RECIPIENT |
PROJECT NUMBER |
PROJECT TITLE |
TOTAL OBLIGATIONS |
ESTIMATED TOTAL COST |
---|---|---|---|---|
South Dakota | Pierre Area ; Replace Structure (Bridge), Intersection Improvements; On the following routes: 014, 014 E, 014 W | $39,618,065.98 |
$54,460,392.51 |
|
South Dakota | County of Lincoln; Grading, PCC Surfacing, Replace Str RCBC; On the following routes: 018 | $39,565,797.94 |
$56,538,783.69 |
|
South Dakota | City of Mitchell; Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, Surfacing, Replace Bridge, Shared Use Path; On 037, 037 N, 037S | $20,061,534.24 |
$25,950,160.79 |
|
South Dakota | County of Clay; Rural Reconstruction, Mill and Surfacing, Structure Replacement, On the following routes: 046 | $33,273,980.65 |
$53,197,353.14 |
|
South Dakota | City of Beresford; Grading, Interim Surfacing, Replace/Repair Str RCBC; On the following routes: 046 | $36,142,529.65 |
||
South Dakota | Winner Area; US83 Reconstruction - South of I-90 | $35,359,313.84 |
$69,998,228.71 |
|
South Dakota | City of Sioux Falls; New roadway construction of Veterans Parkway Hwy 100 | $31,087,077.55 |
$50,995,079.70 |
|
South Dakota | City of Sioux Falls; Grading, Str Bridge, PCC Surfacing, Curb and Gutter, Storm Sewer, Signals, Lighting | $34,702,619.50 |
$56,329,810.92 |
|
South Dakota | City of Sioux Falls; Modify Interchange, Bent Strengthening; On routes: 029 N, 029 N1, 029 N2, 029 N7, 029 N8, 029 S, 029 S1, 029 S2, 029 S7 | $20,738,109.34 |
$25,247,346.16 |
|
South Dakota | County of Pennington; Grading, Interim Surfacing; On the following routes: 385 | $26,919,180.14 |
||
South Dakota | Meade County; Grading, Interchange Recon. (Exit 37), PCC Surfacing, Replace Bridge, Railroad Crossing,Tilford Port of Entry; I90 EBL | $30,961,127.97 |
$38,124,540.62 |
|
South Dakota | County of McCook; Remove and Replace PCC, Pipe Work, Replace Str and Approach Grading, Deck Overlay, Polymer Chip Seal; On the following route I90E | $34,449,329.11 |
$38,843,663.50 |
|
South Dakota | County of McCook; Rural Interstate Reconstruction, Replace Bridge; Structure On the following routes 090W, 090E. | $86,832,677.91 |
$112,627,956.89 |
|
South Dakota | Sioux Falls; Mod Interchange, LSDC, Approach Slab, Joints, Rail Replace and Repair, Signals, Lighting, Bike Path; Rroutes: 229 N, 229 N1, 229 N2, 229 | $21,137,555.26 |
$25,723,859.04 |
|
South Dakota | Pennington County; Reconstruction of Sheridan Lake Road | $12,223,760.59 |
$25,115,440.87 |