RECIPIENT |
PROJECT NUMBER |
COUNTY |
POPULATION RANGE |
OWNERSHIP |
PROGRAM |
TYPE OF IMPROVEMENT |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|---|---|---|---|
New Mexico | Bernalillo | >= 200,000 | N/A | BRIDGE REPLAC & REHAB - DISC | Bridge Replacement (Obsolete) | $7,200,000.00 |
$9,000,000.00 |
|
New Mexico | Bernalillo | >= 200,000 | State | CONGESTION AIR QUALITY | Safety | $866,283.77 |
$1,082,854.71 |
|
New Mexico | Bernalillo | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | Debt Service | $4,177,397.00 |
$4,177,397.00 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE 4R | Preliminary Engineering | $976,461.98 |
$1,054,039.27 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE MAINT DISC | 4R - No Added Capacity | $10,000,000.00 |
$10,794,473.23 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $36,329,496.34 |
$39,215,777.57 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $3,000,000.00 |
$3,238,341.97 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $629,757.21 |
$679,789.73 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | Safety | $1,114,918.17 |
$1,203,495.43 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | ITS DEPLOYMENT-METROPOL-TEA21 | Other | $1,019,487.00 |
$2,038,974.00 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $23,924,644.83 |
$23,924,644.83 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $54,868,197.76 |
$297,381,155.53 |
|
New Mexico | Luna | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 15% OFF SYST | Debt Service | $104,017.56 |
$130,021.95 |
|
New Mexico | Luna | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $531,599.12 |
$11,764,232.16 |
|
New Mexico | Luna | >= 5,000 AND < 50,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $2,310,890.80 |
$2,888,613.51 |
|
New Mexico | Luna | >= 5,000 AND < 50,000 | State | BRIDGE REP & REHAB-20% ON/OFF | Debt Service | $10,544,813.93 |
||
New Mexico | Luna | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,736,068.99 |
$4,670,086.24 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | 4R - No Added Capacity | $2,358,754.52 |
$2,948,443.15 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $879,180.15 |
$949,028.66 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $1,583,800.70 |
$1,709,629.43 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $2,377,115.50 |
$2,565,970.96 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,769,805.81 |
$16,577,959.45 |
|
New Mexico | Statewide | N/A | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $13,008,281.47 |
$14,041,754.61 |
|
New Mexico | Cibola | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $3,580,834.47 |
$6,265,322.18 |
|
New Mexico | Cibola | >= 5,000 AND < 50,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $1,595,747.88 |
$1,722,525.78 |
|
New Mexico | Cibola | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $14,489,674.39 |
$20,554,888.37 |
|
New Mexico | Bernalillo | >= 200,000 | State | CONGESTION AIR QUALITY | Debt Service | $385,883.94 |
$849,008.94 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINT DISC | Right of Way | $940,419.00 |
$1,015,132.77 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | $13,748,214.52 |
$15,105,364.52 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $106,184,220.75 |
$151,405,809.81 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $264,083.32 |
$352,111.09 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,898,086.24 |
$2,221,542.88 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $3,426,083.23 |
$3,698,276.37 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $2,552,339.59 |
$2,755,116.14 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $20,070,032.65 |
$28,662,266.38 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $6,565,725.15 |
$7,087,354.43 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | $4,403,616.05 |
$4,753,471.56 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $22,022,320.30 |
$31,403,671.55 |
|
New Mexico | Bernalillo | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Bridge Replacement - Added Capacity | $2,013,621.43 |
$2,517,026.79 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Utilities | $113,858.23 |
$142,322.79 |
|
New Mexico | Bernalillo | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $755,283.40 |
$2,248,160.13 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $164,472.17 |
$192,500.20 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | $1,222,855.72 |
$3,182,663.41 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $16,310,633.20 |
$18,994,472.81 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,519,348.79 |
$3,964,756.42 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $1,800,287.00 |
$2,107,077.48 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $15,663,093.31 |
$19,048,288.13 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | CONGESTION AIR QUALITY | 4R - Added Capacity | $592,276.67 |
