RECIPIENT
PROJECT
NUMBER
PROJECT TITLE
TOTAL
OBLIGATIONS
ESTIMATED
TOTAL
COST
Ohio
E034667
IR-77 from near Oakes Rd. to IR-480 in Cuyahoga County. GARVEE Bond Project.
$76,257,886.37
$112,446,681.03
Ohio
E036192
FRA IR 270 2.60 (Recon),Major reconstruction project with pavement replacement. Upgrade drainage, guardrail, GARVEE BOND PROJECT
$78,579,836.79
$89,752,786.25
Ohio
E036466
FRA IR 270 9.15
$13,288,001.31
$66,992,285.97
Ohio
E036702
IR-75 from Ft. Shawnee to CR-162 in Allen County. Major rehabilitation.
$82,639,375.20
$105,079,704.36
Ohio
E040035
SR-8 from Graham Rd. to SR-303 in Summit County. pavement replacement and bridge work.
$28,221,573.12
$68,513,975.26
Ohio
E040187
US-33 in the vicinity of Carroll in Fairfield County. New interchange.
$32,480,334.19
$50,292,628.38
Ohio
E040268
IR-75 from 3.4 miles north of Butler County to Montgomery County in Warren County. Reconstruction and added capacity. GARVEE BOND.
$58,161,008.61
$139,035,087.48
Ohio
E040537
US-24 from US-127 to SR-424 in Paulding and Defiance Counties. GARVEE Bond project
$61,146,288.57
$77,847,366.77
Ohio
E040542
MOT IR 75 11.01, PROVIDE THREE CONTINUOUS LANES AT THE US35 INTERCHANGE. PHASE 1B. GARVEE BOND PROJECT..
$64,622,824.12
$75,490,275.83
Ohio
E040555
MAH/TRU IR 0080 4.50/0.00, Widen IR-80 to six lanes, Add auxiliary lanes
$12,492,751.95
$105,770,869.00
Ohio
E040563
SUM IR 0076 10.00. Reconstruct IR-76/77, & change the access points & geometry of Main/Broadway & Wolf Ledges/Grant Interchanges.
$108,346,711.47
$123,929,342.78
Ohio
E040631
IR-70/71 from Hague to James Rd, city of Columbus in Franklin Cty. Reconstruct I-70/71 Split in Downtown Columbus. Design/Build
$227,419,964.94
$247,678,515.34
Ohio
E040634
FRA IR 70 13.54 (FOURTH PROJECT), South Trench - I-70/71 Overlap including western downtown connections
$105,381,495.72
$280,968,508.00
Ohio
E040793
IR-75 from the Great Miami River to Leo St. in the city of Dayton in Montgomery County. Reconstruction. MPI-0042 - GARVEE bond
$112,016,390.54
$140,620,721.69
Ohio
E040822
IR-75 from 0.1 miles south of Paddock Rd. to 0.08 miles north of Kemper Rd. in Hamilton County.
$54,215,826.86
$65,011,744.66
Ohio
E040889
Provide a full movement interchange at IR-71 & MLK Drive, ramp metering, auxiliary lane, capacity improvements
$20,041,635.50
$90,260,927.77
Ohio
E041146
HAM IR 75 7.85, Phase 8 of the Mill Creek Expressway Project. Project will widen for additional through lanes,
$97,364,070.41
$205,586,994.66
Ohio
E050670
JEF-Wellsburg Bridge, Construct a new Ohio River Bridge south of Wellsburg
$31,735,233.60
$138,678,494.76
Ohio
E060287
LUC US 24 6.19 Part 3 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT.
$60,790,379.76
$77,239,169.93
Ohio
E060288
HEN/LUC US 24 15.85 Part 2 F2P, Construct a new 4 lane divided facility on a new alignment, GARVEE BOND PROJECT.
$55,998,307.11
$70,612,514.21
Ohio
E060290
LUC SR 2 18.62 Bridge Rehab, by repairing steel batten plates in towers, steel floor beams and sidewalk supports
$32,293,937.06
$44,440,269.15
Ohio
E060308
IR-70 at US-40 in Belmont County.
$18,924,302.46
$25,802,904.14
Ohio
E070090
FRA IR 270 21.670, Reconfigure I-270 EB between SR-315 and US-23. FRA-315 Mainline Work.
$39,768,754.96
$89,068,427.58
Ohio
E070348
HAM IR 75 5.58,Phase 1 of the HAM-75 Corridor projects. Project will complete reconstruction of Mitchell Ave interchg-GARVEE bond.
