Minnesota | MN 5: FROM I-494 IN BLOOMINGTON TO SOUTH END OF THE MISSISSIPPI RIVER BR #9300- CONCRETE PAVEMENT REHAB & RESURFACE, LIGHTING, TMS & REHAB 12 BRIDGES | $20,550,013.69 |
$29,572,876.70 |
|
Minnesota | US 10: FROM ANOKA/RAMSEY CITY LIMITS (0.48 MI E OF CSAH 57) TO W OF GREEN HAVEN RD (0.28 MI W OF MN 47)- R/W ACQUISITION FOR CONST OF NEW INTERCHANGE | $34,031,500.00 |
$55,256,523.13 |
|
Minnesota | RAMSEY GATEWAY PROJECT (US HIGHWAY 10/169) | $40,000,000.00 |
$94,437,021.00 |
|
Minnesota | TH 12: CR 6 to Wayzata Blvd; Reconstruction, New Bridges, Replace Br 90650 w/Br27274, Signals, and Signs | $45,822,305.53 |
$58,197,503.65 |
|
Minnesota | TH 14: BROADWAY ST TO 0.6 MI E OF TH 14/TH 15/CR 21 INT & TH 15: TH 14/TH15/CR 21 INT TO 0.1 MI N OF 428TH LN, RECONST, REPL BRS 9200 & 9294 (cont) | $24,896,460.54 |
$32,391,528.60 |
|
Minnesota | US 14: FROM 1.25 MI NW OF CSAH 37 TO 0.5 MI E OF 481ST AVE IN NICOLLET CO- RECONSTRUCT FROM 2 LN TO 4 LN DIVIDED, CONCRETE & BIT SURFACING, ADA (CONT) | $22,250,696.08 |
$83,539,141.56 |
|
Minnesota | MN 23: 0.1 MI W OF LINCOLN AV TO CSAH 1 & ON US 10, FROM 0.2 MI N OF GERMAIN ST TO 650' N OF 15TH AVE SE IN ST. CLOUD- RECONST MN23/US10 INTCHG (CONT) | $3,816,640.52 |
$43,678,235.93 |
|
Minnesota | TH 52: Oronoco ''Design Build' - New Interchange at CR 112 & New Overpass at CSAH 12, Repl brs 9234 & 9235 | $25,028,944.00 |
$40,294,392.00 |
|
Minnesota | US 52: 0.4 MI S OF CSAH 86 IN HAMPTON TO 0.2 MI N OF 140TH ST IN ROSEMOUNT- CONCRETE SURFACING, UNBONDED CONC OVERLAY, BIT MILL & OVERLAY, TMS (CONT) | $46,693,224.81 |
$58,375,608.35 |
|
Minnesota | MN 55/MN 62: BLOOMINGTON RD IN MPLS TO US 52 IN INVER GROVE HEIGHTS- REHAB BRIDGES 4190, 19819 & 19827, BIT MILL & OVERLAY, CONCRETE PVMT REHAB (CONT) | $23,614,933.85 |
$29,282,271.47 |
|
Minnesota | TH 60: 1.4 MI W OF W JCT TH 4 TO W JCT TH 15, CONC SURF, ADA, REHAB BR #91543 & TH 4: REHAB BR #83026 & CSAH 12: REHAB BR #83027 & TH 15: REMOVE(cont) | $24,248,889.58 |
$30,495,245.67 |
|
Minnesota | TH 63: AT TH 61 IN REDWING TO 0.2 MI N OF 825TH ST IN WI & ON TH 61, FROM 0.47 MI E OF TH 58 TO 0.09 MI E OF TH 58- BIT & CONC PVMT, ADA, (CONT BELOW) | $28,112,178.88 |
$63,436,184.27 |
|
Minnesota | MN 210: 0.19 MI E OF CSAH 1 (RIPPLE RVR) TO N JCT US 169 & US 169, FROM N JCT OF MN 210 TO 0.28 MI S OF CSAH 21 (MISSISSIPPI RVR) IN AITKIN CO. (CONT) | $4,100,000.00 |
$36,214,110.00 |
|
Minnesota | TH 212: CARVER CR 147 IN CHASKA TO CSAH 4 IN EDEN PRAIRIE, DESIGN BUILD, GR, SURF, BRS. | $124,041,073.12 |
$253,585,892.17 |
|
Minnesota | US 212: FROM 0.30 MI E OF CSAH 36 TO CSAH 11 IN DAHLGREN TWP- RECONSTRUCT & EXPAND FROM A 2-LANE TO A 4-LANE DIVIDED HWY, REDUCED CONFLICT INT. (CONT) | $22,301,129.28 |
$27,868,911.60 |
|
Minnesota | US 10 RUM RIVER BRIDGE REPLACEMENT & INTERSECTION IMPROVEMENTS | $15,000,000.00 |
$44,883,760.20 |
|
