RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
Louisiana | Caddo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | New Construction Roadway | $1,241,000.79 |
$1,378,886.28 |
|
Louisiana | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Construction Engineering | $3,200,000.00 |
$4,000,000.00 |
|
Louisiana | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $15,544,015.30 |
$19,430,017.87 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $0.03 |
$0.04 |
|
Louisiana | Caddo | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | New Construction Roadway | $107,509.01 |
$134,970.34 |
|
Louisiana | Caddo | >= 200,000 | N/A | SEC 115 UNOBL BAL TRANSF | New Construction Roadway | $48,457.46 |
$48,457.46 |
|
Louisiana | Caddo | >= 200,000 | N/A | SURF TRANS PROJ | Construction Engineering | $125,506.34 |
$125,506.34 |
|
Louisiana | Caddo | >= 200,000 | N/A | SURF TRANS PROJ | New Construction Roadway | $836,708.91 |
$836,708.91 |
|
Louisiana | Caddo | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | 4R - Restoration & Rehabilitation | $31,546,064.46 |
$31,549,064.46 |
|
Louisiana | Caddo | >= 200,000 | N/A | ARRA AMERICAN RECOV & REINV AC | Construction Engineering | $1,007,963.56 |
$1,007,963.56 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $271,680.00 |
$339,600.00 |
|
Louisiana | Caddo | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | 4R - Restoration & Rehabilitation | $654,489.83 |
$818,112.29 |
|
Louisiana | St. Tammany | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $607,921.00 |
$759,901.25 |
|
Louisiana | St. Tammany | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $112,000.00 |
$140,000.00 |
|
Louisiana | St. Tammany | >= 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | 4R - Added Capacity | $20,976.05 |
$106,720.06 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $20,959,141.88 |
$26,198,927.38 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,398,707.84 |
$4,248,384.80 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $511,525.93 |
$639,407.41 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $24,664.65 |
$1,555,830.81 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Bridge Replacement - No Added Capacity | $288,079.80 |
$360,099.75 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | N/A | DONOR STATE BONUS | Environmental Only | $605,915.70 |
$757,394.62 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $232,007.48 |
$290,009.35 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Environmental Only | $153,953.03 |
$192,441.29 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $206,006.97 |
$257,508.71 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - No Added Capacity | $45,000,000.00 |
$56,250,000.00 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,286,927.53 |
$93,073,848.80 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,119,592.89 |
$36,857,324.31 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $913,875.00 |
$1,190,681.94 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $60,745.00 |
||
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,405,514.07 |
$3,006,892.59 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,932,240.00 |
$8,665,300.00 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $652,807.10 |
$816,008.87 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $3,132,720.83 |
$11,132,720.83 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $867,279.17 |
$867,279.17 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $362,191.37 |
$452,739.21 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $5,192,244.31 |
$6,342,087.86 |
|
Louisiana | Plaquemines | >= 5,000 AND < 50,000 | State | TRAN COMM SYS PRES PILOT-TEA21 | Environmental Only | $471,609.00 |
$589,511.25 |
|
Louisiana | St. Charles | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $40,617,369.04 |
$50,771,711.30 |
|
Louisiana | St. Charles | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $5,403,424.64 |
$6,754,280.80 |
|
Louisiana | St. Charles | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - No Added Capacity | $125,795.21 |
$157,244.01 |
|
Louisiana | St. Charles | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $3,729,054.13 |
$4,661,317.66 |
|
Louisiana | St. Charles | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $897,497.38 |
$1,121,871.74 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $15,788.07 |
$19,735.09 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $759,202.95 |
$1,637,255.69 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $427,042.45 |
$533,803.06 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINT DISC | 4R - Added Capacity | $1,081,581.00 |
$1,351,976.25 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | NAT'L COOR INF IM PROGRAM | 4R - Added Capacity | $10,238,755.61 |
$62,910,363.51 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | NAT'L COOR INF IM PROGRAM | Construction Engineering | $386,298.76 |
$4,085,063.45 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $661,307.09 |
$826,633.86 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,881,677.86 |
$6,102,097.33 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $4,963.72 |
$6,204.65 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Preventive Maintenance | $28,339,253.20 |
$43,814,521.27 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Preventive Maintenance | $47,277,504.13 |
$73,094,417.71 |
|
Louisiana | Calcasieu | >= 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Preliminary Engineering | $111,047.59 |
$138,809.49 |
|
Louisiana | Calcasieu | >= 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $196,919.17 |
$246,148.96 |
|
Louisiana | Calcasieu | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Preliminary Engineering | $262,491.70 |
$328,114.63 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $13,371,859.71 |
$16,714,824.64 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $285,308.04 |
$356,635.05 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $967,452.48 |
$1,209,315.60 |
|
Louisiana | Calcasieu | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $48,556.76 |
$60,695.95 |
|
Louisiana | Calcasieu | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $1,056,378.00 |
$1,320,472.50 |
|
Louisiana | Calcasieu | >= 200,000 | State | REPURPOSED SPECIAL | Bridge Replacement - No Added Capacity | $8,601,873.15 |
$10,752,341.44 |
|
Louisiana | Calcasieu | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $176,310.11 |
$220,387.65 |
|
Louisiana | Calcasieu | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $76,899.20 |
$96,124.00 |
|
Louisiana | Morehouse | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $230,639.48 |
$288,299.35 |
|
Louisiana | Morehouse | >= 5,000 AND < 50,000 | State | HIGHWAY BRIDGE PROGRAM | Preliminary Engineering | $4,766.24 |
$5,957.80 |
|
Louisiana | Morehouse | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Utilities | $799,817.25 |
$999,771.56 |
|
Louisiana | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $25,726,482.40 |
||
Louisiana | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $307,369.03 |
||
Louisiana | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,280,679.10 |