$50,176,957.17
$68,126,431.62
Ohio
E070405
HAM IR 75 12.60, redesign of the Shepherd Ln. interchange, removal of the collector distributor system
$97,837,157.88
$132,178,943.38
Ohio
E080604
LAK IR 090 21.42, MAJOR REHAB FROM PAINE RD TO THE ASHTABULA COUNTY LINE SFY 2010. GARVEE Bond Project
$36,819,242.06
$41,070,780.06
Ohio
E080951
FRA IR 70 3.41, Major rehabilitation, Resurfacing of I-70, addition of auxilliary lanes
$15,620,633.52
$57,916,013.68
Ohio
E081090
FRA IR 71 5.29, Major Rehabilitation, Additional third lane widened to the median. Re-deck and widen structures
$30,154,919.61
$49,135,052.77
Ohio
E090644
CUY US 006 12.20 Pavement, Major Rehabilitation, including the ramps, Replace the mainline bridge
$34,535,445.57
$51,017,258.13
Ohio
E100378
LUC IR 475 06.48/7.53 Bridges, widen and redeck the main line I-475 bridges (L & R) over Hill Ave and Dorr St
$17,565,240.61
$49,751,620.01
Ohio
E100386
LOR SR 0057 19.42, Add Lanes in each direction from IR 80 to IR 90, Interchange modifications at I-90.
$7,424,241.60
$25,325,753.26
Ohio
E100633
DEL IR 71 11.500, Full depth pavement replacement and addition of 3rd median lane. Widen ML Bridge MRW-71-3.00.
$25,935,151.09
$58,874,099.27
Ohio
E100634
FRA IR 270 17.29, reconstruction of the FRA IR 270 at US 33/SR 161 interchange to include replacement of loop ramps
$28,827,686.63
$95,168,606.59
Ohio
E100878
Full right of way acquisition for major rehab of IR 75 from the Auglaize CL to mm 5.53 in Allen County.
$52,181,504.09
$70,716,955.71
Ohio
E100995
HAM IR 275 10.57, Plane, repair, and pave a portion of IR 275, Overlay and misc bridge work
$24,182,685.16
$36,479,618.81
Ohio
E110266
R US 0020 22.19, Widening to 5 Lanes from Stoney Ridge Road to Lear Nagle in the City of North Ridgeville
$33,360,932.28
$56,166,678.34
Ohio
E110547
FRA Lazelle Road Ph B
$19,715,047.00
$27,992,252.50
Ohio
E110820
HAN IR 75 14.39, MAJOR NEW WIDENING AND RECONSTRUCTION OF IR 75. BEGIN RECONSTRUCTION AT BEGINING OF OLD CONCRETE PAVEMENT
$71,215,610.62
$151,500,082.08
Ohio
E111416
CUY IR 480 18.42 L&R Deck
$107,760,715.83
$242,278,702.51
Ohio
E120394
MED SR 0018 13.54, Widen to 5 lanes from Foote Rd to River Styx Rd and to 7 lanes from River Styx Rd to Nettleton Rd.
$26,967,588.04
$34,155,108.28
Ohio
E120441
MED US 0042 17.68, Widen from 3 to 4 lanes with a median, Upgrade & synchronize signals.Add 5 foot sidewalk, & a multi-use path.
$17,295,100.76
$33,193,787.43
Ohio
E120585
LUC IR 75 1.10, reconstruct the existing pavement and to rehabilitate/widen/replace existing bridges
$8,385,393.76
$175,135,392.35
Ohio
E120602
LUC IR 75 2.75 Pav Reconst, Bridge repl
$11,215,892.51
$29,958,572.34
Ohio
E120609
CLA IR 70 10.55/13.98, Ph. 2, Major rehabilitation of the existing lanes and the construction of an additional lane.
$55,517,162.11
$56,515,805.69
Ohio
E120958
WOO/LUC IR75 30.70/0.00 Major
$20,024,565.07
$191,824,538.16
Ohio
E130382
RIC US 0030 09.13
$61,179,509.42
$75,559,136.77
Ohio
E130407
SUM IR 0076 00.00, Pavement replacement, Re-Deck of two structures
$45,831,187.94
$99,573,032.28
Ohio
E130869
STA IR 0077 08.40/VAR
$23,694,366.75
$65,533,753.02
Ohio
E130952
HAM IR 275 39.81
$8,917,914.66
$35,412,501.27
Ohio
E131180
FRA-70-22.61 (FEF 1A), Interchange, Reconstruction
$21,824,687.99
$90,596,514.44
Ohio
E131486
FRA-270-51.50/FRA-23-4.19 Pt 1&2
$8,248,130.70
$34,347,534.00
Ohio
E131492
CUY INNERBELT CCG6B Broadway, Remove and build a new longer bridge for Broadway (SR 14) over IR-77
$29,195,085.47
$33,950,849.53
Ohio
E131510
WAR IR 71 3.62 Western Row Rd, Conversion of the IR-71 and Western Row Road interchange to a full interchange
$13,999,392.63
$26,517,489.49
Ohio
E140008
PIK SR 104 10.64 Lake White, reconstructing the highway surface in conjunction with the ODNR improvements
$5,894,956.00
$35,573,730.00
Ohio
E140305
CUY IR 077 14.35 CCG6A, Replace the mainline IR-77 bridge over IR-490.