$693,207.71 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $4,643,357.50 |
$5,434,641.27 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $130,146.31 |
$152,324.80 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - Added Capacity | $2,761,171.84 |
$2,980,539.55 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $1,693,967.11 |
$1,828,548.26 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | $853,680.81 |
$13,620,108.17 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,999,302.03 |
$3,237,588.55 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,383,135.29 |
$4,731,363.66 |
|
New Mexico | Bernalillo | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $146,726.33 |
$17,711,034.38 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,866,683.23 |
$6,866,436.36 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $119,538.41 |
$139,909.19 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Other | $659,057.41 |
$771,368.69 |
|
New Mexico | Bernalillo | >= 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $7,624,222.32 |
$8,923,481.18 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | 4R - Added Capacity | $3,642,625.47 |
$3,932,022.31 |
|
New Mexico | Bernalillo | >= 200,000 | State | INTERSTATE MAINTENANCE | Debt Service | $6,183,110.36 |
$6,674,341.93 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,932,633.22 |
$8,067,495.63 |
|
New Mexico | Quay | >= 5,000 AND < 50,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $153,271.00 |
$179,390.22 |
|
New Mexico | Quay | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Debt Service | $3,705,163.97 |
$3,999,529.32 |
|
New Mexico | Quay | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,743,113.73 |
$27,486,560.27 |
|
New Mexico | Otero | >= 50,000 AND < 200,000 | N/A | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $9,712,831.11 |
$11,607,768.07 |
|
New Mexico | Otero | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,485,862.21 |
$4,485,862.21 |
|
New Mexico | Otero | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $7,323,854.05 |
$41,842,351.70 |
|
New Mexico | Otero | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,986,149.53 |
$5,948,209.24 |
|
New Mexico | Otero | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $294,917.20 |
$345,174.62 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $225,524.91 |
$263,957.06 |
|
New Mexico | Otero | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $14,089,705.03 |
$22,254,419.63 |
|
New Mexico | Rio Arriba | >= 5,000 AND < 50,000 | State | BRIDGE REP & REHAB-65% ON SYS | 4R - No Added Capacity | $1,735,045.48 |
$2,168,806.85 |
|
New Mexico | Rio Arriba | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $17,130,078.54 |
$25,748,127.16 |
|
New Mexico | Rio Arriba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $1,816,477.71 |
$2,126,027.28 |
|
New Mexico | Rio Arriba | >= 5,000 AND < 50,000 | State | TECHNOLOGY DEPLOYMENT GRANTS T | Bridge Replacement - No Added Capacity | $48,359.38 |
$48,359.38 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,270,358.71 |
$3,270,358.71 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $5,060,634.79 |
$29,411,209.63 |
|
New Mexico | Do a Ana | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Other | $860,000.00 |
$1,075,000.00 |
|
New Mexico | Do a Ana | >= 200,000 | N/A | SURFACE TRANSPORTATION PROJECT | Preliminary Engineering | $126,085.23 |
$157,606.54 |
|
New Mexico | Do a Ana | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | $3,180,809.60 |
$3,976,012.00 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,418,596.02 |
$2,418,596.02 |
|
New Mexico | Otero | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $220,204.37 |
$220,204.37 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $4,083,346.61 |
$23,731,443.06 |
|
New Mexico | Do a Ana | >= 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - No Added Capacity | $6,239,589.43 |
$8,557,369.46 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,864,618.53 |
$3,352,783.86 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,414,914.86 |
$2,414,914.86 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $3,942,720.49 |
$22,525,396.53 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | 4R - Added Capacity | $8,642,964.97 |
$10,115,829.79 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | Right of Way | $15,165.60 |
$17,750.00 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,593,605.43 |
$5,593,605.43 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,637,603.83 |
$5,637,603.83 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $5,284,265.56 |
$6,184,767.74 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $20,195,564.86 |
$112,052,593.71 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | 4R - Added Capacity | $12,401,077.76 |
$15,501,347.20 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECTS-TEA-21 | Utilities | $63,801.79 |
$79,752.24 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,667,677.71 |
