RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Florida | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $12,425,279.58 |
$12,425,279.58 |
|
Florida | Seminole | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $4,148,354.42 |
$4,148,354.42 |
|
Florida | Seminole | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $19,272,979.41 |
$19,272,979.41 |
|
Florida | Orange | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $57,727,024.59 |
$57,727,024.59 |
|
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $555,048,748.56 |
$3,080,502,743.39 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $185,310,834.44 |
$1,028,469,184.61 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $45,996,283.52 |
||
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $137,769,492.48 |
||
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $45,628,973.27 |
$49,519,181.50 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,233,874.73 |
$16,532,675.50 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $112,436.30 |
$112,436.30 |
|
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $336,772.70 |
$336,772.70 |
|
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $3,034,928.44 |
$3,034,928.44 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,013,253.56 |
$1,013,253.56 |
|
Florida | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $123,100.52 |
$123,100.52 |
|
Florida | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $368,714.48 |
$368,714.48 |
|
Florida | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $22,196,884.72 |
||
Florida | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $7,410,742.28 |
||
Florida | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,030,262.59 |
$14,463,403.89 |
|
Florida | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,085,874.41 |
$43,321,235.11 |
|
Florida | Duval | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $659,485.00 |
$659,485.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $80,816,549.00 |
$82,063,284.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,953,305.00 |
$16,193,466.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $2,901,170.00 |
$9,047,918.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $32,754.00 |
$32,754.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $13,681.00 |
||
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,631,694.00 |
$8,725,911.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $62,499.00 |
$62,499.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $36,579,583.00 |
||
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $80,000.00 |
$915,325.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $134,000.00 |
$140,858.00 |
|
Florida | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $13,597,925.00 |
$47,270,221.00 |
|
Florida | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,664,509.00 |
||
Florida | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $135,294.00 |
$135,294.00 |
|
Florida | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $794,080.00 |
$794,080.00 |
|
Florida | Sumter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $25,328.00 |
$25,328.00 |
|
Florida | Sumter | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $51,213.00 |
$51,213.00 |
|
Florida | Broward | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $20,031.00 |
$20,031.00 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,275,519.00 |
$97,758,241.00 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $185,665.00 |
$185,665.00 |
|
Florida | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,159,441.00 |
$49,097,426.00 |
|
Florida | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,843,316.00 |
$5,107,766.00 |
|
Florida | Lee | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $155,000.00 |
$155,000.00 |
|
Florida | Lee | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $4,256,063.00 |
$5,369,304.00 |
|
Florida | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $176,667.00 |
||
Florida | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,771,385.00 |
||
Florida | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $167,525.00 |
||
Florida | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $156,500.00 |
$156,500.00 |
|
Florida | Manatee | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | $36,934,207.00 |
$41,053,385.00 |
|
Florida | Manatee | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Administration | $2,482,999.00 |
||
Florida | Manatee | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $3,842,309.00 |
$3,842,309.00 |
|
Florida | Manatee | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Other | $2,220,000.00 |
$2,220,000.00 |
|
Florida | Manatee | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Utilities | $1,599,109.00 |
$1,599,109.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $349,577.00 |
$495,028.00 |
|
Florida | Broward | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $1,909,687.00 |
$1,909,687.00 |
|
Florida | Broward | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $929,652.00 |
$929,652.00 |
|
Florida | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $32,632.00 |
$32,632.00 |
|
Florida | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,185,787.00 |
$1,185,787.00 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $50,861,642.00 |
$50,861,643.00 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $835,931.00 |
$22,027,554.00 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,094,318.00 |
$104,029,133.00 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $18,717,734.00 |
||
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $893,663.00 |
$1,997,443.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,842,051.00 |
$13,695,737.86 |
|
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $18,198,667.00 |
$21,047,382.14 |
|
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,847,757.26 |
$2,129,436.11 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,202,353.74 |
$1,385,644.89 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $107,238.15 |
$107,238.15 |
|
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $164,801.85 |
$164,801.85 |
|
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,066,379.59 |
$1,066,379.59 |
|
Florida | Miami-Dade | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,638,794.41 |
$1,638,794.41 |
|
Florida | Miami-Dade | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $56,746.50 |
$56,746.50 |
|
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $36,925.50 |
$36,925.50 |
|
Florida | Broward | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Traffic Management/Engineering - HOV | $2,973,224.72 |
$2,973,224.72 |
|
Florida | Palm Beach | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Traffic Management/Engineering - HOV | $28,122.28 |
$28,122.28 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $782,532.21 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $82,733,131.79 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,055,442.07 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $28,899.93 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $271,470.42 |
$271,470.42 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $28,701,180.58 |
$28,701,180.58 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $159,804.49 |
$159,804.49 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,511.51 |
$1,511.51 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,261.96 |
$4,261.96 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $450,595.04 |
$450,595.04 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $22,325,230.00 |
$22,325,230.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $8,054,144.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $27,516,016.00 |
$27,516,016.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $121,593.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $18,438.00 |
||
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $305,568.00 |
$305,568.00 |
|
Florida | Palm Beach | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $112,908.00 |
$112,908.00 |
|
Florida | Palm Beach | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $188,164.00 |
$188,164.00 |
|
Florida | Palm Beach | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $8,340,643.00 |
$8,431,963.00 |
|
Florida | Palm Beach | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Administration | $17,843,503.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,786,865.00 |
$24,518,172.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $809,912.00 |
$831,566.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $80,468.00 |
||
Florida | Volusia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $48,255,617.83 |
$54,354,407.99 |
|
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $36,771,277.17 |
$41,418,618.01 |
|
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,833,365.71 |
$2,655,799.65 |
|
Florida | Volusia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,405,959.29 |
$3,485,254.35 |
|
Florida | Volusia | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $16,066,697.37 |
$16,066,697.37 |
|
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $12,242,988.63 |
$12,242,988.63 |
|
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Administration | $611,082.41 |
||
Florida | Volusia | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Administration | $801,934.59 |
||
Florida | Volusia | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $718,080.95 |
$718,080.95 |
|
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $547,185.05 |
$547,185.05 |
|
Florida | Brevard | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,552,866.26 |
$1,552,866.26 |
|
Florida | Volusia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,037,854.74 |
$2,037,854.74 |
|
Florida | Volusia | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $252,309.55 |
$252,309.55 |
|
Florida | Brevard | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $192,262.45 |
$192,262.45 |
|
Florida | Brevard | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $1,160,673.00 |
$1,187,077.00 |
|
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $40,884,957.00 |
$40,884,957.00 |
|
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,590,555.00 |
||
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,929,783.00 |
$1,957,283.00 |
|
Florida | Brevard | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $488,035.00 |
$497,341.00 |
|
Florida | Brevard | >= 200,000 | State | SURFACE TRANS PRIORITIES S129 | 4R - Added Capacity | $1,086,818.00 |
$1,086,818.00 |
|
Florida | Brevard | >= 200,000 | State | SURFACE TRANSPORTATION PROJECT | 4R - Added Capacity | $634,645.00 |
$3,377,228.00 |
|
Florida | Brevard | >= 200,000 | State | SURFACE TRANSPORTATION PROJECT | Administration | $1,620,430.00 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $75,342,356.00 |
$225,671,710.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,186,748.00 |
$12,200,098.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $320,000.00 |
$320,000.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,872,308.00 |
$1,967,547.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $29,763.00 |
$171,865.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $470,118.00 |
$470,118.00 |
|
Florida | Duval | >= 200,000 | Other | INTERSTATE MAINTENANCE | 4R - Added Capacity | $0.07 |
$0.07 |
|
Florida | Duval | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $0.93 |
$0.93 |
|
