U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FISCAL MANAGEMENT INFORMATION SYSTEM
Report: FMISF71A-2
New Mexico

SUMMARY PROJECT LEVEL DATA PURSUANT TO 23 U.S.C. 104(g)(3)(B) WITH AN ESTIMATED TOTAL COST OF $25,000,000 OR MORE
AS OF SEPTEMBER 30, 2023
RECIPIENT
PROJECT
NUMBER
PROJECT TITLE
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
New Mexico
0254078
ALBUQUERQUE, I-40/I-25 SYSTEM INTERCH. CONS.
$144,106,644.06
$393,790,943.27
New Mexico
0261011
NM 26 PAVEMENT AND BRIDGE REHAB
$6,682,576.47
$29,997,767.79
New Mexico
0401117
INTERSTATE 40 WEST OF GALLUP SEG. 1
$28,976,938.15
$38,792,786.26
New Mexico
0402073
I-40, M.P. 117 TO M.P. 122.5
$19,666,256.74
$28,542,736.33
New Mexico
0403144
I-40 COORS INTERCHANGE
$123,420,907.77
$170,948,970.01
New Mexico
0403147
I-40, MP 177.15 TO MP 181.66
$26,048,455.47
$35,115,658.89
New Mexico
0403150
I 4O TO NM 14
$32,991,661.50
$43,244,497.54
New Mexico
0403155
San Mateo I-40 Interchange, 160.73 MP TO 162.17 MP
$41,563,453.25
$52,397,268.16
New Mexico
0403157
I-40 SAN MATEO TO PENNSYLVANIA STREET
$18,057,037.56
$32,678,321.97
New Mexico
0403165
RECONSTRUCTION I-40, WEST CENTRAL TO 98TH ST.
$6,792,005.38
$25,488,748.62
New Mexico
0403187
I-40, MP 173.73 TO MP 177.11
$23,382,591.37
$27,597,341.05
New Mexico
0405072
RECONSTRUCTION - NO ADDED CAPACITY I-40, MP 308 TO MP 313.87
$12,601,548.70
$31,665,479.81
New Mexico
0541031
6.5 MI N ORO GRANDE - N., MAJOR WIDENING
$21,522,547.37
$57,935,981.98
New Mexico
0542027
US 54, FROM MP 94.23 TO MP 107.1, TULAROSA TO VAUGHN, RECONSTRUCTION
$19,596,296.67
$28,811,760.55
New Mexico
0644027
US 64, DULCE TO LUMBERTON
$20,729,961.11
$30,091,320.67
New Mexico
0702023
US 70 INTERCHANGE, I-25 TO INT-E., CONS. DESIGN, R/W, RECONS.,CMGT
$9,317,078.73
$33,914,174.88
New Mexico
0702031
1.4 MI. E I-25 INTERCHANGE - E., RECONSTRUCTION W/ADDED CAPACITY
$9,902,956.60
$30,346,255.45
New Mexico
0702032
T.4 MI E I-25 INTERCHANGE-E., RECONSTRUCTION
$15,461,843.31
$36,850,464.71
New Mexico
0704035
US 70, Hondo Valley, Design Build Project
$45,369,170.25
$139,602,150.50
New Mexico
0846078
ALAMO DRIVE TO OPERA/FLEA MARKET, RECONSTRUCTION
$36,297,552.75
$81,877,167.71
New Mexico
1100990
EXIT 75 AT WILLIAMSBURG INTERCHANGE PROJECT
$38,563,669.95
$45,480,658.41
New Mexico
1102080
I-10 AZ State Line to MP 15 Pavement Preservation
$23,539,644.30
$27,551,081.81
New Mexico
2101351
Downtown Clovis Reconstruction Project
$16,847,820.34
$45,492,848.52
New Mexico
2101381
Downtown Lovington Construction Phase I
$24,241,272.35
$29,324,667.14
New Mexico
2101771
US-82-P, FROM MP 107.4 TO MP 139.1, NOT SPECIFIED, ROADWAY CONSTRUCTION
$40,039,974.61
$71,654,376.76
New Mexico
2102112
