U.S. Department of Transportation
Federal Highway Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
202-366-4000


Skip to content
Facebook iconYouTube iconTwitter iconFlickr iconLinkedInInstagram

Federal Highway Administration Research and Technology
Coordinating, Developing, and Delivering Highway Transportation Innovations

Report
This report is an archived publication and may contain dated technical, contact, and link information
Publication Number: FHWA-RD-03-052
Date: May 2005

Field Observations and Evaluations of Streambed Scour at Bridges

APPENDIX A:PIER SCOUR FIELD DATA

Table 24. Pier scour observations, continued.

Measurement

Site

State

Date

Time

Pier

Upstream/ Downstream

Pier Type

Pier Shape

Pier Width (m)

Pier Length (m)

Skew (deg)

Velocity (m/s)

Depth (m)

Debris Effects

Bed Material

D16 (mm)

D50 (mm)

D84 (mm)

D95 (mm)

Grad-ation

Scour Depth (m)

Ac-curacy (m)

386

45

OH

8/22/1990

10:40

2

Upstream

Single

Round

0.8

11.4

0

0.2

1.5

Insignificant

Noncohesive

0.08

0.25

5.00

7.90

8.0

0.2

0.2

387

45

OH

12/30/1990

14:30

2

Upstream

Single

Round

0.8

11.4

0

0.7

3.1

Insignificant

Noncohesive

0.08

0.25

5.00

7.90

8.0

0.2

0.2

388

65

OH

1/28/1994

10:50

1

Upstream

Single

Round

1.3

8.3

18

1.5

4.5

Insignificant

Noncohesive

0.10

0.30

0.75

1.40

2.7

0.6

0.2

389

65

OH

1/28/1994

10:50

2

Upstream

Single

Round

1.3

8.3

18

1.7

6.0

Unknown

Noncohesive

0.46

2.20

8.00

15.00

4.2

0.9

0.2

390

46

OH

5/14/1990

16:05

1

Upstream

Single

Sharp

1.1

10.2

8

0.4

1.8

Moderate

Noncohesive

0.03

0.17

0.36

0.70

3.5

0.2

0.2

391

46

OH

5/18/1990

10:50

1

Upstream

Single

Sharp

1.1

10.2

8

0.5

2.5

Insignificant

Noncohesive

0.03

0.17

0.36

0.70

3.5

0.1

0.2

392

46

OH

12/31/1990

11:55

1

Upstream

Single

Sharp

1.1

10.2

8

0.8

4.2

Insignificant

Noncohesive

0.03

0.17

0.36

0.70

3.5

0.2

0.2

393

66

OH

1/29/1994

11:50

28

Upstream

Single

Round

1.4

18.3

0

0.9

3.7

Insignificant

Noncohesive

0.70

6.00

18.00

22.00

5.1

0.4

0.2

394

66

OH

1/29/1994

11:50

29

Upstream

Single

Round

1.4

18.3

8

1.5

5.9

Unknown

Noncohesive

0.18

0.59

1.30

1.70

2.7

1.3

0.2

395

66

OH

1/29/1994

11:50

30

Upstream

Single

Round

1.4

18.3

10

1.3

5.7

Unknown

Noncohesive

0.04

2.41

16.00

19.00

19.8

1.9

0.2

396

67

OH

1/14/1993

11:15

1

Upstream

Single

Round

0.9

18.8

0

1.3

1.7

Insignificant

Noncohesive

0.74

21.50

66.00

82.00

9.4

0.2

0.2

397

67

OH

12/6/1993

8:20

1

Upstream

Single

Round

0.9

18.8

0

1.3

1.8

Unknown

Noncohesive

6.10

19.00

45.00

63.00

2.7

0.2

0.2

398

69

OH

1/15/1993

10:45

2

Upstream

Single

Round

1.0

8.9

0

1.2

2.3

Insignificant

Noncohesive

0.46

1.15

3.10

8.50

2.6

0.5

0.2

399

69

OH

12/6/1993

10:00

2

Upstream

Single

Round

1.0

8.9

0

1.5

2.4

Insignificant

Noncohesive

1.30

10.00

27.00

40.00

4.6

0.7

0.2

400

69

OH

1/15/1993

10:45

3

Upstream

Single

Round

1.0

