DETAILED PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT NUMBER
COUNTY
POPULATION
RANGE
OWNERSHIP
PROGRAM
TYPE OF
IMPROVEMENT
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL COST
Connecticut
0003109
Hartford >= 200,000 N/A NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$8,601,070.40
$27,569,619.00
Connecticut
0003109
Hartford >= 200,000 N/A SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$13,910,486.00
$17,388,108.00
Connecticut
0006113
Hartford >= 200,000 State HSIP LIMITING FLEXIBLE Safety
$5,911,547.00
$7,389,433.75
Connecticut
0006113
Hartford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$13,801,707.02
$19,187,572.72
Connecticut
0006113
Hartford >= 200,000 State NATIONAL HIGHWAY SYSTEM Safety
$473,270.83
$591,588.55
Connecticut
0008126
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$6,978,750.00
$8,210,295.00
Connecticut
0008126
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$27,737,870.83
$32,674,114.33
Connecticut
0008130
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$28,521,949.60
$35,652,437.00
Connecticut
0008134
Fairfield >= 200,000 Other NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$61,542,734.00
$77,737,425.52
Connecticut
0008134
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$61,542,734.00
$77,737,425.50
Connecticut
0008134
New Haven >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$1,500,000.00
$1,875,000.00
Connecticut
0008134
Fairfield >= 200,000 Other SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$1,500,000.00
$1,875,000.00
Connecticut
0008141
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$72,421,739.20
$98,258,407.03
Connecticut
000T285
Middlesex >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$54,902,076.80
$73,670,220.01
Connecticut
000T323
Statewide N/A State HIGHWAY INFRA PRGM -APPOR Bridge Preventive Maintenance
$28,749,204.80
$35,936,506.00
Connecticut
000T328
Statewide N/A State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$23,564,119.20
$29,455,149.00
Connecticut
000T347
Statewide N/A State REDISTRIBUTION OF CERTAIN AUTH Safety
$7,856,187.98
$27,856,187.98
Connecticut
000T347
Statewide N/A State SURFACE TRANSP BLOCK GRNT PRGM Safety
$2,143,812.02
$2,143,812.02
Connecticut
000T383
Statewide N/A State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$22,889,088.00
$25,432,320.01
Connecticut
000T392
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$5,000,000.00
$278,972,560.00
Connecticut
0015105
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$25,285,893.60
$37,178,725.00
Connecticut
0015105
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$5,000,000.00
$6,250,000.00
Connecticut
0015105
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$22,000,000.00
$27,500,000.00
Connecticut
0015134
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$62,117,641.81
$77,651,735.01
Connecticut
0015134
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$5,000,000.00
$6,250,000.01
Connecticut
0015145
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$41,150,830.40
$51,692,306.01
Connecticut
0032203
Hartford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$68,814,621.60
$86,018,277.00
Connecticut
0034122
Fairfield >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$11,476,455.59
$14,345,569.49
Connecticut
0034122
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$13,252,450.01
$19,084,382.64
Connecticut
0044139
Hartford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$11,979,009.60
$16,659,003.00
Connecticut
0044139
Hartford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$13,345,984.80
$16,682,482.25
Connecticut
0044160
Litchfield >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$1,000,000.00
$36,159,860.00
Connecticut
0066121
Middlesex >= 50,000 AND < 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$31,116,099.60
$57,278,621.00
Connecticut
0066121
Middlesex >= 50,000 AND < 200,000 State REPURPOSED SPECIAL Bridge Rehabilitation - No Added Capacity
$229,810.00
$229,810.00
Connecticut
0082141
Middlesex >= 50,000 AND < 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$36,150,108.00
$45,187,635.00
Connecticut
0082141
Middlesex >= 50,000 AND < 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$24,980,250.40
$39,015,813.00
Connecticut
0842195
New Haven >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$149,059.76
$186,324.72
Connecticut
0842195
New Haven >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity
$1,618,940.24
$2,023,675.31
Connecticut
0842195
New Haven >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Added Capacity