US 54 Corridor Construction Phase II
$2,674,250.99
$27,433,988.67
New Mexico
2102113
US 54 Corridor Construction Phase III
$2,159,167.64
$44,868,510.13
New Mexico
2102162
US 285 Corridor Construction Phase III
$558,985.19
$57,968,116.76
New Mexico
2102163
US 285 Corridor Construction Phase IV
$30,280,813.58
$35,445,255.65
New Mexico
4100382
NM434 COYOTE CREEK CANYON PROJECT 2
$22,164,125.06
$26,648,875.99
New Mexico
4100401
US-54-P, FROM MP 324.9 TO MP 326.3, 22.1 MILES NORTH OF JCT. LOOP 36 - EAST, BRIDGE REPLACEMENT
$22,713,536.45
$27,314,087.25
New Mexico
4100701
US 64 Palo Flechado Pass (US 64 Study (CN 4100700) Project 1)
$7,922,784.06
$31,557,355.65
New Mexico
4100822
RATON PASS PROJECT 2
$22,894,784.74
$26,974,759.09
New Mexico
4100823
RATON PASS PROJECT 3
$2,450,053.18
$27,723,571.61
New Mexico
4100850
NM39 (NORTH OF LOGAN)
$3,659,708.62
$25,455,153.78
New Mexico
5100451
NM 41- Phase III
$8,508,352.32
$25,752,916.12
New Mexico
5100750
NM 68, US 64 FROM LA POSTA RD. NORTH TO CAMINO DE LA PLACITAS (NORTH) IN THE TOWN OF TAOS -, ALIGNMENT STUDY
$22,892,044.46
$37,347,336.85
New Mexico
5101172
US 64- Phase II  
$59,239,451.00
New Mexico
5101341
I-25 La Bajada Slope Mitigation
$7,580,703.25
$44,575,382.03
New Mexico
5101441
US 285 Tres Piedras
$27,113,687.30
$31,738,678.19
New Mexico
5101670
I-40 Pavement Preservation
$6,844,213.01
$25,165,092.28
New Mexico
6100671
NEAR CHURCH ROCK, NM.
$22,727,801.29
$26,871,783.17
New Mexico
6100780
41.846 MILES NORTH OF I-40 ON US491 BEGINNING IN GALLUP, NM
$12,731,864.43
$27,999,761.62
New Mexico
6100783
US 491, FROM MP15.116 TO MP 36.984, 15 MILES NORTH OF I40, RECONSTRUCTION WITH ADDED CAPACITY
$13,006,129.16
$93,319,498.42
New Mexico
6101181
I-40 Concrete Wall Barrier Project near Laguna
$10,746,089.23
$29,085,501.41
New Mexico
A300160
T/LPA-SUNPORT BLVD EXTENSION-FROM BROADWAY TO I-25 EXIT 221 AT SUNPORT BLVD.CONSTRUCT NEW 4 LANE DIVIDED FACILITY WITH BIKE LANES
$23,705,527.00
$28,152,339.20
New Mexico
A300280
I-25, MP 221.62 TO MP 222.02, RECONSTRUCT INTERCHANGE WITH POSSIBLE CHANGES IN CONFIGURATION
$50,566,726.25
$64,791,085.58
New Mexico
A300381
NM 528, FROM MP 8.32 TO MP 9.79, NM 528 RIO RANCHO BLVD IMPROVEMENTS (UPPER SECTION) - FROM RIDGECREST DR/LEON GRANDE AVE
$31,023,410.78
$36,804,611.76
New Mexico
A301234
US0550, FROM MP .6 TO MP 3, US 550 CONSTRUCTION & WIDENING PHASE 2 - FROM MP.6 TO  MP 3.0, ROW PURCHASE,
$26,679,048.08
$35,042,987.71
New Mexico
A301901
I25/Montgomery Blvd Interchange Reconstruction
$49,453,036.56
$181,827,941.72
New Mexico
E100203
NM 404 Widening Project
$33,950,267.18
$48,263,680.03
New Mexico
LC00290
University Ave Multimodal Project
$18,953,201.39
$27,000,953.61