8.9

0

1.3

3.0

Moderate

Unknown

4.40

11.50

22.00

33.00

2.2

0.4

0.2

401

69

OH

12/6/1993

10:00

3

Upstream

Single

Round

1.0

8.9

0

1.4

3.1

Unknown

Noncohesive

3.70

17.00

29.00

38.00

2.8

0.5

0.2

402

47

OH

5/16/1990

11:45

1

Upstream

Single

Round

1.1

11.9

0

1.6

1.6

Insignificant

Noncohesive

0.67

5.00

16.00

22.00

4.9

0.4

0.2

403

47

OH

5/17/1990

9:05

1

Upstream

Single

Round

1.1

11.9

0

2.1

2.9

Insignificant

Noncohesive

0.67

5.00

16.00

22.00

4.9

0.7

0.2

404

47

OH

12/18/1990

14:30

1

Upstream

Single

Round

1.1

11.9

0

1.8

3.1

Insignificant

Noncohesive

0.67

5.00

16.00

22.00

4.9

0.5

0.2

405

47

OH

1/28/1994

12:50

1

Upstream

Single

Round

1.1

11.9

0

1.8

2.5

Insignificant

Noncohesive

13.00

30.00

40.00

46.00

1.8

0.6

0.2

406

47

OH

5/16/1990

11:45

2

Upstream

Single

Round

1.3

11.9

0

1.7

2.0

Insignificant

Noncohesive

4.55

17.00

29.00

40.00

2.5

0.7

0.2

407

47

OH

5/17/1990

9:05

2

Upstream

Single

Round

1.3

11.9

0

2.1

3.2

Insignificant

Noncohesive

4.55

17.00

29.00

40.00

2.5

0.9

0.2

408

47

OH

12/18/1990

14:30

2

Upstream

Single

Round

1.4

11.9

0

2.0

3.4

Insignificant

Noncohesive

4.55

17.00

29.00

40.00

2.5

1.0

0.2

409

47

OH

1/28/1994

12:50

2

Upstream

Single

Round

1.3

11.9

0

1.7

2.7

Insignificant

Unknown

37.00

51.00

63.00

70.00

1.3

1.0

0.2

410

71

OH

7/13/1992

12:30

1

Upstream

Single

Round

0.6

10.2

0

0.9

2.0

Insignificant

Noncohesive

1.20

6.80

16.00

23.00

3.7

0.5

0.2

411

71

OH

7/17/1992

15:00

1

Upstream

Single

Round

0.6

10.2

0

1.2

3.1

Moderate

Noncohesive

1.20

6.80

16.00

23.00

3.7

0.3

0.2

412

74

TX

10/23/1994

-

6

Downstream

Group

Square

22.9

14.0

0

2.4

12.5

Substantial

Cohesive

-

-

-

-

-

7.5

0.9

413

51

VA

5/29/1990

12:00

2

Upstream

Single

Round

0.8

13.1

0

0.6

2.7

Unknown

Unknown

0.29

0.92

4.80

10.50

4.1

0.8

0.3

414

52

VA

10/24/1990

11:00

1

Upstream

Single

Round

1.0

25.3

0

1.6

6.2

Unknown

Noncohesive

0.14

0.28

0.46

0.77

1.8

1.1

0.3

415

52

VA

10/25/1990

11:00

1

Upstream

Single

Round

1.0

25.3

0

1.9

7.9

Unknown

Noncohesive

0.14

0.28

0.46

0.77

1.8

1.2

0.3

416

52

VA

4/22/1992

12:00

1

Upstream

Single

Round

1.0

25.3

0

1.3

5.8

Unknown

Noncohesive

0.14

0.28

0.46

0.77

1.8

0.8

0.3

417

52

VA

10/25/1990

11:00

2

Upstream

Single

Round

1.0

25.3

0

2.2

9.3

Unknown

Noncohesive

0.14

0.28

0.46

0.77

1.8

1.1

0.3

418

52

VA

4/22/1992

12:00

2

Upstream

Single

Round

1.0

25.3

0

1.7

8.4

Unknown

Noncohesive

0.14

0.28

0.46

0.77

1.8

1.5

0.3

419

54

VA

5/2/1989

13:00

1

Upstream

Single

Round

0.7

8.5

0

0.7

1.7

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.4

0.3

420

54

VA

8/24/1990

10:30

1

Upstream

Single

Round

0.7

8.5

0

0.7

1.8

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.4

0.3

Table 24. Pier scour observations, continued.

