Figure 3-3. Modal Split

Modal Split - Volume
Pie Chart
Air0%
Highway72%
Other2%
Rail16%
Water10%
Bar Chart
  Volume (Million Tons)
Within corridor
Volume (Million Tons)
Out of corridor
Volume (Million Tons)
Into corridor
Air122
Highway3,153406457
Other98110
Rail325216371
Water315116124

Modal Split - Value
Pie Chart
Air10%
Highway79%
Other0%
Rail10%
Water1%
Bar Chart
  Value ($bil)
Within corridor
Value ($bil)
Out of corridor
Value ($bil)
Into corridor
Air99126143
Highway1,773611669
Other1301
Rail127144111
Water271316