Minnesota | TH 610:CR 81 TO I-94 & CONST OF 105TH AV FR MAPLE GROVE PKWY TO 0.5 MI W OF I-94, 4 LN FREEWAY CONST, 9 NEW BRIDGES | $4,346,171.64 |
$81,001,000.00 |
|
Minnesota | CSAH 70: FROM KENRICK AVE/KENSINGTON BLVD TO CSAH 23 IN LAKEVILLE- RECONSTRUCT FROM A 2-LN UNDIVIDED TO A 4 -LN DIVIDED HWY, PED/BIKE TRAIL & SIGNALS | $14,018,000.00 |
$28,168,224.61 |
|
Minnesota | CSAH5 (FRANKLIN AV): IN MPLS, OVER W. RIVER RD & MISSISSIPPI RIVER, RECONDITION BR# 2441 | $8,320,000.00 |
$43,097,946.99 |
|
Minnesota | HISTORIC STONE ARCH BRIDGE: OVER THE MISSISSIPPI RVR AT ST. ANTHONY FALLS IN MINNEAPOLIS FROM PORTLAND AVE TO SE 6TH AVE (BTWN I-35W & MN 65)- | $1,104,000.00 |
$29,367,280.00 |
|
Minnesota | MN 65 (3RD AVE S): FROM 1ST ST S TO 180' S OF 2ND ST SE IN MINNEAPOLIS- REHAB BRIDGE 2440 OVER THE MISSISSIPPI RIVER *CMGC* | $99,776,966.16 |
$144,476,702.50 |
|
Minnesota | MSAS 143 (RUSH CREEK BLVD): CSAH 30 TO MN 610 IN MAPLE GROVE- CONSTRUCT NEW 4-LANE DIVIDED HWY, NEW BR'S 27R09 & 27W13 OVER I-94, SIGNALS, ADA (CONT) | $2,750,000.00 |
$42,661,000.00 |
|
Minnesota | MSAS 425 (HENNEPIN AV): DOUGLAS AV TO LAKE ST IN MPLS- RECONSTRUCT RDWY INCLUDING SIDEWALKS, SIGNALS, REHAB BR 27599, BRT STATIONS & STREETSCAPING | $7,550,000.00 |
$35,215,000.00 |
|
Minnesota | I-494: TH5 TO 0.1 MI S OF TH55 - RECONST, GR, SURF, REPL BRS, & ADD 3RD LN EACH DIRECTION | $80,156,404.35 |
$143,797,249.42 |
|
Minnesota | MSAS 158 (KELLOGG BLVD): W 7TH ST TO MARKET ST IN ST. PAUL- REPLACE BR 90378 W/BR'S 62671 & 62672, RETAINING WALLS, SIGNALS, ADA, LIGHTING (CONT) | $36,216,438.00 |
||
Minnesota | MNDOT D1/ST. LOUIS COUNTY: BRIDGE BUNDLE PARTNERSHIP TO REPLACE BRIDGES & BOX CULVERTS, INCLUDES PE & MNDOT BR'S 6290, 6292, 6293 & 6294 ALONG MN210 | $15,719,224.38 |
$25,396,593.69 |
|
Minnesota | US 169: 0.6 MI N OF MN41/CSAH 78 TO 0.5 MI S OF CSAH 14- RECONSTRUCTION, INCLS INTERCHANGES AT CSAH 14 & MN41/CSAH 78 & CONST NEW FRONTAGE RD'S(CONT) | $37,438,933.00 |
$44,619,364.23 |
|
Minnesota | MN 13: 800' W OF LOUISANA AVE TO QUENTIN AVE IN SAVAGE-CONSTRUCT INTERCHANGE & FRONTAGE ROADS, CONSTRUCT NEW BRIDGE 70053 & REMOVE BRIDGE 5831 | $20,126,557.76 |
$30,894,467.55 |
|
Minnesota | TH 101:PRELIM ENG & 147 TH AV TO MISSIPPI RIVER, GR, SURF, WALLS, LIGHTS, SIG, BRS. - "BAP" PROJECT | $36,733,284.00 |
$63,262,521.00 |
|
Minnesota | I-35E:"ELLA", 0.6 MI N OF 80TH ST E TO JCT OF I-35/I-35W/I-35E & I-35W:2.3 MI N OF MAIN ST TO JCT I-35/I-35W/I-35E & I-35:JCT I-35/I-35W/I-35E(cont) | $53,836,899.53 |
$64,438,956.79 |
|
Minnesota | I-35: FROM CHISAGO CO LN TO 0.94 MI S OF CSAH 11- UNBONDED CONC OVLY, REPLC BR'S 58801 W/58825, BR 58802 W/58826, BR 58803 W/58823 & BR 58804 W/58824 | $26,084,985.07 |
$30,438,475.96 |
|
Minnesota | DULUTH TWIN PORTS INTERCHANGE ON I-35, I-535 & US 53 (CMGC WORK PACKAGES 1 & 2) | $163,478,106.83 |
$275,839,504.55 |
|
Minnesota | I-35: 0.58 MI S OF CSAH 48 TO 0.54 MI N OF MN 21 IN CITY OF FARIBAULT- BIT MILL & OVLY, UNBONDED CONCRETE OVLY, SIGNAL, HTCG, REHAB BR'S 66808 & 66811 | $26,108,105.90 |
