RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Connecticut | GLASTONBURY; RTE 3 BRIDGE REHABILITATION - NO ADDED CAPACITY (PUTNAM BR. #417) OVER THE CONNECTICUT RIVER. (CN) | $22,511,556.40 |
$44,957,727.00 |
|
Connecticut | BRISTOL; PROVIDE A SECOND EASTBOUND THROUGH LANE FROM CAROL DRIVE TO PEGGY LANE, A ONE MILE SEGMENT OF THE ROUTE 6 CORRIDOR. (CN) | $20,186,524.85 |
$27,168,595.02 |
|
Connecticut | BPORT, RTE 8, REPL OF BRIDGE #S 03761, 03762, 03764, 03765 O/LINDLEY ST & CAPITOL AVE (NO ADDED CAP) DESIGN BLD PILOT PROJECT CN. | $34,716,620.83 |
$40,884,409.33 |
|
Connecticut | SHELTON/DERBY; REHABILITATION OF BRIDGE #00571A, (COMMODORE HULL) ROUTE 8 OVER THE HOUSATONIC RIVER, ROUTE 110 & LOCAL ROADS. (CN) | $28,521,949.60 |
$35,652,437.00 |
|
Connecticut | WATERBURY; REHABILITATION OF BRIDGES (NO ADDED CAPACITY) IN THE ROUTE 8/I-84 INTERCHANGE AREA (CN). | $126,085,468.00 |
$159,224,851.02 |
|
Connecticut | D-B RBC PROJECT - RESURFACING, BRIDGE REHABILITATION, & SAFETY IMPROVEMENTS ON APPROX. 6.43 MILES OF MAINLINE (CN). | $72,421,739.20 |
$98,258,407.03 |
|
Connecticut | Middletown; Reconfiguration of Route 17 On-Ramp onto Route 9 North. | $54,902,076.80 |
$73,670,220.01 |
|
Connecticut | Bridge Painting/Metalizing along the I-395 Corridor in District 2. | $28,749,204.80 |
$35,936,506.00 |
|
Connecticut | DISTRICT 1; Address Steel Beam end deterioration on various Bridges using Ultra High Performance Concrete (UHPC). | $23,564,119.20 |
$29,455,149.00 |
|
Connecticut | Statewide; Job Order Contracting (JOC) Program through 12/31/2025 for installation of pavement markings | $10,000,000.00 |
$30,000,000.00 |
|
Connecticut | District 4 - Bridge Deck Preservation of Various Bridges (CN). | $22,889,088.00 |
$25,432,320.01 |
|
Connecticut | Meriden; I-91/I-691/Route 15 Interchange - Improvements to I-91 Northbound, I-691 Westbound, and Route 15 Northbound. | $5,000,000.00 |
$278,972,560.00 |
|
Connecticut | NEW CANAAN/NORWALK - MERRITT PARKWAY (RTE 15) IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS (CN). | $52,285,893.60 |
$70,928,725.00 |
|
Connecticut | WESTPORT - SAFETY IMPROVEMENTS, RESURFACING, ENHANCEMENTS & BRIDGE IMPROVEMENTS ON THE MERRITT PKWY (CT15) IN THE TOWNS OF WESTPORT & FAIRFIELD (CN). | $67,117,641.81 |
$83,901,735.02 |
|
Connecticut | NORWALK - MERRITT PARKWAY (ROUTE 15) RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS (CN) | $41,150,830.40 |
$51,692,306.01 |
|
Connecticut | EAST HARTFORD - RESURFACING, BRIDGE & SAFETY IMPROVEMENTS ON RTE 2 FROM THE CHARTER OAK BRIDGE AREA (CN) | $68,814,621.60 |
$86,018,277.00 |
|
Connecticut | NEWTOWN - MAJOR INTERSECTION IMPROVEMENTS, CT 34 at I-84 (CN). | $24,728,905.60 |
$33,429,952.13 |
|
Connecticut | HARTFORD - SAFETY IMPROVEMENTS, HOMESTEAD AVE TO GARDEN STREET, RT44 (CN). | $25,324,994.40 |
$33,341,485.25 |
|
Connecticut | Norfolk - This project will replace 3 retaining walls adjacent to Rte. 44 (CN). | $1,000,000.00 |
$36,159,860.00 |
|
Connecticut | MIDDLETOWN, REHABILITATION OF BRIDGE #00524 (ARRIGONI) WHICH CARRIES ROUTE 66 OVER THE CONNECTICUT RIVER (CN). | $31,345,909.60 |
$57,508,431.00 |
|
Connecticut | EAST HADDAM - REHABILITATION OF BRIDGE #01138, ROUTE 82 OVER CONNECTICUT RIVER (CN) | $61,130,358.40 |
$84,203,448.00 |
|
Connecticut | WATERBURY, I-84 RECONSTRUCT EXPRESSWAY (ADDED CAP) & OPERATIONAL IMPROVEMENTS INCLUDING INTERCHANGES - PHASE 3 (CN). | $256,807,457.22 |
$335,107,487.04 |
|
Connecticut | WATERBURY; REHABILITATION OF BR. 03191B CARRYING I-84 WB OVER RTE. 8 AND THE NAUGATUCK RIVER. (CN) | $51,646,374.00 |
$58,609,144.02 |
|
Connecticut | WATERBURY; REHABILITATION OF BR. 03191A CARRYING I-84 EB OVER I-84 WB, RTE. 8, AND THE NAUGATUCK RIVER. (CN) | $56,328,658.20 |
$63,971,087.00 |
|
Connecticut | NEWTOWN; RESURFACING, BRIDGE AND SAFETY IMPROVEMENTS ON I-84. | $38,486,323.80 |