$1,600,848.87 |
|
Louisiana | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $230,744.56 |
$288,430.70 |
|
Louisiana | Morehouse | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,233,457.65 |
$9,659,096.10 |
|
Louisiana | Catahoula | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Environmental Only | $60,252.78 |
$75,315.97 |
|
Louisiana | Catahoula | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $686,564.71 |
$858,205.89 |
|
Louisiana | Catahoula | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $133,580.34 |
$166,975.43 |
|
Louisiana | Catahoula | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $34,677,490.60 |
$43,346,863.26 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,189,801.32 |
$1,487,251.64 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $16,501.46 |
$20,626.83 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $15,950,764.48 |
$15,950,764.48 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $50,348,503.40 |
$64,458,803.53 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,012,712.82 |
$11,265,891.04 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $24,747.28 |
$30,934.10 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,266,602.74 |
$4,083,253.41 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $539,253.87 |
$539,253.87 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $691,813.49 |
$864,766.86 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $75,809.76 |
$94,762.20 |
|
Louisiana | Avoyelles | >= 5,000 AND < 50,000 | N/A | EXTENSION OF ALLOC PROGRAMS | Utilities | $1,693,560.54 |
$2,116,950.68 |
|
Louisiana | Avoyelles | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Utilities | $986,617.65 |
$1,233,272.07 |
|
Louisiana | Avoyelles | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,331,153.95 |
$10,413,942.59 |
|
Louisiana | Avoyelles | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $9,924,941.63 |
$12,406,177.04 |
|
Louisiana | Avoyelles | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $253,966.55 |
$317,458.19 |
|
Louisiana | Avoyelles | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $46,135.63 |
$57,669.54 |
|
Louisiana | Avoyelles | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $1,820,895.30 |
$2,276,119.13 |
|
Louisiana | St. Tammany | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $347,928.00 |
$434,910.00 |
|
Louisiana | St. Tammany | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $214,408.47 |
$268,010.59 |
|
Louisiana | St. Tammany | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Bridge New Construction | $59,233.87 |
$74,042.34 |
|
Louisiana | St. Tammany | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $2,879,681.00 |
$3,599,601.25 |
|
Louisiana | St. Tammany | >= 200,000 | State | MINIMUM GUARANTEE - TEA-21 | 4R - No Added Capacity | $256,256.71 |
$320,320.89 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $30,000.00 |
$37,500.00 |
|
Louisiana | St. Tammany | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $79,300.78 |
$99,125.97 |
|
Louisiana | St. Tammany | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Right of Way | $2,147.22 |
$2,684.03 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | SURF TRANS PROJ | Bridge New Construction | $1,043,175.00 |
$1,043,175.00 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $11,276,393.34 |
$14,120,491.67 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $4,662,572.51 |
$5,828,215.64 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $140,518.20 |
$175,647.75 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $51,915.96 |
$64,894.95 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,312,670.62 |
$3,076,654.95 |
|
Louisiana | St. Tammany | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $12,427,633.73 |
$15,534,542.16 |
|
Louisiana | St. Tammany | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge New Construction | $5,000,000.00 |
$12,685,267.58 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,172,366.27 |
$1,465,457.83 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $5,648,828.90 |
||
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $287,381.99 |
$359,227.49 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $83,414.56 |
$104,268.20 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,869,794.30 |
$2,337,242.89 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,917,705.92 |
$4,897,132.40 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Environmental Only | $11,243.83 |
$14,054.79 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $8,435.96 |
$10,544.95 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $91,762.19 |
$114,702.74 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Right of Way | $45,280.00 |
$56,600.00 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Environmental Only | $15,792.02 |
$19,740.03 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $55,208.92 |
$69,011.16 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $26,938,701.21 |
$33,673,376.51 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,003,871.93 |
$5,004,839.91 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $770,505.34 |
$963,125.62 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $799,482.66 |
$999,353.32 |
|
Louisiana | Terrebonne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $156,867.72 |
$196,084.65 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Environmental Only | $3,989.29 |
$4,986.62 |
|
Louisiana | Caddo | >= 200,000 | State | EXTENSION OF ALLOC PROGRAMS | Environmental Only | $476.61 |
$595.76 |
|
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,495,716.42 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $32,293,650.58 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $37,565,753.12 |
||
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,154,246.88 |
||
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $16,940,826.78 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $201,758,118.81 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $70,284,661.38 |
||
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $25,019,547.82 |
||
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $987,851.16 |
$1,749,508.95 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $25,912.11 |
$32,390.14 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $7,672,994.47 |
||
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $2,731,390.43 |
||
Louisiana | Ascension | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $6,491,668.16 |
$8,114,585.20 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $2,900,500.00 |
$25,383,941.26 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Utilities | $5,263,710.05 |
$6,476,765.54 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | N/A | SURFACE TRANS PRIORITIES S129 | Right of Way | $245,000.00 |
$245,000.00 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,980,531.57 |
$6,225,664.45 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $322.51 |
$403.14 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $3,956,750.00 |
$4,165,000.00 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $172,965.00 |