$29,081,825.95 |
|
Minnesota | I-35: FROM 1 MI S OF MN 48 TO 2.2 MI N OF MN 48 IN PINE COUNTY- MILL & OVERLAY, UNBONDED CONCRETE OVERLAY, HIGH TENSION CABLE GUARDRAIL, TMS (CONT) | $29,607,640.00 |
||
Minnesota | I-35W:72' S OF E 43RD ST TO 520' E OF CHICAGO AV S & I-94:NICOLLET AV S TO 70' E OF PARK AV S & TH 65:168' N OF 24TH ST TO 550' S OF E 15TH ST, (cont) | $154,605,775.49 |
$239,129,843.40 |
|
Minnesota | I-35W: CLIFF RD IN BURNSVILLE THROUGH THE 106TH ST INTCHG IN BLOOMINGTON, PVMT RECONST, AUX LNS, REPL BR #5983 W BRS 27W38 27W39, REPL BRS 9043 (cont) | $114,388,208.78 |
$130,190,886.45 |
|
Minnesota | I-35W:CR B2 IN ROSEVILLE TO 0.1 MI N OF SUNSET AV (CR 53) IN LINO LAKES,CONST MnPASS LN FROM CR C TO LEXINGTON AV (CSAH 17),CONC OVLY FR CR C (cont.) | $180,752,750.44 |
$207,674,620.00 |
|
Minnesota | I-35W (NB): FROM E 42ND ST TO E 40TH ST IN MINNEAPOLIS- CONSTRUCT STORMWATER HOLDING CAVERN SYSTEM, INCLUDES LIGHTING, NOISE & RETAINING WALLS | $53,670,157.28 |
$64,488,815.10 |
|
Minnesota | I-494: (ELLA) FROM 3RD AVE S IN S ST PAUL TO E END OF MN RIVER BR IN EAGAN- M&O, DRAINAGE, REHAB 7 BR'S, GUARDRAIL, TMS, TURN LNS, SIGNALS, ADA (CONT) | $28,930,292.04 |
$32,951,443.24 |
|
Minnesota | I-494: PILOT KNOB RD IN EAGAN TO 24TH AVE IN BLOOMINGTON- REHAB BR'S 19825, 27765, 27767, 9217E & 9217W, CONCRETE PVMT REHAB, BIT MILL & OVLY (CONT) | $57,716,754.33 |
$62,167,893.70 |
|
Minnesota | I-494 (EB & WB): 1000’ W OF EAST BUSH LAKE RD (CSAH 28) TO 1000’ E OF 12TH AVE S IN HENNEPIN CO- CONST EB/WB EZPASS LANES FROM CSAH 28 TO I-35W (CONT) | $86,050,487.29 |
$377,412,915.00 |
|
Minnesota | TWIN PORTS INTERCHANGE (TPI) IN DULUTH - CMGC WORK PACKAGES #3 & #4 | $141,908,901.36 |
$158,787,768.54 |
|
Minnesota | I-694:IN OAKDALE, 10TH ST (CSAH 10) TO JCT I-694/494/94 & I-494:0.1 MI S OF TAMARACK RD TO JCT I-694/494/94, CONC OVLY, AUX LN SB FROM 10TH ST (cont.) | $26,268,290.46 |
$32,230,557.30 |
|
Minnesota | I-90: 2 MI W OF US 169 TO MN 22 IN FARIBAULT CO- UNBONDED CONC OVLY, RAMPS, LIGHTING, ADA, REHAB BR'S 22803, 22804, 22815, 22816, 22825 & 22826 AND PE | $76,182,544.10 |
$80,192,151.70 |
|
Minnesota | I-94: 0.4 MI W OF CSAH 19 IN ALBERTVILLE TO 0.3 MI E OF MN 241 IN ST MICHAEL- RECONST, INCLS ADDITION OF EB THIRD LN FROM CSAH 19 TO MN 241 (CONT.) | $7,384,072.50 |
$70,995,000.00 |
|
Minnesota | I-94: FROM MN 24 IN CLEARWATER TO 0.3 MI E OF BR #86802 (CSAH 39) NEAR MONTICELLO (EBL & WBL)- RECONSTRUCTION, REHAB 5 BR'S & REPLC 1 BR W/NEW CULVERT | $81,401,519.20 |
$103,918,000.00 |
|
Minnesota | I-94: 0.3 MI E OF MN 120 (CENTURY AVE) IN OAKDALE TO 0.27 MI E OF THE E JCT OF MN 95 (W OF THE ST CROIX RIVER) IN LAKELAND- BIT & CONCRETE OVLY (CONT) | $87,397,299.45 |
$102,542,218.30 |
|
Minnesota | I-494/169: DESIGN BUILD, RECONT INTERCHANGE, WIDEN BRS, NEW BRS. | $81,516,658.09 |
$145,513,079.35 |