Ohio | Cuyahoga | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $5,936,356.28 |
$7,420,445.35 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $2,334,388.93 |
$2,917,986.16 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $13,965,623.79 |
$17,457,029.74 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $2,986,398.59 |
$20,857,321.32 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $2,793,015.13 |
$3,491,268.90 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $22,562,812.22 |
$28,203,515.27 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,061,878.28 |
$6,327,347.85 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $5,520,956.73 |
$6,901,195.91 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $12,096,241.79 |
$15,120,302.24 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $3,000,214.63 |
$3,750,268.29 |
|
Ohio | Franklin | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $1,069,073.94 |
$1,187,859.93 |
|
Ohio | Franklin | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $35,920.62 |
$39,911.79 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $19,858,220.79 |
$24,187,500.48 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $16,603,171.47 |
$18,697,104.98 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $2,267,230.06 |
$2,527,515.45 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $3,198,127.14 |
$3,627,794.11 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $29,492,984.29 |
$32,769,982.55 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,940,076.24 |
$6,600,084.72 |
|
Ohio | Franklin | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Construction Engineering | $3,739.41 |
$3,739.41 |
|
Ohio | Franklin | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Facilities for Pedestrians and Bicycles | $111,292.83 |
$111,292.83 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,334,526.26 |
$56,100,052.60 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,080,617.12 |
$2,600,771.40 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $981,921.63 |
$1,227,402.04 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,890,936.30 |
$7,064,059.93 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | 2% HIGHWAY PLAN & RESEARCH | Research | $9,355.20 |
$11,694.00 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $6,101.72 |
$7,627.15 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Debt Service | $22,291.10 |
$27,863.87 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $142,468.50 |
$178,085.63 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Facilities for Pedestrians and Bicycles | $140,631.40 |
$175,789.25 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $185,396.17 |
$227,491.40 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | $138,567.71 |
$138,567.71 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $3,194,818.23 |
$3,214,473.97 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $1,361,776.20 |
$1,513,084.67 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $10,952,772.88 |
$12,245,771.96 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | $9,563,728.82 |
$10,626,365.36 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,074,364.99 |
$23,415,961.10 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,724,569.43 |
$10,805,077.14 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $11,104,317.44 |
$12,338,130.50 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $619,953.70 |
$688,837.44 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,544,722.97 |
$7,271,914.41 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,701,514.39 |
$5,223,904.89 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,616,454.72 |
$2,907,171.91 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $12,847,212.09 |
||
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $269,761.95 |
$337,202.43 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $137,637.03 |
$253,005.61 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $464,258.54 |
||
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Construction Engineering | $3,995.05 |
$4,993.82 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Debt Service | $34,658.35 |
$43,322.94 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Landscaping and Other Scenic Beautification | $89,517.25 |
$111,896.57 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $14,574,350.46 |
$37,886,958.78 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $50,491.30 |
$63,114.12 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $11,619,650.00 |
||
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $633,532.70 |
$791,915.87 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $9,409,613.06 |
$11,428,634.49 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $2,281,720.00 |
||
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,903,229.60 |
$2,379,037.00 |
|
Ohio | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,650,356.00 |
$2,062,945.00 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $5,103,517.00 |
$6,379,396.25 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | New Construction Roadway | $504,743.00 |
$630,928.75 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $315,000.00 |
$350,000.00 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $6,202,719.94 |
$8,061,580.21 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | N/A | NAT COR PL DV/COOR BDR INF-TEA | Preliminary Engineering | $185,445.00 |
$2,453,951.00 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $899,473.34 |
$3,414,370.55 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $538,188.80 |
$672,736.00 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $231,393.60 |
$289,242.00 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,503,298.96 |
$1,879,123.69 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,554,008.49 |
$6,090,331.31 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $10,742,546.06 |
$17,945,968.62 |
|
Ohio | Fairfield | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,700,000.00 |
$2,125,000.00 |
|
Ohio | Warren | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - Added Capacity | $170,936.00 |
$213,670.00 |
|
Ohio | Warren | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $1,109,048.28 |
$1,232,275.87 |
|
Ohio | Warren | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | 4R - No Added Capacity | $542,991.64 |
$678,739.55 |
|
Ohio | Warren | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Bridge Rehabilitation - Added Capacity | $645,626.08 |
$807,032.60 |
|
Ohio | Warren | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Bridge Replacement - No Added Capacity | $1,000,000.00 |
$1,111,111.11 |
|
Ohio | Warren | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Construction Engineering | $1,293,215.91 |
$48,740,868.36 |
|
Ohio | Warren | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Right of Way | $236,719.87 |
$295,899.84 |
|
Ohio | Warren | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $4,076,512.24 |
$4,529,458.04 |
|
Ohio | Warren | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $850,104.65 |
$944,560.72 |
|
Ohio | Warren | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Right of Way | $4,550,819.49 |
$5,688,524.36 |
|
Ohio | Warren | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - Added Capacity | $1,822,685.00 |
$1,822,685.00 |
|
Ohio | Warren | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $180,265.00 |
$200,294.44 |
|
Ohio | Warren | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $3,872,073.07 |
$4,508,516.94 |
|
Ohio | Warren | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Rehabilitation - No Added Capacity | $286,084.42 |
$317,871.57 |
|
Ohio | Warren | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $826,610.39 |
$918,455.99 |
|
Ohio | Warren | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,729,487.92 |
$17,477,208.80 |
|
Ohio | Warren | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,631,142.34 |
$2,923,491.49 |
|
Ohio | Warren | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $3,716,930.92 |
$4,129,923.24 |
|
Ohio | Warren | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $945,541.47 |
$1,050,601.63 |
|
Ohio | Warren | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $3,027,811.14 |
$6,947,272.06 |
|
Ohio | Warren | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Right of Way | $572,253.97 |
$715,317.46 |
|
Ohio | Warren | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,642,735.84 |
$27,164,646.62 |
|
Ohio | Warren | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,494,465.46 |
$1,868,081.82 |
|
Ohio | Warren | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,023,987.48 |
$1,137,763.87 |
|
Ohio | Warren | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $580,115.46 |
$725,144.32 |
|
Ohio | Warren | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,725,422.50 |
$2,126,394.19 |
|
Ohio | Warren | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $607,422.07 |
$759,277.59 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS EXEMPT LIM | Construction Engineering | $126,066.04 |
$157,582.55 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS EXEMPT LIM | Debt Service | $518,579.75 |
$648,224.69 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $4,627,038.69 |
$5,783,798.36 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS EXEMPT LIM | Rail/Hwy Crossing | $198,625.60 |
$248,282.00 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $4,753,845.96 |
$5,942,307.45 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | New Construction Roadway | $12,272,312.00 |
$15,340,390.00 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | MINIMUM GUARANTEE - TEA-21 | New Construction Roadway | $434,233.60 |
$542,792.00 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $500.00 |
$625.00 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,278,882.02 |
$2,848,602.53 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $14,270,604.22 |
$17,838,255.28 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $358,491.16 |
$448,113.95 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $2,121,345.82 |
$2,653,200.67 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $11,830,303.71 |
$16,225,022.28 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Construction Engineering | $8,779.44 |
$8,779.44 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | State | RAIL HWY CROSSING HAZ ELI | Rail/Hwy Crossing | $87,840.56 |
$87,840.56 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | REDISTRIBUTION OF CERTAIN AUTH | Construction Engineering | $3,000.00 |
$3,750.00 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $618,711.03 |
$773,388.79 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $39,585.46 |
$49,481.83 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $410,414.54 |
$513,018.18 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $5,874,180.97 |
$7,342,726.21 |
|
Ohio | Paulding | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $312,948.00 |
$391,185.00 |
|
