS |
|---|---|---|---|---|---|---|---|
| D.I. = distress index, a measure of pavement condition. Scale values: 0 = no distress, 50 = reconstruction required. R.S.L. = remaining service life, the remaining time in which a pavement can be preserved. | |||||||
| New Construction | 0 | 0 | 25 | $508,000 | Construction cost | ||
| $21,000 | User cost | ||||||
| Major Construction | 51 | 0 | 25 | 25 | $490,000 | Construction cost | |
| $19,000 | User cost | ||||||
| Total | $998,000 | Construction cost | |||||
| $40,000 | User cost | ||||||
In the preservation alternative, shown in Table 3, a highway is constructed with a 25-year design life, also at a cost of $508,000 per lane-mile. After 5 years, the first short-term preservation action is performed for $15,000 per lane-mile, extending the pavement life 2 years. A second preservation is applied 10 years after initial construction - a different treatment that costs $39,500 per lane-mile but that extends the pavement life an additional 8 years. A third preservation is applied in Year 14, a fourth in Year 20, and another in Year 25.
| ACTIVITY | D.I. (Before) | D.I. (After) | AGE | LIFE EXTENDED (Years) | R.S.L. (Years) | COST (Lane-Mile) | COMMENTS |
|---|---|---|---|---|---|---|---|
| D.I. = distress index, a measure of pavement condition. Scale values: 0 = no distress, 50 = reconstruction required. R.S.L. = remaining service life, the remaining time in which a pavement can be preserved. | |||||||
| New Construction | 0 | 0 | 25 | $508,000 | Construction cost | ||
| $21,000 | User cost | ||||||
| First Preservation | 11 | 6 | 5 | 2 | 22 | $15,000 | Construction cost |
| $350 | User cost | ||||||
| Second Preservation | 21 | 0 | 10 | 8 | 25 | $39,500 | Construction cost |
| $350 | User cost | ||||||
| Third Preservation | 16 | 8 | 14 | 1 | 22 | $15,000 | Construction cost |
| $350 | User cost | ||||||
| Fourth Preservation | 33 | 0 | 20 | 5 | 21 | $55,500 | Construction cost |
| $700 | User cost | ||||||
| Fifth Preservation | 14 | 7 | 25 | 2 | 18 | $15,000 | Construction cost |
| $350 | User cost | ||||||
| Total | $648,000 | Construction cost | |||||
| $23,100 | User cost | ||||||
The preservation alternative offers potential savings in construction. In the traditional alternative, the pavement must be completely reconstructed after 25 years at a cost of $490,000 per lane-mile to extend the expected service life another 25 years. In contrast, preservation treatments cost $140,000 per lane-mile over 25 years and extend the expected service life another 18 years. Moreover, if the deterioration rate does not accelerate, pavement preservation can continue for more cycles, assuming that the pavement was designed and constructed properly.
Considering the user costs shown in the tables, additional savings will accrue. As shown in Figure 2, substantial savings can accrue with a well-planned pavement preservation program.
Figure 2. Pavement option curve (example). (PCI = Pavement Condition Index.)

Pavement preservation is not a maintenance program, but an agency program. Almost every part of an agency should be involved. Success depends on support and input from staff in planning, finance, design, construction, materials, and maintenance. Two other essentials for an effective program are long-term commitment from agency leadership and a dedicated annual budget.
Agency personnel must address many critical issues before implementing a pavement preservation program. For example, terminology must be defined clearly and concepts such as cost-effectiveness, optimal timing, and pavement performance should be understood. Integrating pavement management with pavement preservation, to maximize the benefits to the highway network, also is imperative. In addition, agency personnel should be instructed about each preservation treatment and its appropriate use.
After preparing the groundwork, the next step is to tailor a program that meets agency needs. People with a thorough understanding of pavement engineering should develop preservation guidelines that relate to various pavement conditions, the purpose and limitations of each treatment, and the expected performance. The guidelines will assist in treatment selection and program assessment.
A good preservation program should establish continual monitoring to assure effective feedback for improvement of the guidelines. A process model is shown in Figure 3.
Figure 3. Pavement preservation process.

Several issues and barriers may arise as an agency develops and implements a pavement preservation program. The issues and barriers, however, vary for each group involved.
Institutional Changes
Some of the issues and barriers from the transportation agency point of view may include the following:
Marketplace Pressures
The issues and barriers for industry groups mostly involve reluctance to disturb the status quo and include the following:
Convincing the Public
The introduction of preservation programs also affects the traveling public - the ultimate customer - raising a different set of issues and barriers:
Galehouse is Director, National Center for Pavement Preservation, Michigan State University, Okemos; Moulthrop is Senior Consultant, Fugro-BRE, Austin, Texas; and Hicks is Principal, MACTEC, Sacramento, California.
From TR News, September-October 2003, pp. 4-15. Copyright, Transportation Research Board (TRB), National Research Council, Washington, D.C. Reprinted with permission of TRB.