RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
Louisiana | I-49, I-49 NORTH (LA 2 TO MIRA-MYRTIS ROAD) | $21,103,197.84 |
$25,954,547.24 |
|
Louisiana | I-49 NORTH; (Mira-Myrtis Road - LA 168) | $33,480,197.85 |
$33,714,740.31 |
|
Louisiana | US 190, US 190 Widening (LA 22 to Little Bayou Castine), LOC On Route US 190 From ITS Intersection with Route LA 22, Bayou Castine | $25,610,272.70 |
$32,093,340.90 |
|
Louisiana | REPLACEMENT BRIDGE FOR TUNNEL BELLE CHASE | $81,847,628.90 |
$222,718,424.36 |
|
Louisiana | I-310 MISSISSIPPI RIVER BRIDGE (LULING) | $50,773,140.40 |
$63,466,425.51 |
|
Louisiana | US 90 INTERCHANGE | $18,456,617.51 |
$77,473,132.89 |
|
Louisiana | US 190; BEG LOG MILE 0.000 END LOG MILE 1.110; MISSISSIPPI RIVER BRIDGE CLEAN, PAINT & REPAIR PHASE 1 | $75,616,757.33 |
$116,908,938.98 |
|
Louisiana | ROUTE LA 12 | $25,155,095.91 |
$31,443,869.91 |
|
Louisiana | MISSOURRI PACIFIC RAILROAD OVERPASS NEAR BONITA, END. BEG LOG MI 9.061,END LOG MI 9.35 | $4,780,104.28 |
$38,876,255.81 |
|
Louisiana | OUACHITA RIVER BRIDGE (HARRISONBURG) | $35,557,888.43 |
$44,447,360.55 |
|
Louisiana | LA 1: PORT ALLEN CANAL BR REPL (PH1)(HBI) | $81,116,510.62 |
$98,796,307.96 |
|
Louisiana | LA 1 AT JCT LA 107 & JCT 1189; BEG. LOG. MILE 7.290 END LOG MILE 10.480 | $23,057,271.25 |
$28,821,589.24 |
|
Louisiana | LA 21 WIDENING; BEG LOG MILE 5.00 END LOG MILE 6.000; LA 1085-11TH; CONSTRUCT NEW 2 LANE BRIDGE | $23,356,201.68 |
$29,145,275.03 |
|
Louisiana | US 190: LA 437 - US 190 BUS (PH 1) | $24,758,296.77 |
$43,031,967.45 |
|
Louisiana | LA 24 DISTRICT 02 TERREBONNE PARISH BEG. LOG MILE 1.000 END LOG MILE 1.403 BRIDGE REPLACEMENT | $32,897,151.78 |
$41,121,433.68 |
|
Louisiana | JIMMIE DAVIS BRIDGE (LA 511); REPLACE EXISTING TRUSS WITH NEW BRIDGE AND APPROACHES | $1,018,229.17 |
$410,704,388.16 |
|
Louisiana | LA 42: US 61 - LA 44; | $30,270,977.92 |
$59,800,282.37 |
|
Louisiana | AMITE R.BR. NEAR FRENCH SETTLEMENT; BEG: 700' BEFORE BRIDGE BEGIN; END: 700' AFTER BRIDGE END | $21,329,727.21 |
$26,662,159.11 |
|
Louisiana | LA 70: SUNSHINE BRIDGE - LA 22 | $11,279,583.60 |
$62,618,738.69 |
|
Louisiana | ROUTE LA 616; ARKANSAS ROAD: (CALDWELL ROAD - LA 143) | $66,902,936.33 |
$83,708,710.42 |
|
Louisiana | I-49 S:AMB CAFFERY/US90 INTERCHANGE | $21,971,599.81 |
$204,255,346.46 |
|
Louisiana | I-10 OVERPASS OVER US 165 | $18,489,963.80 |
$98,290,701.91 |
|
Louisiana | I-10: E. JCT I-49 TO LA 328; BEG: E. JCT I-49; END: LA 328 | $148,722,227.82 |
$186,715,041.00 |
|