$1,633,582.47 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,800,000.00 |
$6,000,000.00 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | TRANSPORTATION ALTERNATIVES | 4R - Added Capacity | $1,363,303.05 |
$1,435,055.84 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | TRANSPORTATION ALTERNATIVES | Construction Engineering | $96,227.58 |
$120,284.47 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $9,537.82 |
$11,922.28 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $21,772.10 |
$27,215.13 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $39,768.48 |
$49,710.61 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Bridge Replacement - No Added Capacity | $802,875.12 |
$1,003,593.90 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $44,908.09 |
$56,135.11 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $37,705.56 |
$47,131.96 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF TIFIA FUNDS | Preliminary Engineering | $362,318.67 |
$452,898.34 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $18,611,171.30 |
$23,263,964.13 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $84,611.47 |
$105,764.34 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $617,619.20 |
$772,024.00 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $463,738.45 |
$579,673.12 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $191,987.20 |
$239,984.00 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $41,713.75 |
$52,142.19 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $7,076,810.75 |
$35,472,273.05 |
|
Louisiana | St. James | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $4,202,772.85 |
$21,066,255.88 |
|
Louisiana | St. James | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $69,619.87 |
||
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $108,117.86 |
||
Louisiana | St. James | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,902,472.03 |
||
Louisiana | Ouachita | >= 50,000 AND < 200,000 | N/A | REDISTRIBUTION OF TIFIA FUNDS | Utilities | $6,477,628.64 |
$8,097,035.80 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $34,071,037.90 |
$42,668,837.38 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $400.00 |
$500.00 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $57,075.17 |
$71,343.96 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $23,040,000.00 |
$28,800,000.00 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $2,649,896.80 |
$3,312,371.00 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $606,897.82 |
$758,622.28 |
|
Louisiana | Lafayette | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Relocation | $539,625.50 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $37,137,552.49 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,069,592.20 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $62,574,564.29 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,749,131.40 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $42,277,132.38 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $2,500,407.00 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $21,542,796.63 |
$50,871,337.22 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $428,803.18 |
$536,003.98 |
|
Louisiana | Jefferson Davis | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $415,186.13 |
$518,982.66 |
|
Louisiana | Jefferson Davis | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - Added Capacity | $16,504,255.98 |
$20,630,319.98 |
|
Louisiana | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $75,178,247.16 |
||
Louisiana | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $200,684.36 |
$250,855.45 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $67,560.52 |
$84,450.65 |
|
Louisiana | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,102,100.07 |
$1,377,625.08 |
|
Louisiana | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $133,086.95 |
$166,358.69 |
|
Louisiana | Jefferson Davis | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $22,640.00 |
$28,300.00 |
|
Louisiana | Jefferson Davis | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $44,449.79 |
$55,562.24 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $4,375.25 |
$4,861.40 |
|
Louisiana | Lafayette | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | Preliminary Engineering | $12,715.55 |
$14,128.38 |
|
Louisiana | Lafayette | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $44,772.64 |
$1,221,869.07 |
|
Louisiana | Lafayette | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $20,073,770.00 |
$25,072,212.50 |
|
Louisiana | Lafayette | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - Added Capacity | $20,846,142.00 |
$26,057,677.50 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | 4R - Added Capacity | $768,934.00 |
$961,167.50 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $8,759.10 |
$9,732.35 |
|
Louisiana | Lafayette | >= 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $25,456.20 |
$28,284.65 |
|
Louisiana | Lafayette | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $239,980.12 |
$266,644.60 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $82,573.80 |
$91,748.65 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $20,910,000.00 |
$26,137,500.00 |
|
Louisiana | Lafayette | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $29,090,000.00 |
$36,362,500.00 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,699,712.47 |
$7,124,640.59 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,085,074.19 |
$21,361,342.74 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $115,800.90 |
$144,751.10 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $15,934,791.91 |
$19,918,489.91 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,959,184.02 |
$4,948,980.01 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,540,670.65 |
$1,712,855.99 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $535,313.45 |
$595,499.63 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,758,195.83 |
$2,197,744.79 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $13,396.29 |
$16,647.81 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $402,400.75 |
$503,000.94 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $222,639.25 |
$278,299.06 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $2,650,164.11 |
$3,312,705.14 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $4,911,838.04 |
$6,139,797.56 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Traffic Management/Engineering - HOV | $318,618.10 |
$398,272.63 |
|
Louisiana | Lafayette | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $938,552.00 |
$1,173,190.00 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $333,166.00 |
$416,457.50 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $178,253.20 |
$222,816.50 |
|
Louisiana | Lafayette | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $16,978.00 |
$21,222.50 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,900,308.80 |
$2,375,386.00 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $4,313,837.20 |
$5,392,296.49 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $1,256,755.84 |
$1,396,395.38 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | 4R - Added Capacity | $10,000,000.00 |
