RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
South Carolina | Clements Ferry Road | $18,536,000.00 |
$33,555,002.70 |
|
South Carolina | Rehabilitation of eastbound and westbound lanes of I-26 with bridge jackings at: S-36-32 Jalapa Road Bridge; S-36-81 Old Whitmire Highway Bridge; SC 1 | $70,079,125.08 |
$135,086,248.09 |
|
South Carolina | Closed and/or Load Restricted Bridge Replacements DB Package 2023-3 | $12,638,809.71 |
$50,738,766.05 |
|
South Carolina | Leesburg Road (SC 262); Intersection Improvements - SC 262 (Leesburg Road) at Patricia Drive | $34,828,686.65 |
$53,419,744.72 |
|
South Carolina | I-85 (Near MM 77 to near MM 80) & I-85 (Gossett Rd (S-57) to NC State Line) - Gossett Rd (S-57) to SC 18 | $352,401,815.81 |
$646,528,067.55 |
|
South Carolina | SC 174 Br Replacement over Store, Sand, and Russell Creeks north of Edisto - Charleston County | $21,942,752.62 |
$27,428,440.78 |
|
South Carolina | REPLACE US 176 BRIDGE OVER BROAD RIVER BETWEEN S-114 AND S-213 Sufficiency Rating: 35.8 | $27,437,679.98 |
$32,055,442.78 |
|
South Carolina | US 701 over Great Pee Dee River | $47,608,527.28 |
$59,555,755.70 |
|
South Carolina | Design Build Package E | $48,032,817.69 |
$57,318,626.76 |
|
South Carolina | Phase III Berlin Myers Parkway | $53,512,057.31 |
$151,164,692.68 |
|
South Carolina | Port Access Road | $8,000,000.00 |
$388,184,242.27 |
|
South Carolina | Henry Brown Boulevard Extension - Phase I widening of S-136 from Liberty Hall Road( S-529) to Red Bank Road(S-29) | $5,039,440.00 |
$27,956,140.23 |
|
South Carolina | Widening S-29(South Cashua Dr) from SC 51 ( Second Loop Rd) to S-103(Knollwood Rd) as follows: South Cashua Dr. from SC 51 | $20,196,837.13 |
$25,269,183.82 |
|
South Carolina | Batesville Rd (S-164) (SC 14 to Roper Mountain Road) | $22,892,058.39 |
$28,459,085.60 |
|
South Carolina | I385 FROM I85 TO US 276(STONE AVE), GR/DR/PAVE/WIDEN 6 LANES/BRIDGES | $90,687,407.85 |
$118,119,611.51 |
|
South Carolina | CAROLINA BAYS PKWY FR SC9 NR STEPHENS CROSS RDS TO US 501 NEW 6 LANES NEW LOCATION DESIGN BUILD, ROWA, CONSTRUCTION, & PE | $194,798,809.94 |
$295,515,917.74 |
|
South Carolina | I-85 @ I-385 (Design Build) | $243,445,286.40 |
$324,404,081.50 |
|
South Carolina | I-26 (near MM 60 to Near MM 75) | $23,191,447.43 |
$25,768,274.92 |
|
South Carolina | US 301 over North Edisto River & Swamp | $28,669,423.40 |
$38,050,401.22 |
|
South Carolina | US 21 over Harbor River | $61,390,365.44 |
$77,287,956.80 |
|
South Carolina | I-77 (I-20 to Killian Road (Exit 22) | $68,213,440.97 |
$101,098,812.04 |
|
South Carolina | I-20 Widening (US 378 to Longs Pond) - Design Build | $12,500,000.00 |
$120,716,784.25 |
|
South Carolina | I-26 from near Jedburg Road (Exit 194) to near Nexton Parkway (Exit 197) | $52,195,591.67 |
$67,242,611.08 |
|
South Carolina | I-85 - Widening from near SC 18 (Exit 96) to near NC State Line (Phase 3) | $189,546,637.76 |
