RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Florida | I-4 MANAGED LANES FROM KIRKMAN TO SR 434; ADD LANES & RECONSTRUCT; PRELIMINARY ENGINEERING & CONSTRUCTION; DB | $903,901,412.00 |
$4,544,744,671.00 |
|
Florida | I-10 (SR 8) / SR 200 (US 301) INTERCHANGE OPERATIONAL IMPROVEMENTS;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $108,271,456.00 |
$154,434,764.00 |
|
Florida | I-75 FROM SR 470 TO SR91(FLORIDA TURNPIKE);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $14,603,840.00 |
$51,940,645.00 |
|
Florida | SR-93/I-75 ML SYSTEM FR S OF MIRAMAR PKWY INTG TO S OF SHERIDAN ST;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $1,481,215.00 |
$97,963,937.00 |
|
Florida | I-75 AT SR 884 (COLONIAL BLVD) INTERCHANGE;INTERCHANGE IMPROVEMENT;PRELIMINARY ENGINEER | $55,570,320.00 |
$63,001,573.00 |
|
Florida | I-75 AT SR 64; INTERCHANGE IMPROVEMENT;CONSTRUCTION | $44,945,202.00 |
$51,692,830.00 |
|
Florida | SR-9/I-95 FR S. OF SR-842/BROWARD BLVD TO N. OF SR-870/COMMERCIAL BLVD; ADD SPECIAL USE LANE;CONSTRUCTION;DB | $77,743,312.00 |
$201,691,265.00 |
|
Florida | SR 9A/I-95 FROM NW 8 STREET TO NW 29 STREET;RIGID PAVEMENT RECONSTRUCTION;PRELIMINARY ENGINEER;DB | $36,161,715.00 |
$41,329,087.00 |
|
Florida | SR-9/I-95 FROM SW 10TH STREET TO BROWARD/PALM BEACH COUNTY LINE;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $32,590,171.00 |
$119,190,177.00 |
|
Florida | SR-9/I-95 FROM BROW/PALM BCH CO LINE TO SOUTH OF GLADES RD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $50,146,814.00 |
$58,340,989.00 |
|
Florida | SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON BLVD.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $31,238,492.00 |
$52,006,744.00 |
|
Florida | I-95 FROM SR 406 TO 0.5 MILE N OF SR 44;ADD LANES & REHABILITATE PVMN;CONSTRUCTION | $122,876,465.00 |
$136,937,342.00 |
|
Florida | I-95 INT @ ELLIS RD /ST JOHNS HERITAGE PKWY;INTERCHANGE (NEW);CONSTRUCTION | $46,184,911.00 |
$52,201,689.00 |
|
Florida | I-95 (SR 9) AT NORTH I-295 INTERCHANGE ;INTERCHANGE RAMP (NEW);CONSTRUCTION;DB | $90,221,293.00 |
$240,801,338.00 |
|
Florida | I-95 (SR 9) AT I-10 INTERCHANGE OPERATIONAL IMPROVEMENT;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $4,544,596.00 |
$161,948,558.00 |
|
Florida | SR-80/SOUTHERN BLVD BRIDGES 930097 & 930098;BRIDGE REPLACEMENT;CONSTRUCTION | $48,901,530.00 |
$120,115,888.00 |
|
Florida | SR 77 FROM NORTH OF CR 279 TO N SUNNY HILLS ENTRANCE;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $59,508,228.00 |
$89,488,062.00 |
|
Florida | GATEWAY EXPRESSWAY FM SR690 @ US19 & SR686 EXT @ CR611 TO W OF I-275;NEW ROAD CONSTRUCTION;PRELIMINARY ENGINEER;DB | $257,661,996.00 |
