SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
PROJECT TITLE
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Connecticut
0003109
GLASTONBURY; RTE 3 BRIDGE REHABILITATION - NO ADDED CAPACITY (PUTNAM BR. #417) OVER THE CONNECTICUT RIVER. (CN)
$22,511,556.40
$44,957,727.00
Connecticut
0006113
BRISTOL; PROVIDE A SECOND EASTBOUND THROUGH LANE  FROM CAROL DRIVE TO PEGGY LANE, A ONE MILE SEGMENT OF THE ROUTE 6 CORRIDOR. (CN)
$20,186,524.85
$27,168,595.02
Connecticut
0008126
BPORT, RTE 8, REPL OF BRIDGE #S 03761, 03762, 03764, 03765 O/LINDLEY ST & CAPITOL AVE (NO ADDED CAP) DESIGN BLD PILOT PROJECT CN.
$34,716,620.83
$40,884,409.33
Connecticut
0008130
SHELTON/DERBY; REHABILITATION OF BRIDGE #00571A, (COMMODORE HULL) ROUTE 8 OVER THE HOUSATONIC RIVER, ROUTE 110 & LOCAL ROADS. (CN)
$28,521,949.60
$35,652,437.00
Connecticut
0008134
WATERBURY; REHABILITATION OF BRIDGES (NO ADDED CAPACITY) IN THE ROUTE 8/I-84 INTERCHANGE AREA (CN).
$126,085,468.00
$159,224,851.02
Connecticut
0008141
D-B RBC PROJECT - RESURFACING, BRIDGE REHABILITATION, & SAFETY IMPROVEMENTS ON APPROX. 6.43 MILES OF MAINLINE (CN).
$72,421,739.20
$98,258,407.03
Connecticut
000T285
Middletown; Reconfiguration of Route 17 On-Ramp onto Route 9 North.
$54,902,076.80
$73,670,220.01
Connecticut
000T323
Bridge Painting/Metalizing along the I-395 Corridor in District 2.
$28,749,204.80
$35,936,506.00
Connecticut
000T328
DISTRICT 1; Address Steel Beam end deterioration on various Bridges using Ultra High Performance Concrete (UHPC).
$23,564,119.20
$29,455,149.00
Connecticut
000T347
Statewide; Job Order Contracting (JOC) Program through 12/31/2025 for installation of pavement markings
$10,000,000.00
$30,000,000.00
Connecticut
000T383
District 4 - Bridge Deck Preservation of Various Bridges (CN).
$22,889,088.00
$25,432,320.01
Connecticut
000T392
Meriden; I-91/I-691/Route 15 Interchange - Improvements to I-91 Northbound, I-691 Westbound, and Route 15 Northbound.
$5,000,000.00
$278,972,560.00
Connecticut
0015105
NEW CANAAN/NORWALK - MERRITT PARKWAY (RTE 15) IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS (CN).
$52,285,893.60
$70,928,725.00
Connecticut
0015134
WESTPORT - SAFETY IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS ON THE MERRITT PKWY (CT15) IN THE TOWNS OF WESTPORT & FAIRFIELD (CN).
$67,117,641.81
$83,901,735.02
Connecticut
0015145
NORWALK - MERRITT PARKWAY (ROUTE 15) RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS (CN)
$41,150,830.40
$51,692,306.01
Connecticut
0032203
EAST HARTFORD - RESURFACING, BRIDGE & SAFETY IMPROVEMENTS ON RTE 2 FROM THE CHARTER OAK BRIDGE AREA (CN)
$68,814,621.60
$86,018,277.00
Connecticut
0034122
NEWTOWN - MAJOR INTERSECTION IMPROVEMENTS, CT 34 at I-84 (CN).
$24,728,905.60
$33,429,952.13
Connecticut
0044139
HARTFORD - SAFETY IMPROVEMENTS, HOMESTEAD AVE TO GARDEN STREET, RT44 (CN).
$25,324,994.40
$33,341,485.25
Connecticut
0044160
Norfolk - This project will replace 3 retaining walls adjacent to Rte. 44 (CN).
$1,000,000.00
$36,159,860.00
Connecticut
0066121
MIDDLETOWN, REHABILITATION OF BRIDGE #00524 (ARRIGONI) WHICH CARRIES ROUTE 66 OVER THE CONNECTICUT RIVER (CN).
$31,345,909.60
$57,508,431.00
Connecticut
0082141
EAST HADDAM - REHABILITATION OF BRIDGE #01138, ROUTE 82 OVER CONNECTICUT RIVER (CN)
$61,130,358.40
$84,203,448.00
Connecticut
0842195
WATERBURY, I-84 RECONSTRUCT EXPRESSWAY (ADDED CAP) & OPERATIONAL IMPROVEMENTS INCLUDING INTERCHANGES - PHASE 3 (CN).
$256,807,457.22
$335,107,487.04
Connecticut
0842306
WATERBURY; REHABILITATION OF BR. 03191B CARRYING I-84 WB OVER RTE. 8 AND THE NAUGATUCK RIVER. (CN)
$51,646,374.00
$58,609,144.02
Connecticut
0842307
WATERBURY; REHABILITATION OF BR. 03191A CARRYING I-84 EB OVER I-84 WB, RTE. 8, AND THE NAUGATUCK RIVER. (CN)
$56,328,658.20
$63,971,087.00
Connecticut
0842310
NEWTOWN; RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS ON I-84.