Florida | Duval | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $45,746.19 |
$45,746.19 |
|
Florida | Duval | >= 200,000 | Other | INTERSTATE MAINTENANCE | Construction Engineering | $3,703.81 |
$3,703.81 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $3,500,424.84 |
$142,533,037.71 |
|
Florida | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $283,409.16 |
$9,999,058.29 |
|
Florida | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $565,217.21 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $8,090,482.79 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $441,943.09 |
$441,943.09 |
|
Florida | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $34,895.91 |
$34,895.91 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $216,910.05 |
$216,910.05 |
|
Florida | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $17,561.95 |
$17,561.95 |
|
Florida | Palm Beach | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - No Added Capacity | $5.00 |
$5.00 |
|
Florida | Palm Beach | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $65,548.00 |
$65,548.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $9,864,383.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $34,824,419.00 |
$92,740,197.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,985,160.00 |
$10,708,315.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $837,495.00 |
$1,168,551.00 |
|
Florida | Palm Beach | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $1,012,405.00 |
$1,012,405.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $1,357,685.00 |
$1,821,185.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,818,813.00 |
$2,735,299.00 |
|
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $48,951,049.00 |
$68,176,153.00 |
|
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $6,677,739.00 |
||
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,013,666.00 |
$10,250,383.00 |
|
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,543,513.00 |
$4,383,787.00 |
|
Florida | Pinellas | >= 200,000 | State | CONGESTION AIR QUALITY | New Construction Roadway | $1,913,647.00 |
$1,913,647.00 |
|
Florida | Pinellas | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | New Construction Roadway | $22,907.00 |
$22,907.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $312,776,037.00 |
||
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,482,557.00 |
$140,660,819.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $185,536,699.00 |
$1,875,953,406.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $674,119.00 |
$65,236,655.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $852,318.00 |
$142,937,423.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $5,846.00 |
$5,846.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $127,441.00 |
$127,441.00 |
|
Florida | Pinellas | >= 200,000 | State | SEC 115 UNOBL BAL TRANSF | New Construction Roadway | $789,243.00 |
$789,243.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $62,257,219.00 |
$62,320,392.00 |
|
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $52,267,405.00 |
$54,697,390.00 |
|
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,056,040.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,102,181.00 |
$7,102,181.00 |
|
Florida | Citrus | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $680,511.00 |
$735,345.00 |
|
Florida | Citrus | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $10,441.00 |
$10,441.00 |
|
Florida | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,947,945.00 |
$114,267,659.00 |
|
Florida | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,422,354.00 |
||
Florida | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,676,693.00 |
$7,101,166.00 |
|
Florida | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,091,365.00 |
||
Florida | Citrus | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $892,736.00 |
$892,736.00 |
|
Florida | Citrus | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $669,324.00 |
$2,771,821.00 |
|
Florida | Citrus | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $145,000.00 |
$145,000.00 |
|
Florida | Citrus | >= 50,000 AND < 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $492,296.00 |
$492,296.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,438,526.00 |
$56,735,494.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $33,757,335.00 |
||
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $108,376,625.00 |
$126,743,743.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $16,961,947.00 |
||
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $3,910,580.00 |
$3,910,580.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $80,381,817.00 |
$83,370,089.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,472.00 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,994,895.00 |
$9,994,895.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $212,238.00 |
$212,238.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $878,279.00 |
$878,279.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $229,845.00 |
$229,845.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $45,762.00 |
$45,762.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $37,899,358.00 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $17,331,091.00 |
||
Florida | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,612,790.89 |
$1,617,345.92 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $145,575,881.11 |
$147,118,546.08 |
|
Florida | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $15,693.50 |
$15,693.50 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $85,164.50 |
$85,164.50 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $211,100.00 |
$211,100.00 |
|
Florida | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $38,900.00 |
$38,900.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $10,000.00 |
$2,711,044.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $813,712.00 |
$16,854,423.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,552,017.00 |
$3,552,017.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $145,169.67 |
$145,169.67 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $745,310.00 |
$745,310.00 |
|
Florida | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $24,800.33 |
$24,800.33 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,313,194.00 |
$6,313,194.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $53,852,191.00 |
$53,852,191.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,257,329.00 |
$1,257,329.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $3,693,753.00 |
||
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $15,507.00 |
$15,507.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,220,453.00 |
$11,919,130.00 |
|
Florida | Lake | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $688,769.00 |
$688,769.00 |
|
Florida | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $15,842,495.00 |
||
Florida | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,426,723.00 |
$1,426,723.00 |
|
Florida | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $1,295,185.00 |
$1,295,185.00 |
|
Florida | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $19,137,199.00 |
$265,485,181.00 |
|
Florida | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $980,749.00 |
$980,749.00 |
|
Florida | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $6,973,493.00 |
$6,973,493.00 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,341,179.00 |
$204,273,223.00 |
|
Florida | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $8,799,021.00 |
||
Florida | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,805,509.00 |
$33,098,897.00 |
|
Florida | Miami-Dade | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $561,698.12 |
$574,777.65 |
|
Florida | Miami-Dade | >= 200,000 | Other | CONGESTION AIR QUALITY | Construction Engineering | $211,351.88 |
$216,273.35 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,418,800.00 |
$3,418,800.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $154,588,055.00 |
$680,932,126.00 |
|
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,809,679.59 |
$11,781,797.35 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,467,129.41 |
$31,311,828.65 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,736,861.00 |
||
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $500,236.97 |
$500,236.97 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,329,452.03 |
$1,329,452.03 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,053,570.00 |
||
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $396,430.00 |
||
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $354,259.70 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $941,496.30 |
||
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $150,494.00 |
||
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,249,272.00 |
$13,499,452.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $22,766,475.00 |
$27,079,992.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,410,309.00 |
||
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,834,849.00 |
$7,870,593.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $23,277.00 |
||
Florida | Miami-Dade | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $375,070.00 |
$375,070.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,191,534.00 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $8,872,525.00 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $24,976,510.00 |
$24,976,510.00 |
|
Florida | Hillsborough | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $1,964,317.00 |
$1,964,317.00 |
|
Florida | Hillsborough | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | Rail/Hwy Crossing | $30,000.00 |
$30,000.00 |
|
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $229,593.00 |
$229,593.00 |
|
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,933,139.00 |
$15,997,459.00 |
|
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,028,238.00 |
||
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,427,736.00 |
$4,427,736.00 |
|
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,082,445.00 |
$1,168,599.00 |
|
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $28,600.00 |
$28,600.00 |
|
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,704,194.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $11,305,527.89 |
||
Florida | Escambia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,030,545.06 |
||
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $10,214,147.05 |
||
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $18,344,966.00 |
$465,964,192.00 |
|
Florida | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $602,313.29 |
$619,466.03 |
|
Florida | Walton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $45,487,535.71 |
$46,782,933.97 |
|
Florida | Walton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,125,194.41 |
||
Florida | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $41,381.59 |
||
Florida | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $102,776.67 |
$105,475.28 |
|
Florida | Walton | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,761,835.33 |
$7,965,638.72 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,229,726.00 |
$3,229,726.00 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $178,050.00 |
$178,050.00 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $723,133.00 |
$41,399,727.00 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $396,256.00 |
$396,256.00 |
|
Florida | Nassau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $105,072.00 |