Ohio | Montgomery | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - Added Capacity | $358,333.33 |
$447,916.66 |
|
Ohio | Montgomery | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $195,235.25 |
$244,044.06 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $4,066,240.45 |
$4,518,044.94 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $2,082,115.94 |
$2,313,462.16 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $363,580.98 |
$403,978.86 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Rail/Hwy Crossing | $735,256.80 |
$816,952.00 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $49,861.45 |
$236,228.35 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,291,272.30 |
$16,990,302.55 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $2,810,143.13 |
$3,512,678.92 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,222,061.48 |
$5,802,290.53 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,251,171.66 |
$6,563,964.58 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $10,818,424.45 |
$12,020,471.60 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $7,414,144.03 |
$8,266,415.46 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $6,130,136.51 |
$7,662,670.64 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $225,585.48 |
$250,650.53 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - Added Capacity | $1,067,516.78 |
||
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Rehabilitation - No Added Capacity | $1,000,000.00 |
$1,111,111.11 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $577,611.97 |
$722,014.96 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $2,031,648.91 |
$2,539,561.14 |
|
Ohio | Mahoning | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $3,600,000.00 |
$4,000,000.00 |
|
Ohio | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $878,863.93 |
$976,515.48 |
|
Ohio | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $881,238.20 |
$1,962,793.33 |
|
Ohio | Mahoning | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $328,170.80 |
$4,821,372.54 |
|
Ohio | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,959,315.28 |
$87,099,214.38 |
|
Ohio | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $274,570.80 |
$4,033,899.92 |
|
Ohio | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $475,093.84 |
$548,741.02 |
|
Ohio | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,050,499.10 |
$2,278,332.33 |
|
Ohio | Mahoning | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $45,000.00 |
$50,000.00 |
|
Ohio | Summit | >= 200,000 | Local | INTERSTATE MAINT DISC | Preliminary Engineering | $500,000.00 |
$555,555.56 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $27,839,410.90 |
$33,186,646.35 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,591,807.35 |
$18,586,592.87 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $30,223,685.18 |
$33,581,872.41 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $5,039,044.00 |
$5,598,937.78 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,606,495.58 |
$5,118,328.40 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,437,799.39 |
$1,597,554.89 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $820,761.88 |
$911,957.64 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $553,694.78 |
$615,216.43 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,548,182.51 |
$6,192,425.01 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,185,829.90 |
$17,984,255.44 |
|
Ohio | Franklin | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $9,555,030.90 |
$10,616,701.00 |
|
Ohio | Franklin | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Construction Engineering | $955,502.10 |
$1,061,669.00 |
|
Ohio | Franklin | >= 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $1,297,912.00 |
$1,442,124.44 |
|
Ohio | Franklin | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Bridge Replacement - No Added Capacity | $13,123,328.00 |
$16,404,160.00 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINT DISC | Bridge New Construction | $316,589.00 |
$351,765.56 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $49,465,888.64 |
$52,182,989.06 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $11,386,295.10 |
$12,651,439.00 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $11,226,886.43 |
$12,474,318.25 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $1,511,120.94 |
$1,679,023.27 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $15,270,368.10 |
$16,967,075.67 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $34,984,597.17 |
$38,871,774.64 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $7,364,567.67 |
$8,239,560.84 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $25,607,009.00 |
$25,607,009.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $500,000.00 |
$625,000.00 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $3,522,943.84 |
$4,403,679.80 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $39,123.20 |
$48,904.00 |
|
Ohio | Franklin | >= 200,000 | N/A | STP TRANSFERABILITY | 4R - Maintenance Resurfacing | $600,000.00 |
$750,000.00 |
|
Ohio | Franklin | >= 200,000 | N/A | STP TRANSFERABILITY | Preliminary Engineering | $400,000.00 |
$500,000.00 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $15,586,759.46 |
$15,586,759.46 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $2,379,869.10 |
$2,379,869.10 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $4,012,818.12 |
$4,012,818.12 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $14,895,359.52 |
$16,508,973.12 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $755,520.80 |
$944,401.00 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,237,533.40 |
$1,587,322.95 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $1,424,942.45 |
$1,781,178.06 |
|
Ohio | Franklin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | $7,443,367.12 |
$36,158,466.78 |
|
Ohio | Franklin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $4,475,535.44 |
||
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $850,000.00 |
$944,444.44 |
|
Ohio | Franklin | >= 200,000 | State | NAT SIG FREIGHT AND HWY PROJ | Bridge Replacement - Added Capacity | $25,000,000.00 |
$27,777,777.78 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,152,048.54 |
$69,457,831.70 |
|
Ohio | Franklin | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,288,012.14 |
$17,364,457.94 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,370,905.97 |
$3,745,451.08 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,561,224.48 |
$5,068,027.20 |
|
Ohio | Franklin | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,093,960.87 |
$1,215,512.08 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,718,648.80 |
$3,020,720.89 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $10,816,247.40 |
$12,018,052.67 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $5,400,000.00 |
$6,000,000.00 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $8,915,952.40 |
$36,157,180.00 |
|
Ohio | Franklin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $12,870,216.82 |
$53,799,118.48 |
|
Ohio | Franklin | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $900,911.18 |
$3,765,931.52 |
|
Ohio | Montgomery | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $6,429,866.51 |
$7,945,628.95 |
|
Ohio | Montgomery | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Bridge New Construction | $186,542.13 |
$233,177.66 |
|
Ohio | Montgomery | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | $399,903.23 |
$399,903.23 |
|
Ohio | Montgomery | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $2,317,397.68 |
$2,896,747.10 |
|
Ohio | Montgomery | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Facilities for Pedestrians and Bicycles | $43,424.00 |
$54,280.00 |
|
Ohio | Montgomery | >= 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $4,556,711.00 |
$4,556,711.00 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINT DISC | Right of Way | $1,780,837.00 |
$1,978,707.78 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINT DISC | Utilities | $100,000.00 |
$111,111.12 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $10,203,646.46 |
$12,754,558.07 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge New Construction | $4,968,067.24 |
$6,210,084.05 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Bridge Replacement - No Added Capacity | $10,587,213.18 |
$15,426,335.09 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $349,449.43 |
$436,811.79 |
|
Ohio | Montgomery | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $6,523,943.68 |
$8,154,929.60 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,282,290.13 |
$5,352,862.66 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $27,736,935.89 |
$34,671,169.86 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $6,469,942.58 |
$8,087,428.23 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,433,008.00 |
$1,791,260.00 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $2,845,881.60 |
$3,557,352.00 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge New Construction | $16,412,886.36 |
$20,516,107.95 |
|
Ohio | Montgomery | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $4,388,444.44 |
$5,485,555.55 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $21,854,660.10 |
$27,620,088.13 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,152,450.18 |
$12,391,611.31 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,466,707.22 |
$1,833,384.03 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,462,616.38 |
$3,847,351.53 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,672,452.72 |
$3,198,475.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $11,577.60 |
$14,472.00 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,880,000.00 |
$3,600,000.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,584,000.00 |
$3,230,000.00 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $8,131,362.66 |
$9,276,362.66 |
|
Ohio | Hamilton | >= 200,000 | N/A | INTERSTATE MAINT DISC | Preliminary Engineering | $678,405.00 |
$753,783.33 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $99,999.68 |
$124,999.60 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $303,575.28 |
$379,469.10 |
|
Ohio | Hamilton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $129,917.91 |
$162,397.39 |
|
Ohio | Hamilton | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $18,730.73 |
$24,016.38 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,792,005.92 |
$10,120,586.79 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $43,767.56 |
$56,118.41 |
|
Ohio | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $3,019,413.26 |
$50,835,153.22 |
|
Ohio | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - Added Capacity | $1,500,000.00 |
$1,875,000.00 |
|
Ohio | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,345,306.05 |
$24,442,578.40 |
|
Ohio | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Planning | $400,000.00 |
$500,000.00 |
|
Ohio | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $710,514.11 |