$2,602,743,816.00 |
|
Florida | SR 95 (US 29) FROM SR 8 (I-10) TO N OF SR 10 (US 90A) 9 MILE ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $59,369,586.00 |
$66,855,611.00 |
|
Florida | US 19 (SR 55) FROM W JUMP COURT TO W FORT ISLAND TRAIL;ADD LANES & RECONSTRUCT;CONSTRUCTION | $24,514,946.00 |
$139,930,183.00 |
|
Florida | I-275 (SR 93) FROM S OF GANDY BLVD TO N OF 4TH ST N;ADD LANES & RECONSTRUCT;ADMINISTRATION;DB | $138,725,731.00 |
$238,109,099.00 |
|
Florida | I-295 (SR 9A) FROM BUCKMAN BRIDGE TO I-95 AUX-LANES;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB-E2S01 | $91,742,836.00 |
$94,732,580.00 |
|
Florida | I-295 (SR 9A) FROM SR202 JTB BLVD TO SR 9B (MANAGED LANES);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $152,830,539.00 |
$228,349,963.00 |
|
Florida | SR201 FROM S OF BALDWIN TO N OF BALDWIN (BYPASS);NEW ROAD CONSTRUCTION;CONSTRUCTION | $69,658,674.00 |
$77,051,104.00 |
|
Florida | SR429/46(WEKIVA PKW) FROM W OF OLD MCDONALD RD TO E OF WEKIVA RIVER RD;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $30,502,118.00 |
$292,692,595.00 |
|
Florida | SR429/46(WEKIVA PKWY)FROM E OF WEKIVA RIVER RD TO ORANGE BOULEVARD;NEW ROAD CONSTRUCTION;CONSTRUCTION | $58,146,688.00 |
$246,171,141.00 |
|
Florida | SR 836/I-395 FROM WEST OF I-95 TO MACARTHUR CSWY BRIDGE;BRIDGE-REPLACE AND ADD LANES;CONSTRUCTION;DB | $181,135,675.00 |
$760,197,855.00 |
|
Florida | SR20 FROM SW 56TH AVENUE TO CR315 IN INTERLACHEN;ADD LANES & RECONSTRUCT; UTILITY WORK IN PREP FOR CONSTRUCTION. | $30,601,324.00 |
$36,384,171.00 |
|
Florida | SR 997/KROME AVENUE FROM SW 232 STREET TO S OF SW 184TH ST/EUREKA DR.;ADD LANES & RECONSTRUCT;CONSTRUCTION SUPPORT | $25,351,580.00 |
$41,415,639.00 |
|
Florida | CR 580/SAM ALLEN RD FM W OF SR39/BUCHMAN HWY TO E OF PARK RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $23,695,830.00 |
$30,578,736.00 |
|
Florida | SR 30 (US 98) PENSACOLA BAY BRIDGE NO. 480035;BRIDGE REPLACEMENT;CONSTRUCTION;DB | $18,344,966.00 |
$488,514,412.00 |
|
Florida | SR 30 (US 98) FROM EMERALD BAY DRIVE TO TANG-O-MAR DRIVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $53,954,461.00 |
$58,640,090.00 |
|
Florida | SR-7/US-441 FROM N. OF FILLMORE TO S OF STIRLING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $4,527,165.00 |
$45,203,759.00 |
|
Florida | SR 200 (A1A) FROM WEST OF RUBIN RD TO EAST OF CR 107/SCOTT RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $58,985,735.00 |
$81,465,943.00 |
|
Florida | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION | $665,711,369.00 |
$2,573,569,549.00 |
|
Florida | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | $80,952,434.00 |