$12,500,000.00 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $24,016,338.38 |
$31,045,960.61 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $15,278,657.95 |
$19,731,241.28 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,099,497.41 |
$5,129,371.77 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,824,414.88 |
$7,280,518.60 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $939,855.53 |
$1,053,093.72 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $757,380.29 |
$946,725.36 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $869,504.23 |
$1,086,880.28 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $190,815.72 |
$238,519.66 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Traffic Management/Engineering - HOV | $142,291.64 |
$177,864.54 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $5,785,118.00 |
$5,785,118.00 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $5,276,795.99 |
$6,595,994.99 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,901,760.00 |
$2,377,200.00 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $18,930,865.10 |
$36,480,002.01 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,398,989.90 |
$4,248,737.38 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,830,145.00 |
$22,873,460.52 |
|
Louisiana | East Baton Rouge | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $5,343,040.00 |
$6,678,800.00 |
|
Louisiana | East Baton Rouge | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,622,400.00 |
$4,528,000.00 |
|
Louisiana | Calcasieu | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $51,927,522.00 |
$64,909,402.50 |
|
Louisiana | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $9,827,388.44 |
$9,827,388.44 |
|
Louisiana | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Maintenance Resurfacing | $39,171,640.60 |
$39,171,640.60 |
|
Louisiana | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - Added Capacity | $17,356,248.67 |
$17,356,248.67 |
|
Louisiana | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $22,088,087.43 |
$22,088,087.43 |
|
Louisiana | Calcasieu | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Construction Engineering | $85,032.53 |
$85,032.53 |
|
Louisiana | Calcasieu | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,509,805.21 |
$1,509,805.21 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $10,400,000.00 |
$13,000,000.00 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,095,890.21 |
$2,619,862.76 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,352,595.82 |
$2,635,959.17 |
|
Louisiana | Calcasieu | >= 200,000 | State | REPURPOSED EARMARKS EXEMPT | 4R - Added Capacity | $237,500.00 |
$296,875.00 |
|
Louisiana | Calcasieu | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $14,543.24 |
$16,159.16 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Debt Service | $1,635,835.00 |
$1,635,835.00 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Debt Service | $1,500,000.00 |
$1,500,000.00 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $28,253,898.59 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,375.00 |
$1,375.00 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,519,871.20 |
$10,460,911.20 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $369,949.34 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $19,763,584.78 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $19,530,964.84 |
$41,621,871.27 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $9,753.31 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $745,389.54 |
$2,255,840.92 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $7,094,165.00 |
$7,094,165.00 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,770,000.00 |
$4,770,000.00 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,247,646.41 |
$24,355,412.10 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,385,716.08 |
$1,588,396.45 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,791.05 |
$3,488.81 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $42,796.02 |
$53,495.03 |
|
Louisiana | Livingston | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $817,009.55 |
$1,021,261.94 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $53,283.23 |
$66,604.04 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY CORRIDOR ON NHS | Right of Way | $35.22 |
$44.03 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY CORRIDOR ON NHS | Utilities | $164,098.54 |
$205,123.18 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Right of Way | $1,681.19 |
$2,101.49 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Utilities | $33,138.69 |
$41,423.37 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Utilities | $250,324.70 |
$312,905.88 |
|
Louisiana | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $113,533.06 |
$141,916.33 |
|
Louisiana | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Right of Way | $4,666,644.50 |
$8,595,287.91 |
|
Louisiana | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Utilities | $1,386,770.32 |
$1,733,462.91 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $294,422.69 |
$368,028.36 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $7,119,291.46 |
$42,182,803.88 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $118,357.49 |
$212,946.86 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,982,045.62 |
$3,727,557.02 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $733,972.35 |
$917,465.45 |
|
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $359,692.49 |
$449,615.61 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Utilities | $2,834,872.22 |
$3,543,590.28 |
|
Louisiana | Caddo | >= 200,000 | N/A | SURF TRANS PROJ | New Construction Roadway | $151,319.46 |
$189,149.33 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $513,577.56 |
$641,971.95 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $225,272.91 |
$281,591.14 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $65,334,270.01 |
||
Louisiana | East Baton Rouge | >= 200,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $68,885.93 |
$86,107.41 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | CARBON REDUCTION PROGRAM | Construction Engineering | $35,914.07 |
$44,892.59 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $25,554.05 |
$28,393.39 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,507,293.05 |
$47,254,112.15 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,255,660.49 |
$24,635,172.51 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,939,251.61 |
$9,736,107.56 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,720,394.88 |
$18,675,494.75 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $147,028.01 |
$183,785.01 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $51,291,253.12 |
$64,422,778.28 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,977,401.72 |
$18,258,294.61 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,244,486.28 |
$9,519,065.39 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,892,786.86 |
$8,265,104.01 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,198,814.79 |
$1,498,518.48 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | Preliminary Engineering | $563,524.12 |