$986,825.15 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,300,437.25 |
$17,860,124.91 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,072,342.27 |
||
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $32,614,141.14 |
||
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $967,379.09 |
$11,268,523.67 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $810,000.00 |
$1,012,500.00 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $333,035.33 |
$416,294.16 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $19,489,200.00 |
$24,552,164.00 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $6,281,535.87 |
$7,851,919.84 |
|
Ohio | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $16,693,453.06 |
$20,866,816.33 |
|
Ohio | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $17,702,620.31 |
$20,048,497.92 |
|
Ohio | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $2,157,567.19 |
$5,803,067.67 |
|
Ohio | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $23,242,994.21 |
$29,053,742.76 |
|
Ohio | Hamilton | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $8,060,878.24 |
$9,760,647.67 |
|
Ohio | Hamilton | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $324,969.86 |
$406,212.32 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $27,490,872.80 |
$103,347,744.00 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,924,360.80 |
$6,430,750.76 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,600,000.00 |
$10,000,000.00 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $720,000.00 |
$18,900,000.00 |
|
Ohio | Lucas | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Construction Engineering | $1,314,862.92 |
$1,658,443.13 |
|
Ohio | Lucas | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | New Construction Roadway | $5,179,878.03 |
$6,474,847.54 |
|
Ohio | Lucas | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $1,212,274.69 |
$1,515,343.36 |
|
Ohio | Lucas | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | New Construction Roadway | $2,225,000.00 |
$2,781,250.00 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,773,664.32 |
$7,217,080.40 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $33,411,820.93 |
$41,764,776.16 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $86,969.22 |
$108,711.53 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $3,010,905.77 |
$3,763,632.22 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $8,095,003.88 |
$11,355,085.59 |
|
Ohio | Lucas | >= 200,000 | N/A | TRANSPORTATION ALTERNATIVES | Landscaping and Other Scenic Beautification | $480,000.00 |
$600,000.00 |
|
Ohio | Henry | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Construction Engineering | $849,285.88 |
$1,061,607.35 |
|
Ohio | Henry | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $926,232.35 |
$1,157,790.44 |
|
Ohio | Henry | >= 5,000 AND < 50,000 | N/A | EQUITY BONUS SP LIMITATION | New Construction Roadway | $4,850,714.12 |
$6,063,392.65 |
|
Ohio | Henry | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $5,088,171.18 |
$6,360,213.98 |
|
Ohio | Henry | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $30,123,727.62 |
$37,654,659.54 |
|
Ohio | Henry | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $462,046.79 |
$577,558.49 |
|
Ohio | Henry | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $3,232,485.50 |
$4,040,606.87 |
|
Ohio | Henry | >= 5,000 AND < 50,000 | N/A | NATIONAL HIGHWAY SYSTEM | New Construction Roadway | $10,465,643.67 |
$13,696,684.89 |
|
Ohio | Lucas | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Bridge Rehabilitation - No Added Capacity | $791,909.43 |
$3,067,796.18 |
|
Ohio | Lucas | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Debt Service | $398,767.25 |
$552,870.50 |
|
Ohio | Lucas | >= 200,000 | N/A | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,788,507.63 |
$2,235,634.54 |
|
Ohio | Lucas | >= 200,000 | State | BRIDGE PROGRAM - 85% ON/OFF | Preliminary Engineering | $1,585,829.78 |
$1,982,287.22 |
|
Ohio | Lucas | >= 200,000 | N/A | BRIDGE REP & REHAB-65% ON SYS | Preliminary Engineering | $3,528.99 |
$4,411.24 |
|
Ohio | Lucas | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Bridge Rehabilitation - No Added Capacity | $862,490.76 |
$1,078,113.45 |
|
Ohio | Lucas | >= 200,000 | N/A | EQUITY BONUS EXEMPT LIM | Debt Service | $495,497.93 |
$619,372.41 |
|
Ohio | Lucas | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Bridge Rehabilitation - No Added Capacity | $965,365.67 |
$1,206,707.09 |
|
Ohio | Lucas | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $386,130.72 |
$482,663.40 |
|
Ohio | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $644,453.45 |
$805,566.80 |
|
Ohio | Lucas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $18,998,254.05 |
$23,747,817.58 |
|
Ohio | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $907,324.16 |
$3,074,682.17 |
|
Ohio | Lucas | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $4,410,747.34 |
$5,513,434.19 |
|
Ohio | Lucas | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $55,129.90 |
$68,912.38 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | 4R - No Added Capacity | $1,839,566.63 |
$2,299,458.31 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | Local | CONGESTION AIR QUALITY | 4R - No Added Capacity | $36,250.48 |
$45,313.10 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | 4R - No Added Capacity | $1,871,669.34 |
$2,339,586.68 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Bridge Rehabilitation - No Added Capacity | $392,245.24 |
$490,306.55 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | N/A | CONGESTION AIR QUALITY | Construction Engineering | $222,443.26 |
$278,054.08 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $23,282.89 |
$29,103.61 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | CONGESTION AIR QUALITY | Debt Service | $164,518.76 |
$164,518.76 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | 4R - No Added Capacity | $4,953,717.06 |
$9,039,411.81 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $2,226,686.94 |
$2,226,686.94 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | N/A | HIGH PRIORITY PROJECT SEC 1702 | Preliminary Engineering | $1,659,616.00 |
$1,659,616.00 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $64.94 |
$64.94 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,646,171.95 |
$1,829,079.94 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,343,534.96 |
$2,603,927.73 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $419,856.74 |
$491,929.12 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $95,425.68 |
$119,282.10 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $521,473.62 |
$651,842.02 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $343,795.23 |
$429,744.03 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $10,779.05 |
$13,473.81 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $148,546.30 |
$1,058,322.87 |
|
Ohio | Belmont | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Utilities | $4,657.39 |
$33,181.74 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $707,167.70 |
$785,741.89 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,700,967.15 |
$21,753,136.54 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $9,362,081.28 |
$11,702,601.60 |
|
Ohio | Franklin | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $9,306,879.25 |
$25,237,208.68 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,588,533.03 |
$13,758,026.30 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,820,495.74 |
$11,736,826.37 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $1,200,000.00 |
$1,500,000.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $488,461.27 |
$610,576.59 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $132,043.94 |
$156,652.61 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $33,470.08 |
$41,837.60 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,428,655.52 |
$1,785,819.40 |
|
Ohio | Hamilton | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $1,578,861.14 |
$1,973,576.42 |
|
Ohio | Hamilton | >= 200,000 | State | INTERSTATE MAINTENANCE | Utilities | $145,757.89 |
$182,197.37 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $17,508,255.95 |
$21,885,319.93 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $13,148,586.48 |
$16,435,733.10 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,234,246.91 |
$4,042,808.64 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,333,525.28 |
$5,416,906.60 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $7,370,377.86 |
$14,567,717.42 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - Added Capacity | $149,125.58 |
$186,406.98 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $271,432.73 |
$339,290.92 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $1,632,025.08 |
$2,090,521.41 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $59,356.90 |
$74,196.12 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Debt Service | $735,211.85 |
$919,014.81 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Utilities | $10,193.52 |
$12,741.90 |
|
Ohio | Hamilton | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $53,458,934.52 |
$69,024,508.95 |
|
Ohio | Hamilton | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | $10,324,606.48 |
$15,201,236.62 |
|
Ohio | Hamilton | >= 200,000 | State | INTERSTATE MAINTENANCE | Right of Way | $7,436,700.00 |
$8,263,000.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,007,074.52 |
$1,258,843.15 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,027,998.78 |
$10,261,972.83 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,732,936.74 |
$4,777,534.43 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,565,653.24 |
$2,398,197.07 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,339,971.20 |
$2,924,964.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $13,395,000.00 |
$14,883,333.33 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,548,282.40 |
$3,185,353.00 |
|
Ohio | Lake | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | 4R - No Added Capacity | $600,000.00 |
$666,666.67 |
|
Ohio | Lake | >= 200,000 | N/A | EQUITY BONUS SP LIMITATION | Debt Service | $326,905.53 |
$363,228.37 |
|
Ohio | Lake | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $3,786,903.67 |
$4,368,181.86 |
|
Ohio | Lake | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $775,746.41 |
$861,940.45 |
|
Ohio | Lake | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $331,263.74 |
$368,070.82 |
|
Ohio | Lake | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $21,603,319.31 |
$24,003,688.12 |
|
Ohio | Lake | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $43,278.57 |
$48,087.30 |
|
Ohio | Lake | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,446,565.31 |
$3,829,517.01 |
|
Ohio | Lake | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $4,711,385.21 |
$5,234,872.45 |
|
Ohio | Lake | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Debt Service | $1,193,874.31 |
$1,326,527.01 |
|