||
Florida | I595/P3/RESURFACING FROM E OF I-75 TO W. OF I-95;RESURFACING | $124,950,849.00 |
||
Florida | I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB - AVAILABILITY PAYMENTS & OPERATIONS UNDER CRRSSA | $160,390,282.00 |
$160,390,282.00 |
|
Florida | SR 847/NW 47 AVENUE FROM SR 860/NW 183 STREET TO N. OF NW 199 STREET;ADD LANES & RECONSTRUCT;CONSTRUCTION | $20,730,369.00 |
$29,539,605.00 |
|
Florida | SR 826 FROM FLAGLER ST TO NW 154 ST. & I-75 FROM SR 826 TO NW 170 ST.;ADD SPECIAL USE LANE;CONSTRUCTION;DB | $219,899,167.00 |
$319,198,240.00 |
|
Florida | SR-713/KINGS HWY FR 800' S OF SR-70 TO N OF PICOS ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $11,923,352.00 |
$36,958,568.00 |
|
Florida | SR 54 FROM CR 577/CURLEY RD TO CR 579/MORRIS BRIDGE RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $35,007,182.00 |
$53,833,330.00 |
|
Florida | CR 4050 ORANGE AVE BR#794003 VETERANS MEMORIAL BRIDGE;BRIDGE REPLACEMENT;CONSTRUCTION;LAP | $43,321,726.00 |
$50,241,167.00 |
|
Florida | CROSSTOWN PARKWAY FROM MANTH LANE TO SR-5/US-1;NEW BRIDGE CONSTRUCTION;CONSTRUCTION;LAP | $46,175,530.00 |
$107,650,061.00 |
|
Florida | W. MIDWAY RD/CR-712 FROM S. 25TH STREET/SR-615 TO SR-5/US-1;ADD LANES & RECONSTRUCT;CONSTRUCTION | $31,294,239.00 |
$39,562,104.00 |
|
Florida | SR 46 / US 441 FROM W OF US 441 TO E OF VISTA VIEW LANE;ADD LANES & RECONSTRUCT;CONSTRUCTION; WEKIVA SECTIONS 3A AND 3B | $8,051,024.00 |
$65,869,341.00 |
|
Florida | SR 826/SR 836 FROM N OF SW 8 ST TO S OF NW 25 ST & FM NW 87 TO 57 AVE';INTERCHANGE (MODIFY);CONSTRUCTION;DB | $309,200,121.00 |
$567,489,632.00 |
|
Florida | I-4/SELMON EXPRESSWY FROM S OF SELMON EXPRSSW TO I-4;INTERCHANGE (NEW);CONSTRUCTION | $220,736,422.00 |
$226,120,955.00 |
|
Florida | I-75 FROM S OF N JONES LOOP TO N OF US 17 ;ADD LANES & RECONSTRUCT;CONSTRUCTION | $29,974,357.00 |
$36,266,388.00 |
|
Florida | I-75 AT SR 70 INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $90,186,644.00 |
$120,046,639.00 |
|
Florida | US 41 - VENICE BYPASS FROM CENTER RD TO GULF COAST BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $14,153,429.00 |
$26,754,935.00 |
|
Florida | US 41 (SR 45) FROM WINKLER AVENUE TO SR 82 ;RESURFACING;CONSTRUCTION | $6,843,283.00 |
$31,508,035.00 |
|
Florida | I-4 AT SR 557 ;INTERCHANGE IMPROVEMENT;ENVIRONMENTAL;DB | $82,643,756.00 |
$91,583,064.00 |
|
Florida | I-75 (SR 93) AT US 301 INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $152,050,689.00 |
$167,262,842.00 |
|
Florida | US 27 AT SR 60;INTERCHANGE - ADD LANES;CONSTRUCTION | $51,037,209.00 |
$58,529,274.00 |
|
