Quality Assurance Stewardship Reviews
The Materials Engineering program within the FHWA's Office of Preconstruction, Construction, and Pavements supports State highway agencies in assuring the highest standards of quality for the materials and construction practices used on Federally funded highway infrastructure. Quality Assurance focuses on the following activities:
Current Projects and Activities
- Techbrief: Independent Assurance Program
- Memorandum on Technical Advisory T 6120.3 Use of Contractor Test Results in the Acceptance Decision, Recommended Quality Measures, and the Identification of Contractor/Department Risks
- Optimal Procedures for Quality Assurance Specifications
- Quality Assurance Stewardship Activities
- Questions and Answers on the Quality Assurance Regulation (23 CFR 637)
- Non-Regulatory Supplement 23 CFR Part 637
Publications
- Tech Brief: Quality Assurance Random Sampling and Sample Security,
FHWA-HIF-24-022 2024 - Tech Brief: Quality Assurance Asphalt Mixture Sampling,
FHWA-HIF-24-071 2024 - Quality Assurance Stewardship Review Summary Report for Years 2019-2023,
FHWA-HIF-24-074 2024 - Successful Practices for Quality Management of Pavement Surface Condition Data Collection and Analysis,
FHWA-RC-23-0002 2023 - Documenting FHWA Quality Assurance Assessment 2022: Summary Report,
FHWA-HIF-23-021 2023