Ohio | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $45,023.46 |
$50,026.06 |
|
Ohio | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,135,447.70 |
$1,261,608.56 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $2,873,908.02 |
$3,193,231.13 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $353,836.76 |
$393,151.96 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $7,409,216.40 |
$24,480,568.17 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $360,000.00 |
$24,439,856.63 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $390,332.75 |
$433,703.05 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,137,864.67 |
$2,375,405.19 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $915,003.76 |
$1,288,462.93 |
|
Ohio | Franklin | >= 200,000 | State | INTERSTATE MAINTENANCE | Construction Engineering | $339,744.16 |
$377,493.51 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,986,805.58 |
||
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $776,750.15 |
$863,055.72 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,021,020.16 |
$15,934,050.24 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $781,556.87 |
||
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $9,807,591.33 |
$10,945,912.41 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,999,613.64 |
$2,285,104.77 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $400,849.04 |
$1,099,452.62 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $7,772,271.13 |
$8,815,271.05 |
|
Ohio | Franklin | >= 200,000 | N/A | TECHNOLOGY DEPLOYMENT GRANTS T | Other | $37,080.00 |
$46,350.00 |
|
Ohio | Cuyahoga | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $133,634.21 |
$148,482.46 |
|
Ohio | Cuyahoga | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $1,870,099.26 |
$2,086,397.06 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $23,010,874.37 |
$33,568,529.00 |
|
Ohio | Cuyahoga | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $722,505.85 |
$1,658,458.51 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,167,517.49 |
$4,975,375.53 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,221,960.28 |
$2,860,618.76 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $311,863.81 |
$389,829.76 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,096,990.30 |
$5,329,567.05 |
|
Ohio | Lucas | >= 200,000 | Local | CONGESTION AIR QUALITY | 4R - Restoration & Rehabilitation | $1,737,078.00 |
$2,990,280.01 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $5,549,336.00 |
$11,942,989.84 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,378,162.61 |
$10,301,186.35 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $2,400,000.00 |
$5,254,102.92 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $468,000.00 |
$585,000.00 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $330,800.00 |
$413,500.00 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $251,200.00 |
$314,000.00 |
|
Ohio | Lucas | >= 200,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Added Capacity | $450,664.00 |
$563,330.00 |
|
Ohio | Wood | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $4,000,000.00 |
$17,387,230.89 |
|
Ohio | Lorain | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $793,535.00 |
$991,918.00 |
|
Ohio | Lorain | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,148,518.45 |
$1,452,088.06 |
|
Ohio | Lorain | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $7,996.80 |
$9,996.00 |
|
Ohio | Lorain | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $315,794.60 |
$394,743.25 |
|
Ohio | Lorain | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $1,559,000.00 |
$1,948,750.00 |
|
Ohio | Lorain | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $3,599,396.75 |
$20,528,257.95 |
|
Ohio | Delaware | >= 200,000 | N/A | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $28,786,806.09 |
||
Ohio | Delaware | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Construction Engineering | $771,351.30 |
$857,057.00 |
|
Ohio | Delaware | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $125,722.20 |
$181,985.92 |
|
Ohio | Delaware | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,674,430.24 |
$1,860,478.04 |
|
Ohio | Delaware | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,512,734.22 |
$12,791,926.91 |
|
Ohio | Delaware | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,008,132.01 |
$3,342,368.91 |
|
Ohio | Delaware | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | 4R - No Added Capacity | $7,400,000.00 |
$9,250,000.00 |
|
Ohio | Delaware | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Bridge Replacement - No Added Capacity | $315,597.44 |
$394,496.80 |
|
Ohio | Delaware | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Construction Engineering | $771,562.56 |
$964,453.20 |
|
Ohio | Delaware | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $355,621.12 |
$444,526.40 |
|
Ohio | Franklin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $589,324.17 |
$736,655.21 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,045,333.48 |
$5,682,919.41 |
|
Ohio | Franklin | >= 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | $604,666.52 |
$706,573.91 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,335,344.73 |
$39,028,336.84 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,901,256.91 |
$2,112,507.68 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $50,000.00 |
$62,500.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,706,010.36 |
$2,132,512.96 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $20,595,750.46 |
$44,706,600.58 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | 4R - No Added Capacity | $1,702,889.22 |
||
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Debt Service | $40,249.71 |
||
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Right of Way | $1,494,000.00 |
$1,660,000.00 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Utilities | $1,524,318.30 |
$1,693,687.00 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $27,800,000.00 |
$41,883,256.69 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,967,497.09 |
$2,186,107.88 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,091,667.28 |
$2,324,074.76 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,309,283.37 |
$8,121,425.96 |
|
Ohio | Lorain | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,796,176.57 |
$3,106,862.85 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,772,879.78 |
$4,192,088.64 |
|
Ohio | Allen | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $3,425,681.70 |
$3,806,313.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $15,112,767.22 |
$16,791,963.58 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,388,119.20 |
$8,229,990.64 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $826,574.01 |
$4,828,996.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $26,044.48 |
$28,938.31 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,773,862.75 |
$5,352,097.66 |
|
Ohio | Hamilton | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,055,317.50 |
$1,247,632.62 |
|
Ohio | Lorain | >= 200,000 | State | CONGESTION AIR QUALITY | 4R - Added Capacity | $500,000.00 |
$582,265.92 |
|
Ohio | Lorain | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $15,000.00 |
$17,464.08 |
|
Ohio | Lorain | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $3,000,000.00 |
$17,433,333.33 |
|
Ohio | Lorain | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $2,000,000.00 |
$2,322,222.22 |
|
Ohio | Lorain | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $149,998.00 |
$592,664.45 |
|
Ohio | Lorain | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $175,000.00 |
$218,750.00 |
|
Ohio | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,547,827.08 |
$1,934,783.85 |
|
Ohio | Lorain | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $15,831,933.60 |
$19,789,917.00 |
|
Ohio | Lorain | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $981,600.00 |
$1,227,000.00 |
|
Ohio | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $2,957,673.99 |
$3,735,022.48 |
|
Ohio | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,039,500.46 |
$1,299,375.58 |
|
Ohio | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $423,449.93 |
$629,312.41 |
|
Ohio | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $408,057.88 |
$610,072.35 |
|
Ohio | Lorain | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,598,000.00 |
$1,997,500.00 |
|
Ohio | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $148,776.65 |
$194,970.81 |
|
Ohio | Lorain | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $100,000.00 |
$125,000.00 |
|
Ohio | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Facilities for Pedestrians and Bicycles | $130,557.09 |
$263,196.36 |
|
Ohio | Lorain | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $2,353,557.60 |
$3,193,827.50 |
|
Ohio | Delaware | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $1,461,491.69 |
$1,826,864.61 |
|
Ohio | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $13,712,617.71 |
$20,489,215.89 |
|
Ohio | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,404,137.60 |
$1,755,172.00 |
|
Ohio | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,136,800.00 |
$3,921,000.00 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $14,444,725.39 |
$41,978,627.42 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,351,553.25 |
$3,928,926.36 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $30,163,067.38 |
||
Ohio | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,823,664.22 |
||
Ohio | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $729,651.69 |
$912,064.62 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $7,798,152.54 |
$9,747,690.67 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $10,333,888.56 |
$12,917,360.70 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $421,415.26 |
$502,965.84 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,418,186.98 |
$7,768,336.59 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $18,017,788.52 |
$25,873,964.74 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,388,208.43 |
$1,993,363.54 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,748,000.00 |
$2,185,000.00 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,164,040.00 |
$2,705,050.00 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $3,719,600.00 |
$4,649,500.00 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $280,400.00 |
$350,500.00 |
|
Ohio | Hancock | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $2,400,000.00 |
$3,000,000.00 |
|
Ohio | Cuyahoga | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - No Added Capacity | $34,000,000.00 |
$48,181,313.68 |
|
Ohio | Cuyahoga | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | $38,233,522.18 |
$146,976,596.35 |
|
Ohio | Cuyahoga | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Debt Service | $26,835,644.04 |
$36,907,959.58 |
|
Ohio | Cuyahoga | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Preliminary Engineering | $4,691,549.61 |