Florida | SR 542 FROM BUCKEYE LOOP ROAD TO US 27;ADD LANES & RECONSTRUCT;CONSTRUCTION | $43,890,987.00 |
$53,785,491.00 |
|
Florida | I-75 (SR 93) AT SR 72 (CLARK ROAD) INTERCHANGE;INTERCHANGE - ADD LANES;CONSTRUCTION | $57,544,169.00 |
$64,179,810.00 |
|
Florida | I-4 (SR 400) AT CSX RAILROAD;BRIDGE REPLACEMENT;CONSTRUCTION | $14,834,051.00 |
$38,468,962.00 |
|
Florida | SR 70 FROM PEACE RIVER TO SE BAKER STREET;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION | $19,165,583.00 |
$37,425,594.00 |
|
Florida | SR 683 (US 301) FROM S OF 25TH CT E TO S OF 13TH AVE E;RESURFACING;CONSTRUCTION | $6,871,635.00 |
$28,678,990.00 |
|
Florida | SR 25 (US 27) FROM N OF SR 540 TO N OF KOKOMO RD;RESURFACING;CONSTRUCTION;DB | $12,059,231.00 |
$25,064,677.00 |
|
Florida | SR 70 FROM LORRAINE ROAD TO BOURNSIDE BLVD ;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $392,862.00 |
$50,081,155.00 |
|
Florida | FCX SOUTH OF US17 TO NORTH OF SR16; NEW ROAD CONSTRUCTION;CONSTRUCTION | $100,563,020.00 |
$913,741,145.00 |
|
Florida | SR200(US301) FROM: BRADFORD C/L TO: NORTH OF CR218;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION; CONCRETE PROJECT WITH STATE MATERIALS | $19,585,019.00 |
$37,786,847.00 |
|
Florida | SR15(US17) FROM: W. OF DUNNS CREEK TO: HORSE LANDING RD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $42,153,656.00 |
$50,993,035.00 |
|
Florida | I-295(SR9A) ARTERIAL TRAFFIC MGMT (BUCKMAN BRG)SR13 TO US17(SR15);ATMS - ARTERIAL TRAFFIC MGMT;CONSTRUCTION | $15,873,078.00 |
$26,610,098.00 |
|
Florida | I-10 FROM I-295 TO I-95;ADD MANAGED LANES;PRELIMINARY ENGINEER;DB | $172,851,749.00 |
$270,900,377.00 |
|
Florida | SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD);NEW ROAD CONSTRUCTION;CONSTRUCTION | $113,044,129.00 |
$282,609,610.00 |
|
Florida | SR23(FIRST COAST XWAY) FROM EAST OF CR16A (SPUR) TO EAST OF CR209 ;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $673,670,612.00 |
||
Florida | I-95(SR9) FROM: FLAGLER C/L TO: SR207;RESURFACING;CONSTRUCTION | $24,494,496.00 |
$26,805,330.00 |
|
Florida | URBAN CORE RIVERFRONT REVITALIZATION & COMPLETE STREETS;MISCELLANEOUS CONSTRUCTION;PRELIMINARY ENGINEER;LAP | $12,636,580.00 |
$51,182,261.00 |
|
Florida | I-95(SR9) FROM SR207 TO INTL GOLF PARKWAY;RESURFACING;CONSTRUCTION | $17,511,380.00 |
$26,414,490.00 |
|
Florida | I-95(SR9) FROM SOUTH OF SR126(EMERSON ST) TO ATLANTIC BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | $132,586.00 |
$286,918,845.00 |
|
Florida | SR116(WONDERWOOD) FROM: JANE STREET TO SAND CASTLE LANE;RESURFACING;CONSTRUCTION | $23,165,452.00 |
$36,893,498.00 |
|