$4,667,677.71 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $8,713,335.54 |
$10,198,192.35 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $9,309,456.53 |
$50,093,349.63 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $1,142,203.42 |
$1,336,848.58 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $4,142,790.42 |
$5,178,488.03 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,427,850.53 |
$5,182,409.34 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $20,679,972.46 |
$24,204,087.61 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $56,390.00 |
$65,999.53 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $7,190,393.96 |
$8,431,283.72 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $274,288.36 |
$321,030.38 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $933,382.71 |
$1,092,442.31 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $683,449.51 |
$799,917.49 |
|
New Mexico | Sierra | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $175,152.00 |
$205,000.00 |
|
New Mexico | Hidalgo | < 5,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Restoration & Rehabilitation | $4,185,768.02 |
$4,899,073.06 |
|
New Mexico | Hidalgo | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $17,753,876.28 |
$20,779,349.57 |
|
New Mexico | Hidalgo | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,600,000.00 |
$1,872,659.18 |
|
New Mexico | Curry | >= 5,000 AND < 50,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Restoration & Rehabilitation | $3,500,000.00 |
$25,096,441.95 |
|
New Mexico | Curry | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $5,030,052.45 |
$5,890,905.63 |
|
New Mexico | Curry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $8,317,767.89 |
$9,735,215.23 |
|
New Mexico | Curry | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,770,285.71 |
||
New Mexico | Lea | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $11,906,604.14 |
$14,414,141.84 |
|
New Mexico | Lea | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,247,802.99 |
$1,908,878.96 |
|
New Mexico | Lea | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $319,710.92 |
$399,638.90 |
|
New Mexico | Lea | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $9,666,770.00 |
$11,314,104.47 |
|
New Mexico | Lea | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $256,349.88 |
$300,034.97 |
|
New Mexico | Lea | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $760,416.00 |
$890,000.00 |
|
New Mexico | Lea | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $83,618.42 |
$97,868.00 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $35,810,694.61 |
$66,704,376.76 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $384,480.00 |
$450,000.00 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $3,844,800.00 |
$4,500,000.00 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,136,329.08 |
$21,304,156.80 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $1,507,163.91 |
$6,025,851.34 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $67,981.00 |
||
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $30,758.00 |
$35,999.53 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,136,329.11 |
$17,878,735.00 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $693,319.48 |
$26,536,121.08 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $67,981.00 |
||
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $303,887.05 |
$355,673.05 |
|
New Mexico | Lincoln | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $25,632.00 |
$30,000.00 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $558,985.19 |
$654,242.97 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $57,157,528.79 |
||
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $156,345.00 |
||
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $1,022,407.20 |
$1,196,637.64 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Utilities | $22,397.82 |
$26,214.68 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Restoration & Rehabilitation | $3,079,048.28 |
$3,603,755.03 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $14,330,201.13 |
$16,776,467.67 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $76,121.46 |
$89,093.47 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $710,006.00 |
$831,000.00 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $225,966.68 |
$264,474.11 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $10,382,405.04 |
$12,151,690.80 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $341,760.00 |
$400,000.00 |
|
New Mexico | Eddy | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $90,499.97 |
$105,922.25 |
|
New Mexico | Mora | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $2,667,038.88 |
$3,333,798.60 |
|
New Mexico | Mora | < 5,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $211,946.95 |
$248,065.25 |
|
New Mexico | Mora | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $11,283,973.44 |