Louisiana | I-10: CSLM 5.50 TO ATCHAFALAYA FLDWY BR; BEG: ST MARTIN PARISH LINE; END: W. END OF ATCHAFALAYA FLOODWAY BRIDGE | $69,589,657.87 |
$88,354,253.69 |
|
Louisiana | PECUE LANE/I-10 INTERCHANGE | $50,089,113.99 |
$89,567,312.90 |
|
Louisiana | I-10: TEXAS STATE LINE-E. OF COONE GULLY | $157,066,254.15 |
$173,516,461.47 |
|
Louisiana | I-220/1-20 INTERCHANGE IMP & BAFB ACCESS | $43,797,600.58 |
$117,737,184.41 |
|
Louisiana | I-12: LA 63 - TANGIPAHOA PARISH LINE | $23,549,242.34 |
$27,088,658.37 |
|
Louisiana | I-49 NORTH ( I-220 TO MARTIN LUTHER KING DRIVE) BEG. LOG MILE 0.000 END LOG MILE 1.024 | $21,210,200.00 |
$62,623,421.89 |
|
Louisiana | I-49 North: Martin Luther King, Jr. Drive (LA 3194) - LA 1; New Roadway Construction, New Interstate | $738,850.47 |
$66,257,833.10 |
|
Louisiana | I-10; LA 415 TO ESSEN ON I-10 AND I-12 | $126,245,033.49 |
$214,581,936.45 |
|
Louisiana | LA 3241: LA 435 TO LA 40/LA 41(BUSH) | $17,251,187.69 |
$72,882,239.90 |
|
Louisiana | LA 3241: LA 36 TO LA 435 | $18,656,216.88 |
$94,357,386.64 |
|
Louisiana | Nelson Road, Extension of Nelson Road to Contraband Bayou, New Bridge over bayou for access to Port of Lake Charles | $78,053,908.32 |
$140,310,548.44 |
|
Louisiana | WISNER BLVD BRIDGE REPLACEMENT; BEG: EXIST. STRUCTURE: 24'W X 1423'L | $20,405,355.66 |
$25,563,088.19 |
|
Louisiana | KANSAS LANE EXTENSION; INTERSECTION OF US 80 AND EXISTING KANSAS LANE TO INTERSECTION OF US 165 AND FORSYTHE AVE. EXT. | $14,850,687.09 |
$31,125,842.62 |
|
Louisiana | LA 1: LEEVILLE TO GOLDEN MEADOW (PHASE 2) | $160,340,895.00 |
$586,641,425.86 |
|
Louisiana | I-10; HIGHLAND ROAD TO LA 73; WIDEN I-10 FROM 4 TO 6 LANES TOWARDS THE MEDIAN SIDE | $85,204,847.29 |
$98,140,121.15 |
|
Louisiana | I-10 ATCHAFALAYA FLDWY CLEAN & PAINT; | $23,994,928.95 |
$26,590,222.39 |
|
Louisiana | ROUTE LA 1; BEG LOG MILE 2.780 END LOG MILE 3.780; STRUCTURAL REPAIRS CLEANING AND PAINTING OF VERTICAL LIFT BRIDGE | $28,405,885.41 |
$35,507,356.78 |
|
Louisiana | LA 121: CALCASIEU RIVER BRIDGE | $13,373,374.58 |
$34,394,896.26 |
|
Louisiana | I-10:WEST OF LA 108 TO 1-210 INTERCHANG | $46,354,967.93 |
$55,776,317.83 |
|
Louisiana | US 90: RR JCT - PINHOOK, LA 92 - LA 88 | $12,323,577.24 |
$26,687,921.20 |
|
Louisiana | I-10: NO EAST DRAIN CANAL BRIDGE REPLACE | $28,912,673.03 |
$36,140,841.29 |
|
Louisiana | NEW FERRY BOAT / CAMERON FERRY CROSSING | $54,590,000.00 |
||
Louisiana | I-10: LA 328 to LA 347 | $96,053,949.97 |
$115,455,732.66 |
|