$59,588,769.00
$74,485,961.75
Connecticut
0842195
New Haven >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Added Capacity
$327,074.41
$408,843.02
Connecticut
0842195
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$170,588,531.05
$227,333,828.20
Connecticut
0842195
New Haven >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM 4R - Added Capacity
$761,812.39
$952,266.00
Connecticut
0842195
New Haven >= 200,000 State REPURPOSED SPECIAL 4R - Added Capacity
$5,710,988.74
$7,138,736.00
Connecticut
0842195
New Haven >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$18,062,281.63
$22,577,852.04
Connecticut
0842306
New Haven >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$959,067.84
$1,065,630.95
Connecticut
0842306
New Haven >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Bridge Rehabilitation - No Added Capacity
$664,827.36
$738,698.00
Connecticut
0842306
New Haven >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Rehabilitation - No Added Capacity
$4,132,493.04
$4,591,661.00
Connecticut
0842306
New Haven >= 200,000 State INTERSTATE MAINTENANCE Bridge Rehabilitation - No Added Capacity
$680,284.49
$755,871.66
Connecticut
0842306
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$45,102,590.25
$51,338,270.16
Connecticut
0842306
New Haven >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - No Added Capacity
$107,111.02
$119,012.25
Connecticut
0842307
New Haven >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$1,305,474.12
$1,450,526.82
Connecticut
0842307
New Haven >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Bridge Rehabilitation - No Added Capacity
$264,715.13
$294,127.93
Connecticut
0842307
New Haven >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Rehabilitation - No Added Capacity
$137,288.64
$152,542.95
Connecticut
0842307
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$54,404,898.93
$61,833,576.65
Connecticut
0842307
New Haven >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - No Added Capacity
$216,281.38
$240,312.65
Connecticut
0842310
Fairfield >= 200,000 State HIGHWAY INFRA PRGM -APPOR Construction Engineering
$911,520.00
$1,012,800.00
Connecticut
0842310
Fairfield >= 200,000 State INTERSTATE MAINTENANCE Construction Engineering
$7,600,417.43
$8,444,908.28
Connecticut
0842310
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$25,998,743.15
$28,887,492.39
Connecticut
0842310
Fairfield >= 200,000 State NATIONAL HIGHWAY SYSTEM Construction Engineering
$120,863.74
$134,293.05
Connecticut
0842310
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$3,854,779.48
$4,283,088.32
Connecticut
0843236
Hartford >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$866,745.63
$963,051.00
Connecticut
0843236
Hartford >= 200,000 State HIGHWAY BRIDGE PROGRAM (PLUS) Bridge Rehabilitation - No Added Capacity
$89,002.93
$98,892.15
Connecticut
0843236
Hartford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$53,523,939.47
$59,471,045.00
Connecticut
0843236
Hartford >= 200,000 State REPURPOSED EARMARK SUBJ TO LIM Bridge Rehabilitation - No Added Capacity
$456,150.98
$570,188.73
Connecticut
0843236
Hartford >= 200,000 State REPURPOSED SPECIAL Bridge Rehabilitation - No Added Capacity
$647,200.64
$809,000.82
Connecticut
0843236
Fairfield >= 200,000 State REPURPOSED SPECIAL Bridge Rehabilitation - No Added Capacity
$39,192.61
$48,990.76
Connecticut
0912136
Hartford >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - Restoration & Rehabilitation
$5,305,427.00
$5,894,918.90
Connecticut
0912136
Hartford >= 200,000 State INTERSTATE MAINTENANCE 4R - Restoration & Rehabilitation
$1,910,584.86
$2,122,872.07
Connecticut
0912136
Hartford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$28,852,465.94
$32,058,295.50
Connecticut
0912136
Hartford >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Restoration & Rehabilitation
$3,925,240.90
$4,361,378.80
Connecticut
0912136
Hartford >= 200,000 State REPURPOSED SPECIAL 4R - Restoration & Rehabilitation
$735,000.00
$735,000.00
Connecticut
0912136
Hartford >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$18,137,492.80
$20,152,769.79
Connecticut
0913182
Hartford >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$2,827,934.50
$3,142,149.46
Connecticut
0913182
Hartford >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Bridge Rehabilitation - No Added Capacity
$171,059.71
$190,066.35
Connecticut
0913182
Hartford >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$20,000,000.00
$22,222,222.23
Connecticut
0913182
Hartford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$6,701,583.75