$13,611,156.82 |
|
New Mexico | Mora | < 5,000 | State | REPURPOSED SPECIAL | 4R - Restoration & Rehabilitation | $117,600.00 |
$147,000.00 |
|
New Mexico | Mora | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $7,173,646.65 |
$8,396,122.03 |
|
New Mexico | Mora | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $502,300.14 |
$669,733.52 |
|
New Mexico | Mora | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $207,619.00 |
$242,999.77 |
|
New Mexico | Quay | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $19,253,507.40 |
$23,264,427.79 |
|
New Mexico | Quay | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $532,129.50 |
$622,810.74 |
|
New Mexico | Quay | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $33,790.19 |
$39,548.44 |
|
New Mexico | Quay | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $12,816.00 |
$15,000.00 |
|
New Mexico | Quay | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $2,881,293.36 |
$3,372,300.28 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $631,174.92 |
$1,504,409.57 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $6,271,575.39 |
$14,948,341.27 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $111,596.63 |
||
New Mexico | Taos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $11,248.64 |
||
New Mexico | Taos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $93,299.34 |
$1,369,934.12 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $926,734.41 |
$13,611,825.42 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - Restoration & Rehabilitation | $2,783,463.33 |
$3,092,737.03 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $15,012,646.20 |
$17,570,981.04 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,914,476.88 |
$6,095,453.09 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $184,198.33 |
$215,587.93 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $13,250.00 |
$15,507.96 |
|
New Mexico | Colfax | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,436,803.18 |
$27,708,063.65 |
|
New Mexico | Harding | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $3,659,708.62 |
$25,455,153.78 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $7,019,700.55 |
$15,649,476.51 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $520,274.90 |
$8,970,039.70 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $110,459.67 |
$129,283.33 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $857,917.20 |
$1,004,116.58 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | 2% HIGHWAY PLAN & RESEARCH | Preliminary Engineering | $240,000.00 |
$300,000.00 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $882,723.37 |
$1,033,150.01 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | EQUITY BONUS EXEMPT LIM | 4R - Added Capacity | $1,193,683.91 |
$1,397,101.96 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $6,678,308.21 |
$8,239,920.97 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $468,773.12 |
$520,859.02 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $742,989.66 |
$869,604.00 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $10,863,418.73 |
$19,747,083.94 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $352,585.81 |
$412,670.66 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,469,561.65 |
$2,143,946.29 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $2,683,000.00 |
||
New Mexico | San Juan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $56,089,451.00 |
||
New Mexico | San Juan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,150,000.00 |
||
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Restoration & Rehabilitation | $3,500,000.00 |
$4,096,441.95 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $1,395,781.33 |
$3,183,610.20 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $165,681.94 |
$193,916.13 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,519,239.98 |
$37,001,413.75 |
|
New Mexico | Santa Fe | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $100,000.00 |
||
New Mexico | Taos | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $4,049,710.13 |
$4,739,829.30 |
|
New Mexico | Rio Arriba | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $13,586,060.00 |
$15,901,287.55 |
|
New Mexico | Rio Arriba | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $9,374,366.28 |
$10,976,364.14 |
|
New Mexico | Rio Arriba | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $79,772.45 |
$93,366.63 |
|
New Mexico | Taos | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $23,778.44 |
$27,830.57 |
|
New Mexico | Torrance | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,242,900.48 |
$3,620,550.70 |
|
New Mexico | Guadalupe | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $485,024.52 |
$782,939.72 |
|
New Mexico | Guadalupe | < 5,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $149,281.14 |
$2,192,466.46 |
|
New Mexico | Torrance | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $690,466.87 |
$10,141,338.12 |