$5,212,832.90 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,000,000.00 |
$5,000,000.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $297,440.10 |
$330,489.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - Added Capacity | $1,171,337.40 |
$1,401,486.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Construction Engineering | $2,099.82 |
$2,099.82 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $7,180.01 |
$7,180.01 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Facilities for Pedestrians and Bicycles | $835,920.90 |
$1,002,126.73 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $17,946.00 |
$19,940.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $30,004.42 |
$30,004.42 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $832,697.35 |
$913,819.75 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,758,896.01 |
$8,448,620.02 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,045,016.09 |
$6,306,270.12 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,049,850.29 |
$1,360,183.58 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Facilities for Pedestrians and Bicycles | $200,547.89 |
$316,305.78 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,787,318.84 |
$3,484,148.55 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $300,000.00 |
$375,000.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,280,900.00 |
$5,351,125.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $480,072.92 |
$1,218,359.50 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $386,543.20 |
$483,179.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $1,269,665.68 |
$1,587,082.10 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $1,034,360.41 |
$1,292,950.51 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $179,790.71 |
$224,738.39 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $5,126,233.28 |
$17,536,514.43 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $40,000.00 |
$50,000.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,743,061.88 |
$3,875,016.20 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $14,061.60 |
$17,577.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $382,157.60 |
$477,696.80 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $6,099,480.80 |
$7,624,351.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,732,782.40 |
$2,165,978.00 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $1,157,323.20 |
$1,446,654.00 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,534,844.37 |
$3,835,545.79 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $804,794.51 |
$1,005,993.14 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $5,701,754.88 |
$169,863,853.42 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $344,000.00 |
$430,000.00 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,472,260.29 |
$26,810,335.03 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $264,138.19 |
$393,243.94 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,395,722.83 |
$2,661,914.26 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $83,771.20 |
$93,079.11 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | $7,417,193.20 |
$7,417,193.20 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Rehabilitation - No Added Capacity | $249,314.05 |
$249,314.05 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | $16,396,245.64 |
$16,396,245.64 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | FAST ACT NATIONAL FREIGHT | Construction Engineering | $499,360.31 |
$499,360.31 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | N/A | INTERSTATE MAINTENANCE | Preliminary Engineering | $1,567,328.48 |
$1,741,476.09 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $25,391,436.54 |
$25,905,686.42 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $121.09 |
$134.54 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $151,540.39 |
$168,378.21 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,389,974.75 |
$2,561,593.15 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $862,671.52 |
$958,523.91 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $572,755.53 |
$597,429.56 |
|
Ohio | Clark | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $19,220.61 |
$20,470.61 |
|
Ohio | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $616,613.83 |
$39,291,371.81 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $311,815.32 |
$19,869,245.51 |
|
Ohio | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,573,867.19 |
||
Ohio | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $77,011.49 |
$26,371,648.22 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $231,034.50 |
$79,114,944.75 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,335,979.77 |
$1,489,548.74 |
|
Ohio | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $10,019,060.79 |
$11,142,449.99 |
|
Ohio | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $573,673.33 |
$1,168,810.91 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $290,096.04 |
$591,051.04 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,009,108.96 |
$1,261,386.20 |
|
Ohio | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,999,853.80 |
$2,499,817.25 |
|
Ohio | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,356,307.55 |
$2,945,384.44 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,188,972.45 |
$1,486,215.56 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $5,043.00 |
$6,303.75 |
|
Ohio | Wood | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $9,994.24 |
$12,492.80 |
|
Ohio | Richland | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $6,589,800.00 |
$7,322,000.00 |
|
Ohio | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $287,585.74 |
$359,482.18 |
|
Ohio | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $770,050.52 |
$962,563.15 |
|
Ohio | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $15,243,313.49 |
$19,054,141.87 |
|
Ohio | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,346,909.45 |
$5,433,636.81 |
|
Ohio | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,252,880.80 |
$6,566,101.00 |
|
Ohio | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $301,316.00 |
$376,645.00 |
|
Ohio | Richland | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $28,387,653.42 |
$35,484,566.76 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $9,334,311.69 |
$11,667,889.61 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,139,710.36 |
$47,693,428.13 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,570,825.36 |
$6,292,400.65 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,509,958.40 |
$3,487,611.15 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,322,931.46 |
$9,668,054.67 |
|
Ohio | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $12,471,436.59 |
$17,569,783.32 |
|
Ohio | Medina | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,482,014.08 |
$3,193,864.75 |
|
Ohio | Stark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $7,912,937.39 |
$11,183,378.99 |
|
Ohio | Stark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,884,683.42 |
$2,108,201.98 |
|
Ohio | Stark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $10,343,708.80 |
$12,502,777.37 |
|
Ohio | Stark | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,553,037.14 |
$39,739,394.68 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $733,261.01 |
$10,216,700.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,023,376.94 |
$20,235,672.63 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,787,578.31 |
$3,243,005.64 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,373,698.40 |
$1,717,123.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,119,426.35 |
$47,687,522.31 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $3,645,471.14 |
$28,408,461.23 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $75,479.55 |
$588,197.77 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,294,310.95 |
$5,367,888.69 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,210,000.00 |
$5,788,888.88 |
|
Ohio | Franklin | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,480,000.00 |
$2,755,555.56 |
|
Ohio | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $3,845,697.74 |
$4,531,791.99 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $301,948.66 |
$355,818.01 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $344,129.14 |
$430,161.43 |
|
Ohio | Franklin | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,800,000.00 |
$4,407,396.90 |
|
Ohio | Franklin | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $277,661.79 |
$308,513.10 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,654,704.45 |
$24,190,989.90 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,988.92 |
$122,862.67 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $19,193,867.87 |
$21,326,519.86 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $4,285,872.12 |
$4,762,080.13 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,643,589.01 |
$1,826,210.01 |
|
Ohio | Cuyahoga | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,210,370.60 |
$1,344,856.22 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,775,953.01 |
$4,584,392.24 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $85,432.86 |
$106,791.07 |
|
Ohio | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,772,909.95 |
$16,400,000.00 |
|
Ohio | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $593,022.80 |
$3,418,010.83 |
|
Ohio | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $784,191.64 |
$897,110.78 |
|
Ohio | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $3,884,292.05 |
$4,315,880.06 |
|
Ohio | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $410,421.43 |
$513,026.78 |
|
Ohio | Warren | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $479,556.94 |
$839,536.36 |
|
Ohio | Warren | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Right of Way | $74,997.82 |
$133,924.68 |
|
Ohio | Pike | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $1,894,956.00 |
$2,368,695.00 |
|
Ohio | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Restoration & Rehabilitation | $884,133.65 |
$2,808,132.06 |
|
Ohio | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $2,338,290.98 |
$26,585,430.58 |
|
Ohio | Pike | >= 5,000 AND < 50,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $777,575.37 |
$3,811,472.36 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $6,788,558.96 |
$8,485,698.70 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $16,784,076.41 |
$18,683,319.09 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,585,750.83 |
$1,791,554.58 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $443,359.10 |
$684,985.22 |
|
Ohio | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $66,384,635.91 |
$66,810,407.92 |
|
Ohio | Statewide | N/A | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $6,442,739.88 |
$6,442,739.88 |
|
Ohio | Statewide | N/A | Local | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $2,567,186.79 |
$2,567,186.79 |
|
Ohio | Adams | >= 5,000 AND < 50,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Debt Service | $15,396,587.21 |