$14,193,758.00 |
|
Florida | Nassau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,634,542.00 |
||
Florida | Nassau | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $54,007,144.00 |
$56,764,124.00 |
|
Florida | Nassau | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,689,829.00 |
$4,689,829.00 |
|
Florida | Nassau | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $183,690.00 |
$183,690.00 |
|
Florida | Broward | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $385,825.00 |
$385,825.00 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $664,468,266.00 |
$2,416,163,577.00 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $156,162,869.00 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $172,796.00 |
$172,796.00 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $682,026.00 |
$682,026.00 |
|
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,456.00 |
$2,456.00 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $80,952,434.00 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $124,950,849.00 |
||
Florida | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Operations | $14,391,079.00 |
$14,391,079.00 |
|
Florida | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $145,999,203.00 |
$145,999,203.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $41,468.00 |
$41,468.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,215,605.00 |
$1,215,605.00 |
|
Florida | Miami-Dade | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $1,532,020.00 |
$1,532,020.00 |
|
Florida | Miami-Dade | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $3,125,825.00 |
$3,125,825.00 |
|
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,815,451.00 |
$16,087,988.00 |
|
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,666,108.00 |
||
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $346,478.00 |
||
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $5,524,113.00 |
||
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,302,778.26 |
$2,076,762.83 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $112,976,016.74 |
$180,095,415.17 |
|
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $58,983.91 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $5,115,043.09 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,522,454.87 |
$24,801,179.23 |
|
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $17,556.13 |
$285,993.77 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $357,972.06 |
||
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $4,127.94 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,161,227.89 |
||
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $24,922.11 |
||
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,153,601.48 |
$1,154,832.68 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $100,039,510.52 |
$100,146,279.32 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,886.00 |
$37,814.94 |
|
Florida | Miami-Dade | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $114.00 |
$436.06 |
|
Florida | Miami-Dade | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $17,606.45 |
$17,606.45 |
|
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,526,818.55 |
$1,526,818.55 |
|
Florida | Miami-Dade | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $15,194.19 |
$15,194.19 |
|
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,317,629.81 |
$1,317,629.81 |
|
Florida | St. Lucie | >= 200,000 | Other | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $14,521.71 |
$14,521.71 |
|
Florida | St. Lucie | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $168,833.29 |
$168,833.29 |
|
Florida | St. Lucie | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $480,097.00 |
$480,097.00 |
|
Florida | St. Lucie | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $13,602.98 |
$13,602.98 |
|
Florida | St. Lucie | >= 200,000 | Other | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,170.02 |
$1,170.02 |
|
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,752,268.91 |
$5,941,748.37 |
|
Florida | St. Lucie | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $494,765.09 |
$511,062.63 |
|
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,862,273.00 |
$22,894,757.00 |
|
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,290,552.00 |
||
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $57,502.00 |
$3,846,189.00 |
|
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $717,716.00 |
||
Florida | St. Lucie | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $72,115.22 |
$72,115.22 |
|
Florida | St. Lucie | >= 200,000 | Other | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $6,202.78 |
$6,202.78 |
|
Florida | Pasco | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $3,038,355.00 |
$3,038,355.00 |
|
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $28,551,476.00 |
$32,655,167.00 |
|
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,255,503.00 |
$1,447,394.00 |
|
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,913,653.00 |
||
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,161,848.00 |
$6,131,435.00 |
|
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $7,647,326.00 |
||
Florida | Volusia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,273,051.00 |
||
Florida | Volusia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $32,152,105.00 |
$32,152,105.00 |
|
Florida | Volusia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $918,216.00 |
$1,713,215.00 |
|
Florida | Volusia | >= 200,000 | Local | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $34,099.00 |
$34,099.00 |
|
Florida | Volusia | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $3,749,445.00 |
$4,193,079.00 |
|
Florida | Volusia | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $1,647,887.00 |
$1,647,887.00 |
|
Florida | Volusia | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,819,974.00 |
$5,227,731.00 |
|
Florida | St. Lucie | >= 200,000 | Local | CONGESTION AIR QUALITY | Bridge New Construction | $6,814,069.00 |
$6,814,069.00 |
|
Florida | St. Lucie | >= 200,000 | Local | EQUITY BONUS EXEMPT LIM | Construction Engineering | $8,613.00 |
$8,613.00 |
|
Florida | St. Lucie | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | Bridge New Construction | $4,531,043.00 |
$66,005,574.00 |
|
Florida | St. Lucie | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | Construction Engineering | $36,395.00 |
$36,395.00 |
|
Florida | St. Lucie | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Bridge New Construction | $243,780.00 |
$243,780.00 |
|
Florida | St. Lucie | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $11,232.00 |
$11,232.00 |
|
Florida | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $3,856,110.00 |
$3,856,110.00 |
|
Florida | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $30,006,611.00 |
$30,006,611.00 |
|
Florida | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $667,677.00 |
$667,677.00 |
|
Florida | St. Lucie | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Added Capacity | $2,020,976.00 |
$2,020,976.00 |
|
Florida | St. Lucie | >= 200,000 | Local | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $162,520.00 |
$162,520.00 |
|
Florida | St. Lucie | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $839,333.00 |
$839,333.00 |
|
Florida | St. Lucie | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $1,010,267.00 |
$1,010,267.00 |
|
Florida | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,432,080.00 |
||
Florida | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $336,167.00 |
$336,167.00 |
|
Florida | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $23,777,903.00 |
$23,777,903.00 |
|
Florida | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,443,308.00 |
$5,279,093.00 |
|
Florida | St. Lucie | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $703,765.00 |
$703,765.00 |
|
Florida | Lake | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $2,623,603.00 |
$27,850,706.00 |
|
Florida | Lake | >= 200,000 | State | CONGESTION AIR QUALITY | Administration | $27,808,931.00 |
||
Florida | Lake | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $4,782,283.00 |
||
Florida | Lake | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $19,800.00 |
$19,800.00 |
|
Florida | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,262,031.00 |
$5,262,031.00 |
|
Florida | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $145,590.00 |
$145,590.00 |
|
Florida | Miami-Dade | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Special Bridge | $12,187,336.00 |
$12,187,336.00 |
|
Florida | Miami-Dade | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $51,010,032.00 |
$51,010,032.00 |
|
Florida | Miami-Dade | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Special Bridge | $35,082,587.00 |
$35,082,587.00 |
|
Florida | Miami-Dade | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Special Bridge | $18,460.00 |
$18,460.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $69,196,274.00 |
$294,281,225.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $42,900.00 |
$42,900.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,773,742.00 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $24,312,224.00 |
$25,934,492.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $799,500.00 |
$28,608,050.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $114,781,968.00 |
$114,781,968.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,321,606.00 |
$1,321,606.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $441,190.00 |
$441,190.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $6,044.00 |
$6,044.00 |
|
Florida | Hillsborough | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $6,408.00 |
$6,408.00 |
|
Florida | Hillsborough | >= 200,000 | Other | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $173,592.00 |
$173,592.00 |
|
Florida | Hillsborough | >= 200,000 | Other | GRANTS SUP PLAN SECTION 117 | New Construction Roadway | $247,639.58 |
$247,639.58 |
|
Florida | Hillsborough | >= 200,000 | State | GRANTS SUP PLAN SECTION 117 | New Construction Roadway | $9,141.42 |
$9,141.42 |
|
Florida | Hillsborough | >= 200,000 | Other | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $1,019,610.94 |
$1,019,610.94 |
|
Florida | Hillsborough | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $37,638.06 |
$37,638.06 |
|
Florida | Hillsborough | >= 200,000 | State | NAT COR PL DV/COOR BDR INF-TEA | New Construction Roadway | $0.02 |
$0.02 |
|
Florida | Hillsborough | >= 200,000 | Other | NAT COR PL DV/COOR BDR INF-TEA | New Construction Roadway | $0.98 |
$0.98 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $84,035.00 |
||
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,276,498.00 |
||
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $205,475,086.15 |
$205,475,086.15 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $7,584,936.85 |
$7,584,936.85 |
|
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,916,345.60 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $107,654.40 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $32,509.18 |
$32,509.18 |
|
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $880,670.82 |
$880,670.82 |
|
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $4,432,161.57 |
$4,432,161.57 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $163,609.43 |
$163,609.43 |
|
Florida | Hillsborough | >= 200,000 | Other | TRANSPORTATION IMP PROJ | New Construction Roadway | $649,443.35 |
$649,443.35 |