Florida | I-295(SR9A) @ US17 TO SOUTH OF WELLS ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION | $24,409,190.00 |
$27,558,445.00 |
|
Florida | SR115 FROM SOUTHSIDE BLVD TO MATHEWS BRIDGE;RESURFACING;CONSTRUCTION | $7,709,582.00 |
$27,396,026.00 |
|
Florida | I-95(SR9) @ SR115(US1)/ML KING/20TH STREET ;INTERCHANGE - ADD LANES;CONSTRUCTION | $53,049,618.00 |
$91,301,910.00 |
|
Florida | I-295(SR9A) FROM MORSE AVE TO US90 ;RESURFACING;CONSTRUCTION | $22,491,686.00 |
$30,810,812.00 |
|
Florida | SR 30 (US 98) ELEVATED ROADWAY E TO W OF TYNDALL AFB ENTRANCE;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $25,859,887.00 |
$43,726,605.00 |
|
Florida | SR 388 WEST BAY PARKWAY FROM SR 79 TO E OF NWF BEACHES INTL AIRPORT;ADD LANES & RECONSTRUCT;CONSTRUCTION | $65,449,406.00 |
$97,456,770.00 |
|
Florida | SR 30 (US 98) GREGORY ST & BAYFRONT PKWY @ 17TH AVE INTERCHANGE;MISCELLANEOUS CONSTRUCTION;CONSTRUCTION;DB | $11,277,006.00 |
$29,671,630.00 |
|
Florida | SR 390 ST ANDREWS FROM SR 368 23RD ST TO E OF CR 2312 BALDWIN ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $41,030,700.00 |
$53,159,240.00 |
|
Florida | SR 77 FROM BAY COUNTY LINE TO NORTH OF CR 279;ADD LANES & RECONSTRUCT;CONSTRUCTION | $29,224,156.00 |
$46,196,080.00 |
|
Florida | SR 30 (US 98) FROM BAYSHORE ROAD TO PORTSIDE DRIVE;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | $74,959,706.00 |
$86,708,676.00 |
|
Florida | SR 369 (US 319) FROM EAST IVAN ROAD TO NORTH OF SR 267;ADD LANES & RECONSTRUCT;CONSTRUCTION | $24,480,478.00 |
$32,334,416.00 |
|
Florida | SR 8 (I-10) INTERCHANGE WEST OF CRESTVIEW;INTERCHANGE (NEW);CONSTRUCTION SUPPORT;DB | $9,565,369.00 |
$96,859,782.00 |
|
Florida | SR 263 CAPITAL CIRCLE FROM CR 2203 SPRINGHILL RD TO SR 371 ORANGE AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $30,569,186.00 |
$79,866,987.00 |
|
Florida | SR 10 (US 90) OVER SIMPSON RIVER BRIDGE NO. 580056 & 580108;BRIDGE REPLACEMENT;CONSTRUCTION | $8,451,501.00 |
$29,194,674.00 |
|
Florida | SR 77 FROM NORTH OF ROGERS ROAD TO SOUTH OF CANE MILL ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $65,508,453.00 |
||
Florida | SR 8 (I-10) @ SR 95 (US 29) INTERCHANGE ;INTERCHANGE - ADD LANES;CONSTRUCTION | $249,419,876.00 |
||
Florida | SR 30A (US 98) PC BEACH PKWY FROM MANDY LANE TO EAST OF NAUTILUS ST;ADD LANES & RECONSTRUCT;CONSTRUCTION | $57,615,300.00 |
||
Florida | SR 30A (US98) PC BCH PKWY FROM E OF NAUTILUS ST TO E OF R JACKSON BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $74,463,882.00 |
||
Florida | SR 30 (US 98) OVER ST ANDREWS BAY ICWW BRIDGE NO. 460019;BRIDGE REPLACEMENT;CONSTRUCTION;DB | $48,305,698.00 |
$148,933,678.00 |
|