$42,762,582.04 |
|
Connecticut | HARTFORD; REHABILITATION OF BR #03160A-D, BR #03301, AND BR #03303 (I - 84 HARTFORD VIADUCT). (CN) | $55,622,232.26 |
$61,961,168.46 |
|
Connecticut | WETHERSFIELD/HARTFORD; I-91 IMPROVEMENTS AND UPGRADES. | $58,866,211.50 |
$65,325,235.06 |
|
Connecticut | Windsor Locks; Rehabilitation of Bridge #00454, I-91 over CT River, Amtrak and Rte. 159 (Dexter Coffin Bridge). | $29,741,924.70 |
$33,046,583.06 |
|
Connecticut | Hartford - Rehab of Bridge No. 01469B (Dutch Point Viaduct) carrying Interstate-91 SB over the CT Southern Railroad, SR 598 WB and TR 803. | $22,444,217.69 |
$69,951,200.01 |
|
Connecticut | NORWALK/WESTPORT; I-95 RECONSTRUCT THE MEDIAN AND INSTALL 45" CONCRETE BARRIER CURB IN NORWALK & WESTPORT | $73,166,838.30 |
$130,677,425.05 |
|
Connecticut | NEW HAVEN; I-95 ADVANCED UTILITY BREAKOUT FOR UI TRANS. & JET FUEL LINES-"Q" BRIDGE CONTRACT B. (UTILITIES - CONSTRUCTION) | $23,270,092.59 |
$25,855,659.44 |
|
Connecticut | NEW HAVEN; ADVANCE SOIL PRELOAD CONTRACT FOR S. P. #92-531 - I-91/I-95/CT RTE. 34 INTERCHANGE (CONTRACT E1)(CN) | $25,882,832.80 |
$32,400,274.00 |
|
Connecticut | NEW HAVEN; I-95 - NB APPROACH AND RIVER PIERS FOR NEW PEARL HARBOR MEMORIAL BR., CONTRACT B1 (CN) | $135,771,245.61 |
$156,113,746.00 |
|
Connecticut | NEW HAVEN; BREAKOUT OF PROJ 92-531. RECONST OF I-95 / I-91 / ROUTE 34 INTERCHANGE ASSOC WITH Q BR. REPL. CONTRACT E-2 (CN) | $98,935,740.54 |
$113,777,781.00 |
|
Connecticut | NORWALK; REHAB OF BRIDGE #00059 (YANKEE DOODLE BRIDGE), I-95 OVER NORWALK RIVER AND HENDRICKS RD. (CN) | $36,260,541.90 |
$40,945,421.01 |
|
Connecticut | STRATFORD; PROVIDE A FULL INTERCHANGE ON I-95 AT INTERCHANGE 33 BY CONSTRUCTING A NEW SB OFF-RAMP AND A NEW NB ON-RAMP. | $35,645,277.60 |
$39,605,864.02 |
|
Connecticut | STAMFORD; REHABILITATION OF BRIDGE NO. 00032 CARRYING I-95 AND I-95 RAMPS OVER MNRR AND LOCAL ROADS. (CN) | $24,054,682.50 |
$26,727,425.03 |
|
Connecticut | West Haven; Replace Bridge Nos. 161 & 162 carrying I-95 over SR 745 & Metro North RR, respectively. | $96,071,138.97 |
$123,900,000.03 |
|
Connecticut | Stamford - This Design-Build project involves construction of an Auxiliary Lane on I-95 SB from Exit 7 to Exit 6 (CN). | $56,459,011.70 |
$74,366,189.02 |
|
Connecticut | I-95 Pavement Preservation from NY State Line to Exit 6 in Stamford (CN). | $37,411,723.00 |
$45,778,100.03 |
|
Connecticut | NEW LONDON/GROTON; PHASE 1A OF REHAB FOR BR #03819 NB (GOLD STAR MEMORIAL BRIDGE) CARRYING I-95 OVER THAMES RIVER & LOCAL ROADS. | $69,743,408.00 |
||
Connecticut | East Lyme - Improvement of I-95 Interchange 74 at Rte 161 & Replacement of Bridge #00250 | $109,982,807.86 |
$209,881,299.02 |
|
Connecticut | Groton, Stonington, and North Stonington; Safety Improvements and Pavement Rehabilitation on I-95 Southbound. | $24,200,000.00 |
$57,150,760.01 |
|
Connecticut | Safety Improvements and Pavement Rehabilitation on I-95 NB in Groton, Stonington & North Stonington | $41,311,332.00 |
$48,312,500.00 |
|
Connecticut | HARTFORD; INTERCHANGE 29 @ I-91N & RTE 15N IMPROVEMENTS | $5,000,000.00 |
$238,770,664.00 |
|
Connecticut | NEW HAVEN; MAJOR REHABILITATION OF BRIDGE #03810 OVER QUINNIPIAC RIVER. | $4,916,605.11 |
$27,929,200.00 |
|
Connecticut | NEWTOWN; REHABILITATION OF BRIDGES 01218 & 04180, I-84 EB & WB O/ HOUSATONIC RIVER. SUPERSTRUCTURE REPLACEMENTS. | $60,956,185.50 |
$67,729,095.34 |
|
Connecticut | NEW HAVEN; RECONST. OF I-95/I-91/RTE 34 INTERCH. ASSOC WITH Q BRIDGE REPLACEMENT (CONTRACT E) (CN). | $293,831,426.19 |
$328,260,102.88 |
|
Connecticut | DERBY; RECONSTRUCTION OF APPROXIMATELY 2,400 FEET OF ROUTE 34. | $18,188,643.20 |
$29,863,804.03 |
|
Connecticut | STAMFORD; REPLACEMENT OF DEFICIENT MNRR BRIDGE #08012R OVER ATLANTIC ST (CN). | $4,214,710.77 |
$69,702,343.76 |