|
Florida | Hillsborough | >= 200,000 | State | TRANSPORTATION IMP PROJ | New Construction Roadway | $23,973.65 |
$23,973.65 |
|
Florida | Charlotte | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $27,924,703.00 |
$29,867,254.00 |
|
Florida | Charlotte | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,213,142.00 |
||
Florida | Charlotte | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,049,654.00 |
$2,185,992.00 |
|
Florida | Manatee | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $76,433,469.00 |
$77,365,629.00 |
|
Florida | Manatee | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Administration | $26,883,744.00 |
||
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,114,312.00 |
$3,605,742.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $468,052.00 |
||
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,022,103.00 |
$9,046,711.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $49,891.00 |
$49,891.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,790,691.00 |
$1,850,692.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $776,178.00 |
$776,178.00 |
|
Florida | Sarasota | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $1,931,117.00 |
$1,931,117.00 |
|
Florida | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $11,732,450.00 |
$12,538,198.00 |
|
Florida | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $345,000.00 |
||
Florida | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,555,100.00 |
||
Florida | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $489,862.00 |
$3,755,963.00 |
|
Florida | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $6,629,557.00 |
||
Florida | Lee | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Maintenance Resurfacing | $1,822,937.00 |
$1,835,667.00 |
|
Florida | Lee | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,393.00 |
||
Florida | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,476,079.00 |
$13,092,919.00 |
|
Florida | Lee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,475,272.00 |
||
Florida | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $43,589.00 |
$185,304.00 |
|
Florida | Lee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $500,678.00 |
$8,917,480.00 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $67,974,570.00 |
$68,417,935.00 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $7,954,127.00 |
||
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,883,731.19 |
$6,988,731.19 |
|
Florida | Polk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,457.81 |
$5,457.81 |
|
Florida | Polk | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $803.31 |
$31,346.43 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $7,016,562.69 |
$7,230,424.57 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $27,048.00 |
$27,048.00 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $705,583.00 |
$892,994.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $26,250.91 |
$30,626.06 |
|
Florida | Polk | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,749.09 |
$4,373.94 |
|
Florida | Manatee | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $340,977.00 |
$340,977.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $137,842,879.00 |
$137,978,714.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,614,892.00 |
$13,462,166.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,058,555.00 |
$1,058,555.00 |
|
Florida | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $193,386.00 |
$3,101,146.00 |
|
Florida | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $7,015,102.00 |
||
Florida | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $20,591.00 |
||
Florida | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,285,591.00 |
||
Florida | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $4,848,187.00 |
$4,848,187.00 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,207,987.00 |
$47,235,318.00 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,364,391.00 |
||
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $4,010.00 |
$4,010.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $100,343.00 |
||
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $762,131.00 |
$762,131.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,214,894.00 |
$2,214,894.00 |
|
Florida | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $310,712.00 |
$310,712.00 |
|
Florida | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $5,816,535.00 |
$5,816,535.00 |
|
Florida | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $857,557.00 |
$1,035,864.00 |
|
Florida | Polk | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $3,256,205.00 |
$3,256,205.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,671,661.00 |
$2,671,661.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $30,649,802.00 |
$33,310,179.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,034,744.00 |
||
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $151,521.00 |
$201,286.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $176,994.00 |
$176,994.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,971,311.00 |
||
Florida | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $50,107,800.00 |
$51,069,593.00 |
|
Florida | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,432,782.00 |
||
Florida | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,768,655.00 |
$6,574,862.00 |
|
Florida | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $35,000.00 |
||
Florida | Sarasota | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,040,815.00 |
||
Florida | Sarasota | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $1,667,714.00 |
$1,667,714.00 |
|
Florida | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $259,401.00 |
||
Florida | Sarasota | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $99,643.00 |
||
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $11,066.00 |
||
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $11,558,949.00 |
$30,650,071.00 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,275,102.00 |
$7,531,943.00 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $63,996.00 |
||
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $211,886.00 |
||
Florida | DeSoto | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $373,842.00 |
$398,842.00 |
|
Florida | DeSoto | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $10,718,414.00 |
||
Florida | DeSoto | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,122,738.00 |
$1,122,738.00 |
|
Florida | DeSoto | >= 5,000 AND < 50,000 | State | PROTECT PROGRAM APPORTIONED | 4R - No Added Capacity | $8,668,848.00 |
$8,693,848.00 |
|
Florida | DeSoto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,213,867.00 |
$8,705,464.00 |
|
Florida | DeSoto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,280,892.00 |
$2,280,892.00 |
|
Florida | DeSoto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $40,000.00 |
$40,000.00 |
|
Florida | DeSoto | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $5,465,396.00 |
$5,465,396.00 |
|
Florida | Manatee | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $1,563,063.00 |
$1,563,063.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $15,249,297.00 |
||
Florida | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $4,832,997.00 |
$10,247,930.00 |
|
Florida | Manatee | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $475,575.00 |
$1,618,700.00 |
|
Florida | Polk | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $300,000.00 |
$1,544,194.00 |
|
Florida | Polk | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $119,656.00 |
$1,012,134.00 |
|
Florida | Polk | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $10,868,774.00 |
||
Florida | Polk | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $11,639,575.00 |
$11,639,575.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $40,464,152.00 |
||
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,510,754.00 |
||
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,708,025.00 |
||
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $392,862.00 |
$785,724.00 |
|
Florida | Manatee | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $612,500.00 |
||
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $53,443,692.00 |
||
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,239,836.00 |
$7,046,810.00 |
|
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $93,656,199.00 |
$96,201,404.00 |
|
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $756,358,400.00 |
||
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $666,985.00 |
$690,839.00 |
|
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,404,653.00 |
||
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,440,444.00 |
$2,527,651.00 |
|
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $17,065,087.00 |
$33,709,543.00 |
|
Florida | Clay | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $79,488.00 |
$145,000.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $1,244,527.00 |
$1,244,527.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $36,120,299.00 |
$40,843,871.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,099,556.00 |
||
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,788,830.00 |
$4,805,081.00 |
|
Florida | Duval | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Administration | $1,437,906.00 |
||
Florida | Duval | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $560,691.00 |
$692,825.00 |
|
Florida | Duval | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $6,185,810.00 |
$14,762,724.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,081,442.00 |
$9,671,508.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $45,135.00 |
$45,135.00 |
|
Florida | Duval | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $837.00 |
$837.00 |
|
Florida | Duval | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $50,993.00 |
$50,993.00 |
|
Florida | Duval | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,161.00 |
$1,161.00 |
|
Florida | Duval | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,494,346.00 |
$1,494,346.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $143,493,251.00 |
$210,893,818.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $23,021,422.00 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,234,995.00 |
$15,557,142.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $673,373.00 |
$1,667,960.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,551,649.00 |
$5,928,111.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $249,939.00 |
$255,546.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $11,101,205.00 |
$11,229,041.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $800,000.00 |
||
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $14,503,803.00 |
||
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,825,066.00 |
$3,825,066.00 |
|
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $108,783,753.00 |
$263,751,162.00 |
|
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $72,576.00 |
$72,576.00 |
|
Florida | Clay | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $362,734.00 |
$382,697.00 |
|
Florida | Clay | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $74,306.00 |
||
Florida | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $21,143,840.00 |
||
Florida | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,673,965.00 |
||
Florida | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $635,337,556.00 |
||