$704,405.15 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $106,678.84 |
$125,504.51 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Construction Engineering | $55,617.62 |
$65,432.50 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | SECTION 149(B) | Preliminary Engineering | $0.35 |
$0.35 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | SECTION 149(D) | Preliminary Engineering | $4,403.16 |
$7,338.60 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $6,000,000.00 |
$7,058,823.53 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,210,084.54 |
$4,012,605.67 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $2,764,714.59 |
$3,455,893.24 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,763,285.41 |
$2,204,106.76 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,655,928.10 |
$8,416,810.13 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,169,921.60 |
$5,212,402.00 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $701,220.00 |
$876,525.00 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $115,118.06 |
$143,897.58 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,050,877.19 |
||
Louisiana | St. Tammany | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $6,030,793.28 |
||
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $80,999.93 |
$101,249.91 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $44,389,684.81 |
||
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $17,789,955.79 |
||
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $130,687.58 |
||
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $4,528,000.00 |
$5,660,000.00 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $53,846,581.63 |
||
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,258,538.00 |
$9,593,063.04 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,168,458.88 |
$6,460,573.60 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $701,220.00 |
$876,525.00 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Environmental Only | $757,088.85 |
$946,361.07 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Bridge New Construction | $2,384,861.03 |
$2,981,076.29 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Environmental Only | $39,762.98 |
$232,713.69 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Preliminary Engineering | $2,186,488.99 |
$2,790,876.43 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $57,872,789.34 |
$72,340,986.68 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,260,366.82 |
$2,160,334.53 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $670,561.44 |
$838,201.80 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $40,688,721.84 |
||
Louisiana | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $53,246.38 |
$66,557.99 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $6,542,412.00 |
$9,406,805.00 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $189,424.63 |
$236,780.79 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | Bridge New Construction | $941,262.58 |
$1,176,578.22 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | REPURPOSED SPECIAL | Bridge New Construction | $4,922,714.30 |
$6,153,392.88 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | SECTION 149(B) | Preliminary Engineering | $232,928.98 |
$291,161.23 |
|
Louisiana | Orleans | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $17,194,911.00 |
$21,462,461.82 |
|
Louisiana | Orleans | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Bridge Replacement - No Added Capacity | $3,210,444.66 |
$4,100,626.37 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Rail/Hwy Crossing | $100,591.88 |
$803,536.85 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECTS-TEA-21 | Right of Way | $2,556,188.41 |
$3,222,029.29 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | N/A | HIGHWAY PROJECTS,DEMOS S378 | Right of Way | $5,487,900.00 |
$5,487,900.00 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,976,048.51 |
$12,550,628.69 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $8,286,297.79 |
||
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Rail/Hwy Crossing | $181,966.86 |
$227,458.57 |
|
Louisiana | Ouachita | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $547,991.43 |
$547,991.43 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge New Construction | $135,000,000.00 |
$171,215,989.00 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $343,618,306.12 |
||
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $40,131,011.99 |
||
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | PROTECT PROGRAM APPORTIONED | Bridge New Construction | $25,340,895.00 |
$31,676,118.75 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $148,445.99 |
$185,557.49 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $490,031.40 |
$612,539.24 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $18,340,988.73 |
$18,340,988.73 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $32,745.27 |
$32,745.27 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | HIGHWAY INFRASTRUCTURE | Preliminary Engineering | $1,736,640.00 |
$2,170,800.00 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $15,776,025.39 |
$19,720,031.74 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $26,135,542.46 |
$32,669,428.07 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,848,418.13 |
$6,060,522.67 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,478,762.30 |
$1,848,452.87 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $70,600.75 |
$88,444.37 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $70,377.41 |
$88,164.58 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $755,138.90 |
$943,923.62 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $229,567.72 |
$286,959.66 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $6,951.34 |
$6,951.34 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $3,893,525.66 |
$3,893,525.66 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $11,171,141.32 |
$11,171,141.32 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $19,944.52 |
$19,944.52 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $4,880.16 |
$5,422.40 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $6,888.21 |
$7,653.57 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $27,825.96 |
$30,917.74 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $43,913.87 |
$48,793.18 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,980,753.73 |
$6,626,800.64 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $16,927,405.04 |
$18,755,899.31 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $73,489.42 |
$81,654.92 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $51,940.55 |
$57,711.72 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $355,018.96 |
$394,465.52 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $502,296.62 |
$558,107.35 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $12,008.59 |
$13,342.88 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $8,507.84 |
$9,453.16 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $11,287,403.99 |
$14,109,254.99 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $420,971.37 |