$7,446,204.19
Connecticut
0913182
Hartford >= 200,000 State NATIONAL HIGHWAY SYSTEM Bridge Rehabilitation - No Added Capacity
$41,346.74
$45,940.83
Connecticut
0913183
Hartford >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$316,161.69
$351,290.77
Connecticut
0913183
Hartford >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$22,128,056.00
$69,599,909.24
Connecticut
0951191
Fairfield >= 200,000 State FAST ACT NATIONAL FREIGHT Safety
$54,115,711.00
$109,509,505.81
Connecticut
0951191
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Safety
$19,051,127.30
$21,167,919.24
Connecticut
0951200
New Haven >= 200,000 State INTERSTATE MAINTENANCE Construction Engineering
$1,230,041.70
$1,366,713.00
Connecticut
0951200
New Haven >= 200,000 State INTERSTATE MAINTENANCE Utilities
$7,238,134.29
$8,042,371.44
Connecticut
0951200
New Haven >= 200,000 State MINIMUM GUARANTEE - TEA-21 Utilities
$9,201,916.60
$10,224,352.00
Connecticut
0951200
New Haven >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Utilities
$5,600,000.00
$6,222,223.00
Connecticut
0951204
New Haven >= 200,000 N/A EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$3,631,684.08
$4,539,606.00
Connecticut
0951204
New Haven >= 200,000 N/A EQUITY BONUS EXEMPT LIM Safety and Education for Peds/Bicyclists
$21,672.80
$27,091.00
Connecticut
0951204
New Haven >= 200,000 N/A EQUITY BONUS EXEMPT LIM Utilities
$3,899,612.00
$4,874,515.00
Connecticut
0951204
New Haven >= 200,000 N/A EQUITY BONUS SP LIMITATION 4R - Added Capacity
$8,417,983.12
$10,522,481.00
Connecticut
0951204
New Haven >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 4R - Added Capacity
$2,917,609.60
$3,693,742.00
Connecticut
0951204
New Haven >= 200,000 N/A MINIMUM GUARANTEE - TEA-21 Construction Engineering
$6,994,271.20
$8,742,839.00
Connecticut
0951222
New Haven >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Bridge Replacement - No Added Capacity
$85,681,945.48
$98,539,836.00
Connecticut
0951222
New Haven >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Construction Engineering
$16,967,366.40
$19,502,720.00
Connecticut
0951222
New Haven >= 200,000 N/A BRIDGE PROGRAM - 85% ON/OFF Utilities
$106,453.20
$122,360.00
Connecticut
0951222
New Haven >= 200,000 N/A BRIDGE REP & REHAB-65% ON SYS Bridge Replacement - No Added Capacity
$232,741.53
$267,520.00
Connecticut
0951222
New Haven >= 200,000 N/A INTERSTATE MAINT DISC Bridge Replacement - No Added Capacity
$1,076,625.00
$1,237,500.00
Connecticut
0951222
New Haven >= 200,000 N/A NAT'L COOR INF IM PROGRAM Bridge Replacement - No Added Capacity
$31,706,114.00
$36,443,810.00
Connecticut
0951243
New Haven >= 200,000 N/A INTERSTATE MAINTENANCE 4R - No Added Capacity
$85,688,461.08
$98,551,023.00
Connecticut
0951243
New Haven >= 200,000 N/A INTERSTATE MAINTENANCE Construction Engineering
$12,984,486.39
$14,924,697.00
Connecticut
0951243
New Haven >= 200,000 N/A INTERSTATE MAINTENANCE Utilities
$262,793.07
$302,061.00
Connecticut
0951372
Fairfield >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$724,408.65
$804,898.50
Connecticut
0951372
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$35,536,133.25
$40,140,522.51
Connecticut
0951377
Fairfield >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$11,888,025.00
$13,208,916.67
Connecticut
0951377
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$7,024,612.40
$7,805,124.90
Connecticut
0951377
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$16,732,640.20
$18,591,822.45
Connecticut
0951378
Fairfield >= 200,000 State BRIDGE PROGRAM - 85% ON/OFF Bridge Rehabilitation - No Added Capacity
$465,271.30
$516,968.12
Connecticut
0951378
Fairfield >= 200,000 State BRIDGE REP & REHAB-20% ON/OFF Bridge Rehabilitation - No Added Capacity
$100,669.46
$111,854.96
Connecticut
0951378
Fairfield >= 200,000 State BRIDGE REP & REHAB-65% ON SYS Bridge Rehabilitation - No Added Capacity
$5,673.72
$6,304.14
Connecticut
0951378
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$23,483,068.02
$26,092,297.81
Connecticut
0951384
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Replacement - No Added Capacity
$86,071,138.97
$112,788,888.91
Connecticut
0951384
New Haven >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Bridge Replacement - No Added Capacity
$10,000,000.00
$11,111,111.12
Connecticut
0951385
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$46,459,011.70
$63,255,077.89
Connecticut
0951385
Fairfield >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$10,000,000.00
$11,111,111.13
Connecticut
0951386
