Ohio | IR-77 from near Oakes Rd. to IR-480 in Cuyahoga County. GARVEE Bond Project. | $76,257,886.37 |
$112,446,681.03 |
|
Ohio | FRA IR 270 2.60 (Recon),Major reconstruction project with pavement replacement. Upgrade drainage, guardrail, GARVEE BOND PROJECT | $78,579,836.79 |
$89,752,786.25 |
|
Ohio | FRA IR 270 9.15 | $13,288,001.31 |
$66,992,285.97 |
|
Ohio | IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation. | $82,639,375.20 |
$105,079,704.36 |
|
Ohio | SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work. | $28,221,573.12 |
$68,513,975.26 |
|
Ohio | US-33 in the vicinity of Carroll in Fairfield County. New interchange. | $32,480,334.19 |
$50,292,628.38 |
|
Ohio | IR-75 from 3.4 miles north of Butler County to Montgomery County in Warren County. Reconstruction and added capacity. GARVEE BOND. | $58,161,008.61 |
$139,035,087.48 |
|
Ohio | US-24 from US-127 to SR-424 in Paulding and Defiance Counties. GARVEE Bond project | $61,146,288.57 |
$77,847,366.77 |
|
Ohio | MOT IR 75 11.01, PROVIDE THREE CONTINUOUS LANES AT THE US35 INTERCHANGE. PHASE 1B. GARVEE BOND PROJECT.. | $64,622,824.12 |
$75,490,275.83 |
|
Ohio | MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes | $12,492,751.95 |
$105,770,869.00 |
|
Ohio | SUM IR 0076 10.00. Reconstruct IR-76/77, & change the access points & geometry of Main/Broadway & Wolf Ledges/Grant Interchanges. | $108,346,711.47 |
$123,929,342.78 |
|
Ohio | IR-70/71 from Hague to James Rd, city of Columbus in Franklin Cty. Reconstruct I-70/71 Split in Downtown Columbus. Design/Build | $227,419,964.94 |
$247,678,515.34 |
|
Ohio | FRA IR 70 13.54 (FOURTH PROJECT), South Trench - I-70/71 Overlap including western downtown connections | $105,381,495.72 |
$280,968,508.00 |
|
Ohio | IR-75 from the Great Miami River to Leo St. in the city of Dayton in Montgomery County. Reconstruction. MPI-0042 - GARVEE bond | $112,016,390.54 |
$140,620,721.69 |
|
Ohio | IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County. | $54,215,826.86 |
$65,011,744.66 |
|
Ohio | Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements | $20,041,635.50 |
$90,260,927.77 |
|
Ohio | HAM IR 75 7.85, Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes, | $97,364,070.41 |
$205,586,994.66 |
|
Ohio | JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg | $31,735,233.60 |
$138,678,494.76 |
|
Ohio | LUC US 24 6.19 Part 3 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. | $60,790,379.76 |
$77,239,169.93 |
|
Ohio | HEN/LUC US 24 15.85 Part 2 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT. | $55,998,307.11 |
$70,612,514.21 |
|
Ohio | LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports | $32,293,937.06 |
$44,440,269.15 |
|
Ohio | IR-70 at US-40 in Belmont County. | $18,924,302.46 |
$25,802,904.14 |
|
Ohio | FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work. | $39,768,754.96 |
$89,068,427.58 |
|
Ohio | HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond. | $50,176,957.17 |
$68,126,431.62 |