Florida | SR 8 (I-10) OVER SR 10 (US 90A) NINE MILE RD BR NO. 480061 & 480066;BRIDGE REPLACEMENT;CONSTRUCTION | $27,678,980.00 |
$70,291,426.00 |
|
Florida | SR-80 FROM W OF LION COUNTRY SAFARI RD TO FOREST HILL/CRESTWOOD BLVD.;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $33,595,658.00 |
$47,199,656.00 |
|
Florida | SR-9/I-95 @ SR-808/GLADES ROAD;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $27,560,982.00 |
$29,571,843.00 |
|
Florida | SR-9/I-95 @COPANS RD FR S OF NB EXIT RAMP TO N OF SB TO WB EXIT RAMP;INTERCHANGE JUSTIFICA/MODIFICA;CONSTRUCTION | $28,094,527.00 |
$29,351,564.00 |
|
Florida | LOXAHATCHEE RD. FROM ARTHUR MARSHALL LOXAHATCHEE REFUGE TO SR-7/US-441;ROAD RECONSTRUCTION - 2 LANE;CONSTRUCTION | $15,790,125.00 |
$38,037,895.00 |
|
Florida | SR-A1A NORTH BRIDGE OVER ICWW BRIDGE #940045 ;BRIDGE REPLACEMENT;CONSTRUCTION | $13,107,403.00 |
$136,235,123.00 |
|
Florida | SR-5/US-1 FEDERAL HIGHWAY FROM CR-A1A TO BEACH ROAD;BRIDGE REPLACEMENT;CONSTRUCTION SUPPORT | $3,828,311.00 |
$136,545,913.00 |
|
Florida | SR-710/BEELINE HWY FROM NORTHLAKE BLVD TO SR-708/BLUE HERON BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION | $7,468,985.00 |
$170,054,234.00 |
|
Florida | SR-869/SW 10TH STREET CONNECTOR TSM&O SMART WORK ZONE;ITS COMMUNICATION SYSTEM;CONSTRUCTION;DB | $2,791,899.00 |
$29,360,054.00 |
|
Florida | SR-9/I-95 @ 6TH AVENUE SOUTH;INTERCHANGE - ADD LANES;CONSTRUCTION | $26,220,410.00 |
||
Florida | SR-9/I-95 FROM SOUTH OF SW 10TH STREET TO NORTH OF HILLSBORO BLVD.;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $846,113,531.00 |
||
Florida | SR-9/I-95 @ OSLO ROAD INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION | $3,596,419.00 |
$67,285,488.00 |
|
Florida | OSLO ROAD FROM SW 82ND AVE TO 58TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION SUPPORT | $2,880,874.00 |
$48,251,135.00 |
|
Florida | SR 429 (WEKIVA PKWY) FROM ORANGE BOULEVARD TO W OF I-4 (SR 400);NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $134,317,170.00 |
$340,751,641.00 |
|
Florida | SR 46 (WEKIVA PKWY) FROM ORANGE BLVD TO N. OREGON ST/WAYSIDE DR; ADD LANES & RECONSTRUCT; CONSTRUCTION | $15,044,749.00 |
$26,079,015.00 |
|
Florida | SR 500 (US 441) FROM LAKE ELLA RD TO AVENIDA CENTRAL; ADD LANES & RECONSTRUCT; CONSTRUCTION | $42,870,936.00 |
$52,557,246.00 |
|
Florida | I-4 (SR 400) AT DARYL CARTER PARKWAY INTERCHANGE;INTERCHANGE (NEW);CONSTRUCTION | $21,731,972.00 |
$85,257,966.00 |
|
Florida | SR 93 (I-75) FROM SUMTER COUNTY TO SR 200; RESURFACING; CONSTRUCTION | $28,742,179.00 |
$31,573,246.00 |
|
Florida | I-4 @ SAND LAKE RD INTERCHANGE FROM E OF SR 528 TO W OF SR 435;INTERCHANGE IMPROVEMENT;CONSTRUCTION | $206,262,754.00 |