$526,214.21 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Bridge Rehabilitation - No Added Capacity | $8,388.15 |
$10,485.19 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | BRIDGE REP & REHAB-65% ON SYS | Bridge Rehabilitation - No Added Capacity | $4,801,493.92 |
$6,001,867.40 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - No Added Capacity | $2,765,524.27 |
$3,456,905.34 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | HIGHWAY BRIDGE PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,876.47 |
$2,345.59 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $141,432.13 |
$176,790.16 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $5,507,348.49 |
$6,884,185.61 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,477,845.94 |
$3,097,307.43 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $993,600.68 |
$1,242,000.86 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $11,343,989.55 |
$27,431,912.48 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $910,094.87 |
$5,312,750.54 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $251,120.54 |
||
Louisiana | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $226,765.44 |
$283,456.80 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $129,618.03 |
$162,022.54 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $629,290.69 |
$786,613.36 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $133,616.00 |
$167,020.00 |
|
Louisiana | Calcasieu | >= 200,000 | State | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $1,344.00 |
$1,680.00 |
|
Louisiana | Calcasieu | >= 200,000 | State | EQUITY BONUS SP LIMITATION | New Construction Roadway | $23,217.28 |
$29,021.60 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,955,954.58 |
$16,617,732.87 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $8,026,962.80 |
$10,033,703.77 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,587.06 |
$9,483.82 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $22,103,671.32 |
$27,629,589.16 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $501,429.98 |
$559,473.93 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $164,674.83 |
$182,972.03 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $120,639.91 |
$150,802.94 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $449,486.17 |
$561,857.71 |
|
Louisiana | Iberia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,635,383.63 |
$5,888,846.41 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,290,098.55 |
$9,586,358.18 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,535,253.66 |
$10,134,164.86 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $341,444.44 |
$426,805.54 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $322,987.52 |
$403,734.41 |
|
Louisiana | Iberia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $198,409.44 |
$248,011.80 |
|
Louisiana | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $28,844,387.52 |
$36,055,484.40 |
|
Louisiana | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $68,285.51 |
$85,356.89 |
|
Louisiana | Statewide | N/A | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Ferry Boats | $54,590,000.00 |
||
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $23,530,167.00 |
$26,144,630.00 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | INTERSTATE MAINT DISC | Preliminary Engineering | $1,281,094.86 |
$1,423,438.74 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $41,816,998.89 |
$52,271,248.61 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $11,377,688.04 |
$12,641,875.60 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $11,154,502.29 |
$13,943,127.86 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $938,929.95 |
$1,173,662.44 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,241,421.69 |
$2,836,777.12 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $122,190.30 |
$149,163.60 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $497,376.39 |
$1,004,832.99 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,109,797.52 |
$1,387,246.90 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,938,693.12 |
$2,423,366.40 |
|
Louisiana | St. Martin | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $45,089.92 |
$56,362.40 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $66,774,524.05 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $14,530,272.13 |
||
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $5,831,345.00 |
||
Louisiana | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,195,730.45 |
$2,744,663.06 |
|
Louisiana | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,741,425.76 |
$5,869,702.34 |
|
Louisiana | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Tunnel Preventive Maintenance | $17,556,004.51 |
||
Louisiana | Jefferson | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Tunnel Rehabilitation | $16,757,861.04 |
$20,947,326.30 |
|
Louisiana | Jefferson | >= 200,000 | State | PROTECT PROGRAM APPORTIONED | Resilience Improvement - Highway Project | $11,842,672.48 |
$15,857,111.74 |
|
Louisiana | Jefferson | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Tunnel Rehabilitation | $7,630,421.71 |
$9,538,027.14 |
|
Louisiana | Calcasieu | >= 200,000 | State | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $1,413,005.12 |
$1,570,005.69 |
|
Louisiana | Calcasieu | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $73,108.30 |
$81,742.88 |
|
Louisiana | Calcasieu | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $10,864.72 |
$12,071.91 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $40,817,741.49 |
$45,353,223.63 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $999,169.16 |
$1,122,133.00 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $990,279.53 |
$1,100,310.59 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $827,627.76 |
$920,500.15 |
|
Louisiana | Calcasieu | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $19,332.66 |
$21,480.73 |
|
Louisiana | Calcasieu | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $3,750,020.75 |
||
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Safety | $11,735,923.40 |
$11,735,923.40 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $193,604.00 |
||
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,904,060.06 |
||
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,443,525.97 |
$1,443,525.97 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,005.05 |
$2,005.05 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $22,147.02 |
$22,147.02 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $7,718,337.19 |
$20,321,527.61 |
|
Louisiana | Ascension | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $514,555.81 |
$1,354,768.50 |
|
Louisiana | Caddo | >= 200,000 | N/A | EQUITY BONUS - CHARGED TO LIM | New Construction Roadway | $6,141.48 |
$7,676.85 |
|
Louisiana | Caddo | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $52,149.49 |
$65,186.86 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY CORRIDOR ON NHS | Construction Engineering | $71,961.28 |
$89,951.60 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY CORRIDOR ON NHS | New Construction Roadway | $9,258.03 |
$11,572.54 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Construction Engineering | $74,738.73 |