|
Ohio | HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system | $97,837,157.88 |
$132,178,943.38 |
|
Ohio | LAK IR 090 21.42, MAJOR REHAB FROM PAINE RD TO THE ASHTABULA COUNTY LINE SFY 2010. GARVEE Bond Project | $36,819,242.06 |
$41,070,780.06 |
|
Ohio | FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes | $15,620,633.52 |
$57,916,013.68 |
|
Ohio | FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures | $30,154,919.61 |
$49,135,052.77 |
|
Ohio | CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge | $34,535,445.57 |
$51,017,258.13 |
|
Ohio | LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St | $17,565,240.61 |
$49,751,620.01 |
|
Ohio | LOR SR 0057 19.42, Add Lanes in each direction from IR 80 to IR 90, Interchange modifications at I-90. | $7,424,241.60 |
$25,325,753.26 |
|
Ohio | DEL IR 71 11.500, Full depth pavement replacement and addition of 3rd median lane. Widen ML Bridge MRW-71-3.00. | $25,935,151.09 |
$58,874,099.27 |
|
Ohio | FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps | $28,827,686.63 |
$95,168,606.59 |
|
Ohio | Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County. | $52,181,504.09 |
$70,716,955.71 |
|
Ohio | HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work | $24,182,685.16 |
$36,479,618.81 |
|
Ohio | R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville | $33,360,932.28 |
$56,166,678.34 |
|
Ohio | FRA Lazelle Road Ph B | $19,715,047.00 |
$27,992,252.50 |
|
Ohio | HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT | $71,215,610.62 |
$151,500,082.08 |
|
Ohio | CUY IR 480 18.42 L&R Deck | $107,760,715.83 |
$242,278,702.51 |
|
Ohio | MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd. | $26,967,588.04 |
$34,155,108.28 |
|
Ohio | MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path. | $17,295,100.76 |
$33,193,787.43 |
|
Ohio | LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges | $8,385,393.76 |
$175,135,392.35 |
|
Ohio | LUC IR 75 2.75 Pav Reconst, Bridge repl | $11,215,892.51 |
$29,958,572.34 |
|
Ohio | CLA IR 70 10.55/13.98, Ph. 2, Major rehabilitation of the existing lanes and the construction of an additional lane. | $55,517,162.11 |
$56,515,805.69 |
|
Ohio | WOO/LUC IR75 30.70/0.00 Major | $20,024,565.07 |
$191,824,538.16 |
|
Ohio | RIC US 0030 09.13 | $61,179,509.42 |
$75,559,136.77 |
|
Ohio | SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures | $45,831,187.94 |
$99,573,032.28 |
|
Ohio | STA IR 0077 08.40/VAR | $23,694,366.75 |
$65,533,753.02 |
|
Ohio | HAM IR 275 39.81 | $8,917,914.66 |
$35,412,501.27 |
|
Ohio | FRA-70-22.61 (FEF 1A), Interchange, Reconstruction | $21,824,687.99 |
$90,596,514.44 |
|
Ohio | FRA-270-51.50/FRA-23-4.19 Pt 1&2 | $8,248,130.70 |
$34,347,534.00 |
|
Ohio | CUY INNERBELT CCG6B Broadway, Remove and build a new longer bridge for Broadway (SR 14) over IR-77 | $29,195,085.47 |
$33,950,849.53 |
|
Ohio | WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange | $13,999,392.63 |
$26,517,489.49 |
|