Measurement

Site

State

Date

Time

Pier

Upstream/ Downstream

Pier Type

Pier Shape

Pier Width (m)

Pier Length (m)

Skew (deg)

Velocity (m/s)

Depth (m)

Debris Effects

Bed Material

D16 (mm)

D50 (mm)

D84 (mm)

D95 (mm)

Grad-ation

Scour Depth (m)

Ac-curacy (m)

421

54

VA

8/24/1990

14:30

1

Upstream

Single

Round

0.7

8.5

0

0.6

1.6

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.2

0.3

422

54

VA

3/29/1991

12:30

1

Upstream

Single

Round

0.7

8.5

0

0.4

0.9

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.4

0.3

423

54

VA

3/29/1991

15:30

1

Upstream

Single

Round

0.7

8.5

0

0.5

1.4

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.4

0.3

424

54

VA

3/29/1991

17:30

1

Upstream

Single

Round

0.7

8.5

0

0.5

1.6

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.4

0.3

425

54

VA

5/2/1989

13:00

2

Upstream

Single

Round

0.7

8.5

0

0.2

1.0

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.5

0.3

426

54

VA

8/24/1990

10:30

2

Upstream

Single

Round

0.7

8.5

0

0.3

0.9

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.7

0.3

427

54

VA

5/2/1989

13:00

3

Upstream

Single

Round

0.7

8.5

0

0.2

0.9

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.5

0.3

428

54

VA

8/24/1990

10:30

3

Upstream

Single

Round

0.7

8.5

0

0.3

0.8

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.4

0.3

429

54

VA

8/24/1990

14:30

3

Upstream

Single

Round

0.7

8.5

0

0.2

0.6

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.4

0.3

430

54

VA

3/29/1991

17:30

3

Upstream

Single

Round

0.7

8.5

0

0.5

1.1

Unknown

Unknown

0.35

0.69

1.30

1.90

1.9

0.5

0.3

431

56

VA

5/29/1990

11:00

1

Upstream

Single

Round

0.6

9.0

0

1.2

2.2

Unknown

Noncohesive

18.00

37.00

75.00

180.00

2.0

0.1

0.3

432

56

VA

5/29/1990

11:00

2

Upstream

Single

Round

0.6

9.0

0

1.4

2.4

Unknown

Unknown

18.00

37.00

75.00

180.00

2.0

0.1

0.3

433

56

VA

3/30/1991

10:00

2

Upstream

Single

Round

0.6

9.0

0

1.4

2.6

Unknown

Unknown

18.00

37.00

75.00

180.00

2.0

0.2

0.3

434

56

VA

2/26/1992

10:00

2

Upstream

Single

Round

0.6

9.0

0

1.4

3.0

Unknown

Unknown

18.00

37.00

75.00

180.00

2.0

0.3

0.3

435

56

VA

3/4/1993

13:30

2

Upstream

Single

Round

0.6

9.0

0

1.5

3.0

Unknown

Unknown

18.00

37.00

75.00

180.00

2.0

0.2

0.3

436

56

VA

3/4/1993

17:30

2

Upstream

Single

Round

0.6

9.0

0

1.6

3.3

Unknown

Unknown

18.00

37.00

75.00

180.00

2.0

0.4

0.3

437

50

VA

1/16/1991

10:30

CNTR

Upstream

Single

Round

0.9

9.8

0

0.9

4.7

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.3

0.3

438

50

VA

1/18/1991

10:30

CNTR

Upstream

Single

Round

0.9

9.8

0

0.8

4.9

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.5

0.3

439

50

VA

4/4/1991

14:30

CNTR

Upstream

Single

Round

0.9

9.8

0

1.0

5.0

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.4

0.3

440

50

VA

4/5/1991

12:00

CNTR

Upstream

Single

Round

0.9

9.8

0

1.0

4.8

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.4

0.3

441

50

VA

3/12/1992

11:30

CNTR

Upstream

Single

Round

0.9

9.8

0

0.9

4.5

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.4

0.3

442

50

VA

3/11/1993

9:30

CNTR

Upstream

Single

Round

0.9

9.8

0

1.1

5.0

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.4

0.3

443

50

VA

3/17/1993

9:30

CNTR

Upstream

Single

Round

0.9

9.8

0

1.0

5.1

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.5

0.3

444

50

VA

3/18/1993

12:00

CNTR

Upstream

Single

Round

0.9

9.8

0

1.1

4.8

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.6

0.3

445

50

VA

3/19/1993

11:00

CNTR

Upstream

Single

Round

0.9

9.8

0

1.1

5.2

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.6

0.3

446

50

VA

4/1/1993

10:00

CNTR

Upstream

Single

Round

0.9

9.8

0

1.1

4.7

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.6

0.3

447

50

VA

1/16/1991

10:30

LEFT

Upstream

Single

Round

0.9

9.8

0

0.9

4.3

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.3

0.3

448

50

VA

1/18/1991

10:30

LEFT

Upstream

Single

Round

0.9

9.8

0

0.8

4.4

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.2

0.3

449

50

VA

4/4/1991

14:30

LEFT

Upstream

Single

Round

0.9

9.8

0

0.9

4.5

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.3

0.3

450

50

VA

4/5/1991

12:00

LEFT

Upstream

Single

Round

0.9

9.8

0

0.9

4.3

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.3

0.3

451

50

VA

3/12/1992

11:30

LEFT

Upstream

Single

Round

0.9

9.8

0

0.9

4.4

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.5

0.3

452

50

VA

3/11/1993

9:30

LEFT

Upstream

Single

Round

0.9

9.8

0

1.0

4.6

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.4

0.3

453

50

VA

3/17/1993

9:30

LEFT

Upstream

Single

Round

0.9

9.8

0

1.0

4.4

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.4

0.3

454

50

VA

3/18/1993

12:00

LEFT

Upstream

Single

Round

0.9

9.8

0

1.0

4.6

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.5

0.3

455

50

VA

3/19/1993

11:00

LEFT

Upstream

Single

Round

0.9

9.8

0

1.0

4.6

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.5

0.3

Table 24. Pier scour observations, continued.

Measurement

Site

State

Date

Time

Pier

Upstream/ Downstream

Pier Type

Pier Shape

Pier Width (m)

Pier Length (m)

Skew (deg)

Velocity (m/s)

Depth (m)

Debris Effects

Bed Material

D16 (mm)

D50 (mm)

D84 (mm)

D95 (mm)

Grad-ation

Scour Depth (m)

Ac-curacy (m)