|
New Mexico | Torrance | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $2,693,971.83 |
$6,929,336.59 |
|
New Mexico | Guadalupe | < 5,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $582,568.17 |
$1,498,460.69 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $11,978,937.31 |
$14,280,629.43 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $10,531,622.58 |
$12,336,891.80 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,544.00 |
$10,000.00 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Rail/Hwy Crossing | $105,315.00 |
$123,261.94 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $93,129.60 |
$109,000.00 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $10,252.80 |
$12,000.00 |
|
New Mexico | San Juan | >= 50,000 AND < 200,000 | State | HIGHWAY PRIORITY PROJECTS | 4R - Added Capacity | $4,160.19 |
$4,160.19 |
|
New Mexico | San Juan | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $12,629,041.41 |
$14,942,579.73 |
|
New Mexico | San Juan | >= 50,000 AND < 200,000 | State | SEC 115 UNOBL BAL TRANSF | 4R - Added Capacity | $98,662.83 |
$13,053,021.70 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | EQUITY BONUS EXEMPT LIM | Utilities | $219,627.00 |
$257,054.00 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $670,836.38 |
$785,154.94 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | EQUITY BONUS SP LIMITATION | Utilities | $207,573.00 |
$242,946.00 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | MINIMUM GUARANTEE - TEA-21 | Right of Way | $1,430.48 |
$1,674.25 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $242,451.51 |
$67,783,768.14 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $7,357,967.90 |
$19,208,822.79 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $991,628.49 |
$1,160,613.87 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | REDISTRIBUTION OF CERTAIN AUTH | 4R - Added Capacity | $2,108,797.00 |
$2,468,161.29 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,110,720.00 |
$1,300,000.00 |
|
New Mexico | McKinley | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $95,097.40 |
$111,303.14 |
|
New Mexico | Cibola | >= 5,000 AND < 50,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Restoration & Rehabilitation | $10,676,242.03 |
$29,003,751.41 |
|
New Mexico | Cibola | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $69,847.20 |
$81,750.00 |
|
New Mexico | Bernalillo | >= 200,000 | Local | HIGHWAY DEMONSTRATION | Preliminary Engineering | $143,525.00 |
$179,406.25 |
|
New Mexico | Bernalillo | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $2,962,216.00 |
$3,467,013.00 |
|
New Mexico | Bernalillo | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $15,834,584.00 |
$18,532,987.00 |
|
New Mexico | Bernalillo | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $3,019,691.00 |
$3,534,282.97 |
|
New Mexico | Bernalillo | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,347,816.00 |
$1,577,499.98 |
|
New Mexico | Bernalillo | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $308,775.00 |
$750,000.00 |
|
New Mexico | Bernalillo | >= 200,000 | Local | TRAN COMM SYS PRES PILOT-TEA21 | Preliminary Engineering | $88,920.00 |
$111,150.00 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,352,292.40 |
$1,582,739.25 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $636,431.00 |
$686,993.74 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $39,544,663.09 |
$51,510,673.93 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $285,202.55 |
$333,804.48 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $645,110.61 |
$755,045.19 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $861,235.19 |
$1,008,000.00 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $457,484.33 |
$535,445.14 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $463,267.08 |
$579,083.85 |
|
New Mexico | Bernalillo | >= 200,000 | N/A | REPURPOSED SPECIAL | 4R - Added Capacity | $5,039,440.00 |
$6,299,300.00 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,281,600.00 |
$1,500,000.00 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,714,517.36 |
$23,438,309.21 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $72,151.00 |
$84,446.40 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $1,396,404.00 |
$1,745,505.00 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $240,000.00 |
$300,000.00 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $227,502.98 |
$266,272.22 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,740,773.06 |
$5,548,657.60 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,421,751.38 |
$1,664,034.86 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,210,311.00 |
$3,757,386.47 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,567,568.54 |
$3,856,915.60 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $858,321.00 |
$1,004,589.19 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $1,115,034.64 |
||
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $5,138,985.90 |