$234,171,755.00 |
|
Florida | SR 464 FROM SR 500 (US 27/301) TO SR 35; RESURFACING; CONSTRUCTION | $14,432,051.00 |
$25,279,655.00 |
|
Florida | SPACE COMMERCE WAY;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $16,500,000.00 |
$29,722,571.00 |
|
Florida | NEPTUNE ROAD FROM SOUTH OF KINGS CREST RD TO SR 500 / US 192;WIDEN/RESURFACE EXIST LANES;CONSTRUCTION;LAP | $4,393,714.00 |
$51,314,503.00 |
|
Florida | I-75 (SR 93) REST AREA MARION COUNTY FROM N OF SR 484 TO S OF SR 200;REST AREA;CONSTRUCTION | $6,453,801.00 |
$38,067,726.00 |
|
Florida | NEPTUNE RD FROM PARTIN SETTLEMENT RD TO S OF KINGS CREST ROAD;WIDEN/RESURFACE EXIST LANES;CONSTRUCTION;LAP | $1,320,585.00 |
$25,906,667.00 |
|
Florida | SR 968/SW 1ST STREET AT MIAMI RIVER (BRIDGE #870660);BRIDGE REPLACEMENT;CONSTRUCTION | $64,999,715.00 |
$88,768,005.00 |
|
Florida | SR 826/PALMETTO EXPY - SR 826 EASTBOUND RAMP TO SR 9A/I-95 NORTHBOUND;INTERCHANGE RAMP (NEW);CONSTRUCTION | $14,706,111.00 |
$92,050,159.00 |
|
Florida | SR 25/OKEECHOBEE RD FROM E. OF NW 107 AVE TO E. OF NW 116 WAY(CNCRETE);ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $62,378,658.00 |
$126,031,294.00 |
|
Florida | SR 25/OKEECHOBEE RD FROM BROWARD COUNTY LINE TO WEST OF HEFT;ADD LANES & RECONSTRUCT;CONSTRUCTION | $49,547,094.00 |
$54,710,096.00 |
|
Florida | SR 7 AND SR 9/GOLDEN GLADES INTERCHANGE VARIOUS RAMP IMPROVEMENTS;INTERCHANGE RAMP (NEW);CONSTRUCTION | $47,531,861.00 |
$93,799,931.00 |
|
Florida | SR 826 CONNECTOR AT GOLDEN GLADES INTERCHG AND VARIOUS RAMPS;ADD LANES & RECONSTRUCT;CONSTRUCTION | $86,534,505.00 |
$86,534,505.00 |
|
Florida | I75/SR 56 INTERCHANGE FM E OF CR 54 TO W OF CYPRESS RIDGE BL(PHASE I);INTERCHANGE - ADD LANES;CONSTRUCTION | $42,211,254.00 |
$49,395,195.00 |
|
Florida | SR 52 (SCHRADER HWY) FROM W OF SUNCOAST PKWY TO E OF US 41 (SR 45);ADD LANES & RECONSTRUCT;CONSTRUCTION | $34,218,196.00 |
$59,861,589.00 |
|
Florida | I-275 (HOWARD FRKL) FROM N OF SR687(4TH ST N) TO N OF HOWARD FRANKLAND;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | $230,619,874.00 |
$706,960,914.00 |
|
Florida | I-275 (HOWARD FRKL) FM N OF HOWARD FRANKLAND TO S OF SR 60;BRIDGE-REPLACE AND ADD LANES;PRELIMINARY ENGINEER;DB | $33,377,721.00 |
$51,682,122.00 |
|
Florida | SR 50 FM WINDMERE RD/BRONSON BL TO US 98/MCKETHAN RD;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $37,756,362.00 |
$43,900,810.00 |
|
Florida | SR 50 FROM US 98/MCKETHAN RD TO US 301;ADD LANES & REHABILITATE PVMNT;CONSTRUCTION | $21,032,174.00 |
$25,399,595.00 |
|
Florida | US 41/SR 45 FROM N OF 15TH AVE TO S OF BULLFROG CREEK;RESURFACING;CONSTRUCTION | $23,790,391.00 |