$38,486,323.80
$42,762,582.04
Connecticut
0843236
HARTFORD; REHABILITATION OF BR #03160A-D, BR #03301, AND BR #03303 (I - 84 HARTFORD VIADUCT). (CN)
$55,622,232.26
$61,961,168.46
Connecticut
0912136
WETHERSFIELD/HARTFORD; I-91 IMPROVEMENTS AND UPGRADES.
$58,866,211.50
$65,325,235.06
Connecticut
0913182
Windsor Locks; Rehabilitation of Bridge #00454, I-91 over CT River, Amtrak and Rte. 159 (Dexter Coffin Bridge).
$29,741,924.70
$33,046,583.06
Connecticut
0913183
Hartford - Rehab of Bridge No. 01469B (Dutch Point Viaduct) carrying Interstate-91 SB over the CT Southern Railroad, SR 598 WB and TR 803.
$22,444,217.69
$69,951,200.01
Connecticut
0951191
NORWALK/WESTPORT; I-95 RECONSTRUCT THE MEDIAN AND INSTALL 45" CONCRETE BARRIER CURB IN NORWALK & WESTPORT
$73,166,838.30
$130,677,425.05
Connecticut
0951200
NEW HAVEN; I-95 ADVANCED UTILITY BREAKOUT FOR UI TRANS. & JET FUEL LINES-"Q" BRIDGE CONTRACT B. (UTILITIES - CONSTRUCTION)
$23,270,092.59
$25,855,659.44
Connecticut
0951204
NEW HAVEN; ADVANCE SOIL PRELOAD CONTRACT FOR S. P. #92-531 - I-91/I-95/CT RTE. 34 INTERCHANGE (CONTRACT E1)(CN)
$25,882,832.80
$32,400,274.00
Connecticut
0951222
NEW HAVEN; I-95 - NB APPROACH AND RIVER PIERS FOR NEW PEARL HARBOR MEMORIAL BR., CONTRACT B1 (CN)
$135,771,245.61
$156,113,746.00
Connecticut
0951243
NEW HAVEN; BREAKOUT OF PROJ 92-531. RECONST OF I-95 / I-91 / ROUTE 34 INTERCHANGE ASSOC WITH Q BR. REPL. CONTRACT E-2 (CN)
$98,935,740.54
$113,777,781.00
Connecticut
0951372
NORWALK; REHAB OF BRIDGE #00059 (YANKEE DOODLE BRIDGE), I-95 OVER NORWALK RIVER AND HENDRICKS RD. (CN)
$36,260,541.90
$40,945,421.01
Connecticut
0951377
STRATFORD; PROVIDE A FULL INTERCHANGE ON I-95 AT INTERCHANGE 33 BY CONSTRUCTING A NEW SB OFF-RAMP AND A NEW NB ON-RAMP. 
$35,645,277.60
$39,605,864.02
Connecticut
0951378
STAMFORD; REHABILITATION OF BRIDGE NO. 00032 CARRYING I-95 AND I-95 RAMPS OVER MNRR AND LOCAL ROADS. (CN)
$24,054,682.50
$26,727,425.03
Connecticut
0951384
West Haven;  Replace Bridge Nos. 161 & 162 carrying I-95 over SR 745 & Metro North RR, respectively.
$96,071,138.97
$123,900,000.03
Connecticut
0951385
Stamford - This Design-Build project involves construction of an Auxiliary Lane on I-95 SB from Exit 7 to  Exit 6 (CN).
$56,459,011.70
$74,366,189.02
Connecticut
0951386
I-95 Pavement Preservation from NY State Line to Exit 6 in Stamford (CN).
$37,411,723.00
$45,778,100.03
Connecticut
0953073
NEW LONDON/GROTON; PHASE 1A OF REHAB FOR BR #03819 NB (GOLD STAR MEMORIAL BRIDGE) CARRYING I-95 OVER THAMES RIVER & LOCAL ROADS.  
$69,743,408.00
Connecticut
0953078
East Lyme - Improvement of I-95 Interchange 74 at Rte 161 & Replacement of Bridge #00250
$109,982,807.86
$209,881,299.02
Connecticut
0954110
Groton, Stonington, and North Stonington; Safety Improvements and Pavement Rehabilitation on I-95 Southbound.
$24,200,000.00
$57,150,760.01
Connecticut
0954118
Safety Improvements and Pavement Rehabilitation on I-95 NB in Groton, Stonington & North Stonington
$41,311,332.00
$48,312,500.00
Connecticut
1063143
HARTFORD; INTERCHANGE 29 @ I-91N & RTE 15N IMPROVEMENTS
$5,000,000.00
$238,770,664.00
Connecticut
1092144
NEW HAVEN; MAJOR REHABILITATION OF BRIDGE #03810 OVER QUINNIPIAC RIVER.
$4,916,605.11
$27,929,200.00
Connecticut
1096111
NEWTOWN; REHABILITATION OF BRIDGES 01218 & 04180, I-84 EB & WB O/ HOUSATONIC RIVER.  SUPERSTRUCTURE REPLACEMENTS.
$60,956,185.50
$67,729,095.34
Connecticut
H017003
NEW HAVEN; RECONST. OF I-95/I-91/RTE 34 INTERCH. ASSOC WITH Q BRIDGE REPLACEMENT (CONTRACT E) (CN).
$293,831,426.19
$328,260,102.88
Connecticut
H100002
DERBY; RECONSTRUCTION OF APPROXIMATELY 2,400 FEET OF ROUTE 34.
$18,188,643.20
$29,863,804.03
Connecticut
H121002
STAMFORD; REPLACEMENT OF DEFICIENT MNRR BRIDGE  #08012R OVER ATLANTIC ST (CN).
$4,214,710.77
$69,702,343.76