$93,423.41 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $900,032.52 |
$1,125,040.65 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Construction Engineering | $640,673.20 |
$800,841.50 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | New Construction Roadway | $24,742.80 |
$30,928.50 |
|
Louisiana | Caddo | >= 200,000 | N/A | HIGHWAY PRIORITY PROJECTS | New Construction Roadway | $6,709.92 |
$6,709.92 |
|
Louisiana | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | Construction Engineering | $621,229.48 |
$776,536.86 |
|
Louisiana | Caddo | >= 200,000 | N/A | NAT'L COOR INF IM PROGRAM | New Construction Roadway | $7,379,201.94 |
$9,224,002.42 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,275,166.75 |
$1,593,958.43 |
|
Louisiana | Caddo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $49,447,567.31 |
$142,108,035.01 |
|
Louisiana | Caddo | >= 200,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $1,727,556.12 |
$2,159,445.15 |
|
Louisiana | Caddo | >= 200,000 | N/A | SURF TRANS PROJ | Construction Engineering | $85,020.16 |
$1,005,643.36 |
|
Louisiana | St. Tammany | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,111,242.57 |
$1,234,713.97 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $59,373,770.33 |
||
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $36,474.52 |
||
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Protection | $4,006,962.51 |
||
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $12,679,995.45 |
||
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,351,213.00 |
||
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,091,948.30 |
$4,546,609.23 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $21,262.76 |
$23,625.29 |
|
Louisiana | St. Tammany | >= 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,086,886.66 |
$1,207,651.84 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $8,873,781.13 |
$9,859,756.81 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,515,348.31 |
$31,894,185.39 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $18,298,932.46 |
$22,873,665.57 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,409,503.36 |
$4,899,448.18 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $405,097.15 |
$506,371.43 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $3,133,951.82 |
$3,487,572.79 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $148,422.17 |
$185,527.71 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $6,787.97 |
$8,484.96 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $22,987,923.17 |
$28,734,903.96 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $2,552,868.98 |
$3,191,086.23 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,856,894.34 |
$3,571,117.93 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,339,570.80 |
$1,674,463.50 |
|
Louisiana | Jefferson | >= 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | New Construction Roadway | $6,117,882.00 |
$6,117,882.00 |
|
Louisiana | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $19,833,806.00 |
||
Louisiana | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $17,078,904.88 |
$33,175,272.77 |
|
Louisiana | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $16,499,991.47 |
$108,054,466.93 |
|
Louisiana | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $514,228.00 |
$642,785.00 |
|
Louisiana | Jefferson | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $11,591,854.51 |
$39,302,360.85 |
|
Louisiana | Jefferson | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | Debt Service | $1,595,656.75 |
$1,595,656.75 |
|
Louisiana | Jefferson | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | New Construction Roadway | $51,817.58 |
$51,817.58 |
|
Louisiana | Jefferson | >= 200,000 | State | REPURPOSED SPECIAL | Debt Service | $735,218.25 |
$735,218.25 |
|
Louisiana | Jefferson | >= 200,000 | State | REPURPOSED SPECIAL | New Construction Roadway | $2,490,308.95 |
$2,490,308.95 |
|
Louisiana | Jefferson | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $4,000,000.00 |
$4,000,000.00 |
|
Louisiana | Orleans | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $17,090,608.89 |
$21,363,261.11 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $16,704,829.02 |
$20,881,036.28 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,008,190.97 |
$1,260,225.36 |
|
Louisiana | Orleans | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,031,436.30 |
$1,289,281.73 |
|
Louisiana | Orleans | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $573,430.34 |
$716,787.93 |
|
Louisiana | St. Tammany | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $560,457.89 |
$700,572.36 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Bridge New Construction | $15,067,684.24 |
$18,834,605.30 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | New Construction Roadway | $1,354,315.76 |
$1,692,894.70 |
|
Louisiana | Lafourche | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $409,923.49 |
||
Louisiana | Lafourche | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $3,084,057.97 |
||
Louisiana | Lafourche | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $1,106,716.80 |
$7,047,977.85 |
|
Louisiana | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $44,012,608.52 |
$55,015,760.65 |
|
Louisiana | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,692,819.06 |
$10,866,023.82 |
|
Louisiana | Orleans | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,370,516.23 |
$5,463,145.29 |
|
Louisiana | St. James | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $23,792,337.86 |
$29,740,422.32 |
|
Louisiana | St. John the Baptist | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - No Added Capacity | $21,762,613.48 |
$27,203,266.85 |
|
Louisiana | St. John the Baptist | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $2,418,068.16 |
$3,022,585.19 |
|
Louisiana | St. James | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $2,643,593.10 |
$3,304,491.38 |
|
Louisiana | St. James | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Planning | $95,596.84 |
$234,934.65 |
|
Louisiana | St. John the Baptist | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Planning | $70,026.87 |
$172,094.99 |
|
Louisiana | St. James | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $236,345.82 |
$295,432.27 |
|
Louisiana | St. John the Baptist | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $172,917.03 |
$216,146.29 |
|
Louisiana | Lafayette | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Maintenance Resurfacing | $23,853,704.00 |
$26,504,115.56 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $22,572,286.44 |
$58,270,900.30 |
|
Louisiana | Acadia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $671.88 |
$1,734.48 |
|
Louisiana | Acadia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $251.30 |
$349.00 |
|
Louisiana | Lafayette | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $8,442,505.22 |
$11,724,859.68 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,232,081.57 |
$2,232,081.57 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $12,699,398.57 |
$22,065,163.07 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $4,200,000.00 |