$29,681,359.00 |
|
Florida | I-75 (SR 93A) FM S OF CSX/BROADWAY AVE TO EB/WB I-4 EXIT RAMP;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $97,259,199.00 |
$105,261,264.00 |
|
Florida | I-275 (SR 93) FROM N OF MLK TO N OF HILLSBOROUGH AVE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $40,506,860.00 |
$46,884,409.00 |
|
Florida | I-275/SR 93 FROM N OF I-4 TO N OF MLK;ADD LANES & RECONSTRUCT;CONSTRUCTION | $52,839,257.00 |
$59,132,214.00 |
|
Florida | US 19 (SR 55) FROM N OF SR 580 (MAIN ST) TO NORTHSIDE DR;ADD LANES & RECONSTRUCT;CONSTRUCTION | $103,765,660.00 |
$123,557,404.00 |
|
Florida | I-4/SR 400 FROM DOWNTOWN TAMPA TO POLK COUNTY LINE;ITS COMMUNICATION SYSTEM;CONSTRUCTION | $11,541,288.00 |
$27,780,963.00 |
|
Florida | US 19 (SR 55) FROM NORTHSIDE DR TO NORTH OF CR 95;ADD LANES & RECONSTRUCT;CONSTRUCTION | $131,474,428.00 |
$147,783,516.00 |
|
Florida | US 19/SR55/34TH ST FROM SR 682/54TH AVE S TO 22ND AVE N;RESURFACING;CONSTRUCTION | $14,166,520.00 |
$26,131,707.00 |
|
Florida | I-4/SR 400 FROM E OF MCINTOSH RD TO E OF COUNTY LINE RD;RESURFACING;CONSTRUCTION SUPPORT | $35,130,965.00 |
$42,877,932.00 |
|
Florida | I-75/SR 93A FROM S OF PROGRESS BLVD TO N OF WOODBERRY RD;RIGID PAVEMENT REHABILITATION;CONSTRUCTION | $28,921,149.00 |
||
Florida | HURRICANE IAN SANIBEL ISLAND ACCESS - EMERGENCY ROAD REPAIRS; EMERGENCY OPERATIONS; SANIBEL CSWY/SEXTANT - DB - IN12002E | $70,758,737.00 |
||
Florida | HURRICANE IAN PINE ISLAND ROADWAY PERMANENT REPAIRS; EMERGENCY OPERATIONS; PINE ISLAND BRIDGE APPROACH - IN12006P | $41,243,579.00 |
$50,340,028.00 |
|
Florida | NASA CAUSEWAY BRIDGE; BRIDGE REPLACEMENT; CONSTRUCTION | $86,988,000.00 |
$93,773,517.00 |
|
Florida | PORT OF MIAMI TUNNEL FROM PORT OF MIAMI TO SR 836/I-395;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | $214,270,573.00 |
$2,365,899,035.00 |
|
Florida | SR20 FROM ALACHUA C/L TO SW 56TH AVENUE;ADD LANES & RECONSTRUCT;CONSTRUCTION | $45,637,697.00 |
$73,076,726.00 |
|
Florida | SR-90/US HWY-41/TAMIAMI TRAIL FROM STRUCTURE S-333 TO STRUCTURE S-334;FLEXIBLE PAVEMENT RECONSTRUCT.;CONSTRUCTION;DB | $65,772,857.00 |
$74,140,362.00 |
|
Florida | FIU UNIVERSITY CITY PROSPERITY PROJ. ALONG SW 109 AVE & SR 90/SW 8 ST; PEDESTRIAN OVERPASS; DESIGN & CONSTRUCTION MANAGED BY FDOT | $25,015,326.00 |
$33,441,740.00 |
|
Florida | BIG BEND ROAD/CR 672 @ I-75/SR93A FROM W OF COVINGTON TO E OF SIMMONS;INTERCHANGE - ADD LANES;CONSTRUCTION;DB | $25,000,000.00 |
$104,015,237.00 |
|
Florida | I275/SR93 FM N OF HFB TO N OF LOIS,SR60 FM KENNEDY TO N OF SPRUCE/TIA;ADD LANES & RECONSTRUCT;PRELIMINARY ENGINEER;DB | $467,677,830.00 |
$1,541,965,168.00 |