$242,486,335.55 |
|
South Carolina | I-26/US 21 Interchange (Exit 119). Reconfigure existing I-26 @ US 21 interchange in Lexington County | $48,767,364.81 |
$60,959,206.02 |
|
South Carolina | SC 85 over Southern R.R. and S-995 | $21,764,739.38 |
$28,486,762.74 |
|
South Carolina | I-95 RECONSTRUCTION (near MM 33 to near MM 64 Northbound/Southbound) | $3,614,004.70 |
$82,750,934.04 |
|
South Carolina | I-95 (Near MM 23 to near MM 33) (NB/SB) | $22,607,722.99 |
$25,119,692.21 |
|
South Carolina | I-26 widening from near SC 202 (Exit 85) to near US 176 (Exit 101) | $472,721,273.57 |
$552,521,165.44 |
|
South Carolina | I-26 from near SC 27 (Exit 187) to near Jedburg Road (Exit 194) | $14,374,032.21 |
$218,484,081.13 |
|
South Carolina | I-77 at SC 160 Interchange Improvement | $6,189,888.80 |
$123,117,789.28 |
|
South Carolina | Design Build I-20 EB & WB over Wateree River and Wateree Swamp Overflow | $98,236,154.46 |
$112,428,558.58 |
|
South Carolina | Clements Ferry Road - Phase II | $16,000,000.00 |
$48,887,327.82 |
|
South Carolina | US 78 (US 178 to SC 27S) Widening Phase IIA & US 78 (SC 27 to S-22) Widening Phase IIB | $24,641,587.90 |
$35,148,152.88 |
|
South Carolina | South Main Street Streetscaping Improvements | $15,017,608.28 |
$28,191,923.96 |
|
South Carolina | I-26 (Near MM 149 to near MM 172) | $51,235,837.01 |
$57,090,539.20 |
|
South Carolina | Seamless City Revitalization Project | $17,666,966.50 |
$39,935,597.69 |
|
South Carolina | US 76 WB over Wateree River | $40,700,564.42 |
$50,875,705.54 |
|
South Carolina | Country Club Road Corridor Project | $26,275,501.75 |
$38,565,006.20 |
|
South Carolina | SC 277 NB over I-77 | $28,113,902.00 |
$31,237,668.89 |
|
South Carolina | US 1 over I-20 Bridge Replacement | $67,292,880.05 |
$76,422,505.92 |
|
South Carolina | I-85 over Rocky Creek Bridge Design Build | $34,365,876.51 |
$38,534,777.12 |
|
South Carolina | I-77 Panther's Interchange (MM81) Design Build | $34,597,743.00 |
$65,500,000.00 |
|
South Carolina | I-26 Interchange Improvement from Exit 169 I-95 to Exit 187 Ridgeville Road | $111,243,039.84 |
$236,786,261.79 |
|
South Carolina | I-20/I-26/I-126 - Corridor Improvements - Phase 1 DB Construction | $199,120,863.78 |
$226,259,229.92 |
|
South Carolina | I-20/I-26/I-126 - Corridor Improvements - Phase 2 DB Construction | $120,246,226.92 |
$134,933,105.35 |
|
South Carolina | I-20/I-26/I-126 - Corridor Improvements - Phase 3 DB Construction | $1,059,730,000.00 |
||
South Carolina | US 17 over Waccamaw River Bridge Repair (Asset 4792) | $35,027,200.38 |
$58,094,939.52 |
|
South Carolina | US 17 Widening | $49,252,583.26 |
$62,426,418.87 |
|
South Carolina | FROM US 1 TO I-20 (PHASE 2) - PALMETTO PARKWAY | $109,690,531.24 |
$159,805,376.76 |
|
South Carolina | SC 170 - FROM ROAD S-20 TO SC ROUTE 280. | $71,433,937.86 |
$95,027,499.84 |
|
South Carolina | Hardscrabble Road (S-83) | $45,221,073.89 |
$90,713,396.04 |