$6,423,732.38 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | 4R - Added Capacity | $15,889,733.31 |
$19,862,166.74 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Construction Engineering | $426,440.33 |
$533,050.41 |
|
New Mexico | Sandoval | >= 50,000 AND < 200,000 | State | REPURPOSED SPECIAL | Right of Way | $1,797,999.00 |
$2,247,498.75 |
|
New Mexico | Bernalillo | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $2,540,443.00 |
$2,973,364.93 |
|
New Mexico | Bernalillo | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $821,600.00 |
$961,610.53 |
|
New Mexico | Bernalillo | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $178,400.00 |
$208,801.46 |
|
New Mexico | Bernalillo | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $90,912.63 |
$106,405.20 |
|
New Mexico | Bernalillo | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Preliminary Engineering | $418,687.37 |
$490,036.75 |
|
New Mexico | Bernalillo | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Right of Way | $2,463,970.01 |
$2,883,860.05 |
|
New Mexico | Bernalillo | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | Right of Way | $526,429.99 |
$616,139.95 |
|
New Mexico | Bernalillo | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,522,022.74 |
||
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $43,852,544.51 |
||
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,868,613.05 |
$32,194,062.69 |
|
New Mexico | Bernalillo | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $404,043.10 |
$6,988,829.10 |
|
New Mexico | Bernalillo | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $264,811.20 |
$309,938.17 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,239,456.21 |
$1,450,674.44 |
|
New Mexico | Bernalillo | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,893,387.48 |
$3,386,455.42 |
|
New Mexico | Bernalillo | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $618,175.52 |
$723,520.00 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $32,315,227.00 |
$71,422,128.97 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $155,177.27 |
$181,621.37 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,148,110.00 |
$1,343,761.70 |
|
New Mexico | Bernalillo | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $33,694.73 |
$39,436.68 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,471,898.00 |
$1,722,727.06 |
|
New Mexico | Bernalillo | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $450,000.00 |
||
New Mexico | Do a Ana | >= 200,000 | State | BORDER STATE INFRASTRUCTURE | 4R - Added Capacity | $1,131,680.84 |
$1,324,532.82 |
|
New Mexico | Do a Ana | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $15,769,656.98 |
$18,456,995.53 |
|
New Mexico | Do a Ana | >= 200,000 | State | HIGHWAY INFRA PRGM - COVID APP | 4R - Added Capacity | $600.00 |
$600.00 |
|
New Mexico | Do a Ana | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $881,222.00 |
$1,031,392.79 |
|
New Mexico | Do a Ana | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $240,464.02 |
$281,441.97 |
|
New Mexico | Do a Ana | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $5,314,652.27 |
$5,905,169.19 |
|
New Mexico | Do a Ana | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - Added Capacity | $2,750,000.00 |
$3,218,632.96 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,389,523.38 |
$4,888,797.81 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $419,195.37 |
$7,237,069.17 |
|
New Mexico | Do a Ana | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,929,235.20 |
$2,258,000.00 |
|
New Mexico | Do a Ana | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,967,882.08 |
$3,478,282.06 |
|
New Mexico | Do a Ana | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $13,336.64 |
$15,609.36 |
|
New Mexico | Do a Ana | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $142,818.40 |
$167,156.37 |
|
New Mexico | Do a Ana | >= 200,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $965,038.00 |
$1,129,492.04 |
|
New Mexico | Do a Ana | >= 200,000 | State | CARBON REDUCTION PROGRAM | Facilities for Pedestrians and Bicycles | $1,294,975.00 |
$1,515,654.26 |
|
New Mexico | Do a Ana | >= 200,000 | State | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $2,395,644.41 |
||
New Mexico | Do a Ana | >= 200,000 | State | HIGH RISK RURAL ROAD | Facilities for Pedestrians and Bicycles | $4,421,429.00 |
$5,174,893.49 |
|
New Mexico | Do a Ana | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $284,963.48 |
||
New Mexico | Do a Ana | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $10,087,819.00 |
$13,944,195.93 |
|
New Mexico | Do a Ana | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $738,340.91 |
$864,163.05 |
|
New Mexico | Do a Ana | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $765,497.48 |
$895,947.42 |
|
New Mexico | Do a Ana | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $680,102.00 |
$795,999.53 |