Louisiana | US 90: ALBERTSON'S PKWY TO AMB. CAFFERY; Scope: 6 lane facility from Albertson's Pkwy to Amb. Caff. and frontage road construction | $87,136,141.18 |
||
Louisiana | US90Z : HARVEY CANAL TUNNEL REHABILITATION | $42,168,111.44 |
$72,512,835.09 |
|
Louisiana | PRIEN LAKE MAIN SPAN RE-DECKING (DDIR LA2020-01 I-210: C.S. 450-30: LM 1.02 - 4.00) | $45,151,128.74 |
$53,931,489.33 |
|
Louisiana | LA 30 ROUNDABOUTS @ TANGER MALL & I-10 | $21,436,494.44 |
$37,977,561.61 |
|
Louisiana | I-49 NORTH, SEGMENT K - PHASE 2; SCOPE: Construction of new roadway, including bridges for I-49 North, between I-220 and MLK Dr | $62,322,149.21 |
$159,098,953.06 |
|
Louisiana | I-12: LA 21 TO US 190; Scope: Roadway widening and overlay includes bridge widening/replacement. | $5,224,453.63 |
$84,253,364.30 |
|
Louisiana | I-12: US 190 TO LA 59; ROADWAY WIDENING AND OVERLAY | $61,878,711.03 |
$74,922,664.68 |
|
Louisiana | LA 182: BERWICK BAY BRIDGE REHAB (HBI) | $29,737,257.29 |
$37,171,571.62 |
|
Louisiana | I-10 / LOYOLA INTERCHANGE IMPROVEMENT | $60,675,862.39 |
$215,999,575.08 |
|
Louisiana | US 11: LAKE PONTCHARTRAIN BR. REHAB PH 2 | $36,968,953.41 |
$46,211,164.77 |
|
Louisiana | AIRPORT CONNECTOR ROAD AND BRIDGE | $17,528,716.80 |
$31,069,459.31 |
|
Louisiana | LA 47: IWGO BRIDGE REHABILITATION (HBI) | $57,075,943.81 |
$71,344,929.76 |
|
Louisiana | LA 3213: GRAMERCY BRIDGE REHABILITATION | $51,191,499.16 |
$64,189,373.94 |
|
Louisiana | I-10:JEFF DAV PL-I-49 (OGFC/SLAB REPAIR) | $54,869,418.84 |
$96,501,959.02 |
|
Louisiana | LA 3064 TO LA 1248 PHASE 2 | $19,131,480.14 |
$28,497,244.64 |
|
Louisiana | I-10: ATCH BASIN BR - W BATON ROUGE P/L | $24,448,087.74 |
$27,164,541.93 |
|
Louisiana | I-20 MRB AT VICKSBURG OVERLAY AND REHAB | $34,079,514.09 |
$38,021,091.27 |
|
Louisiana | I-20 REHAB (W OF LA 3 TO AIRLINE DR) | $8,948,652.84 |
$155,746,315.85 |
|
Louisiana | US 190: 0.5 MI W OF LA 978 - LA 976 | $21,156,384.28 |
$26,445,480.35 |
|
Louisiana | US 90: LA 318 - LA 83 | $40,790,846.98 |
$50,988,558.72 |
|
Louisiana | MOTORIST ASSISTANCE PATROL (MAP) | $28,346,245.86 |
$35,432,807.33 |
|
Louisiana | US 90: LA 14 - LA 83 | $27,689,351.20 |
$37,851,680.51 |
|
Louisiana | CAUSEWAY BLVD - EARHART EXPRESSWAY PH 1A | $20,286,305.98 |
$72,034,194.58 |
|
Louisiana | I-12: LA 21 TO US 190 | $56,270,482.41 |
$72,422,537.78 |
|
Louisiana | I-10 & I-12 COLLEGE DR FLYOVER RAMP | $21,460,889.00 |
$71,370,091.98 |
|
Louisiana | US 190: ROUGON RD - 0.5 MI W OF LA 978 | $19,439,382.20 |
$25,233,844.97 |
|
Louisiana | LA 302: BAYOU BARATARIA MB REPL PHASE 1 | $59,695,631.62 |
$74,660,915.31 |