$16,566,707.88 |
|
Ohio | Hamilton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $6,610,195.80 |
$7,344,662.00 |
|
Ohio | Hamilton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $6,139.04 |
$6,821.16 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,344,322.30 |
$19,204,816.05 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $3,675,459.42 |
$4,524,849.03 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,421,088.94 |
$5,241,161.25 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $389,169.60 |
$486,462.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $960,000.00 |
$1,200,000.00 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $13,996,429.00 |
$18,382,840.68 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $6,318,530.40 |
$7,898,163.00 |
|
Ohio | Summit | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - Added Capacity | $2,170,055.72 |
$2,170,055.72 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $62,034.65 |
$62,034.65 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $317,382.20 |
$317,382.20 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $6,646,737.27 |
||
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,299,153.07 |
||
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $404,005.26 |
$404,005.26 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,268,978.80 |
$2,445,147.70 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,499,749.62 |
||
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $489,450.61 |
$3,413,330.07 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $137,768.71 |
$165,967.51 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,551,099.57 |
$1,834,619.98 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $2,448,694.39 |
$3,061,690.12 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $478,480.51 |
$598,294.98 |
|
Ohio | Summit | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $722,500.00 |
$903,125.00 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,167,500.00 |
$2,709,375.00 |
|
Ohio | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $383,889.08 |
$592,429.29 |
|
Ohio | Summit | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $40,037.51 |
$61,787.11 |
|
Ohio | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $652,453.69 |
$815,567.11 |
|
Ohio | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $783,861.16 |
$987,706.45 |
|
Ohio | Summit | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,802.49 |
$4,324.95 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,183,102.29 |
$75,198,067.86 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $292,817.71 |
$366,022.14 |
|
Ohio | Lucas | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $220,000.00 |
$275,000.00 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,285,000.00 |
$3,902,750.00 |
|
Ohio | Lucas | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $4,060,000.00 |
$5,075,000.00 |
|
Ohio | Lucas | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $4,000,000.00 |
$33,147,372.48 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $10,473,413.59 |
$11,637,126.21 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $11,644,630.36 |
$13,211,151.12 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,742,959.64 |
$1,944,649.30 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $17,326,892.18 |
$21,690,295.23 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $78,222,370.61 |
$130,277,963.26 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $8,727,365.20 |
$10,964,549.50 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $3,127,428.01 |
$4,699,942.01 |
|
Ohio | Summit | >= 200,000 | N/A | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,100,000.00 |
$1,375,000.00 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,225,000.00 |
$10,281,250.00 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,080,000.00 |
$1,850,000.00 |
|
Ohio | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $733,957.30 |
$917,446.62 |
|
Ohio | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $51,378.70 |
$64,223.38 |
|
Ohio | Preble | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $14,879,596.68 |
$27,642,654.76 |
|
Ohio | Preble | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $998,582.60 |
$1,866,035.64 |
|
Ohio | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $56.52 |
$105.61 |
|
Ohio | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $36.31 |
$40.35 |
|
Ohio | Preble | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $641,592.59 |
$712,880.65 |
|
Ohio | Preble | >= 5,000 AND < 50,000 | State | REPURPOSED EARMARK SUBJ TO LIM | 4R - Maintenance Resurfacing | $880,000.00 |
$3,354,283.32 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $757,542.13 |
$946,927.66 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $53,025.87 |
$66,282.34 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $37,371.62 |
$46,714.52 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $886,585.32 |
$985,094.80 |
|
Ohio | Summit | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $1,544.58 |
$1,716.20 |
|
Ohio | Summit | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,133.97 |
$1,259.97 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $650,903.89 |
$723,226.54 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $12,665,485.80 |
$14,072,762.00 |
|
Ohio | Summit | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $22,065.30 |
$24,517.00 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,890.28 |
$24,862.85 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $11,417,024.14 |
$14,271,280.17 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $799,189.26 |
$998,986.58 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,392.32 |
$1,740.40 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,018.15 |
$1,272.69 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $584,421.03 |
$730,526.28 |
|
Ohio | Summit | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $770,672.00 |
$963,340.00 |
|
Ohio | Summit | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge Replacement - No Added Capacity | $5,714,290.00 |
$6,573,973.69 |
|
Ohio | Summit | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $3,800,000.00 |
$23,487,843.55 |
|
Ohio | Summit | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $1,200,000.00 |
$1,500,000.00 |
|
Ohio | Summit | >= 200,000 | Local | REPURPOSED EARMARK SUBJ TO LIM | Bridge Replacement - No Added Capacity | $1,785,710.00 |
$1,879,694.76 |
|
Ohio | Butler | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | New Construction Roadway | $19,440.00 |
$38,880.00 |
|
Ohio | Butler | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $862,261.73 |
$1,077,827.16 |
|
Ohio | Butler | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $116,503.51 |
$145,629.39 |
|
Ohio | Butler | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $61,180.00 |
$76,475.00 |
|
Ohio | Butler | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $231,983.07 |
$1,597,680.14 |
|
Ohio | Butler | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $6,544,538.32 |
$13,089,075.64 |
|
Ohio | Butler | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | New Construction Roadway | $4,867,463.61 |
$9,734,928.22 |
|
Ohio | Hamilton | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $6,750,000.00 |
$7,500,000.00 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $18,639,216.50 |
$25,461,952.84 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $12,935,378.81 |
$14,458,722.39 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,178,400.52 |
$35,328,246.80 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $6,080,821.40 |
$7,496,875.04 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $7,011,734.99 |
$8,050,000.01 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $6,109,920.15 |
$7,947,419.69 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $24,639,072.73 |
$54,887,116.01 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,490,480.00 |
||
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $1,960,070.00 |
||
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $12,155,620.00 |
||
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $1,972,830.00 |
||
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $15,731,030.00 |
||
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,610,349.63 |
$2,012,937.04 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $15,553,350.20 |
$23,302,589.83 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Environmental Only | $411,760.00 |
||
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | New Construction Roadway | $3,536,288.00 |
$4,567,775.25 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $165,100.00 |
||
Ohio | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $135,000.00 |
$150,000.00 |
|
Ohio | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $4,500,000.00 |
$5,000,000.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $5,130,355.82 |
$7,232,931.57 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,000,000.00 |
$1,250,000.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - Added Capacity | $4,303,586.71 |
$4,303,586.71 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $499,960.48 |
$3,413,593.19 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,963,604.50 |
$5,249,545.50 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,616,464.83 |
$9,921,976.82 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Other | $5,939,498.14 |
$6,529,658.89 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $5,007,000.00 |
$6,258,750.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $18,702,096.84 |
||
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,038,333.24 |
$53,209,360.00 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $6,240,000.00 |
$6,966,666.67 |
|
Ohio | Delaware | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $3,201,843.00 |
$3,677,032.78 |
|
Ohio | Delaware | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $2,000,000.00 |
$2,500,000.00 |
|
Ohio | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $333,988.61 |
$417,485.76 |
|
Ohio | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,323,726.76 |
$4,154,658.45 |
|
Ohio | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,318,027.70 |
$6,647,534.62 |
|
Ohio | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $23,379.39 |
$29,224.24 |
|
Ohio | Delaware | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $1,200,000.00 |
$1,950,000.00 |
|
Ohio | Delaware | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $65,482.87 |
$81,853.59 |
|
Ohio | Delaware | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $318,245.54 |
$397,806.93 |
|
Ohio | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,256,206.80 |
$6,105,029.56 |
|
Ohio | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - Added Capacity | $11,274,032.77 |
$14,092,540.96 |
|
Ohio | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,713,911.97 |
$2,142,389.96 |
|
Ohio | Delaware | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $4,581.13 |