456

50

VA

4/1/1993

10:00

LEFT

Upstream

Single

Round

0.9

9.8

0

1.0

4.7

Unknown

Unknown

0.35

0.74

2.00

4.00

2.4

0.4

0.3

457

49

VA

5/31/1990

13:30

CNTR

Upstream

Single

Round

0.9

10.7

0

1.4

8.7

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.5

0.3

458

49

VA

1/14/1991

12:00

CNTR

Upstream

Single

Round

0.9

10.7

0

1.0

7.3

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.8

0.3

459

49

VA

12/13/1992

11:30

CNTR

Upstream

Single

Round

0.9

10.7

0

1.0

4.9

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.4

0.3

460

49

VA

12/14/1992

10:00

CNTR

Upstream

Single

Round

0.9

10.7

0

1.0

6.9

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.1

0.3

461

49

VA

12/15/1992

11:00

CNTR

Upstream

Single

Round

0.9

10.7

0

0.9

6.7

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.4

0.3

462

49

VA

1/11/1993

12:00

CNTR

Upstream

Single

Round

0.9

10.7

0

0.9

6.5

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.6

0.3

463

49

VA

1/12/1993

10:30

CNTR

Upstream

Single

Round

0.9

10.7

0

0.9

6.6

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.3

0.3

464

49

VA

4/12/1993

12:00

CNTR

Upstream

Single

Round

0.9

10.7

0

1.0

7.5

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.2

0.3

465

49

VA

4/13/1993

9:30

CNTR

Upstream

Single

Round

0.9

10.7

0

1.0

7.4

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.1

0.3

466

49

VA

4/19/1993

10:00

CNTR

Upstream

Single

Round

0.9

10.7

0

1.0

7.6

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.1

0.3

467

49

VA

5/31/1990

13:30

LEFT

Upstream

Single

Round

0.9

10.7

0

0.5

6.5

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

1.0

0.3

468

49

VA

12/13/1992

11:30

LEFT

Upstream

Single

Round

0.9

10.7

0

0.4

5.0

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.5

0.3

469

49

VA

12/14/1992

10:00

LEFT

Upstream

Single

Round

0.9

10.7

0

0.4

5.3

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.9

0.3

470

49

VA

12/15/1992

11:00

LEFT

Upstream

Single

Round

0.9

10.7

0

0.3

5.2

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.6

0.3

471

49

VA

1/11/1993

12:00

LEFT

Upstream

Single

Round

0.9

10.7

0

0.3

4.8

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.5

0.3

472

49

VA

1/12/1993

10:30

LEFT

Upstream

Single

Round

0.9

10.7

0

0.3

5.0

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.9

0.3

473

49

VA

4/12/1993

12:00

LEFT

Upstream

Single

Round

0.9

10.7

0

0.5

5.5

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.5

0.3

474

49

VA

4/13/1993

9:30

LEFT

Upstream

Single

Round

0.9

10.7

0

0.4

5.6

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.6

0.3

475

49

VA

4/19/1993

10:00

LEFT

Upstream

Single

Round

0.9

10.7

0

0.5

5.8

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.7

0.3

476

49

VA

5/31/1990

13:30

RT

Upstream

Single

Round

0.9

10.7

0

0.6

8.0

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.9