Florida | Statewide | N/A | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,515,251.00 |
||
Florida | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $19,490,444.00 |
$19,490,444.00 |
|
Florida | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,488,115.00 |
$3,097,957.00 |
|
Florida | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Maintenance Resurfacing | $2,515,937.00 |
$3,270,840.00 |
|
Florida | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Administration | $946,089.00 |
||
Florida | Duval | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $3,144,864.44 |
$12,635,403.17 |
|
Florida | Duval | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $9,317,635.56 |
$37,436,297.83 |
|
Florida | Duval | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Administration | $233,793.70 |
||
Florida | Duval | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Administration | $692,686.30 |
||
Florida | Duval | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $130,151.57 |
$137,628.11 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $43,928.43 |
$46,451.89 |
|
Florida | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $15,159,110.00 |
$22,550,256.00 |
|
Florida | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $925,144.00 |
||
Florida | St. Johns | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,352,270.00 |
$2,939,090.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,000.00 |
$171,209,294.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $9,283,676.00 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $101,068,042.00 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,071,100.00 |
||
Florida | Duval | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,038.58 |
$231,054.90 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $123,547.42 |
$4,055,678.10 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,253,286.00 |
$26,376,023.00 |
|
Florida | Duval | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $461,700.00 |
$461,700.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $1,319,416.00 |
$8,238,761.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,248,062.00 |
||
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $131,050.00 |
$568,952.00 |
|
Florida | Duval | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $6,564,550.46 |
$7,285,657.01 |
|
Florida | Duval | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $8,135,402.86 |
$9,029,065.31 |
|
Florida | Clay | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $1,460,904.73 |
$1,621,383.04 |
|
Florida | Clay | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $3,711,387.95 |
$4,119,078.64 |
|
Florida | Clay | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Administration | $172,067.35 |
||
Florida | Clay | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Administration | $67,730.46 |
||
Florida | Duval | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Administration | $304,345.66 |
||
Florida | Duval | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Administration | $377,173.53 |
||
Florida | Duval | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $937,326.07 |
$937,326.07 |
|
Florida | Duval | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Construction Engineering | $1,161,621.82 |
$1,161,621.82 |
|
Florida | Clay | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Construction Engineering | $208,596.78 |
$208,596.78 |
|
Florida | Clay | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $529,934.33 |
$529,934.33 |
|
Florida | Clay | >= 200,000 | Other | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $124,935.87 |
$124,935.87 |
|
Florida | Clay | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $317,396.12 |
$317,396.12 |
|
Florida | Duval | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $561,397.23 |
$561,397.23 |
|
Florida | Duval | >= 200,000 | Other | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $695,735.78 |
$695,735.78 |
|
Florida | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,422.33 |
||
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $14,865.19 |
||
Florida | Clay | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $8,404.31 |
||
Florida | Clay | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,308.17 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,239,093.00 |
$9,038,041.00 |
|
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $9,559,309.00 |
||
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $994,972.00 |
||
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,470,489.00 |
$7,803,704.00 |
|
Florida | Duval | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Administration | $1,682,171.36 |
||
Florida | Duval | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Administration | $1,292,490.64 |
||
Florida | Duval | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $3,776,551.51 |
$3,776,551.51 |
|
Florida | Duval | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Construction Engineering | $2,901,700.49 |
$2,901,700.49 |
|
Florida | Duval | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Freight | $26,223,007.48 |
$30,171,741.89 |
|
Florida | Duval | >= 200,000 | Other | FAST ACT NATIONAL FREIGHT | Freight | $20,148,358.52 |
$23,182,355.11 |
|
Florida | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $44,156.93 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $57,470.07 |
||
Florida | Duval | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Freight | $11,959,533.86 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Freight | $15,565,285.14 |
||
Florida | Duval | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $290,442.82 |
||
Florida | Duval | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $378,010.18 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $22,421,714.00 |
$27,961,406.00 |
|
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,016,532.00 |
||
Florida | Duval | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $69,972.00 |
$1,832,874.00 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,119,478.00 |
$26,696,458.00 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $12,146,877.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,792,368.00 |
$3,894,224.00 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $150,087.00 |
$150,087.00 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $797,954.00 |
$838,959.00 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $58,054,974.00 |
$66,017,602.00 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $23,728,333.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,394,432.00 |
$7,710,835.00 |
|
Florida | Escambia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,386,214.47 |
$6,040,801.24 |
|
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,890,791.53 |
$22,507,408.76 |
|
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $885,704.33 |
||
Florida | Escambia | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $237,715.67 |
||
Florida | Bay | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,517,142.63 |
$8,247,048.98 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $29,418,462.37 |
$37,227,281.02 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,442,570.82 |
||
Florida | Bay | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $319,576.18 |
||
Florida | Bay | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $924,026.76 |
$1,028,790.38 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,171,068.24 |
$4,643,972.62 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $204,660.96 |
||
Florida | Bay | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,339.04 |
||
Florida | Washington | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $459,457.36 |
$719,143.70 |
|
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,785,452.64 |
$38,794,246.30 |
|
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,102,307.72 |
||
Florida | Washington | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $38,971.28 |
||
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,906,823.72 |
$4,458,757.31 |
|
Florida | Washington | >= 5,000 AND < 50,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $72,422.28 |
$82,653.69 |
|
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $67,375,956.00 |
$69,748,166.00 |
|
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,976,426.00 |
||
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,579,990.00 |
$8,287,799.00 |
|
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $3,760.00 |
$3,760.00 |
|
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,692,525.00 |
||
Florida | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $880,019.00 |
||
Florida | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,263,345.00 |
$24,927,617.00 |
|
Florida | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,121,379.00 |
||
Florida | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,217,133.00 |
$4,472,886.00 |
|
Florida | Wakulla | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $932,515.00 |
||
Florida | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,601,369.00 |
$8,499,630.00 |
|
Florida | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $84,500,880.00 |
||
Florida | Okaloosa | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,964,000.00 |
$3,859,272.00 |
|
Florida | Leon | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,628,554.00 |
$70,745,571.00 |
|
Florida | Leon | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,590,655.00 |
||
Florida | Leon | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,762,632.00 |
$6,352,761.00 |
|
Florida | Leon | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $178,000.00 |
$178,000.00 |
|
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $8,450,501.00 |
$8,450,501.00 |
|
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,893,275.00 |
||
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $13,477,084.00 |
||
Florida | Santa Rosa | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,000.00 |
$5,373,814.00 |
|
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $53,912,991.00 |
||
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,077,725.00 |
||
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,301,647.00 |
||
Florida | Washington | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,216,090.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $7,800,474.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,258,960.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $214,900,149.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,460,293.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $49,741,215.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,701,894.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,172,191.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $67,534,713.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,929,169.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $38,439,583.00 |
$38,439,583.00 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $9,866,115.00 |
$9,866,115.00 |
|
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $67,692,848.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $30,755,132.00 |
||
Florida | Bay | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,180,000.00 |
||
Florida | Escambia | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $27,678,980.00 |
$27,678,980.00 |
|
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,221,776.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $30,517,518.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,075,192.00 |