$5,726.41 |
|
Ohio | Delaware | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $762,135.20 |
$952,669.00 |
|
Ohio | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $9,000,000.00 |
$10,000,000.00 |
|
Ohio | Franklin | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $270,000.00 |
$300,000.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $545,102.10 |
$18,666,993.02 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $7,888,787.93 |
$8,247,081.49 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $4,514,404.02 |
$26,581,916.87 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $890,054.49 |
$901,952.74 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,889,640.66 |
$3,905,832.78 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,152,563.51 |
$3,665,156.45 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $8,150,758.84 |
$10,359,006.25 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Utilities | $460,182.19 |
$460,282.19 |
|
Ohio | Franklin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $237,732.00 |
$2,194,176.30 |
|
Ohio | Franklin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $5,702.40 |
$84,903.70 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $832,054.00 |
$2,002,540.00 |
|
Ohio | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $382,500.00 |
$425,000.00 |
|
Ohio | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $1,761,878.80 |
$1,957,643.11 |
|
Ohio | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $40,531,536.54 |
$45,035,040.60 |
|
Ohio | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $1,908,781.81 |
$2,120,868.68 |
|
Ohio | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $3,239,397.00 |
$3,599,330.00 |
|
Ohio | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $2,074,902.85 |
$2,305,447.61 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $20,478,774.06 |
$25,598,467.58 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $4,947,791.40 |
$6,184,739.25 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $5,221,902.91 |
$6,527,378.64 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $1,261,642.23 |
$1,577,052.79 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $183,773.19 |
$229,716.49 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $450,495.22 |
$563,119.02 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,796,076.99 |
$2,245,096.23 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,248,633.50 |
$1,498,828.88 |
|
Ohio | Greene | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $800,000.00 |
$1,000,000.00 |
|
Ohio | Summit | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $4,500,000.00 |
$5,000,000.00 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $4,788,296.24 |
$6,884,103.40 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $8,932,974.73 |
$90,502,198.90 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Preventive Maintenance | $4,633,469.78 |
$28,826,121.18 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,139,175.98 |
$2,265,751.09 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $2,907,440.61 |
$15,230,489.57 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,259,325.53 |
$10,377,410.29 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $4,130,467.92 |
$12,986,241.34 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $8,016,248.47 |
$13,675,360.00 |
|
Ohio | Clermont | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge New Construction | $500,000.00 |
$625,000.00 |
|
Ohio | Clermont | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Safety | $4,462.29 |
$5,577.86 |
|
Ohio | Clermont | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Safety | $995,537.71 |
$1,244,422.14 |
|
Ohio | Clermont | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | Safety | $2,729,709.14 |
$16,092,771.15 |
|
Ohio | Clermont | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $12,235.36 |
$72,132.55 |
|
Ohio | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $11,117.32 |
$52,845.91 |
|
Ohio | Clermont | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $2,480,274.33 |
$11,789,923.06 |
|
Ohio | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $970.02 |
$29,816.58 |
|
Ohio | Clermont | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $216,409.44 |
$6,652,077.39 |
|
Ohio | Clermont | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,029,458.51 |
$2,536,823.16 |
|
Ohio | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,096.63 |
$11,370.78 |
|
Ohio | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $16,010,120.00 |
$20,012,650.00 |
|
Ohio | Clermont | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Safety | $368,921.93 |
$461,152.40 |
|
Ohio | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $1,653.61 |
$2,067.02 |
|
Ohio | Clermont | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $555,602.06 |
$5,437,504.81 |
|
Ohio | Clermont | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $339,500.15 |
$424,375.19 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $340,574.22 |
$340,574.22 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Maintenance Resurfacing | $8,733,101.86 |
$36,603,446.51 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $308,422.16 |
$342,691.29 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $12,450,316.64 |
$45,538,988.86 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,130,442.50 |
$3,478,269.44 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $11,321,526.14 |
$12,579,473.51 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,085,000.00 |
$4,538,888.88 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Safety | $520,178.00 |
$577,975.56 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $73,242.73 |
$91,553.41 |
|
Ohio | Muskingum | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $697,695.22 |
$872,119.03 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $131,617.66 |
$164,522.08 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,780,736.28 |
$9,725,920.34 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $28,673,873.46 |
$32,019,149.55 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $484,673.35 |
$541,183.24 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $5,895,198.32 |
$6,550,220.36 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $1,732,193.11 |
$2,165,241.39 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $1,442,633.16 |
$1,644,511.14 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $20,597.34 |
$23,466.84 |
|
Ohio | Franklin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $8,030,000.00 |
$10,037,500.00 |
|
Ohio | Franklin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - No Added Capacity | $14,415,317.62 |
$18,031,280.00 |
|
Ohio | Franklin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - Added Capacity | $1,360,000.00 |
$1,700,000.00 |
|
Ohio | Franklin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge Replacement - No Added Capacity | $6,480,000.00 |
$7,200,000.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $95,695.01 |
$119,618.76 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $97,948.01 |
$108,831.12 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $83,312.64 |
$104,140.80 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $95,547.64 |
$106,164.04 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,126,081.70 |
$2,455,345.28 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,598,855.92 |
$3,681,602.29 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $151,144.08 |
$257,707.71 |
|
Ohio | Franklin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | 4R - Added Capacity | $56,769,177.77 |
$94,961,472.21 |
|
Ohio | Franklin | >= 200,000 | State | FAST ACT NATIONAL FREIGHT | Bridge New Construction | $28,357,595.59 |
$48,466,344.68 |
|
Ohio | Franklin | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Landscaping and Other Scenic Beautification | $2,370,702.16 |
$2,963,377.70 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,954,764.35 |
$9,943,455.44 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $250,616.00 |
$1,806,780.00 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge New Construction | $19,873,226.64 |
$22,081,362.93 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $9,250,832.65 |
$109,184,314.74 |
|
Ohio | Franklin | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $227,432.00 |
$554,540.00 |
|
Ohio | Franklin | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Landscaping and Other Scenic Beautification | $2,068,653.84 |
$8,384,872.30 |
|
Ohio | Montgomery | >= 200,000 | State | EQUITY BONUS SP LIMITATION | Preliminary Engineering | $1,110,000.00 |
$1,233,333.33 |
|
Ohio | Montgomery | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $626,101.50 |
$778,869.67 |
|
Ohio | Montgomery | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $50,000.00 |
$100,000.00 |
|
Ohio | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $698,369.21 |
$1,396,738.42 |
|
Ohio | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $1,494,196.20 |
$3,007,521.99 |
|
Ohio | Montgomery | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,135,936.01 |
$50,962,667.62 |
|
Ohio | Trumbull | >= 200,000 | State | CARBON REDUCTION PROGRAM | Safety | $1,529,069.00 |
$1,911,336.25 |
|
Ohio | Trumbull | >= 200,000 | State | CONGESTION AIR QUALITY | Safety | $2,500,000.00 |
$3,125,000.00 |
|
Ohio | Trumbull | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $161,552.86 |
$179,503.16 |
|
Ohio | Trumbull | >= 200,000 | Other | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $108,447.14 |
$120,496.84 |
|
Ohio | Trumbull | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $1,809,000.00 |
$2,010,000.00 |
|
Ohio | Trumbull | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Right of Way | $300,000.00 |
$375,000.00 |
|
Ohio | Trumbull | >= 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $2,973,429.90 |
$3,303,811.00 |
|
Ohio | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $33,131.19 |
$41,413.98 |
|
Ohio | Trumbull | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $198,787.22 |
$248,484.03 |
|
Ohio | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,441,040.02 |
$5,051,300.02 |
|
Ohio | Trumbull | >= 200,000 | Other | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $18,714.42 |
$23,392.98 |
|
Ohio | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $285,991.15 |
$357,488.99 |
|
Ohio | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $1,526,200.80 |
$1,907,751.00 |
|
Ohio | Trumbull | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $625,590.00 |
$695,100.00 |
|
Ohio | Trumbull | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $63,430.12 |
$178,407.48 |
|
Ohio | Trumbull | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $301,293.13 |
$847,435.68 |
|
Ohio | Trumbull | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $200,217.38 |
$283,225.07 |
|
Ohio | Trumbull | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $6,388.32 |
$14,922.96 |
|
Ohio | Trumbull | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $1,470,931.00 |