Ohio | PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements | $5,894,956.00 |
$35,573,730.00 |
|
Ohio | CUY IR 077 14.35 CCG6A, Replace the mainline IR-77 bridge over IR-490. | $25,601,745.30 |
$29,645,557.59 |
|
Ohio | STW - Ohio Bridge Partnership Program Debt Service Authorization | $90,791,149.79 |
$92,387,042.47 |
|
Ohio | HAM IR 71 8.42 | $19,406,375.10 |
$38,008,771.49 |
|
Ohio | FRA CR 103 2.56 | $20,314,959.40 |
$26,281,003.68 |
|
Ohio | SUM IR 0076 05.62 | $15,080,994.35 |
$29,992,483.06 |
|
Ohio | LUC IR 475 1.85 @20A Interchnge, Build a new interchange | $15,040,920.00 |
$117,964,212.48 |
|
Ohio | GRE IR 675 0.00 - Pt. 1 | $23,861,003.59 |
$26,792,926.63 |
|
Ohio | SUM SR 0008 01.75. Replacement / re-alignment of High Level Bridge between Glenwood and Perkins. | $118,594,392.00 |
$182,120,670.00 |
|
Ohio | PRE IR 70 0.00 | $17,399,864.70 |
$33,576,000.33 |
|
Ohio | WAY SR 0021 00.00 | $27,898,593.66 |
$32,897,170.00 |
|
Ohio | SUM Main Street Corridor | $13,270,672.00 |
$34,404,852.00 |
|
Ohio | BUT SR 129 25.00 Liberty Way | $12,703,370.24 |
$25,760,495.55 |
|
Ohio | HAM IR 75 3.84 | $56,595,552.22 |
$98,295,797.08 |
|
Ohio | FRA-71-9.62/9.71 Part 1 & 2 | $51,448,980.71 |
$126,604,727.82 |
|
Ohio | FRA IR 670 3.920 | $38,095,470.48 |
$68,012,139.52 |
|
Ohio | SUM IR 77/277/US 224 Interchange | $9,278,333.24 |
$60,176,026.67 |
|
Ohio | DEL US 36/SR 37 11.03/11.25 | $34,795,561.74 |
$43,153,952.26 |
|
Ohio | FRA IR 70 14.54 (Proj 2E) | $39,836,982.14 |
$87,369,841.79 |
|
Ohio | MOT IR 75 7.15 | $49,898,997.00 |
$55,443,330.00 |
|
Ohio | GRE US 35 5.63 | $36,389,089.50 |
$45,424,398.88 |
|
Ohio | SUM IR 0076/0077 8.42/09.74 | $48,307,399.26 |
$185,747,675.77 |
|
Ohio | CLE 32-3.50 | $26,265,068.50 |
$65,450,510.00 |
|
Ohio | MUS IR 70 10.66 | $41,660,499.47 |
$104,963,980.71 |
|
Ohio | FRA IR 71 0.00 | $46,161,522.68 |
$52,834,214.94 |
|
Ohio | FRA IR 71 17.46 (Proj 3B) | $35,533,902.62 |
$43,802,190.00 |
|
Ohio | FRA-70/71-12.68/15.16 (Proj 4R) | $127,123,001.00 |
$298,346,520.00 |
|
Ohio | MOT IR 75 14.74 | $7,114,602.92 |
$57,479,131.03 |
|
Ohio | TRU SR 46/82 DDI | $19,430,131.90 |
$26,108,881.00 |
|
Ohio | WAY SR 0083 10.81 | $25,939,021.80 |
$32,634,630.00 |
|
Ohio | MAH Youngstown Smart 2 Network | $22,577,156.72 |
$27,232,240.63 |
|
Ohio | MAD/PIC-71-7.30/0.00 | $41,792,534.19 |
$136,724,764.68 |
|
Ohio | LAK US 020 19.59 Major Rehab | $63,760,200.00 |
||
Ohio | SUM IR 0077 28.75 | $55,803,632.60 |
$64,536,267.00 |
|
Ohio | CUY Pleasant Valley Road Bridges | $31,030,000.00 |
||
Ohio | CLE 32-2.33 | $25,877,291.50 |
$33,539,940.00 |
|
Ohio | UNI US 33 24.870 | $24,764,000.00 |
$42,755,700.01 |
|
Ohio | HAM-71-0.00 - Brent Spence Paint | $32,000,000.00 |
||
Ohio | JEF SR 7 14.440 | $16,825,874.76 |
$25,289,354.00 |
|
Ohio | LUC Toledo Build Grant - GCR | $23,668,160.00 |
$57,062,892.00 |
|
Ohio | CUY IR 077 00.42 Interchange | $22,478,101.39 |
$33,846,769.99 |
|
Ohio | WAR SR 63 0.83 | $8,676,207.20 |
$27,224,186.39 |