||
Florida | Escambia | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $797,960.00 |
||
Florida | Palm Beach | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $443,249.00 |
$443,249.00 |
|
Florida | Palm Beach | >= 200,000 | N/A | MIN ALLOC 90%-SUB TO LIM-STEA | 4R - Added Capacity | $1.00 |
$1.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,577,608.00 |
$10,093,528.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $54,744.00 |
$54,744.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $21,698,070.00 |
$22,768,162.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $5,009,687.00 |
||
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,603,297.00 |
$7,927,373.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $218,689.00 |
$263,244.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $639,668.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,013,426.00 |
$25,163,290.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,035,551.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,340,815.00 |
$2,535,940.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $152,978.00 |
$683,299.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $53,763.00 |
$53,763.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $100,000.00 |
||
Florida | Broward | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | New Construction Roadway | $27,462.04 |
||
Florida | Broward | >= 200,000 | State | HSIP LIMITING FLEXIBLE | New Construction Roadway | $52,442.67 |
||
Florida | Broward | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | New Construction Roadway | $71,401.29 |
||
Florida | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $612,174.46 |
$634,456.13 |
|
Florida | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,591,653.56 |
$1,649,585.89 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,169,033.98 |
$1,211,583.98 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $8,230,706.75 |
$8,327,021.01 |
|
Florida | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $4,310,078.69 |
$4,360,514.45 |
|
Florida | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $11,206,204.56 |
$11,337,337.54 |
|
Florida | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $176,903.51 |
$304,876.26 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $337,822.35 |
$582,204.47 |
|
Florida | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $459,949.14 |
$792,678.27 |
|
Florida | Broward | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - No Added Capacity | $364,105.00 |
$10,913,472.00 |
|
Florida | Broward | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $12,494,495.00 |
$20,359,449.00 |
|
Florida | Broward | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,278,502.00 |
||
Florida | Broward | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $338,633.00 |
$2,893,580.00 |
|
Florida | Broward | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | 4R - No Added Capacity | $2,592,892.00 |
$2,592,892.00 |
|
Florida | St. Lucie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,656,615.00 |
$8,451,329.00 |
|
Florida | St. Lucie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,812,721.00 |
$1,868,125.00 |
|
Florida | St. Lucie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $4,761,349.00 |
$4,761,349.00 |
|
Florida | St. Lucie | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $206,018.00 |
||
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $4,460,605.00 |
||
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $115,448,750.00 |
||
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $28,888.00 |
$191,117.00 |
|
Florida | St. Lucie | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $847,830.00 |
$847,830.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,628,671.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $64,756.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,000.00 |
$113,485,736.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,441,098.00 |
||
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $3,807,311.00 |
$3,807,311.00 |
|
Florida | Palm Beach | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $20,000.00 |
$118,341.00 |
|
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,999,403.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,246,852.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $14,228,778.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $80,000.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $2,200,000.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $11,000.00 |
||
Florida | Palm Beach | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $7,468,985.00 |
$104,288,201.00 |
|
Florida | Broward | >= 200,000 | State | CONGESTION AIR QUALITY | Other | $160,031.00 |
$160,031.00 |
|
Florida | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Other | $2,460,270.00 |
$2,460,270.00 |
|
Florida | Broward | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Other | $166,598.00 |
$166,598.00 |
|
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,088,563.00 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $22,479,592.00 |
||
Florida | Broward | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,000.00 |
$5,000.00 |
|
Florida | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,305,007.88 |
||
Florida | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $4,187,893.88 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,327,923.24 |
||
Florida | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $890,795.94 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,558,703.36 |
||
Florida | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,341,121.70 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $933,719.65 |
||
Florida | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $803,380.39 |
||
Florida | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $533,618.96 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $24,672.00 |
||
Florida | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Other | $14,100.00 |
||
Florida | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Other | $21,228.00 |
||
Florida | Palm Beach | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $936,884.34 |
||
Florida | Palm Beach | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $535,362.58 |
||
Florida | Palm Beach | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $805,998.08 |
||
Florida | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $201,249,531.06 |
||
Florida | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,285,362.18 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $558,908,659.76 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $38,193,159.65 |
||
Florida | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $13,752,435.81 |
||
Florida | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $87,835.54 |
||
Florida | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $264,300.00 |
||
Florida | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $1,688.06 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $734,011.94 |
||
Florida | Broward | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $8,361,539.36 |
||
Florida | Broward | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $23,221,603.26 |
||
Florida | Broward | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $53,404.38 |
||
Florida | Indian River | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,758,927.00 |
||
Florida | Indian River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,618,788.00 |
||
Florida | Indian River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,112,276.00 |
||
Florida | Indian River | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $3,596,419.00 |
$51,795,497.00 |
|
Florida | Indian River | >= 50,000 AND < 200,000 | Local | PROTECT PROGRAM APPORTIONED | 4R - Added Capacity | $2,297,071.00 |
$36,149,956.00 |
|
Florida | Indian River | >= 50,000 AND < 200,000 | Local | PROTECT PROGRAM APPORTIONED | Utilities | $5,527,234.00 |
||
Florida | Indian River | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,146,121.00 |
||
Florida | Indian River | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $583,803.00 |
$5,427,824.00 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $48,592,245.00 |
||
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,388,231.00 |
$161,254,043.00 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $120,055,112.00 |
$120,055,112.00 |
|
Florida | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $20,000.00 |
$20,000.00 |
|
Florida | Seminole | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $3,853,827.00 |
$10,830,241.00 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $13,393,656.00 |
$14,817,002.00 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,824,927.00 |
||
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,651,093.00 |
$2,062,030.00 |
|
Florida | Seminole | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,375,056.00 |
||
Florida | Lake | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $5,731,128.00 |
$5,731,128.00 |
|
Florida | Lake | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $15,830,910.00 |
$15,830,910.00 |
|
Florida | Lake | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $6,009,171.00 |
$6,009,171.00 |
|
Florida | Lake | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Maintenance Resurfacing | $121,891.00 |
$121,891.00 |
|
Florida | Lake | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $839,043.00 |
$839,043.00 |
|
Florida | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $12,176,911.00 |
$15,438,642.00 |
|
Florida | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $1,983,398.00 |
||
Florida | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,161,882.00 |
$5,102,017.00 |
|
Florida | Lake | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,501,046.00 |
||
Florida | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Administration | $3,416,882.00 |
||
Florida | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $6,622,000.00 |
$10,098,224.00 |
|
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,634,361.00 |
||
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $6,443,640.00 |
$53,392,167.00 |
|
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $4,050,000.00 |
||
Florida | Orange | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,666,332.00 |
$8,666,332.00 |
|
Florida | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $27,961,192.12 |
$28,418,058.75 |
|
Florida | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $28,603.88 |
$29,071.25 |
|
Florida | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,146.61 |
||
Florida | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,120,847.39 |
||
Florida | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $751,614.11 |
$2,002,073.91 |
|
Florida | Sumter | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $768.89 |
$2,048.09 |
|
Florida | Orange | >= 200,000 | Local | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $1,744,714.02 |
$1,744,714.02 |
|
Florida | Orange | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $9,153,106.35 |
$9,153,106.35 |
|
Florida | Orange | >= 200,000 | Other | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $3,862,873.63 |
$3,862,873.63 |
|
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $111,399,404.83 |
$111,956,635.37 |
|
Florida | Orange | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,234,332.60 |