$25,601,745.30
$29,645,557.59
Ohio
E140310
STW - Ohio Bridge Partnership Program Debt Service Authorization
$90,791,149.79
$92,387,042.47
Ohio
E140985
HAM IR 71 8.42
$19,406,375.10
$38,008,771.49
Ohio
E150336
FRA CR 103 2.56
$20,314,959.40
$26,281,003.68
Ohio
E150345
SUM IR 0076 05.62
$15,080,994.35
$29,992,483.06
Ohio
E150403
LUC IR 475 1.85 @20A Interchnge, Build a new interchange
$15,040,920.00
$117,964,212.48
Ohio
E150808
GRE IR 675 0.00 - Pt. 1
$23,861,003.59
$26,792,926.63
Ohio
E150816
SUM SR 0008 01.75. Replacement / re-alignment of High Level Bridge between Glenwood and Perkins.
$118,594,392.00
$182,120,670.00
Ohio
E150996
PRE IR 70 0.00
$17,399,864.70
$33,576,000.33
Ohio
E170580
WAY SR 0021 00.00
$27,898,593.66
$32,897,170.00
Ohio
E170601
SUM Main Street Corridor
$13,270,672.00
$34,404,852.00
Ohio
E170641
BUT SR 129 25.00 Liberty Way
$12,703,370.24
$25,760,495.55
Ohio
E170713
HAM IR 75 3.84
$56,595,552.22
$98,295,797.08
Ohio
E170982
FRA-71-9.62/9.71 Part 1 & 2
$51,448,980.71
$126,604,727.82
Ohio
E171059
FRA IR 670 3.920
$38,095,470.48
$68,012,139.52
Ohio
E171457
SUM IR 77/277/US 224 Interchange
$9,278,333.24
$60,176,026.67
Ohio
E180007
DEL US 36/SR 37 11.03/11.25
$34,795,561.74
$43,153,952.26
Ohio
E180134
FRA IR 70 14.54 (Proj 2E)
$39,836,982.14
$87,369,841.79
Ohio
E180372
MOT IR 75 7.15
$49,898,997.00
$55,443,330.00
Ohio
E180373
GRE US 35 5.63
$36,389,089.50
$45,424,398.88
Ohio
E180428
SUM IR 0076/0077 8.42/09.74
$48,307,399.26
$185,747,675.77
Ohio
E180439
CLE 32-3.50
$26,265,068.50
$65,450,510.00
Ohio
E180746
MUS IR 70 10.66
$41,660,499.47
$104,963,980.71
Ohio
E180796
FRA IR 71 0.00
$46,161,522.68
$52,834,214.94
Ohio
E190121
FRA IR 71 17.46 (Proj 3B)
$35,533,902.62
$43,802,190.00
Ohio
E190122
FRA-70/71-12.68/15.16 (Proj 4R)
$127,123,001.00
$298,346,520.00
Ohio
E190184
MOT IR 75 14.74
$7,114,602.92
$57,479,131.03
Ohio
E190304
TRU SR 46/82 DDI
$19,430,131.90
$26,108,881.00
Ohio
E190328
WAY SR 0083 10.81
$25,939,021.80
$32,634,630.00
Ohio
E190498
MAH Youngstown Smart 2 Network
$22,577,156.72
$27,232,240.63
Ohio
E190542
MAD/PIC-71-7.30/0.00
$41,792,534.19
$136,724,764.68
Ohio
E191584
LAK US 020 19.59 Major Rehab  
$63,760,200.00
Ohio
E200136
SUM IR 0077 28.75
$55,803,632.60
$64,536,267.00
Ohio
E200167
CUY Pleasant Valley Road Bridges  
$31,030,000.00
Ohio
E200428
CLE 32-2.33
$25,877,291.50
$33,539,940.00
Ohio
E200605
UNI US 33 24.870
$24,764,000.00
$42,755,700.01
Ohio
E200851
HAM-71-0.00 - Brent Spence Paint  
$32,000,000.00
Ohio
E201074
JEF SR 7 14.440
$16,825,874.76
$25,289,354.00
Ohio
E210348
LUC Toledo Build Grant - GCR
$23,668,160.00
$57,062,892.00
Ohio
E220056
CUY IR 077 00.42 Interchange
$22,478,101.39
$33,846,769.99
Ohio
E220273
WAR SR 63 0.83
$8,676,207.20
$27,224,186.39