0.3

477

49

VA

12/13/1992

11:30

RT

Upstream

Single

Round

0.9

10.7

0

0.4

5.9

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.5

0.3

478

49

VA

12/14/1992

10:00

RT

Upstream

Single

Round

0.9

10.7

0

0.4

6.1

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.6

0.3

479

49

VA

12/15/1992

11:00

RT

Upstream

Single

Round

0.9

10.7

0

0.2

5.7

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.4

0.3

480

49

VA

1/11/1993

12:00

RT

Upstream

Single

Round

0.9

10.7

0

0.3

5.6

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.5

0.3

481

49

VA

1/12/1993

10:30

RT

Upstream

Single

Round

0.9

10.7

0

0.3

5.9

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.4

0.3

482

49

VA

4/12/1993

12:00

RT

Upstream

Single

Round

0.9

10.7

0

0.4

6.3

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.5

0.3

483

49

VA

4/13/1993

9:30

RT

Upstream

Single

Round

0.9

10.7

0

0.3

6.4

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.5

0.3

484

49

VA

4/19/1993

10:00

RT

Upstream

Single

Round

0.9

10.7

0

0.3

7.1

Unknown

Unknown

0.32

0.70

1.60

2.80

2.2

0.9

0.3

485

55

VA

3/29/1991

14:30

2

Upstream

Single

Round

0.6

9.1

0

1.1

0.8

Unknown

Noncohesive

38.00

55.00

84.00

130.00

1.5

0.5

0.3

486

55

VA

6/5/1992

10:30

2

Upstream

Single

Round

0.6

9.1

0

1.7

3.2

Unknown

Noncohesive

38.00

55.00

84.00

130.00

1.5

0.6

0.3

487

55

VA

3/24/1993

9:30

2

Upstream

Single

Round

0.6

9.1

0

2.0

3.2

Unknown

Noncohesive

38.00

55.00

84.00

130.00

1.5

0.5

0.3

488

53

VA

5/3/1989

12:00

2

Upstream

Single

Round

0.6

12.5

0

0.6

0.5

Unknown

Noncohesive

33.00

72.00

170.00

250.00

2.3

0.2

0.3

489

53

VA

5/7/1989

9:00

2

Upstream

Single

Round

0.6

12.5

0

1.6

0.7

Unknown

Noncohesive

33.00

72.00

170.00

250.00

2.3

0.2

0.3

490

53

VA

4/22/1992

11:00

2

Upstream

Single

Round

0.6

12.5

0

1.6

1.7

Unknown

Noncohesive

33.00

72.00

170.00

250.00

2.3

0.5

0.3

Table 24. Pier scour observations, continued.

Measurement

Site

State

Date

Time

Pier

Upstream/ Downstream

Pier Type

Pier Shape

Pier Width (m)

Pier Length (m)

Skew (deg)

Velocity (m/s)

Depth (m)

Debris Effects

Bed Material

D16 (mm)

D50 (mm)

D84 (mm)

D95 (mm)

Grad-ation

Scour Depth (m)

Ac-curacy (m)

491

53

VA

5/3/1989

12:00

3

Upstream

Single

Round

0.6

12.5

0

1.2

1.2

Unknown

Noncohesive

33.00

72.00

170.00

250.00

2.3

0.3

0.3

492

53

VA

5/7/1989

9:00

3

Upstream

Single

Round

0.6

12.5

0

1.6

1.5

Unknown

Noncohesive

33.00

72.00

170.00

250.00

2.3

0.4

0.3

493

53

VA

4/22/1992

11:00

3

Upstream

Single

Round

0.6

12.5

0

2.6

2.6

Unknown

Noncohesive

33.00

72.00

170.00

250.00

2.3

0.8

0.3

Previous | Table of Contents | Next

Federal Highway Administration | 1200 New Jersey Avenue, SE | Washington, DC 20590 | 202-366-4000
Turner-Fairbank Highway Research Center | 6300 Georgetown Pike | McLean, VA | 22101