$21,340,548.78 |
|
Florida | Orange | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $47,013,746.57 |
$47,248,913.85 |
|
Florida | Orange | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,397,719.47 |
||
Florida | Orange | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,097,333.01 |
||
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,844,562.52 |
||
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,348,703.70 |
$9,351,362.57 |
|
Florida | Orange | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,103,941.43 |
$3,982,832.01 |
|
Florida | Orange | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,401,930.87 |
$1,798,864.42 |
|
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $87,287.00 |
||
Florida | Orange | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,480,784.26 |
||
Florida | Orange | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $7,350,736.42 |
||
Florida | Orange | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,473,481.32 |
||
Florida | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,199,967.00 |
||
Florida | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,031,110.00 |
||
Florida | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $14,279,971.00 |
$14,279,971.00 |
|
Florida | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $152,080.00 |
$1,734,107.00 |
|
Florida | Marion | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $34,500.00 |
||
Florida | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $14,790,000.00 |
$26,159,982.00 |
|
Florida | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Administration | $1,052,589.00 |
||
Florida | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $1,710,000.00 |
$2,510,000.00 |
|
Florida | Osceola | >= 200,000 | Local | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $2,088,570.00 |
$48,838,290.00 |
|
Florida | Osceola | >= 200,000 | Local | CARBON REDUCTION PROGRAM | Administration | $162,951.00 |
||
Florida | Osceola | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,270,144.00 |
$2,278,262.00 |
|
Florida | Osceola | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $35,000.00 |
$35,000.00 |
|
Florida | Marion | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - No Added Capacity | $603,801.00 |
$603,801.00 |
|
Florida | Marion | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - No Added Capacity | $5,850,000.00 |
$8,301,350.00 |
|
Florida | Marion | >= 200,000 | State | CARBON REDUCTION PROGRAM | Administration | $1,360,429.00 |
||
Florida | Marion | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $27,802,146.00 |
||
Florida | Osceola | >= 200,000 | Local | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $365,615.00 |
$365,615.00 |
|
Florida | Osceola | >= 200,000 | Local | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $802,538.00 |
$802,538.00 |
|
Florida | Osceola | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $152,432.00 |
$24,675,766.00 |
|
Florida | Osceola | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Administration | $62,748.00 |
||
Florida | Miami-Dade | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Replacement - No Added Capacity | $258,900.00 |
$258,900.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $5,298,490.00 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $60,404,410.00 |
$78,854,549.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,330,905.00 |
$4,331,536.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $5,500.00 |
$24,530.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $71,195,461.00 |
||
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $14,706,111.00 |
$16,929,698.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Utilities | $3,925,000.00 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $54,800,040.00 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,332,533.00 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $60,878,771.00 |
$64,391,092.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $48,519.00 |
$48,519.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,451,368.00 |
$2,459,110.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $42,367,281.00 |
$45,367,281.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,024,945.00 |
||
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,454,014.00 |
$6,592,071.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $725,799.00 |
$725,799.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $31,909,541.00 |
$78,177,611.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $15,122,320.00 |
$15,122,320.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Rail/Hwy Crossing | $500,000.00 |
$500,000.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $71,694,063.00 |
$71,694,063.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $14,340,442.00 |
$14,340,442.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Rail/Hwy Crossing | $500,000.00 |
$500,000.00 |
|
Florida | Pasco | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $79,971.25 |
$79,971.25 |
|
Florida | Pasco | >= 200,000 | Other | CONGESTION AIR QUALITY | 4R - No Added Capacity | $82,110.75 |
$82,110.75 |
|
Florida | Pasco | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,433,847.18 |
$17,906,007.49 |
|
Florida | Pasco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $16,979,589.82 |
$17,439,447.51 |
|
Florida | Pasco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,486,955.07 |
||
Florida | Pasco | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,553,488.93 |
||
Florida | Pasco | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,767,471.64 |
$4,365,215.37 |
|
Florida | Pasco | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,868,263.36 |
$4,481,998.63 |
|
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $9,035,509.00 |
$9,035,509.00 |
|
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $20,965,119.00 |
$38,475,451.00 |
|
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $2,127,544.00 |
||
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,353,744.00 |
$7,388,926.00 |
|
Florida | Pasco | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,970,335.00 |
||
Florida | Pasco | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $863,824.00 |
$863,824.00 |
|
Florida | Pinellas | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $3,143,906.00 |
$3,143,906.00 |
|
Florida | Pinellas | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Replacement - Added Capacity | $71,784.00 |
$71,784.00 |
|
Florida | Pinellas | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | $26,297,958.00 |
$26,297,958.00 |
|
Florida | Pinellas | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $6,558,502.00 |
$6,558,502.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $6,622,838.67 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,724,445.33 |
||
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $187,820,365.00 |
$642,463,890.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,759,211.35 |
$13,509,730.48 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,957,802.65 |
$5,557,514.52 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $3,015.25 |
$3,015.25 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $7,329.75 |
$7,329.75 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $4,215,995.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,511,503.00 |
$2,511,503.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $30,866,218.00 |
$30,866,218.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $14,088,406.00 |
||
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,113,982.00 |
$2,113,982.00 |
|
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,577,896.00 |
$30,830,616.00 |
|
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,931,959.00 |
||
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,064,484.00 |
$5,297,645.00 |
|
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,726,608.00 |
||
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $18,732,755.00 |
$19,559,924.00 |
|
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $906,005.00 |
||
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,947,147.00 |
$2,612,447.00 |
|
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,968,947.00 |
||
Florida | Hernando | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $352,272.00 |
$352,272.00 |
|
Florida | Hillsborough | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Maintenance Resurfacing | $367,426.00 |
$376,879.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $20,532,944.00 |
$21,503,129.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,398,196.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,781,021.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $105,178.00 |
||
Florida | Hillsborough | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Maintenance Resurfacing | $2,890,021.00 |
$3,235,992.00 |
|
Florida | Hillsborough | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $280,964.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $86,927,414.00 |
$90,743,519.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,542,601.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,364,037.00 |
$9,594,606.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $967,748.00 |
$967,748.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $412,790.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $37,568,627.00 |
$38,445,008.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $3,072,533.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,938,233.00 |
$5,220,185.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $146,683.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $47,556,102.00 |
$49,394,697.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $2,571,062.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,661,233.00 |
$6,544,533.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $621,922.00 |
$621,922.00 |
|
Florida | Pinellas | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $3,000,000.00 |
$3,000,000.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $74,126,401.00 |
$74,126,401.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $756,972.00 |
$3,723,840.00 |
|
Florida | Pinellas | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $812,600.00 |
$812,600.00 |
|
Florida | Pinellas | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $68,002.00 |
$68,002.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $20,019,924.00 |
$21,267,209.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $4,782,613.00 |
||
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,681,761.00 |
$5,540,119.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $9,936,620.00 |
||
Florida | Pinellas | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $300,000.00 |
$300,000.00 |
|
Florida | Hillsborough | >= 200,000 | Local | FAST ACT NATIONAL FREIGHT | Construction Engineering | $22,441.70 |
$29,995.33 |
|
Florida | Hillsborough | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $936,581.94 |
$1,251,824.11 |
|
Florida | Polk | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $24.36 |
$32.56 |
|
Florida | Hillsborough | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Other | $498,678.04 |
$498,678.04 |
|
Florida | Hillsborough | >= 200,000 | Local | FAST ACT NATIONAL FREIGHT | Other | $11,948.99 |
$11,948.99 |
|
Florida | Polk | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Other | $12.97 |
$12.97 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Administration | $27.23 |