Fairfield >= 200,000 State FAST ACT NATIONAL FREIGHT 4R - Restoration & Rehabilitation
$17,411,723.00
$19,346,358.89
Connecticut
0951386
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$20,000,000.00
$26,431,741.14
Connecticut
0953073
New London >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$69,743,408.00
Connecticut
0953078
New London >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - No Added Capacity
$466,059.67
$582,574.59
Connecticut
0953078
New London >= 200,000 State EQUITY BONUS SP LIMITATION 4R - No Added Capacity
$1,600.00
$2,000.00
Connecticut
0953078
New London >= 200,000 State MINIMUM GUARANTEE - TEA-21 4R - No Added Capacity
$1,288,256.13
$1,610,320.17
Connecticut
0953078
New London >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$108,226,892.06
$207,686,404.26
Connecticut
0954110
New London >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Restoration & Rehabilitation
$5,200,000.00
$36,039,648.89
Connecticut
0954110
New London >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Restoration & Rehabilitation
$19,000,000.00
$21,111,111.12
Connecticut
0954118
New London >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Maintenance Relocation
$41,311,332.00
$48,312,500.00
Connecticut
1063143
Hartford >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - No Added Capacity
$5,000,000.00
$238,770,664.00
Connecticut
1092144
New Haven >= 200,000 Local REPURPOSED SPECIAL Bridge Rehabilitation - No Added Capacity
$3,616,605.11
$4,520,756.39
Connecticut
1092144
New Haven >= 200,000 Local SURFACE TRANSP BLOCK GRNT PRGM Bridge Rehabilitation - No Added Capacity
$1,300,000.00
$23,408,443.61
Connecticut
1096111
Fairfield >= 200,000 State HIGHWAY INFRA PRGM -APPOR Bridge Rehabilitation - No Added Capacity
$46,517,436.00
$51,686,040.33
Connecticut
1096111
Fairfield >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Bridge Rehabilitation - No Added Capacity
$14,438,749.50
$16,043,055.01
Connecticut
H017003
New Haven >= 200,000 State EQUITY BONUS EXEMPT LIM 4R - Added Capacity
$15,212,608.31
$16,902,900.00
Connecticut
H017003
New Haven >= 200,000 State EQUITY BONUS SP LIMITATION 4R - Added Capacity
$19,674,505.65
$21,860,563.00
Connecticut
H017003
New Haven >= 200,000 State EXTENSION OF ALLOC PROGRAMS 4R - Added Capacity
$21,302,921.00
$23,669,913.00
Connecticut
H017003
New Haven >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - Added Capacity
$1,439,840.00
$1,799,801.00
Connecticut
H017003
New Haven >= 200,000 State HIGH PRIORITY PROJECTS-TEA-21 4R - Added Capacity
$295,916.80
$369,898.00
Connecticut
H017003
New Haven >= 200,000 State HIGHWAY INFRASTRUCTURE 4R - Added Capacity
$8,542,232.00
$10,677,790.13
Connecticut
H017003
New Haven >= 200,000 State INTERSTATE MAINTENANCE 4R - Added Capacity
$37,361,720.55
$41,513,028.00
Connecticut
H017003
New Haven >= 200,000 State INTERSTATE MAINTENANCE Construction Engineering
$7,558,638.09
$8,398,487.00
Connecticut
H017003
New Haven >= 200,000 State MINIMUM GUARANTEE - TEA-21 4R - Added Capacity
$4,646,487.80
$5,162,768.00
Connecticut
H017003
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM 4R - Added Capacity
$53,891,735.12
$59,879,706.07
Connecticut
H017003
New Haven >= 200,000 State NATIONAL HIGHWAY PERF PROGRAM Construction Engineering
$21,380,907.31
$23,756,563.68
Connecticut
H017003
New Haven >= 200,000 State NATIONAL HIGHWAY SYSTEM 4R - Added Capacity
$37,956,204.25
$42,173,565.00
Connecticut
H017003
New Haven >= 200,000 State REDISTRIBUTION OF CERTAIN AUTH 4R - Added Capacity
$12,524,620.66
$13,916,247.00
Connecticut
H017003
New Haven >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - Added Capacity
$26,094,580.65
$29,347,197.00
Connecticut
H017003
New Haven >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM Construction Engineering
$25,948,508.00
$28,831,676.00
Connecticut
H100002
New Haven >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - No Added Capacity
$2,087,460.06
$2,609,325.10
Connecticut
H100002
New Haven >= 200,000 State HIGHWAY INFRA PRGM -APPOR 4R - No Added Capacity
$1,097,483.00
$8,499,853.75
Connecticut
H100002
New Haven >= 200,000 State HWY INFRA PRGM-IIJA DEMO 4R - No Added Capacity
$5,000,000.00
$6,250,000.00
Connecticut
H100002
New Haven >= 200,000 State SURFACE TRANSP BLOCK GRNT PRGM 4R - No Added Capacity
$10,003,700.14
$12,504,625.18
Connecticut
H121002
Fairfield >= 200,000 State HIGH PRIORITY PROJECT SEC 1702 4R - No Added Capacity
$3,969,710.77
$4,962,139.23
Connecticut
H121002
Fairfield >= 200,000 State SURFACE TRANS PRIORITIES S129 4R - No Added Capacity
$245,000.00
$64,740,204.53