Grade Crossings
Attachment 2
Example of an estimate of cost for grade crossing warning devices to support an authorization to proceed with construction under an agreement providing for a lump sum payment
Formerly Federal-aid Policy Guide Non-Regulatory Supplement NS 23 CFR, Part 646 B,
July 6, 2005, Transmittal 34
See Order 1321.1C FHWA Directives Management
Description of Improvement
Installation of two automatic gate units with cantilever mounted flashing light signal controlled by motion sensor and other track circuit equipment at the crossing of __________ Road and a single main line track, replacing existing reflectorized crossbuck signs.
- Estimate of Cost
Item | Quantity | Unit | Unit Price | Amount |
---|---|---|---|---|
Preliminary Engineering | _______ | Man-Hrs. | __________ | ______ |
Construction Engineering | _______ | Man-Hrs. | __________ | ______ |
Material | ||||
Automatic gate signals | _______ | Each | __________ | ______ |
Cantilever amounted flashing light signals | _______ | Each | __________ | ______ |
Relays, incl. housing | _______ | Each | __________ | ______ |
Motion Sensor | _______ | Each | __________ | ______ |
Batteries and housing | _______ | L. Sum | __________ | ______ |
Foundations | _______ | L. Sum | __________ | ______ |
Wire, cable and conduit | _______ | L. Sum | __________ | ______ |
Insulated Joints | _______ | L. Sum | __________ | ______ |
Item | Quantity | Unit | Unit Price | Amount |
---|---|---|---|---|
Miscellaneous items | _______ | L. Sum | __________ | ______ |
Total Material | _______ | L. Sum | __________ | ______ |
Transportation of Material | _______ | L. Sum | __________ | ______ |
Store expense | _______ | % | __________ | ______ |
Equipment | ||||
Outfit cars | _______ | Days | __________ | ______ |
Trucks | _______ | Days | __________ | ______ |
Trencher | _______ | Days | __________ | ______ |
Labor | ||||
Foreman | _______ | Hrs. | __________ | ______ |
Signalman | _______ | Hrs. | __________ | ______ |
Asst. Signalman | _______ | Hrs. | __________ | ______ |
Holidays | _______ | % | __________ | ______ |
Vacation | _______ | % | __________ | ______ |
Payroll taxes | _______ | % | __________ | ______ |
Supplemental pension | _______ | % | __________ | ______ |
Insurance | _______ | % | __________ | ______ |
Meal and Lodging Allowance | _______ | Man-Hrs. | __________ | ______ |
Total Labor | _______ | Man-Hrs. | __________ | ______ |
(No contingencies allowed) | _______ | __________ | ______ | |
Item | Quantity | Unit | Unit Price | Amount |
---|---|---|---|---|
Less Credit for material salvaged | _______ | _______ | __________ | _______ |
Net Total | _______ | _______ | __________ | _______ |