$1,838,663.75 |
|
Ohio | Trumbull | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Safety | $2,876,918.25 |
$3,596,147.81 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Construction Engineering | $12,616.00 |
$31,860.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Preliminary Engineering | $16,482.00 |
$32,964.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | HSIP LIMITING FLEXIBLE | Safety | $218,207.00 |
$455,160.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $986,320.00 |
$1,232,900.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $52,560.00 |
$65,700.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $72,720.00 |
$90,900.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $65,928.00 |
$82,410.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Maintenance Resurfacing | $447,464.00 |
$559,330.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $17,342,504.80 |
$21,678,131.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Rehabilitation - No Added Capacity | $3,974,451.20 |
$4,968,064.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,523,508.00 |
$1,904,385.00 |
|
Ohio | Wayne | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Preliminary Engineering | $1,226,260.80 |
$1,532,826.00 |
|
Ohio | Mahoning | >= 200,000 | Local | APPALACHIAN DEV HIGHWAY SYSTEM | 4R - No Added Capacity | $868,840.00 |
$868,840.00 |
|
Ohio | Mahoning | >= 200,000 | State | APPALACHIAN DEV HIGHWAY SYSTEM | 4R - No Added Capacity | $581,160.00 |
$581,160.00 |
|
Ohio | Mahoning | >= 200,000 | Local | CONGESTION AIR QUALITY | Construction Engineering | $250,047.43 |
$250,047.43 |
|
Ohio | Mahoning | >= 200,000 | State | CONGESTION AIR QUALITY | Construction Engineering | $167,250.27 |
$167,250.27 |
|
Ohio | Mahoning | >= 200,000 | Local | CONGESTION AIR QUALITY | Safety | $1,234,079.05 |
$1,234,079.05 |
|
Ohio | Mahoning | >= 200,000 | State | CONGESTION AIR QUALITY | Safety | $825,444.32 |
$825,444.32 |
|
Ohio | Mahoning | >= 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | Preliminary Engineering | $363,998.49 |
$454,998.11 |
|
Ohio | Mahoning | >= 200,000 | Local | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $6,503,232.64 |
$8,153,008.80 |
|
Ohio | Mahoning | >= 200,000 | State | NATL INTRASTRUCTURE INVESTMENT | 4R - No Added Capacity | $4,349,959.36 |
$5,453,481.20 |
|
Ohio | Mahoning | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $5,753,068.12 |
$7,191,335.15 |
|
Ohio | Mahoning | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $1,680,077.04 |
$2,052,596.30 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $6,553.09 |
$7,281.21 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | INTERSTATE MAINTENANCE | Preliminary Engineering | $4,743.54 |
$5,270.60 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,219,332.53 |
$8,989,756.84 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $7,789,235.33 |
$19,951,790.17 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $26,266,091.70 |
||
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $19,194,963.79 |
||
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $2,625,594.78 |
$3,844,934.32 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $5,122,678.34 |
$7,247,759.18 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $3,499,431.06 |
$6,388,121.31 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - Added Capacity | $2,013,832.48 |
||
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,950,864.00 |
||
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $7,682,966.55 |
$12,487,493.51 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $4,362,851.33 |
$5,063,997.40 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $2,316,516.96 |
$2,659,485.30 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $902,110.16 |
$5,493,433.46 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Debt Service | $1,246,057.05 |
$7,588,063.33 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,898,635.42 |
$3,220,706.03 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $2,098,397.71 |
$2,331,553.01 |
|
Ohio | Pickaway | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $7,319.12 |
$8,132.36 |
|
Ohio | Madison | >= 5,000 AND < 50,000 | State | NATIONAL HIGHWAY SYSTEM | Preliminary Engineering | $10,111.22 |
$11,234.68 |
|
Ohio | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $55,930,000.00 |
||
Ohio | Lake | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $7,830,200.00 |
||
Ohio | Summit | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $4,709,506.05 |
$5,886,882.56 |
|
Ohio | Summit | >= 200,000 | State | HIGHWAY INFRA PRGM -APPOR | Construction Engineering | $48,131.85 |
$60,164.81 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Preliminary Engineering | $4,808,309.60 |
$6,010,387.00 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $51,200.00 |
$64,000.00 |
|
Ohio | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - Added Capacity | $7,338,166.95 |
$9,172,708.69 |
|
Ohio | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $35,522,436.63 |
$39,531,879.78 |
|
Ohio | Summit | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $41,222.85 |
$45,803.15 |
|
Ohio | Summit | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $3,281,773.07 |
$3,761,234.81 |
|
Ohio | Summit | >= 200,000 | Other | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $2,885.60 |
$3,206.20 |
|
Ohio | Cuyahoga | >= 200,000 | Local | HIGHWAY INFRA PRGM -APPOR | Bridge Rehabilitation - Added Capacity | $31,030,000.00 |
||
Ohio | Clermont | >= 200,000 | State | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $3,320,976.61 |
$3,689,974.01 |
|
Ohio | Clermont | >= 200,000 | Local | HSIP LIMITING FLEXIBLE | 4R - No Added Capacity | $4,287,078.89 |
$4,763,420.99 |
|
Ohio | Clermont | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | Bridge New Construction | $1,127,000.00 |
$1,408,750.00 |
|
Ohio | Clermont | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge New Construction | $873,000.00 |
$1,091,250.00 |
|
Ohio | Clermont | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Right of Way | $2,400,000.00 |
$3,000,000.00 |
|
Ohio | Clermont | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $267,515.23 |
$334,394.04 |
|
Ohio | Clermont | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $345,337.85 |
$431,672.31 |
|
Ohio | Clermont | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $3,526,350.76 |
$4,407,938.45 |
|
Ohio | Clermont | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $2,731,680.16 |
$3,414,600.20 |
|
Ohio | Clermont | >= 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge New Construction | $5,400,000.00 |
$9,000,000.00 |
|
Ohio | Clermont | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $697,693.34 |
$872,116.67 |
|
Ohio | Clermont | >= 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | Construction Engineering | $900,658.66 |
$1,125,823.33 |
|
Ohio | Union | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | 4R - No Added Capacity | $6,526,922.50 |
$8,158,653.13 |
|
Ohio | Union | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM - COVID APP | Bridge Replacement - No Added Capacity | $2,797,252.50 |
$3,496,565.63 |
|
Ohio | Union | >= 50,000 AND < 200,000 | N/A | HIGHWAY INFRA PRGM -APPOR | 4R - No Added Capacity | $1,336,760.66 |
$1,670,950.83 |
|
Ohio | Union | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $2,769,835.04 |
$4,375,766.85 |
|
Ohio | Franklin | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $3,000,081.86 |
$4,739,509.26 |
|
Ohio | Union | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Replacement - No Added Capacity | $3,636,793.12 |
$12,282,279.86 |
|
Ohio | Union | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $576,652.72 |
$720,815.90 |
|
Ohio | Union | >= 50,000 AND < 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $703,947.90 |
$1,333,159.23 |
|
Ohio | Union | >= 50,000 AND < 200,000 | Local | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $2,653,342.08 |
$5,024,984.80 |
|
Ohio | Union | >= 50,000 AND < 200,000 | N/A | SURFACE TRANSP BLOCK GRNT PRGM | Bridge Replacement - No Added Capacity | $762,411.62 |
$953,014.52 |
|
Ohio | Hamilton | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Special Bridge | $32,000,000.00 |
||
Ohio | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | 4R - Restoration & Rehabilitation | $14,023,583.56 |
$17,529,479.45 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $50,000.00 |
$62,500.00 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Preliminary Engineering | $320,000.00 |
$400,000.00 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | State | EMERGENCY RELIEF | Right of Way | $24,000.00 |
$30,000.00 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Restoration & Rehabilitation | $2,182,230.01 |
$5,654,371.95 |
|
Ohio | Jefferson | >= 50,000 AND < 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $226,061.19 |
$1,613,002.60 |
|
Ohio | Lucas | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Facilities for Pedestrians and Bicycles | $21,516,480.00 |
$53,385,792.00 |
|
Ohio | Lucas | >= 200,000 | N/A | NATL INTRASTRUCTURE INVESTMENT | Preliminary Engineering | $2,151,680.00 |
$3,677,100.00 |
|
Ohio | Cuyahoga | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $1,285,250.00 |
$2,734,574.46 |
|
Ohio | Cuyahoga | >= 200,000 | Local | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $1,214,750.00 |
$2,584,574.47 |
|
Ohio | Summit | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Bridge Rehabilitation - Added Capacity | $2,451,926.39 |
$3,064,907.99 |
|
Ohio | Summit | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | Construction Engineering | $48,073.61 |
$60,092.01 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - Added Capacity | $1,683,466.27 |
$2,104,332.84 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $9,229,133.33 |
$10,254,592.59 |
|
Ohio | Cuyahoga | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,530,636.67 |
$3,432,721.25 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | 4R - No Added Capacity | $1,619,469.66 |
$3,631,944.84 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $1,584,255.15 |
$3,370,755.64 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Bridge Rehabilitation - No Added Capacity | $408,683.28 |
$454,092.53 |
|
Ohio | Summit | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $916,050.12 |
$1,051,362.04 |
|
Ohio | Cuyahoga | >= 200,000 | State | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $314,229.40 |
$681,609.64 |
|
Ohio | Cuyahoga | >= 200,000 | Local | NATIONAL HIGHWAY PERF PROGRAM | Construction Engineering | $192,177.51 |
$421,209.69 |
|
Ohio | Warren | >= 200,000 | State | HWY INFRA PRGM-IIJA DEMO | 4R - No Added Capacity | $5,000,000.00 |
$6,250,000.00 |
|
Ohio | Warren | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | 4R - No Added Capacity | $14,878,927.39 |
||
Ohio | Warren | >= 200,000 | State | SURFACE TRANSP BLOCK GRNT PRGM | Right of Way | $3,676,207.20 |
$6,095,259.00 |