$4,200,000.00 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $23,050,159.33 |
$25,611,288.14 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,159.41 |
$19,066.01 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $50.83 |
$56.48 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $833,867.74 |
$926,519.71 |
|
Louisiana | Iberville | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $546,413.30 |
$607,125.89 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $437.13 |
$485.70 |
|
Louisiana | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $25,593,411.04 |
$28,437,123.38 |
|
Louisiana | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,804,570.99 |
$2,005,078.88 |
|
Louisiana | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $448,207.07 |
$652,972.36 |
|
Louisiana | Madison | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $6,233,324.99 |
$6,925,916.65 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | CARBON REDUCTION PROGRAM | Landscaping and Other Scenic Beautification | $1,125,889.39 |
$1,250,988.21 |
|
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,263,909.24 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $126,351,136.81 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,000,000.00 |
$13,452,538.36 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $529,726.63 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,539,368.72 |
$1,710,409.71 |
|
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $380,727.61 |
$423,030.68 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $4,418,472.80 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $2,343,137.73 |
||
Louisiana | Bossier | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $830,441.15 |
$922,712.38 |
|
Louisiana | Caddo | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $72,225.97 |
$80,253.30 |
|
Louisiana | Pointe Coupee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $21,156,384.28 |
$26,445,480.35 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $37,410,491.74 |
$46,763,114.67 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $3,125,125.20 |
$3,906,406.50 |
|
Louisiana | St. Mary | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $255,230.04 |
$319,037.55 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | CARBON REDUCTION PROGRAM | Traffic Management/Engineering - HOV | $510,000.00 |
$637,500.00 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | CARBON REDUCTION PROGRAM | Traffic Management/Engineering - HOV | $327,500.00 |
$409,375.00 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | CARBON REDUCTION PROGRAM | Traffic Management/Engineering - HOV | $2,185,500.00 |
$2,731,875.00 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $352,899.82 |
$441,124.77 |
|
Louisiana | Tangipahoa | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $6,694.67 |
$8,368.34 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $353,005.69 |
$441,257.12 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Traffic Management/Engineering - HOV | $352,899.82 |
$441,124.77 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 |
$1,488,392.81 |
|
Louisiana | Orleans | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 |
$1,488,392.81 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 |
$1,488,392.81 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 |
$1,488,392.82 |
|
Louisiana | Tangipahoa | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,188,870.15 |
$1,486,087.70 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,354,804.46 |
$1,693,505.57 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,190,714.25 |
$1,488,392.81 |
|
Louisiana | East Baton Rouge | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $4,727,288.50 |
$5,909,110.63 |
|
Louisiana | St. Tammany | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $1,344,739.41 |
$1,680,924.26 |
|
Louisiana | Tangipahoa | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $810,824.60 |
$1,013,530.75 |
|
Louisiana | Bossier | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $3,108,855.75 |
$3,886,069.68 |
|
Louisiana | Calcasieu | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $831,457.39 |
$1,039,321.74 |
|
Louisiana | Orleans | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $4,126,355.75 |
$5,157,944.69 |
|
Louisiana | Rapides | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Traffic Management/Engineering - HOV | $810,978.60 |
$1,013,723.25 |
|
Louisiana | Iberia | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - Restoration & Rehabilitation | $2,460,025.00 |
$2,460,025.00 |
|
Louisiana | Iberia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $24,326,125.33 |
$34,262,654.42 |
|
Louisiana | Iberia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $809,663.17 |
$1,012,078.96 |
|
Louisiana | Iberia | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $93,537.70 |
$116,922.13 |
|
Louisiana | Jefferson | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $47,937.24 |
$59,921.55 |
|
Louisiana | Jefferson | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $46,676,312.11 |
||
Louisiana | Jefferson | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $16,790,168.74 |
$20,987,710.92 |
|
Louisiana | Jefferson | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,448,200.00 |
$4,310,250.00 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $30,382,321.50 |
$40,062,336.65 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $670,510.84 |
$838,138.54 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $217,650.07 |
$272,062.59 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - Added Capacity | $7,653,581.52 |
$9,566,976.90 |
|
Louisiana | St. Tammany | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | Bridge Replacement - Added Capacity | $17,346,418.48 |
$21,683,023.10 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $12,602,540.00 |
||
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,355,845.00 |
$11,996,246.98 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $15,600,000.00 |
$44,640,000.00 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $250,000.00 |
||
Louisiana | East Baton Rouge | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Traffic Management/Engineering - HOV | $1,498,604.00 |
$1,873,255.00 |
|
Louisiana | East Baton Rouge | >= 200,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | Other | $6,440.00 |
$8,050.00 |
|
Louisiana | Pointe Coupee | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $13,405,297.57 |
$17,334,402.32 |
|
Louisiana | West Baton Rouge | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $6,034,084.63 |
$7,899,442.65 |
|
Louisiana | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Protection | $15,884,774.12 |
$19,855,967.65 |
|
Louisiana | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $37,528,145.25 |
$46,910,181.56 |
|
Louisiana | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,826,208.49 |
$7,324,136.40 |
|
Louisiana | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Environmental Only | $332,626.97 |
$415,783.71 |
|
Louisiana | Jefferson | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $123,876.79 |
$154,845.99 |