||
Florida | Hillsborough | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Administration | $1,046,917.28 |
||
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANS RESEARCH-TEA21 | Administration | $25,085.49 |
||
Florida | Hillsborough | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Construction Engineering | $282,718.35 |
$282,718.35 |
|
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANS RESEARCH-TEA21 | Construction Engineering | $6,774.30 |
$6,774.30 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Construction Engineering | $7.35 |
$7.35 |
|
Florida | Hillsborough | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Other | $9,552,950.38 |
$24,050,045.01 |
|
Florida | Hillsborough | >= 200,000 | Local | SURFACE TRANS RESEARCH-TEA21 | Other | $228,901.14 |
$576,270.42 |
|
Florida | Polk | >= 200,000 | State | SURFACE TRANS RESEARCH-TEA21 | Other | $248.48 |
$625.57 |
|
Florida | Pinellas | >= 200,000 | State | CARBON REDUCTION PROGRAM | 4R - Added Capacity | $2,197,136.00 |
$2,197,136.00 |
|
Florida | Pinellas | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $2,683,028.00 |
$2,683,028.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $107,690,235.00 |
$107,690,235.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,887,738.00 |
$9,136,933.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $5,622,027.00 |
$5,622,027.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $740,000.00 |
$1,202,239.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $5,180,827.00 |
||
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $339,348.00 |
$476,616.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $9,279,559.00 |
||
Florida | Pinellas | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $3,191,531.00 |
$3,191,531.00 |
|
Florida | Pinellas | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $1,123,385.00 |
$1,123,385.00 |
|
Florida | Pinellas | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $413,703.00 |
$418,703.00 |
|
Florida | Pinellas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $64,011.00 |
$64,011.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $5,412,591.00 |
$5,412,591.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $8,276,215.00 |
$17,138,149.00 |
|
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Administration | $947,640.00 |
||
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,885,707.00 |
||
Florida | Pinellas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $264,906.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $35,118,052.00 |
$35,735,836.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $1,606,804.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,913.00 |
$5,485,292.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $50,000.00 |
||
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $7,365,997.72 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $17,032,802.28 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $724,962.90 |
||
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Administration | $313,517.10 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,397,183.95 |
||
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,036,685.05 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $34,905.00 |
||
Florida | Hillsborough | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $15,095.00 |
||
Florida | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,813,626.00 |
||
Florida | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Other | $58,267,089.00 |
||
Florida | Lee | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,678,022.00 |
||
Florida | Lee | >= 200,000 | Other | EMERGENCY RELIEF | Construction Engineering | $1,868,389.00 |
$2,280,471.00 |
|
Florida | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Construction Engineering | $2,188,356.00 |
$2,671,008.00 |
|
Florida | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Other | $18,236,305.00 |
$22,258,398.00 |
|
Florida | Lee | >= 200,000 | Other | EMERGENCY RELIEF | Other | $15,569,910.00 |
$19,003,919.00 |
|
Florida | Lee | >= 200,000 | Other | EMERGENCY RELIEF | Preliminary Engineering | $2,072,782.00 |
$2,529,945.00 |
|
Florida | Lee | >= 200,000 | Local | EMERGENCY RELIEF | Preliminary Engineering | $1,307,837.00 |
$1,596,287.00 |
|
Florida | Brevard | >= 200,000 | State | FRA TRANSFER DEVELOPMENT | Bridge Replacement - No Added Capacity | $12,778,000.00 |
$12,778,000.00 |
|
Florida | Brevard | >= 200,000 | State | FRA TRANSFER DEVELOPMENT | Construction Engineering | $48,493.00 |
$48,493.00 |
|
Florida | Brevard | >= 200,000 | Local | FRA TRANSFER DEVELOPMENT | Construction Engineering | $661,507.00 |
$661,507.00 |
|
Florida | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Administration | $6,644,517.00 |
||
Florida | Brevard | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | $66,972,351.00 |
$66,972,351.00 |
|
Florida | Brevard | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $437,051.70 |
$446,682.00 |
|
Florida | Brevard | >= 200,000 | Local | NAT SIG FREIGHT AND HWY PROJ | Construction Engineering | $6,090,597.30 |
$6,221,967.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $1,259,859.00 |
$1,259,859.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $15,139,869.00 |
$16,081,331.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $194,860,142.00 |
$2,342,736,170.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,842,639.00 |
$4,653,611.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $171,996.00 |
$171,996.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $587,707.00 |
$587,707.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $157,567.00 |
$157,567.00 |
|
Florida | Miami-Dade | >= 200,000 | State | SECTION 149(B) | Preliminary Engineering | $103,548.00 |
$103,548.00 |
|
Florida | Miami-Dade | >= 200,000 | State | SECTION 149(D) | Preliminary Engineering | $146,246.00 |
$146,246.00 |
|
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,000.00 |
$1,000.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $35,758,561.00 |
$55,621,484.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $2,755,499.00 |
$2,771,481.00 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $6,520,230.00 |
||
Florida | Putnam | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,171,997.38 |
$7,154,649.38 |
|
Florida | Alachua | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $87.62 |
$87.62 |
|
Florida | Putnam | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $951,552.00 |
$1,008,794.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Administration | $2,500,798.00 |
||
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Bridge New Construction | $53,225,456.00 |
$53,225,456.00 |
|
Florida | Miami-Dade | >= 200,000 | State | HIGHWAY INFRA PRGM -ALLOC | Construction Engineering | $6,774,544.00 |
$11,341,377.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,945,742.00 |
$6,074,360.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $827,115.00 |
$827,115.00 |
|
Florida | Miami-Dade | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $120,003.00 |
||
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $51,253.00 |
||
Florida | Miami-Dade | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | Administration | $101,131.55 |
||
Florida | Miami-Dade | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Administration | $84,635.45 |
||
Florida | Miami-Dade | >= 200,000 | Local | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $80,401.35 |
$663,963.31 |
|
Florida | Miami-Dade | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $67,286.65 |
$555,660.69 |
|
Florida | Miami-Dade | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $346,157.13 |
$533,805.55 |
|
Florida | Miami-Dade | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $413,625.87 |
$637,848.45 |
|
Florida | Miami-Dade | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,188,505.50 |
$1,341,721.96 |
|
Florida | Miami-Dade | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,420,154.50 |
$1,603,234.04 |
|
Florida | Miami-Dade | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $734,901.02 |
||
Florida | Miami-Dade | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $878,138.98 |
||
Florida | Miami-Dade | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Safety and Education for Peds/Bicyclists | $3,657,865.24 |
$4,524,116.20 |
|
Florida | Miami-Dade | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Safety and Education for Peds/Bicyclists | $4,370,811.76 |
$5,405,901.80 |
|
Florida | Miami-Dade | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety and Education for Peds/Bicyclists | $455,600.00 |
$455,600.00 |
|
Florida | Miami-Dade | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety and Education for Peds/Bicyclists | $544,400.00 |
$544,400.00 |
|
Florida | Miami-Dade | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Construction Engineering | $545,787.49 |
$1,919,922.12 |
|
Florida | Miami-Dade | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | Construction Engineering | $496,786.51 |
$1,747,550.88 |
|
Florida | Miami-Dade | >= 200,000 | Local | TRANSPORTATION ALTERNATIVES | Safety and Education for Peds/Bicyclists | $1,440,884.03 |
$1,440,884.03 |
|
Florida | Miami-Dade | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Safety and Education for Peds/Bicyclists | $8,556,000.00 |
$8,837,264.00 |
|
Florida | Miami-Dade | >= 200,000 | State | TRANSPORTATION ALTERNATIVES | Safety and Education for Peds/Bicyclists | $1,431,059.97 |
$1,431,059.97 |
|
Florida | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $11,710,000.00 |
$38,711,158.29 |
|
Florida | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $6,415,000.00 |
$21,206,838.63 |
|
Florida | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $6,875,000.00 |
$22,727,516.08 |
|
Florida | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Administration | $1,070,530.45 |
||
Florida | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Administration | $998,902.23 |
||
Florida | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Administration | $1,823,405.32 |
||
Florida | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,145,869.33 |
||
Florida | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $2,299,743.05 |
||
Florida | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Construction Engineering | $3,917,089.62 |
||
Florida | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,787,691.40 |
||
Florida | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,915,881.27 |
||
Florida | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $3,263,268.33 |
||
Florida | Hillsborough | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $1,005,815.46 |
||
Florida | Hillsborough | >= 200,000 | Other | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $551,008.21 |
||
Florida | Hillsborough | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Right of Way | $590,519.33 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $406,791,606.00 |
$965,140,764.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Administration | $75,547,317.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $102,241,107.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $2,500,000.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $12,217,982.00 |
||
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $60,886,224.00 |
$375,225,766.00 |
|
Florida | Hillsborough | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $9,092,232.00 |